Request for Quotation (RFQ): Headworks Actuator Valve Upgrade Project
Description
Project Summary Gary Sanitary District is requesting quotations for upgrades to five existing electric actuator assemblies: three primary butterfly valve actuators and two Headworks main sluice gate actuators. The primary objective is to improve opening and closing speeds while maintaining safe, reliable operation, with updated position indication screens and compatible controls. Quotation submissions should follow the requirements and instructions in this RFQ. Actuators for North, Center, and South Primary Butterfly Valves Actuator for East Main Sluice Gate (1-SMB-2) Actuator for West Main Sluice Gate (1-SMB-3) Position indicator screens and associated controls Adapters, mounting hardware, and associated components Removal and installation labor, if offered Electrical and control integration, if offered Testing, commissioning, and startup, if offered Freight, delivery, and other applicable charges Scope of Work The Scope of work shall include the following: SEE ATTACHMENT Minimum Technical Requirements SEE ATTACHMENT Instructions to Bidders Please submit this quote electronically in the OpenGov portal to the Gary Sanitary District. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic quote. Please submit this quote by: Monday, November 16, 2026 , 12:00 pm . Only quotes received on time will be considered. Bidders shall submit all inquiries regarding this RFQ via the OpenGov portal , located at https://procurement.opengov.com/portal/garysan . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the OpenGov Portal. Bidders may also click “Follow” on this quote to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. Upon submitting a quote for the project, it will be assumed that the contractor has reviewed the project site and is fully aware of the existing conditions. Project Description Release RFQ Date: October 21, 2026 Question Submission Deadline: November 11, 2026, 5:00pm Quote Submission Deadline: November 16, 2026, 12:00pm Gary Sanitary District: 3600 W 3rd Avenue, Gary, IN 46406 The Gary Sanitary District (GSD) is seeking sealed proposals from qualified vendors for the supply and delivery of Request for Quotation (RFQ): Headworks Actuator Valve Upgrade Project , located at Gary Sanitary District: 3600 W 3rd Avenue, Gary, IN 46406 . Project Summary Gary Sanitary District is requesting quotations for upgrades to five existing electric actuator assemblies: three primary butterfly valve actuators and two Headworks main sluice gate actuators. The primary objective is to improve opening and closing speeds while maintaining safe, reliable operation, with updated position indication screens and compatible controls. Quotation submissions should follow the requirements and instructions in this RFQ. Provide all specified items in accordance with the specified directions below and all other applicable standards. Contractor Time If the Contractor is unable to take over the project site immediately or is unable to complete the project within the time frame giving below, the contract will be rescinded and awarded to the next lowest bidder. The Contractor agrees that the work shall commence immediately of issuance of Notice Proceed and be completed with 60 days of said notice to proceed. Insurance Requirements 14. Insurance Requirements 14.1 General Requirements The selected vendor or contractor shall, at its own expense, procure and maintain the insurance coverage required for its scope of work throughout the duration of the contract. These requirements apply to the contractor and its subcontractors, as applicable. The contractor shall provide evidence of required insurance coverage to Gary Sanitary District before commencing any on-site work. All required coverage shall remain in effect for the duration of the applicable work and any required completed-operations period specified in the final contract. 14.2 Minimum Insurance Limits For vendors performing installation, electrical work, commissioning, or other on-site services, the following minimum limits are requested: A. Commercial General Liability Minimum limit of $1,000,000 per occurrence. Minimum general aggregate of $2,000,000. Coverage shall include bodily injury, property damage, contractual liability, personal and advertising injury, and products and completed operations, as applicable. Products and completed operations coverage shall have a minimum limit of $1,000,000 per occurrence. B. Automobile Liability Minimum combined single limit of $1,000,000 per accident. Coverage shall include owned, hired, and non-owned vehicles used in connection with the project, as applicable. C. Workers' Compensation Coverage meeting applicable Indiana statutory requirements for employees performing work under the contract. D. Employer's Liability Minimum limit of $1,000,000 for each accident. Minimum limit of $1,000,000 for disease policy limit. Minimum limit of $1,000,000 for disease per employee. E. Umbrella or Excess Liability Minimum limit of $1,000,000 per occurrence and in the aggregate. Coverage may be used to supplement the underlying liability policies, provided the required limits and coverage are maintained. 14.3 Additional Insured and Policy Requirements For on-site work, Gary Sanitary District shall be included as an additional insured on the contractor's Commercial General Liability policy for liability arising out of the contractor's operations, subject to the terms of the applicable policy and endorsement. The contractor's liability coverage shall be primary and non-contributory with respect to insurance maintained by Gary Sanitary District, where applicable and supported by the policy endorsement. A waiver of subrogation in favor of Gary Sanitary District shall be provided where required by the final contract and permitted by law and the applicable insurance policy. All insurance shall be issued by insurers authorized to provide the applicable coverage in Indiana. Deductibles and self-insured retentions shall remain the contractor's responsibility and shall be disclosed upon request. 14.4 Certificates of Insurance The contractor shall provide a Certificate of Insurance evidencing the required coverage before commencing on-site work. Gary Sanitary District may request copies of applicable additional-insured endorsements and other documentation necessary to verify compliance. The contractor shall promptly notify the District of any material reduction, cancellation, or nonrenewal of required coverage, in accordance with the applicable policy and contract requirements. 14.5 Subcontractors The contractor shall ensure that subcontractors performing work under the contract maintain insurance appropriate to their respective scopes of work and comply with applicable requirements of this section. 14.6 Equipment-Only Vendors Vendors providing equipment only, without installation or other on-site services, shall maintain appropriate commercial general liability and products liability coverage. Additional insurance requirements may apply if the vendor performs installation, commissioning, or other services at the facility. 14.7 Verification and Approval The District reserves the right to review the submitted insurance documentation and require reasonable clarification or correction of deficiencies before work begins. Any waiver, exception, or modification of these requirements must be approved in writing by the District. Price Proposal Respondent Submittals
Published attachments
- Gary_Sanitary_District_Headworks_Actuator_Valve_Upgrade_RFQ
- Trash Rack Installation -Plot Plans & Details 1
- Trash Rack Installation -Plot Plans & Details 3
- Trash Rack Installation -Plot Plans & Details
- North, Center, and South Primary Drawings
- Primary Gate Valves
- Request_for_Quotation_(RFQ):_Headworks_Actuator_Valve_Upgrade_Project.pdf
Public questions and answers
would it be possible to see the full specs of the valves these actuators are operating (i.e. valve style, size, dimensions....etc) Also, more specifics on the plant interface with these actuators. How are they being monitored/controlled?
Yes! Would you like to schedule a site visit so these questions can be answered? If so, please call me at 219-944-0595 ext. 1224 or 219-269-4381 (work cell).
OpenGov categories
- 89000 · Water Supply, Groundwater, Sewage Treatment, And Related Equipment (Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water)