(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Description

Henry County is issuing this solicitation for Engineering and Design Services for Gardner Road Bridge. Submissions shall be received before 3:00PM on November 19, 2026 , via the County's eProcurement Portal at https://procurement.opengov.com/portal/henryga . Late submissions will not be accepted. Project Details Important Instructions for Electronic Submittals The Henry County Board of Commissioners is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details Please see the Attachments section for specifications and attachments. Introduction Summary Henry County is issuing this solicitation for Engineering and Design Services for Gardner Road Bridge. Submissions shall be received before 3:00PM on November 19, 2026 , via the County's eProcurement Portal at https://procurement.opengov.com/portal/henryga . Late submissions will not be accepted. Timeline Release Project Date: October 22, 2026 Question Submission Deadline: November 5, 2026, 3:00pm Question Response Deadline: November 12, 2026, 3:00pm Bid Submission Deadline: December 3, 2026, 3:00pm Procurement Contact Shawnviez Lilly Procurement Agent II 140 Henry Parkway McDonough , GA 30253 Email: slilly@henrycountyga.gov Phone: (770) 288-6263 Evaluation Criteria Vendor Questionnaire Attachments

Published attachments
Addenda and notices
Public questions and answers
  • Page 1 of the RFQ states, "Submittals may be delivered by mail, common carrier, or in person to Henry County Purchasing Department, 140 Henry Parkway, McDonough, GA 30253. Electronic bids are to be submitted through the County’s eProcurement Portal..." Can you please clarify whether qualifications should be submitted via mail (hard copy), via the County's eProcurement Portal (electronically), or both?

    Qualifications may be submitted either physically by mail (hard copy) or electronically through the County’s eProcurement Portal.

  • May the fee schedule be submitted separately in a sealed envelope, or as a separate attachment if submitted electronically?

    The fee schedule will be removed from the solicitation.

  • The RFQ did not mention prime and subcontractor GDOT qualifications/certifications. Can you provide clarification for both? Thank you

    Prime Consultant MUST be prequalified in: 4.01(a) Minor Bridge Design (which includes a GA PE and or SE for bridge design) and a KTL 3.01 Rural Roadway Design or 3.02 Urban Roadway Design KTL Prime or subconsultant team member(s) MUST be prequalified in: 4.04 Hydraulic and Hydrological Studies (Bridges) 3.12 Hydraulic and Hydrological Studies (Roadway) 1.06(a) NEPA Documentation 1.06(e) Ecology if there are impacted wetlands / streams) 5.02 Engineering Surveying 3.10 Utility Coordination 5.08 Overhead/Subsurface Utility Engineering (SUE) (conditional — if SUE mapping is needed) 6.01(a) Soil Survey Studies (conditional — geotechnical if needed) 6.02 Bridge Foundation Studies (conditional — geotechnical if needed) 9.01 Erosion, Sedimentation and Pollution Control Plan (ESPCP) Preparation 8.01 Construction Engineering - only if the optional Construction Administration task is exercised

  • Will this project have to be designed in accordance with GDOT’s Plan Development Process (PDP)?

    No

  • Please identify the anticipated funding source(s) for the Gardner Road Bridge Improvement Project, state whether any federal or state funds will be used, and, if so, whether the project will be subject to Georgia DOT oversight or administered as a locally administered project.

    The Gardner Road Bridge Improvement Project is anticipated to be funded through Local Road Assistance (LRA) funds, with Stormwater Management funds utilized as needed.

  • The RFQ requires submittal of an Engineering Services Fee Schedule with position classifications and hourly rates. Please clarify how the fee schedule and rates will be considered in the evaluation, including whether they will be scored as an evaluation criterion (and at what weight) or used only after selection to negotiate the contract.

    They are used only after selection, to negotiate a fair and reasonable contract price with the top-ranked firm; if no agreement is reached, the county negotiates with the next-ranked firm.

  • Will the County consider removing Bid Support, Construction Administration and Other Services from the Engineering Services Fee Schedule, since the scope and fees can't be determined until engineering is complete and the project is ready for bidding?

    Bid Support, Construction Administration, and Other Services are included to accommodate potential project needs. Any adjustments to the fee schedule will be coordinated with Purchasing.

  • Beyond the 5-year minimum time in business, the submission of professional licenses, and the Section I.B.22 responsibility standards, does the County require any additional minimum prequalification for the prime consultant or subconsultants, such as GDOT prequalification in specific work types or area classes, or particular professional licensure?

    Prime Consultant MUST be prequalified in: 4.01(a) Minor Bridge Design (which includes a GA PE and or SE for bridge design) and a KTL 3.01 Rural Roadway Design or 3.02 Urban Roadway Design KTL Prime or subconsultant team member(s) MUST be prequalified in: 4.04 Hydraulic and Hydrological Studies (Bridges) 3.12 Hydraulic and Hydrological Studies (Roadway) 1.06(a) NEPA Documentation 1.06(e) Ecology if there are impacted wetlands / streams) 5.02 Engineering Surveying 3.10 Utility Coordination 5.08 Overhead/Subsurface Utility Engineering (SUE) (conditional — if SUE mapping is needed) 6.01(a) Soil Survey Studies (conditional — geotechnical if needed) 6.02 Bridge Foundation Studies (conditional — geotechnical if needed) 9.01 Erosion, Sedimentation and Pollution Control Plan (ESPCP) Preparation 8.01 Construction Engineering - only if the optional Construction Administration task is exercised

  • Will the County consider extending the November 19, 2026, submission deadline by three weeks to allow proposers adequate time to prepare complete qualification packages?

    The Submission deadline will be extended.

  • On page 18 in Section 4-References, the first sentence mentions "janitorial services similar in size and scope..." and Section 5-Methodology/Operations also seems geared toward janitorial services. Please let us know if this is accurate or the language should reference the scope of services outlined on page 15. Thank you.

    Will be removed with the addendum.

  • Can the county provide any page limit per section of the statement of qualifications response?

    Three page limit per section

  • Can the material sheets that were referenced be removed?

    yes

  • Under section 5 operations/methodology, can items E - I be removed as they are not relevant to a consultant's delivery of this contract?

    yes

  • Can a list of GDOT prequals be provided that are required by the county?

    Prime Consultant MUST be prequalified in: 4.01(a) Minor Bridge Design (which includes a GA PE and or SE for bridge design) and a KTL 3.01 Rural Roadway Design or 3.02 Urban Roadway Design KTL Prime or subconsultant team member(s) MUST be prequalified in: 4.04 Hydraulic and Hydrological Studies (Bridges) 3.12 Hydraulic and Hydrological Studies (Roadway) 1.06(a) NEPA Documentation 1.06(e) Ecology if there are impacted wetlands / streams) 5.02 Engineering Surveying 3.10 Utility Coordination 5.08 Overhead/Subsurface Utility Engineering (SUE) (conditional — if SUE mapping is needed) 6.01(a) Soil Survey Studies (conditional — geotechnical if needed) 6.02 Bridge Foundation Studies (conditional — geotechnical if needed) 9.01 Erosion, Sedimentation and Pollution Control Plan (ESPCP) Preparation 8.01 Construction Engineering - only if the optional Construction Administration task is exercised

  • Can the county clarify which resumes for key team leads are required?

    Resumes are recommended for key personnel responsible for project management, hydrologic and hydraulic analysis, structural/bridge design, roadway engineering. and environmental permitting, as applicable to the proceed scope of services.

  • Based on responses to questions, we would like to request consideration of a time extension for proposal due date.

    The proposal due date will be extended.

  • On page 19 of the RFQ, under Section 5 – Methodology/Operations, item d. through item i. appear to be related to services other than the scope of the RFQ. Please clarify if these are correct or if other items are to be addressed.

    This will be removed with the addendum.

  • On page 18 of the RFQ, under Section 4 – References, item f. through item j. appear to be related to services other than the scope of the RFQ. Please clarify if these are correct or if other items are to be addressed.

    This will be removed with the addendum

  • Please confirm if a Fee Proposal is required. The RFQ notes on page 15 to provide a Fee Proposal; however, the Fee Proposal is not listed in the sections to submit noted on page 18 and is not listed in the evaluation criteria noted on page 20.

    the Fee schedule will be removed from the solicitation

  • The "List of Subcontractors" and "Description of Good Faith Efforts" forms are listed in the table of contents on page 2, but are not included in the forms provided by the County. Are these forms required to be submitted with the proposal? And if so, can the County please provide them?

    These forms are not required

  • Section II, C., Section 4 – References and Section 5 – Methodology/Operations (pages 18-19) both refer to Janitorial Services and operations for those services. This project is to provide engineering and design services. Can the County update these sections to apply to engineering and design services?

    Will be updated with the addendum

  • The Standard Contract Form is included in the RFQ on page 22 with "sample" across it and is not included in the RFQ checklist. Can the County please confirm the Henry County Standard Contract Form is not required to be submitted with the proposal?

    The contract from is not required to be submitted with the proposal

  • Would the County be willing to amend the statement on page 11 under 30.c. Performance of Contract to remove "The Contractor accepts the relationship of trust and confidence established by the award of this bid solicitation."?

    No changes will be made

  • Would the County be willing to amend the statement on page 10 under 25. a. Indemnification to state "The vendor that is selected as the contractor shall, (but only to the extent not prohibited by O.C.G.A. §13-8-2(c)), indemnify, save and hold harmless Henry County and its elected and appointed officers, employees, servants and agents from all claims, damages, lawsuits, costs and expenses including, but not limited to, all costs from administrative proceedings, court costs and reasonable attorney fees that Henry County and its elected and appointed officers, employees, servants and agents may incur as a result of the negligence, recklessness, or intentionally wrongful conduct of the Contractor or other persons employed or utilized by the Contractor in the performance of the contract."?

    No changes will be made

  • On page 3, Section I - General Overview, 1. Qualification Submission, B., the County states "proposals may be submitted by mail, common carrier or delivered in person. Electronic bids are to be submitted through the County’s eProcurement Portal." Can the County confirm that the submission of physical materials is not required, and firms should solely submit their proposal via the County's eProcurement Portal?

    Proposals can be submitted electronically or a physical copy.

  • Do any of the required forms/documents need to be signed/provided by subconsultants? If so, can you please indicate which?

    no

  • Which page of the RFQ is the Project Schedule form located? I do not believe it was included with the original RFQ package.

    The project schedule is not included in the RFQ

  • In the OpenGov portal, there is a location for consultants to submit the proposals without cost but no place to submit the fee proposal. Can the County provide a section for consultants to submit their fee proposals?

    The Fee schedule requirement will be removed from the solicitation.

  • If firms have exceptions to the terms and conditions included in the RFP, where should they be included within their proposal?

    Please include exceptions in your proposal with your qualifications

  • Is the County willing to negotiate contract terms with the selected consultant following the selection?

    Contract terms are as stated in the RFQ. Any exceptions to the specifications or terms and conditions must be submitted during the question/clarification period and, if accepted, will be addressed by addendum. The County will not renegotiate material contract terms after selection. After selection, the County will negotiate the fee and final scope with the highest-ranked firm in accordance with qualifications-based selection; the contract term will be determined from the successful consultant's submitted timeline, and the award is subject to Board of Commissioners approval.

Plain text

OpenGov categories

  • 91140 · C.I.P., Land Surveying Services
  • 91843 · Environmental Consulting
  • 92517 · Civil Engineering
  • 92546 · Geotechnical Engineering
  • 92588 · Structural Engineering
  • 96143 · Hydrological and Oceanography Services