Request for Qualifications for Capital Building and Maintenance Project Management Services for Charleston County School District
Description
General work description: The Charleston County School District (CCSD) is soliciting sealed Qualifications for Project Management Services for its Phase VI 2029-2035 Capital Building and Maintenance Program and Long-Term Debt Projects. Enclosed is the Request for Qualifications (RFQ) for Project Management services. Project Details Important Instructions for Electronic Submittal The Charleston County School District is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details SEE ATTACHED REQUEST FOR QUALIFICATIONS Vendor Submissions
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. The deadline for qualifications has been extended to December 9, 2026 @ 2:00 PM ET. A sample AIA document as well as a draft matrix is attached to this addendum.
Public questions and answers
Page 9 states the selected firm will negotiate a contract based on a fixed percentage of the program budget minus the Project Management fee, while page 11 states the contract will be based on billed hourly rates. Please confirm which compensation basis will govern, whether it will differ between Capital Building and Capital Maintenance assignments, and whether reimbursable expenses (site manager vehicles, field offices, software licenses) are included in the fee.
The fee will be based on a fixed percentage of the program budget minus the Project Management fee. This will be negotiated based upon the value of each project. The Building and Maintenance fees will vary.
Page 11 refers to the top-ranked offeror "for each lot," but the RFQ does not define any lots. Please identify the lots (for example, Capital Building, Capital Maintenance/Facilities Management, or Waves 1-3), state whether offerors may submit on one or more lots, whether a separate submission or score is required per lot, and whether one firm may be awarded more than one lot.
There are no lots.
Section 6.0 states award will be made to one offeror, while Section 7.0 references "CPM firm(s)" and "if multiple CPM firms are chosen." Please state the number of CPM awards the District anticipates and how projects will be allocated among firms if more than one firm is selected.
It will be one or multiple awards.
The scope references a separate Program Management Firm (PMF) and a "Capital Program Management Firm." Please confirm whether these are the same entity; whether the PMF has been or will be procured under a separate solicitation and on what schedule; whether a firm, its affiliates, or its subconsultants may compete for or hold both the PMF and CPM roles; and whether the PMF will take part in the CPM evaluation.
That is referencing the same firm. The solicitation for the Program Management firm is currently being advertised. The solicitation number is CP2701. It may be possible for a firm to hold both roles per scoring.
Section 7.0 states approximately $1.2 billion. The Project List shows $735,000,000 funded and $383,957,451 unfunded, and the October 2026 Board materials show a $350,000,000 Capital Maintenance program and a $91,000,000 Technology program. Please confirm the components of the $1.2 billion, whether the five unfunded projects and Referendum Item 1 (district-wide safety and security) are in scope, and which Long-Term Debt projects are included.
The total is the funded Capital Maintenance and Building Program. LTD is not included.
The RFQ describes the program as 2029-2035, the Resolution sets the tax period as January 1, 2029 through December 31, 2034, and the Wave list begins Wave 1 in 2027. Please confirm the contract start date, the contract term and any renewal options, and whether Wave 1 projects funded in advance through bond anticipation notes will be assigned upon award.
The program runs through 2034 per the referendum. Contract terms will be negotiated. The status of Wave 1 projects is not known at this time.
Award is pending passage of the November 3, 2026 referendum. If the referendum does not pass, will the District cancel this solicitation, or proceed with an award limited to Long-Term Debt, bond-funded, or Capital Maintenance projects?
The referendum has passed.
Please clarify how active Phase V (2023-2028) projects will be handled. Will current Phase V managers retain their assigned projects through closeout, and how will Phase VI work on campuses with active Phase V projects be coordinated?
Phase V managers will closeout any open projects. Phase V and Phase VI work will be coordinated as needed when necessary.
The RFQ requires online submission only but does not include a Section 4.0, a portal link, page limits, format requirements, file size limits, or a required order of contents. Please provide the submission portal, any page limits, the required organization of the response, and confirm whether SF 330 Parts I and II and resumes count toward any page limit.
The organization of the response should follow the evaluation factors. You will respond in OpenGov. The response shall not exceed 200 pages.
Please confirm whether the South Carolina Construction Manager's License must be held by the offeror entity or may be held by a qualifying individual of the offeror or a joint venture member, and whether subconsultants performing more than 10% of the work must also hold this license.
Whoever is the submitting firm must have the credentials.
The District's prior program management solicitation (CP2300) evaluated Minority Business Enterprise participation. Please confirm whether CP2702 includes SWMBE participation goals, whether an SWMBE utilization or outreach plan is required, and whether SWMBE participation will be considered in any evaluation factor.
A SWMBE plan is not required and not part of the evaluation.
Several offerors may currently hold District contracts that require daily communication with Capital Programs and Facilities Management staff. Please confirm that routine communications required to perform existing District contracts are permitted during this procurement, provided they do not concern this solicitation.
That is correct.
Please confirm whether the $10 million threshold for full-time site managers applies to total project budget or construction contract value; how it applies to multi-school line items (for example, Drayton Hall and Hunley Park early education additions); whether one site manager may cover multiple projects below the threshold; and whether site managers are compensated within the fee or separately.
This will be negotiated.
Please confirm which construction management software the District will require, whether the District or the CPM will procure and pay for licenses, and whether Phase V records will be migrated. Please also confirm whether the CPM or the PMF is responsible for providing and hosting the single-source program dashboard described on page 11.
The firm should propose a solution. The Program Management Firm will provide the program dashboard. The construction management firm will be responsible for their construction management software.
Please clarify whether the CPM or the PMF will be responsible for invoice processing, purchase order and contract entry in the District financial system, monthly reconciliations, and quarterly cost curves.
A matrix has been attached to assist with responsibilities, however, exact duties will be negotiated.
Page 16 references "Early Warning Notification requirements." Please provide or identify these requirements and confirm whether they are the same as the two-business-day written notification described on page 15.
They are the same.
Please provide the District's amended AIA C132-2019 and the required insurance types and limits, including professional liability, before the submission deadline so offerors can confirm acceptance.
A previous AIA document has been attached in OpenGov. It includes requirements. Please note that the document is currently being reviewed by legal counsel and will include changes.
Please confirm whether FF&E procurement and move logistics, commissioning agents, and special inspections and testing will be contracted directly by the District or through the CPM.
Through the CPM.
Section 7.0 includes IT infrastructure and security projects. Please identify which components of the Phase VI Technology program the CPM will manage (for example, infrastructure and physical security versus device purchases) and whether the Project Management line in the Technology budget relates to CPM services.
This will be negotiated but will include infrastructure and physical security.
For Capital Maintenance assignments, please confirm whether the District will use indefinite delivery A/E and contractor pools, the typical minimum project size to be assigned, and whether the CPM will perform or support the annual Facilities Condition Assessment.
The District does utilize IDC’s for A/E and Contractors. The size is not known at this time. The annual assessment participation is not known at this time.
Please confirm whether the Selection Committee will consist only of District employees and whether any consultant or contractor, including the PMF, will participate in scoring.
That is not known at this time. The PMF will not participate in scoring.
Please confirm whether the prior South Carolina K-12 experience requirement applies to all key personnel or only to the principal in charge and project director, and whether site managers are key personnel subject to substitution approval.
This is an evaluation factor and will be scored accordingly.
Section 5.0 requires information for subcontractors exceeding 10% of "your price." Because no price is submitted at the qualification stage, please confirm how offerors should apply this threshold.
Assume 10% of your provided services.
Please define "relatively recent" for the three referenced contracts and confirm that active programs, including current District contracts, may be referenced.
Within the past couple of years. Active programs may be referenced.
Please confirm that the Wave 1-3 attachment is informational and subject to change, and provide the complete title of the Wave 3 Orange Grove Middle School and PACE project, which is truncated.
That is correct. Design, construct, and equip a new Orange Grove Middle School and Pattison's Academy for Comprehensive Education (PACE) on the former St Andrews High School campus
Please confirm how the 30-minute proximity requirement is measured and whether it applies to subconsultant offices.
The office from which our services will be performed. We will measure by Google Maps.
Referendum Item 8 includes a multipurpose room at A.C. Corcoran Elementary, and Item 23 includes an unfunded building replacement for the same school. Please confirm whether the multipurpose room will proceed independently of the replacement.
Yes
Will the District offer debriefings to offerors following award?
Yes.
Will all projects in their respective Waves start concurrently, or will there be any phasing?
They will be phased.
Will the CPM firm award be for the life of the bond (Waves 1-3)?
Yes. The program runs from 2029-2034.
Is there a page limit to the response?
The response shall not exceed 200 pages.
Does CCSD currently use a project management platform (e-Builder, Kahua, Unifier, Procore, etc.), or should firms propose a solution?
Propose a solution.
Can you provide guidance at this time regarding how projects will be allocated if multiple CPM firms are selected? This will help us submit an appropriate staffing plan.
That is unknown at this time.
On Page 11, reference selection of the highest-ranked Offeror “for each lot.” Please identify the anticipated lots or project groupings, including which Phase VI, long-term debt, and capital maintenance projects are anticipated to be assigned to each lot, and clarify the anticipated number of awards under each RFQ.
There are no lots.
Does CCSD anticipate assigning individual projects through separate task orders with scope and fees negotiated for each project, or awarding groups of projects to a CPM firm for management throughout the applicable projects’ lifecycles? Please clarify how CCSD anticipates assigning and authorizing work under the contract.
That is not known at this time.
Please confirm the format of the response: Is it entirely based on the SF330 format, or is that only a portion of the response dependent on any subconsulting? If only a portion, can you provide an overall format requirement?
The organization of the response should follow the evaluation factors. You will respond in OpenGov. The response shall not exceed 200 pages.
How many construction project management firms (CPM) do you expect to award? If no specific number, do you have a maximum you have considered?
We anticipate one or multiple.
If multiple CPM firms are awarded, who will be responsible for determining which CPM works on which project? CCSD or the PMF?
CCSD
The RFQ defines the onsite expectations of a full time Site Manager for projects over $10M in value. What are CCSD's expectations for the remainder of the CPM's staffing? Precon vs. Construction? Examples: One Project Manager can handle two Projects of up to $100M in value, and a Senior Project Manager can handle up to four Projects up to $200M in value with 2 PMs and 4 site managers supporting.
This will be negotiated.
The RFQ references maintenance work, but does not provide a project list or an estimated volume of work for the maintenance program. Could you please outline the anticipated workload?
Capital Maintenance is estimated at $350 million.
If capital projects and Facilities Management (maintenance) projects are awarded separately, how will they be divided among CPM firms?
That is unknown at this time.
The programs run 2029–2034 (PMF) vs. 2029–2035 (CPM). Are these intended to run for different lengths?
The program runs 2029-20234.
When will the CPM and PMF be engaged to commence work? The program is intended to start in 2029, but we suspect some design and permitting work will need to commence prior to 2029. Please define expectations.
This will be negotiated.
If multiple CPM Firms are awarded, how will CCSD decide which Project Management software the CPM's will use and will the cost of the software be reimbursables for the CPM firms who do not already use that software?
This will be negotiated and the cost will be included as part of the percentage fee that is charged.
If the CPM is a separate firm from the PMF, will the CPM be involved in the procurement and contract negotiations of designers and contractors? In our experience, relationships begin at selection and strengthen through proper contract negotiations, so we highly recommend that the CPM be involved, as they will be responsible for day-to-day management of designers and contractors.
That will be negotiated.
Has a Master Program Schedule been developed? If so, can it be shared? If not, can you provide milestone dates for design, construction, and completion for each capital project?
This is not available.
When scoring offerors, will points be awarded/considered for minority business participation or small business participation for the PMF proposal?
That is not an evaluation factor.
In the CPM RFQ, specifically calls out CM-A-R and Design-Build Delivery methods as a needed expertise. Is it anticipated that CCSD will increase (as compared to prior CCSD Building Programs) the number of projects delivered this way?
No.
The CPM RFQ reads as if the CPM reports directly to CCSD, but works closely and collaboratively with the PMF. Please confirm that is accurate.
A matrix has been attached to better explain roles etc.
Both RFQs skip from Section 3.0 to 5.0. Is a Section 4.0 missing? Would 4.0 include submission format, page limits, required forms, portal instructions, etc.?
The organization of the response should follow the evaluation factors. You will respond in OpenGov. The response shall not exceed 200 pages.