State and local · OpenGov
Request for Letters of Interest for CEI Services for SR 534/ SR 417 Ramp Realignment – Segment 1A [Project No. 534- 240] SR 534/ 417 Systems & Service Interchanges - SEG. 1 [Project No. 534- 241]
Description
NOTICE IS HEREBY GIVEN that the Central Florida Expressway Authority, henceforth referred to as the CFX is accepting sealed offers for: Request for Letters of Interest for CEI Services for SR 534/SR 417 Ramp Realignment – Segment 1A [Project No. 534-240] SR 534/417 Systems & Service Interchanges - SEG. 1 [Project No. 534-241] Project Summary: Central Florida Expressway Authority requires the services of a Professional Engineering Consultant to provide CEI services related to the construction of SR 534 Segment 1 - SR 534/SR417 Interchange (534-241) and Segment 1A SR 417 SB Ramp Extensions (534-240). 534-241 consists of the construction of SR 534 from SR 417 to north of Laureate Boulevard. This project includes a four-lane limited access expressway and systems interchange with SR 417 and a service interchange with Medical City Drive within the systems interchange. The project also includes new bridges for multiple interchange ramps, Medical City Drive over SR 417, SR 534 over Lake Nona Boulevard (south of the SR 417 alignment), multiple bridge widenings including Lake Nona Boulevard over SR 417 and OUC, and All Electronic Tolling (AET) gantries for ramps. The project includes reconstruction of the SR 417 interchange ramps with Boggy Creek Road, Jeff Fuqua Boulevard, and Lake Nona Boulevard as well as improvements along Lake Nona Boulevard from south of Nemours Parkway to the north of OUC railroad. 534-240 consist of the construction of the SR 417 southbound ramp extension from Boggy Creek Road to Landstar Blvd. This project includes the realignment and combination of entrance ramps from Boggy Creek Road and South Access Rd into a single ramp entering SR 417 southbound and the addition of a fourth lane from the entrance ramp to Landstar Blvd. This project also includes the demolition of the existing Boggy Creek Mainline Plaza and replacement with an AET gantry, widening of the SR 417 SB bridge over Rhode Island Woods Circle, and the realignment of the SR 417 SB exit to Landstar Blvd. Additional project elements include, but are not limited to, Utility Work by Highway Contractor (UWHC), intelligent transportation systems (ITS), lighting, signing and pavement markings, tolling, maintenance of traffic, noise walls, and utility coordination. The FY 27-31 Work Plan estimated construction cost is $527 million. Sealed offers for furnishing the above will be accepted up to Friday, November 20, 2026 1:30 pm . NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers. Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected. Important Instructions for Electronic Submittal CFX is ONLY accepting electronic submissions using the OpenGov e-Procurement Platform. Respondents shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic offer. It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. CFX shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. OpenGov Technical Support For Technical Support, respondent's can reach the OpenGov Service Desk: Live Chat: Click the blue chat button on the lower right, hours: Mon-Fri 7am - 10pm EST Email: procurement-support@opengov.com Phone: 1 (650) 336-7167, hours: Mon-Fri 7am - 10pm EST General Instruction Questions Regarding this Solicitation The question and answer module of OpenGov is being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the Tuesday, November 10, 2026 12:00 pm deadline for questions. Respondents are instructed not to contact the initiating department directly. Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. CFX shall be bound by information and statements only when such statements are written and executed under the authority of the Director of Procurement. Answers for timely questions will be addressed using the OpenGov question and answer feature or as an addenda to this solicitation depending on volume. Participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein. This provision exists solely for the convenience and administrative efficiency of CFX. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. Untimely questions are unable to be submitted using the OpenGov question and answer feature, after Tuesday, November 10, 2026 12:00 pm respondents raising critical concerns must email robert.johnson@cfxway.com . A response is not guaranteed, CFX may review such information to determine whether they raise issues material to the solicitation. Any clarifications deemed necessary will be issued by addendum. Proposal Opening Any modification to the Project Timeline shall be made by written addendum. Provided the electronic submission vault remains sealed, CFX reserves the right to extend the solicitation due date, including after the originally established deadline has passed, and to postpone the opening when determined to be in CFX's best interest, including to promote additional competition. Notices Notices related to the solicitation, including addenda, meeting notices, intended decisions, and other procurement communications, will be made available on CFX's e-Procurement Portal. Potential Conflict Disclosures Florida law requires each Board Member, Committee Member, employee, and Consultant of CFX (each of which is a “Disclosing Individual”) to annually make the disclosures provided in Section 348.753(8), Florida Statutes, using a Potential Conflict Disclosure Form as provided by CFX. For ease of reference, such requisite disclosures are as follows: (A) Disclosure of Financial Benefit Relationships with Potential for Prohibited Conflict [Fla. Stat. § 348.753(8)(a)]. Disclosure of any relationship that provides a current or future financial benefit to the Disclosing Individual, or to any Relative or Business Associate of the Disclosing Individual, when a reasonable person would conclude the relationship has the potential to create a prohibited conflict of interest. (B) Disclosure of Relatives Who Are Registered Lobbyists [Fla. Stat. § 348.753(8)(b)]. Disclosure of the name of any Registered Lobbyist who is a Relative of the Disclosing Individual and the name of any and all clients of such Registered Lobbyist. (C) Disclosure of Real Property Interests Near Actual or Prospective CFX Roadway Projects [Fla. Stat. § 348.753(8)(c)]. Disclosure of any and all interests in real property held by the Disclosing Individual, or held by any Relative, principal, client, or Business Associate of the Disclosing Individual, if the real property is located within or within one-half mile of any actual or prospective CFX roadway project. Respondents shall review the form and resources provided at: CFX-110: Potential Conflict Disclosure Form Respondents are not required to complete or submit CFX-110 as part of their response to this solicitation. Upon final selection, the selected Consultant will be required to complete and file CFX-110 prior to execution of the Contract. Completion and filing of CFX-110 is a condition precedent to execution of the Contract. Thereafter, Consultants are required to complete and file the requisite form as an annual filing due July 1 of each year or whenever a change in circumstances triggers a disclosure obligation. Consultants shall be responsible for ensuring that all required disclosures are timely made. Solicitation Documents Submit Qualifications and Requirements (Response Form)
Published attachments
- Notice to Professional Consultants CEI
- 534-240-PLANS-04-ITS-90_Redacted
- 534-240-PLANS-05-LIGHTING-90
- 534-240-PLANS-08-STRUCTURES-90_Redacted
- 534-240-PLANS-09-TOLLFACILITIES-90_Redacted
- 534-240-PLANS-01-ROADWAY-90_Redacted
- 534-240-PLANS-02-SAPM-90
- 534-241-PLANS-03-SIGNALIZATION-100
- 534-241-PLANS-04-ITS-100_Redacted
- 534-241-PLANS-05-LIGHTING-100
- 534-241-PLANS-08-STRUCTURES-100_Redacted
- 534-241-PLANS-09-TOLLFACILITIES-100_Redacted
- 534-241-PLANS-10-UTILITYWORK(1)-100_Redacted
- 534-241-PLANS-01-ROADWAY-100_Redacted
- 534-241-PLANS-02-SIGNINGMARKING-100
- REFERENCE-LNS SR 417 Forcemain Relocation Plans
- Request_for_Letters_of_Interest_for_SR_534_SR_417_Ramp_Realignment_–_Segment_1A_[Project_No._534-240]_SR_534_417_Systems_&_Service_Interchanges_-_SEG._1_[Project_No._534-241].pdf
OpenGov categories
- 91327 · Construction, Highway and Road
- 91842 · Engineering Consulting
- 92500 · Engineering Services, Professional
- 92517 · Civil Engineering
- 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering
- 92546 · Geotechnical Engineering
- 92555 · Inspecting, General/Engineering
- 92556 · Inspecting, Structural/Engineering