State and local · OpenGov
Resident Project Representative (RPR) Professional Engineering Services- Corrections Security Upgrade
Description
The County of Volusia Division of Corrections is upgrading the detention controls, security surveillance, and access control systems at the Correctional Facility and the Branch Jail. The Engineer of Record is TLC. A Certified Security System Integrator (CSSI) Company will be hired by the County to implement design and construction based upon Engineer of Record (EOR) construction documents. With this Request for Statement of Qualifications, the County of Volusia is seeking the services of a Florida Licensed Professional Electrical Engineer, specialized in CSSI at correctional facilities, to provide RPR (resident project representative) services for the duration of the construction contract. Scope of Work Corrections Security Upgrade - RPR Professional Engineering Services The County of Volusia is seeking the services of a State of Florida Licensed Professional Electrical Engineer to provide Resident Project Representative (RPR) Services to oversee and administer the contract of the CSSI for improvements described in the Introduction of this solicitation. The project will be funded in part by a state grant. The CSSI Contractor and RPR are subject to compliance with conditions of the grant. For a complete listing of requirements, refer to Exhibit A of this request for statement of qualifications. 1) The RPR shall oversee the CSSI Contractor from notice to proceed through final completion including, but not limited to RFI’s, shop drawings, procurement, installation, configuration, implementation and construction activities. 2) The RPR oversees the engineer of record during all EOR’s construction administration activities. 3) The RPR shall be provided with an office in the construction trailer; and shall be present on-site for all improvement activities. 4) The RPR shall continuously inspect improvements as they are being installed for compliance with EOR (Engineer of Record) construction documents, Florida Model Jail Standards, National Electric Code, ADA and Florida Building Code. 5) The RPR shall keep a weekly record of project budget and schedule; and is charged with keeping project on schedule and within established construction contract amount. 6) The RPR shall attend bi-weekly Owner/ CSSI Contractor/ EOR/ RPR meetings. The meetings are led by the CSSI Contractor. Agenda and minutes prepared by the CSSI Contractor. The RPR reviews both documents for completeness and accuracy; and adds to the agenda as needed. The RPR implements Owner action items and oversees all other action items contained in the meeting minutes. 7) The RPR shall prepare - daily logs of improvements activities. 8) The RPR shall prepare weekly and quarterly status reports; and six week look-aheads. 9) The RPR shall resolve conflicts between the CSSI Contractor and EOR. 10) The RPR shall oversee contractor's CPM (Critical Path Method) schedules and EOR’s processing of shop drawings, RFI's (requests for information), EOR supplemental information, substitution requests, pay requests, contingency usage requests and change orders. 11) The RPR shall make field decisions with the EOR on behalf of the Owner (Volusia County). 12) The RPR shall process Owner direct purchases for tax savings. 13) The RPR shall coordinate software licensing agreements. 14) The RPR shall be the daily eyes and ears of the Owner ensuring implementation of the project adheres to the EOR plans and specifications. The RPR services are in addition to and do not replace the building official regarding jurisdictional agency approval. 15) The RPR shall report directly to the County Project Manager. The County PM leads following team of Owner stakeholders in decision making: a) Volusia County Engineering & Construction Division b) Volusia County Information Technology Division c) Volusia County Facilities Management Division d) Volusia County Division of Corrections 16) The RPR shall oversee the phased implementation activities. As part of that effort, the RPR will coordinate with the CSSI Contractor, the Owner’s movement of detainees and personnel to alternate locations during implementation activities. 17) The RPR shall oversee CSSI Contractor testing of new systems, transition from existing to new systems and Contractor training of Owner staff. 18) The RPR shall process pay applications on behalf of the Owner. 19) The plans, specifications and implementation documents for the Correctional Facility and the Branch Jail are security sensitive and therefore, not for public access. The RPR shall maintain and transmit project documents via password protected file transfer protocol system as designated by Owner (Volusia County). Project documents of any kind shall NOT be emailed, posted to the internet or social media. The RPR shall closely monitor the Contractor and Subcontractors in their secure handling of these sensitive documents. 20) A construction schedule shall be established by the CSSI Contractor. Procurement of a CSSI Contractor is in progress. The overall calendar project schedule for the two campuses combined will likely require an 18-24 month commitment of RPR services. CERTIFICATION/ LICENSE REQUIREMENTS The prime consultant shall be a State of Florida licensed electrical engineering firm. Staff member assigned to be the RPR (resident project representative) shall be experienced in the design and administration of detention security and control systems and have knowledge of vertical construction. BACKGROUND SCREENING REQUIREMENTS Background Screening upon Award: After notification of Contract award and prior to commencement of work, the Contractor shall conduct background screening for all of its employees and approved contractors or subcontractors who provide services to the County or have access to the County proprietary information, including, without limitation, criminal background checks. In addition, the Contractor shall train its employees and approved contractors and subcontractors who handle the County proprietary information on security standards and activities. Background Screening to Access County Facilities: A criminal history and background check is required prior to any Contractor’s personnel entering a County facility. The County will conduct the criminal history and background check. The County reserves the right to deem any employee not acceptable. Upon award, a security clearance shall be required for all employees and contractors needing access to these facilities. The County will provide necessary forms, Exhibit B , to fill out and return. This information must be provided two (2) weeks prior to the start of service for background checks, which will be done at the expense of the County. This information must also be provided any time during the Contract for any ne Introduction Summary Background Contact Information Timeline Purpose and Overview Purpose and Overview The purpose of this request for statement of qualifications (RSQ) is to select the most highly qualified firm(s) to provide the requested services. It is anticipated that one (1) firm will be awarded a contract to provide the necessary services for an initial term of three-years or upon project completion whichever is later. Any renewals will be upon mutual agreement. Authorization for performance of services by the selected firm(s) under the basic contract shall be in the form of written task assignments signed by the firm, executed and issued by the County. Each project shall be negotiated at the time of the development of the scope of work. Each task assignment shall describe the services required, state the commencement and completion date of work and establish the amount and method of payment. The task assignment will be issued under, and incorporate the terms of the basic contract. The County makes no covenant or promise as to the number of available projects or that the firm will perform any project for the County during the life of the basic contract. The basic contract does not authorize the performance of any work or require the County to place orders for work. Expiration of the term of the basic contract will have no effect upon task assignments issued pursuant to the basic contract and prior to the expiration date. Obligations entered therein by both parties shall remain in effect until completion of the work authorized by the task assignment. Special Terms and Conditions Closing Date and Pre-Solicitation Conference A. Request for Statement of Qualifications (RSQ) Closing Date Response must be received through the County's eProcurement Portal before 3:00 pm on Thursday, December 10, 2026 . Responses received after this time will not be considered. B. No Pre-solicitation Conference will be held. Authorized Official The Solicitation response and all required forms must be submitted/signed by an official authorized to legally bind the Respondent to all Solicitation provisions. A Memorandum of Authority may be submitted to document that the individual is authorized to commit the firm to a contract. Payment Terms 1. The County will remit full payment on all undisputed invoices within forty-five (45) business days from receipt by the appropriate person(s) (to be designated at time of Agreement) of the invoice(s) or receipt of all products or services ordered. 2. Pursuant to Chapter 218, Florida Statutes, the County will pay interest not to exceed one percent (1%) per month on all undisputed invoices not paid within thirty (30) days after the due date. 3. The County has the capability of Electronic Funds Transfer (EFT). List any discounts for prompt payment and/or willingness to accept Electronic Funds Transfer (EFT) and the discount to be applied to such payments. Consultant s offering prompt payment discounts, for example 1% - net 10, the discount shall be taken if the check issue date is within specified time period from date of invoice. By submitting a Response to the County of Volusia, Florida, the Respondent expressly agrees that, if awarded an Agreement, the County may withhold from any payment monies owed by the Respondent to the County for any legal obligation between the Respondent and the County, including, but not limited to, real property taxes, personal property taxes, fees, and commissions. Award Term The County is looking to promote partnership relationships within the policies and procedures of public procurement. Pursuant toward that end, the successful Respondent shall be awarded an Agreement for an initial three-year term or project completion whichever comes later. Any renewals will be contingent upon mutual written agreement. Damages Due to the nature of the services to be provided and the potential impact to the County for loss, the awarded Respondent cannot disclaim consequential or special damages related to the performance of this Agreement. The awarded Respondent shall be responsible and accountable for any and all damages, directly or indirectly, caused by the actions or inaction of its employees, staff, or Subconsultant . There are no limitations to this liability. This section does not apply to the extent precluded or prohibited by applicable law. Emergency Response Services In the event goods or services are provided under this Agreement for emergency response for a natural emergency, if Contractor breaches this Agreement during an emergency recovery period Contractor shall pay a $5,000 penalty as well as damages, which may be either actual and consequential damages. As used in this provision, the term “emergency recovery period” means a 1-year period that begins on the date that the Governor initially declared a state of emergency for a natural emergency. Evaluation Method [CCNA] The County will appoint a committee consisting of County staff to evaluate the proposals and to make a recommendation to the County Council. The County will be the sole judge of its own best interests, the proposals, and the resulting Contract, if any. The County’s decisions will be final. Award will be made to the proposal(s), which presents the best value to the County based on the entire evaluation process and all the information gathered. The County may require the short-listed firm(s), if applicable, to do an oral presentation or have discussions by the proposed team relative to their specific experience on similar projects. The selection process shall be in accordance to CCNA process. Note: Respondents are prohibited from contacting any of the committee members, other than the Procurement Analyst, prior to the recommendation of award from the committee. Presentations by Respondents 1. The County of Volusia, at its sole discretion, may ask individual Respondents to make oral presentations and/or demonstrations without charge to the County. 2. The County reserves the right to require any Respondent to demonstrate to the satisfaction of the County that the Respondent has the fiscal and managerial abilities to properly furnish the services proposed and required to fulfill the requirements of the RSQ. The demonstration must satisfy the County and the County shall be the sole judge of compliance. 3. Respondents are cautioned not to assume that presentations will be required and should include all pertinent and required information in their original proposal package. Proposal Acceptance/Rejection The County reserves the right to accept or reject any or all proposals received as a result of this Solicitation, or to negotiate separately with competing Respondents, and to waive any informalities, defects, or irregularities in any proposal, or to accept that proposal or proposals, which in the judgment of the proper officials, is in the best interest of the County. Proposal Acceptance Period Any Proposal in response to this RSQ shall be valid through December 31, 2027 . At the end of this time the proposal may be withdrawn at the written request of the Respondent if no award has been made. If the Proposal is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled regardless of the status of the proposal bond. The County reserves the right to request an extension of the proposals if a Contract has not been executed by November 30, 2027 . Termination (RSQ) The performance of Work or Services under a Contract may be terminated by the County in accordance with this clause in whole or from time to time in part, upon at least thirty (30) days prior written notice to Consultant whenever the County shall determine that such termination is in the best interest of the County. Any such termination shall be effected by delivery to the Consultant of a Notice of Termination specifying the extent to which performance of work under a Contract is terminated, and the subsequent date upon which such termination becomes effective. County may terminate a Contract in whole or part for convenience at will or for non-appropriation of funds by County. Upon receipt of such notification, Consultant shall inform County of the extent to which performance is completed and unless notified in writing by the County otherwise, the Consultant shall take no further steps towards completion of the Project. Upon payment by County, Consultant shall deliver to County any and all completed Deliverables and Deliverables-in-progress that then exist for the Project. If the County terminates the Project due to the Consultant ’s failure to meet a completion deadline as set forth in a Contract, the County may seek the services for the Project from another consultant and no sums shall be due to the Consultant as a result of any work or services that have been performed by the Consultant for the Project. After receipt of a Notice of Termination as set forth in above, and except as otherwise directed by the County, the Consultant shall: Stop work under a Contract on the date and to the extent specified in the Notice of Termination. Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of such portion of the work under a Contract, as it is not terminated. Terminate all orders and subcontracts pursuant to this Article to the extent that they relate to the performance of Work or Services terminated by the Notice of Termination. Assign to the County, in the manner, at the times and to the extent directed by the County, all of the right, title, and interest of the Consultant under the orders and subcontracts so terminated, in which case the County shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts. With the approval of the County and to the extent required by the County, settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts. County's approval of such settlements shall be final for all the purposes of a termination under the Article. In addition, Consultant shall transfer title and deliver to the County, in the manner, at the times, and to the extent, if any, directed by the County: The sketches, calculations, reports, models, studies and other Work-in-process, completed Work or Services, supplies, and other materials produced as a part of, or acquired in connection with the performance of the Work or Services terminated by the Notice of Termination; and, The completed or partially completed designs, plans, drawings, information, and other property, which, if the Contract has been completed, would have been required to be furnished to the County. Consultant shall complete performance of such part of the Work or Services as shall not have been terminated by the Notice of Termination. After receipt of a Notice of Termination, the Consultant shall submit to the County its termination claim, in the form and with a certification as prescribed by the County. Such claim shall be submitted promptly but in no event later than thirty (30) days from the effective date of termination, unless one (1) or more extensions in writing are granted by the County, upon request of the Consultant made in writing within such thirty (30) day period or authorized extension thereof. Upon failure of the Consultant to submit its termination claim within the time allowed, the County may determine on the basis of information available to it, the amount, if any, due to the Consultant by reason of the termination and shall there upon pay to the Consultant the amount so determined. Subject to the provisions of set forth above, the Consultant and the County may agree upon the whole or any part of the amount or amounts to be paid to the Consultant by reason of the total or partial termination of work pursuant to this Article which amount or amounts may include a reasonable allowance for profit on work done; provided, that such agreed amount or amounts exclusive of settlement costs, shall not exceed the total contract price or Compensation as reduced by the amount of payments otherwise made and as further reduced by the contract price of Compensation for Work not terminated. As such, the Contract shall be amended accordingly and the Consultant shall be paid the agreed amount. Nothing herein, prescribing the amount to be paid to the Consultant in the event of failure of the Consultant and the County to agree upon the whole amount to be paid to the Consultant by reason of the termination of Work or Services pursuant to this clause, shall be deemed to limit, restrict, or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Consultant . In the event of the failure of the Consultant and the County to agree as provided in Section 6. above upon the whole amount to be paid to the Consultant by reason of the termination of work pursuant to this Article, the County shall pay to the Consultant the amounts determined by the County as follows, but without duplication of any amounts already agreed upon by the parties. For completed Work or Ser
OpenGov categories
- 92522 · Control Systems Engineering
- 92531 · Electrical Engineering (Incl. Cogeneration Design Services)
- 92532 · Electronic Engineering
- 95826 · Construction Management Services
- 96847 · Inspection Services, Construction Type