Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Request for Proposals - Landfill Gas Beneficial Use Project NMLF

Description

The City invites proposals from qualified developers to finance, design, permit, construct, own, operate, maintain, and ultimately decommission a landfill gas beneficial use project at the North Montgomery Landfill. The City seeks a technically reliable and financially sustainable project that maximizes beneficial use of recoverable LFG while preserving landfill operations, regulatory compliance, public safety, and the City’s long-term flexibility. The City presently anticipates the sale of raw LFG to the selected Developer. Proposers may submit an RNG project, another high-Btu beneficial use project, electricity generation, direct-use project, or another commercially demonstrated alternative, provided the proposer clearly states its commercial structure, environmental attributes, interconnection requirements, site requirements, and economic benefit to the City. Project Details Submission Requirement The City of Montgomery is accepting electronic bid submissions or hardcopy submissions as stated in paragraph 1.8 of the attached RFP. Bidders choosing to submit their proposal electronically can create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Request for Proposal Please see the Attachments for a copy of the RFP. Introduction Summary The City invites proposals from qualified developers to finance, design, permit, construct, own, operate, maintain, and ultimately decommission a landfill gas beneficial use project at the North Montgomery Landfill. The City seeks a technically reliable and financially sustainable project that maximizes beneficial use of recoverable LFG while preserving landfill operations, regulatory compliance, public safety, and the City’s long-term flexibility. The City presently anticipates the sale of raw LFG to the selected Developer. Proposers may submit an RNG project, another high-Btu beneficial use project, electricity generation, direct-use project, or another commercially demonstrated alternative, provided the proposer clearly states its commercial structure, environmental attributes, interconnection requirements, site requirements, and economic benefit to the City. Timeline Release Project Date: October 23, 2026 Pre-Proposal Meeting (Non-Mandatory): November 16, 2026, 10:00am 115 Division Road Montgomery AL 36104 Question Submission Deadline: November 16, 2026, 5:00pm Question Response Deadline: November 17, 2026, 5:00pm Response Submission Deadline: December 15, 2026, 2:00pm 115 Division Road Montgomery AL 36104 Project Contact Lacey Belk City Operations Program Manager 2390 Cong W L Dickinson Drive Montgomery , AL 36104 Email: lbelk@montgomeryal.gov Phone: (334) 625-2931 Procurement Contact Johnny Crawford Director 934 Ripley St. Montgomery , AL 36104 Email: jcrawford@montgomeryal.gov Phone: (334) 625-2390 Evaluation Criteria Vendor Questionnaire Attachments General Terms and Conditions General Terms and Conditions Any and all Supplemental Terms and Conditions and specifications referenced within the solicitation that vary from these General Terms and Conditions shall have precedence. Submission of an offer in accordance with these General Terms and Conditions and Supplemental Terms and Conditions constitutes a binding offer from the offeror. The terms and conditions incorporated herein will become a part of the written agreement between the parties. Hereinafter the City of Montgomery will be referred as the "CITY". 1. INSPECTION AND ACCEPTANCE - All items are subject to final inspection and acceptance by CITY at destination notwithstanding any payment, passage of title, or prior inspection or test at the contractor’s facilities. Final inspection will be made within a reasonable time after receipt of items hereunder. The contractor shall notify the CITY of any known nonconforming product that is expected to be delivered or has been delivered. CITY shall have authority to approve, or refuse identified nonconforming product. Defective goods may be returned at the contractor’s expense. 2. CHANGES - By written notice or order, the CITY may, from time to time, order work suspension and/or make changes in quantities, drawings, designs, specifications, place of delivery or delivery schedules, methods of shipment and packaging, and property and services furnished by the contractor. If any such change causes an increase or decrease in the price of this agreement or in the time required for its performance, the contractor or CITY shall promptly notify the other party thereof and assert its claim for adjustment within thirty (30) days after the change is ordered, and an equitable adjustment shall be made. However, nothing herein shall excuse the contractor from proceeding immediately with the agreement as changed. 3. DEFAULT AND EXCESS REPROCUREMENT LIABILITY - the CITY may terminate this agreement if a federal or state proceeding for the relief of debtors is undertaken by or against the contractor, or if the contractor makes an assignment for the benefit of creditors, or if the contractor fails after reasonable notice by CITY to cure a deficiency in performance or lack of progress thereto. The CITY shall have such additional remedies as may be available whether or not it so terminates this agreement, including, but not limited to, payment by the contractor to the CITY of expenses incurred by the CITY in reprocuring elsewhere the same or similar items or services defaulted by the contractor hereunder, provided the contractor's re-procurement expenses obligation shall be limited to the excess costs above the price specified herein for such items or services. 4. INDEMNIFICATION - The contractor shall indemnify, defend, and hold harmless the CITY from and against any and all claims (including attorneys’ fees and reasonable expenses for litigation or settlement) for any loss, damage, claim, or harm for bodily injuries, including death or damage to property resulting from any accident on development site during Developer’s performance of Agreement with City, including workmen’s compensation claims or caused by the contractor or its employees, subcontractors, or suppliers in connection with the performance of this agreement. 5. ASSIGNMENTS AND SUBCONTRACTS - Neither this agreement nor any interest herein nor claim hereunder may be assigned by the contractor, either voluntarily or by operation of law, nor may all or substantially all of the agreement be subcontracted by the contractor without the CITY’s prior written consent. The CITY’s withholding of consent shall not be deemed to relieve the contractor of its obligations to comply fully with the requirements hereof. 6. FEDERAL, STATE, AND LOCAL LAWS - The contractor warrants that, in the performance of this agreement, it shall comply with all applicable Federal, State and local laws and ordinances and all lawful orders, rules and regulations thereunder. 7. INFRINGEMENT INDEMNITY - In lieu of any other warranty by the CITY or the contractor against infringement, statutory or otherwise, it is agreed that the contractor shall defend, at its expense, any claim or suit against the CITY based on a claim that any item furnished under this agreement or the normal use or sale thereof infringes any United States Letters patent or copyright, and the contractor shall pay all costs and damages finally awarded in any such suit or claim, provided that the contractor is notified in writing of the suit or claim and given authority, information, assistance at the contractor’s expense for the defense of same. If the use or sale of said item is enjoined as a result of such suit, the contractor, at no expense to the CITY, shall obtain for the CITY the right to use and sell said item, or shall substitute an equivalent item acceptable to the CITY, and extend this patent indemnity hereto. 8. TITLE AND RISK OF LOSS - Unless otherwise provided in this agreement, the contractor shall have title to and bear the risk of any loss of or damage to the items purchased hereunder until they are delivered in conformity with this agreement at the F.O.B. point specified herein, and upon such delivery, title shall pass from the contractor, and the contractor’s responsibility for loss or damage shall cease, except for loss or damage resulting from the contractor’s negligence. Passing of title upon such delivery shall not constitute acceptance of the item by the CITY. 9. NOTICE OF LABOR DISPUTE - Whenever the contractor has knowledge that any actual or potential labor dispute may delay this agreement, the contractor shall immediately notify and submit all relevant information to the CITY. The contractor shall insert the substance of this entire clause in any subcontract hereunder as to which a labor dispute may delay this agreement. However, any subcontractor need give notice and information only to its next higher-tier subcontractor. 10. EQUAL Solicitation Terms and Conditions Solicitation Terms and Conditions Submission of a proposal in accordance with these Terms and Conditions and the General Terms and Conditions provided in Section IV below constitutes a binding offer from the respondent. The Terms and Conditions incorporated herein will become a part of the written agreement between the parties. Pre-Proposal Inquiries All inquiries concerning the solicitation, including but not limited to the scope of work, specifications, additional requirements, attachments, and general or supplemental terms and conditions, must be submitted to the Procurement Department via email through the e-procurement portal hosted by OpenGov. All questions or inquiries must be received no later than the last day for questions stated on the cover page of the solicitation. Any modification to the solicitation documents will be in the form of a written addendum issued by the City not less than five days prior to the date and time of solicitation closing. Addenda will be provided to each respondent via email and will be posted to the City of Montgomery website at the City of Montgomery Solicitations page. Such written addenda or modification shall be part of the solicitation documents and shall be binding upon each respondent. Each respondent is required to submit with the proposal a written acknowledgment to confirm receipt of any and all addenda. No respondent may rely upon any verbal modification to or interpretation of the solicitation documents, and no interpretation shall be considered binding unless provided in writing by the Procurement Department. Examination of Documents and Site Before submitting a proposal, respondents shall familiarize themselves with the nature and extent of the work and any local conditions that may affect the work to be done and the equipment, materials, and labor required. Respondents shall also examine all drawings, specifications, addenda, and other relevant documents to be thoroughly informed regarding all conditions and requirements that may affect the work to be performed under the contract. Preparation of Proposal The proposal shall be based upon the Statement of Work and any applicable drawings or specifications together with all addenda thereto and must be executed by an authorized representative listed with the Alabama Secretary of State, with evidence of authority and qualification to do business in the State of Alabama and the City of Montgomery. As applicable, a State of Alabama contractor license number and a City of Montgomery business license shall be included in the proposal. Recommended Proposal Preparation Guidelines All respondents shall provide a straightforward and concise description of their ability to meet the proposal requirements. For construction contracts the proposal shall clearly show the technical approach including work tasks, estimated time phasing, and proposed approach. The City discourages overly lengthy or costly proposals; all proposals shall be submitted in one electronic file or delivered to the Procurement Department. Integrity of Documents Respondents shall use the original solicitation documents and enter information only where responses are requested. Submittal of Proposal A proposal shall be submitted no later than the date and time prescribed in the solicitation and shall be accompanied by all required documents. It is the respondent's responsibility to ensure that its proposal is delivered at the proper time. Identification of Subconsultants/Changes After the Fact After submitting a proposal in response to this solicitation, respondents are prohibited from substituting, modifying, or amending the subcontractors identified in the submittal at any time during the course of the solicitation process up to the final award of contract, including question and answer sessions, presentations, or technical clarifications and submittals as may be required by the Review or Selection Committee. Any substitution or addition of subcontractors or any other material changes to the submittal after the initial response will cause the submittal to be invalid for review and selection purposes. Withdrawal of Submittals Any respondent may withdraw its submittal, either personally or by written request, at any time prior to the scheduled time for opening submittals. Requests to alter or withdraw an offer must be submitted in writing to the Procurement Director. Submittals may not be altered or unilaterally withdrawn by the respondent after the scheduled time for submittal opening. All offers not so withdrawn shall constitute an irrevocable offer and will remain subject to acceptance or rejection by the City for a period of ninety calendar days. Proposal to Remain Subject to Acceptance All proposals will remain subject to acceptance or rejection by the City of Montgomery for ninety calendar days after the closing date of the solicitation. Conditional or Incomplete Proposals The City of Montgomery specifically reserves the right to reject any conditional or incomplete proposal. Addition/Deletion of Items The City reserves the right to add or delete any item from this solicitation or resulting contract when deemed to be in the City’s best interest. Changes to Specification Specifications are based on the most current literature available. The Procurement Department must be notified in writing of any proposed changes to the manufacturer’s specifications, including materials used, manufacturing process, or construction, that conflict with the specifications provided in the solicitation. Proposed changes must be explained in detail and include a copy of the relevant manufacturer’s specifications. Proposed changes shall not be binding upon the City unless evidenced by a Change Notice issued and signed by the Procurement Director. Failure to comply with this provision will result in the respondent being liable for any costs incurred by the City to comply with the specifications provided in the solicitation. Submission of more than one proposal for the

Published attachments
Addenda and notices
  • Addendum #1 · 1

    The addendum is being issued to upload the documents referenced in attachment 1 on page 19 of the RFP. For FlareData and OM_Reports contractors can download the files at https://threenotchgroup.egnyte.com/fl/qjXB7h6QRv6H (Password: KkhXJ656Fwx6). The link will expire in 30 days.

  • Addendum #2 · 2

    The proposal due date is hereby changed to 30 Nov 2026 at 2:00pm. All references to 19 Nov 2026 at 2:00pm in any document associated to this RFP is considered to be changed as result of this addendum.

  • Addendum #3 · 3

    This addendum is being issue to authorize electronic proposal submissions. Offerors may submit proposals either electronically or in hard copy. Electronic submission instructions are provided in the Vendor Questionnaire section of the RFP. Proposals submitted electronically must be received no later than November 30 to be considered timely followed by a hardcopy proposal as stated in the RFP. Offerors electing to submit hard-copy proposals only must ensure delivery to the address specified in the RFP no later than November 30. Proposals received after the stated deadline, regardless of submission method, may be deemed non-responsive.

  • Addendum #4 · 4

    This addendum is being issued to push the response due date back to 15 December 2026.

Public questions and answers
  • After reviewing the attached RFP, I have two requests: • Updated facility information: Section 6.1 includes a note stating that the City and its engineer should replace the placeholder information with verified current facility data before advertising the RFP. Could you please provide a revised version with the updated Section 6 information, or the supporting facility data referenced in that section? • Proposal deadline extension: We would like to request an extension of the November 19 proposal deadline. With the mandatory site visit scheduled for November 16, the current schedule leaves only three days to evaluate the information gathered during the visit and incorporate it into a complete proposal. Additional time would help us provide the City with a thorough, well-supported response. Thank you for your time and support. We are interested in this opportunity and look forward to learning more about the project.

    All data for Section 6 and Attachment 1 is available through the link issued as an amendment.

  • Would the City of Montgomery consider an alternative project delivery structure in which: The City retains ownership of the landfill gas-to-electricity generation facility. Project construction is financed through municipal funding, eligible federal or state grants, revenue bonds, or other public financing mechanisms.

    No, the City does not wish to finance, fund or back any debit to support the landfill gas development.

  • The RFP states the pre-bid meeting is scheduled for November 16th, questions are due the same day (November 16th), and the Proposal Due Date is November 19th. As mentioned in the previously submitted question, 3 days from site visit to bid submission is a short turnaround. We often see questions due approximately 1 week after the pre-bid with an additional allowance of 1-2 weeks for questions to be answered, followed by 1-2 weeks to incorporate the answers into our response. With this sequence in mind, we request that the proposal due date be extended 3-5 weeks.

    The proposal due date has been changed 30 Nov 26 at 2:00pm. See addendum #2.

  • What is the source and makeup of the big waste volume jumps in 2023 and 2025? What are the current water level readings in each vertical well? Is there an available lab analysis of a recent landfill gas sample? This analysis would go a long way in helping respondents design a facility for the expected gas composition. We would also like to suggest an extension of the of the Nov 19th proposal deadline.

    Oasis collected data from forty‐three (43) gas extraction wells and three (3) condensate sumps by measuring total stick up, liquid level depth, total depth, and pump depth if applicable. Liquid levels were noted over 15 feet in eleven (11) wells. Out of the 11 wells, 9 wells had liquid levels over 20 feet. Pump service was completed at the time of the well sounding. A total of thirty‐one (31) wells had pumps removed, serviced, and installed back into the wells. During pump service, forty (40) pumps were cleaned, serviced, and either reinstalled into wells or available for use in the building by the flare. Per Three Notch Engineering request, Oasis conducted a camera investigation on wells with pumps not operational. Perforation was noted on the wells and included in the Pump Pulling and Liquid Levels Table. There is a total of four (4) wells that are broken below grade, and five (5) wells were leaning and not able to obtain well-sounding data. These wells are noted in the “Pump Pulling and Liquid Levels” table.

  • Can you provide current waste rates and anticipated closure date?

    All of those answers are in the data already provided

Plain text