(RFQ) 27- 26, Airport Architectural, Engineering and Planning Consultant Services - Annual Contract
Description
Henry County is requesting proposals from qualified vendors to provide Airport Architectural, Engineering and Planning Consultant Services - Annual Contract. The Contractor shall furnish all materials, labor, tools, equipment and services necessary in the performance of this RFQ. If submitting by paper, proposals shall be mailed or delivered to the Henry County Purchasing Department at 140 Henry Parkway McDonough, Georgia 30253 . The County prefers electronic submittal of proposals via the eProcurement Portal at https://procurement.opengov.com/portal/henryga . Sealed proposals will be accepted until December 3, 2026, at 3:00pm . Late proposals will not be accepted. Submittals will only be considered by those proposers, contractors and subcontractors currently pre-qualified with the Georgia Department of Transportation and registered with SAM.gov. Proposers must include proof in this submission. GENERAL OVERVIEW VENDOR SUBMITTALS VENDOR QUESTIONNAIRE ATTACHMENTS ATTACHMENTS
Published attachments
Addenda and notices
Addendum #1 · 1
Addendum No 1 acknowledges: Removal of Airport Master Planning Services Removal of CIP Insertion of Project List
Addendum #2 · 2
Addendum No 2 acknowledges: Revised Schedule of Events Questions and Answers
Public questions and answers
Limitation of Liability: Would the County consider adding a reasonable limitation of the Consultant’s aggregate liability under the agreement, such as a limitation tied to the Consultant’s compensation or available professional liability insurance?
Limitation of Liability can be tied to the Consultant’s compensation or available professional liability insurance coverage, whichever is greatest.
Consequential Damages: Would the County consider adding a mutual waiver of consequential, incidental, indirect, and special damages arising from the agreement?
Yes, there can be a mutual waiver of consequential, incidental, indirect, and special damages arising from the Agreement.
Section 33, Payment: Would the County consider providing that properly submitted invoices will be paid within 30 days of receipt, subject to the County’s right to dispute specific invoiced amounts?
Yes, the receipt of a properly submitted, undisputed invoice, 30 days is the standard payment timeline for Henry County government.
Sections 30(a)/31(d), Schedule and Delays: Would the County agree to clarify that the Consultant will not be liable or deemed in breach for delays caused by circumstances outside of the Consultant’s reasonable control, including acts or delays of the County, contractors, third parties, governmental agencies, or adverse weather?
Yes, a force majeure clause will be included in the Agreement.
Sections 29/35, Ownership and Reuse of Documents: Would the County agree to clarify that any modification or reuse of the Consultant’s documents without the Consultant’s written authorization will be at the County’s sole risk and without liability to the Consultant?
The County agrees that any modification or reuse of the documents without the Consultant’s written authorization will be at the County’s sole risk.
Section D(b), Insurance: Would the County clarify the requirement for a “Project-specific endorsement incorporating the indemnification obligations” and confirm that this provision does not require project-specific professional liability insurance or contractual liability coverage under the Consultant’s professional liability policy?
Project-specific policies for the consultant are not required. When construction is awarded to a General Contractor, they would need to submit a COI.
Construction Phase Services: Would the County agree to clarify that, in performing construction administration, observation, or resident inspection services, the Consultant will not be responsible for a contractor’s means, methods, techniques, sequences, procedures, or jobsite safety, nor have authority or responsibility to direct or control the contractor’s work?
The contractor holds sole responsibility for construction means, methods, and site safety. YES.
Section 30(c), Standard of Care: Would the County consider removing the references to a relationship of “trust and confidence” and “furthering the interest of the County” and instead clarify that the Consultant will perform its professional services consistent with the applicable professional standard of care?
Yes, the language will be replaced with “perform its professional services in accordance with the applicable professional standard of care.”
The RFQ references a “Proposal Cost Submittal Form,” however, a cost submittal form does not appear to be included in the RFQ. Section II indicates that individual sub-agreements will be negotiated with the selected consultant on an assignment-by-assignment basis. Can the County please confirm that no pricing or fee information is required to be submitted with the Statement of Qualifications?
You are correct, there is no pricing or fee schedule requested at the time of submission. Pricing will be requested after a consultant is selected and will be on a project-by-project basis via Task Order request.
Regarding Divider 4: We have provided services to thousands of airports across the United States. Would the County accept a representative list of government airport clients in Georgia in response to this requirement?
Yes, Please refer to page 17, Divider #4 A,B
Can the County confirm that respondents are permitted to include resumes for key personnel?
Yes, Please refer to page 17, Divider #2 B
If print is required, are respondents permitted to bind proposals as opposed to using 1/2 inch ring binders?
You may submit electronically, through OpenGov. OR if you prefer to submit in person, print will be required, you can bind proposal or use 1/2 inch ring binders either method is acceptable.
Can the County confirm that electronic bids are to be submitted through the County’s eProcurement Portal E-submittal and respondents do not need to provide an original, bound, and digital copy to the Henry County Purchasing Department?
This is correct.
Can the County confirm that the Checklist for RFQ Documents on page 29 includes all licenses that need to be attached for compliance purposes?
Page 29 the checklist refers to any required documents cited in RFQ specifications, so if the RFQ calls for licenses they should be submitted with the proposal.
Given holiday schedules and travel at this time of the year, we would like to respectfully request that the due date be extended to 12/15.
The due date will be extended to 12/10/2026.
OpenGov categories
- 90910 · Airport Facility Construction
- 90911 · Airport Facility Maintenance and Repair
- 91107 · C.I.P., Architectural/Engineering Services
- 91310 · Construction: Airport Roadway, Runway and Taxiway
- 91364 · Maintenance and Repair: Airport Roadway, Runway and Taxiway
- 91817 · Aviation Consulting
- 91842 · Engineering Consulting
- 92503 · Aeronautical/Aerospace Engineering
- 92508 · Airports (Lighting, Fueling, Navaids) - Engineering
- 92517 · Civil Engineering