State and local · OpenGov
RFQ: Master Facility Plan and Space Needs Assessment
Description
The purpose of this Request for Qualifications (RFQ) is to solicit responses from firms that are qualified to provide Master Facility Planning Services for existing and future capital facility projects for the Town of Mooresville . Responding firms must demonstrate a strong background in the planning of municipal facilities, including administrative, operational, public safety, and parks and recreation facilities. The Town is seeking a firm whose combination of qualified experience and personnel will provide timely , cost-effective, and professional planning services for the Town . The Town of Mooresville is seek ing a comprehensive study and report for space allocation that will address short- and long-term needs for the Town and the community . This vision must lay out the most efficient, effective , and functional plan for space needed by Town employees and residents. The comprehensive vision will evaluate the highest and best use of existing Town-owned and leased buildings, land, and available space, identifying alternatives for the use, reconfiguration, consolidation, or repurposing of existing assets. The goal is to optimize the Town’s facilities and physical environment to align with operational needs, improve space utilization and efficiency, support short and long-term growth, and enhance service delivery to the citizens and businesses of the Town of Mooresville. The Town currently provides facilities and building space for its various operational departments. The Town occupies both owned and leased spaces . Functions include Administration , P ublic O perations and S ervices , F ire and R escue, P olice, H ealth C linic, L ibraries, P arks, and R ecreational C enters . Project Scope The Consultant shall provide the following services: Facility Condition and Lifecycle Assessment Conduct non-destructive, on-site assessments of Town-identified facilities, evaluating major building systems and relevant site conditions including safety and accessibility. Establish consistent condition ratings, estimate remaining useful life, and identify deficiencies, code and ADA accessibility concerns, life safety issues, and operational needs affecting facility performance. Capital Needs Assessment Identify and prioritize maintenance, repair, renovation, and replacement needs across short-term (0–5 years), mid-term (5–15 years), and long-term (15+ years) planning horizons. Provide recommended corrective actions and cost estimates. Space Utilization and Needs Assessment Evaluate existing space utilization, operational efficiency, services, and opportunities for optimization. Engage department leadership and key staff to establish current and projected space requirements over 5-year, 10-year, and 15-year planning horizons. Evaluate options for renovation, expansion, replacement, and new construction to align facilities with current and future Town operations and resident/ community needs. Capital Improvement Planning Develop a prioritized facilities investment strategy with short-term (0–5 years), mid-term (5–15 years), and long-term (15+ years) implementation timelines, and preliminary cost estimates. Asset Database and Documentation Develop an editable digital database of facility conditions, major systems, and projected capital needs. Organize available facility documentation, identify information gaps, and establish a standardized digital filing structure compatible with Town systems. Deliverables Project deliverables shall include, at a minimum, the following. All research, data, analyses, findings, reports, recommendations, and supporting documentation shall be submitted electronically in format(s) approved by the Town. Facility Condition Assessment and Digital Asset Database Individual facility condition assessment reports and a consolidated digital database documenting existing facility condition, major building systems, condition ratings, remaining useful life, deferred maintenance, lifecycle requirements, and projected capital costs. Include a consolidated capital needs assessment organized and prioritized by facility location. Comprehensive Facilities Master Plan Develop a long-term facilities strategy integrating facility conditions, space utilization, departmental needs, operational requirements, and projected Town growth across all functions, including administration, public operations, public safety, health clinics, libraries, parks, recreation, and community spaces. Identify deficiencies, space gaps, and opportunities for optimization. Evaluate renovation, consolidation, repurposing, expansion, leasing, and new construction alternatives, with projected costs, risks, and phased investment recommendations aligned with the Town’s 5-, 10-, and 15-year planning horizons. Prioritized Capital Improvement and Implementation Plan Establish a prioritized capital program identifying recommended projects, preliminary cost estimates, implementation timelines, project dependencies, funding considerations, and short-, medium-, and long-term investment priorities. Recommendations shall be supported by defined prioritization criteria and coordinated with the Facilities Master Plan and the Town’s capital budgeting process. Executive Reporting and Stakeholder Presentations Executive-level summaries of key findings, facility and space deficiencies, investment priorities, evaluated alternatives, and recommendations. Present findings to Town staff and designated stakeholders at agreed -upon milestones, including presentations to the Board of Commissioners upon request. Qualification Statement Requirements The qualifications statement shall consist of the following information, tabbed as identified and in the order indicated below: Section 1 - Letter of Transmittal *Maximum of two pages not including COI documents Firm(s) name, year established, address, telephone number, fax number and contact person. Provide copies of Certificates of Insurance (COI) showing General Liability, Automotive, Worker’s Compensation, and Professional Liability Coverage (Certificate of Insurance will not count towards page limit). If two (2) or more firms are collaborating to form a Joint Venture Team, then each individual firm shall meet the required insurance coverage. State any conflicts of interest your firm or any key individuals of the firm may have with the Project or Town of Mooresville. Section 2 - Personnel and Qualifications Demonstrate the firm’s experience and qualifications in delivering comparable projects for municipalities or public-sector organizations, including facility condition assessments, space needs assessments, Facilities Master Plans, and capital improvement planning. Submittals shall include: Relevant Experience: Experience assessing and planning diverse facility types, including administrative, public operations, public safety, health, library, parks and recreation, and community facilities. Project Team and Expertise: Identify the key personnel, and subconsultants, including roles, responsibilities, relevant experience, professional licenses or certifications. Include resumes/ bio and the percentage of each key team member’s time allocated to the project. Comparable Projects and References: Provide at least three comparable projects completed within the past 10 years, identifying the client, project scope, facility types and approximate square footage, services provided, completion date, and client reference with contact information. Project Delivery : Demonstrate experience coordinating multiple departments and stakeholders, managing multi-facility assessments, meeting project schedules, and delivering actionable recommendations and reliable capital cost estimates. Professional Licensing: The Consultant shall identify any North Carolina licensed architects, engineers, planners, or other professionals who will be responsible for services requiring professional licensure and shall provide applicable license numbers. Note: Substitution of other personnel after the selection is made must be approved by the Town’s Project Manager. Section 3 - Project Approach and Understanding Understanding and Methodology: Demonstrate an understanding of the Town’s objectives, project scope, and anticipated challenges. Describe the proposed approach, assessment methodology, data collection, stakeholder engagement, and coordination of facility condition assessments, space needs analysis, and master planning. Project Schedule and Milestones: Provide a detailed project schedule identifying major tasks, phases, milestones, deliverables, stakeholder meetings, Town review periods, and anticipated completion dates. Project Management and Coordination: Describe the approach to project oversight, communication, quality control, risk management, and coordination with Town departments and stakeholders to ensure timely delivery of accurate, actionable recommendations. Additional Information The qualifications submittal shall be limited to a maximum number of twenty (20) pages. This page limit does not include tabs and/or other dividers. Also, note that double-sided pages will be counted as two (2) pages. Failure to comply with the page limits may result in automatic disqualification of the submittal. The front and back cover and copies of the COI do not count towards the total page limit. No additional information regarding this Project will be provided prior to the award. The interested firm shall focus their response to this RFQ on their qualifications to complete the work, and why they should be selected for the specific project. Submission and Award Submission Instructions Submit full S OQ to Town of Mooresville’s OpenGov portal no later than the date and time specified in the RFQ schedule. By submitting a response, the firm certifies that the S OQ was developed independently and without collusion with any other firm . Awarding of Projects Town of Mooresville will consider and evaluate Statements of Qualifications in accordance with N.C.G.S. 143-64.31. Statements of Qualifications will be reviewed by a committee composed of Town of Mooresville personnel. Qualification packages will be ranked based on this review, which will consider the criteria described above. The Town may elect to conduct interviews with a selected number of firms. The Town reserves the right to shortlist firms for interviews. Interview results may be considered as part of the final ranking process. Town of Mooresville will attempt to negotiate a Service Agreement with the highest-ranked firm. Should the parties be unable to reach an agreement, Town of Mooresville reserves the right to continue scope and fee negotiations with the other firms, in order of their submission rankings. The Town may request a detailed fee proposal and staffing plan from the selected firm prior to contract execution. Town of Mooresville reserves the right to reject any or all submittals. General Requirements The Town will select the most qualified firm based on the evaluation criteria contained in this RFQ in accordance with N.C.G.S. 143-64.31. The Town may cancel th is RF Q or reject any and a ll S OQ s at any time prior to an award and is not required to furnish a statement of the reason why a particular SOQ was not deemed to be the most advantageous . This RF Q , the selected firm’s SOQ , and any negotiated terms shall be incorporated into the final agreement. The selected firm shall provide efficient and flexible services that meet the requirements of this RF Q . The Town may request clarification of SOQs . Protest Procedure Any protest regarding the solicitation or award shall be submitted in writing to the Town within five (5) business days of the event giving rise to the protest. Conflict of Interest Firms shall disclose any actual or potential conflict of interest involving the Town, its officials, employees, or representatives. F i rms shall comply with applicable Town ethics and conflict-of-interest requirements. Cybersecurity Consultant shall employ commercially reasonable cybersecurity practices to protect Town information and data throughout the performance of the Services. Consultant shall promptly notify the Town of any actual or suspected data breach involving Town information. Proprietary Information All materials submitted in response to this Request for Qualifications are subject to disclosure under the North Carolina Public Records Act (NCGS Chapter 132). Offerors who believe portions of their submission constitute proprietary, confidential, or trade secret information must clearly mark each applicable page as "Confidential" or "Proprietary" in accordance with NCGS 132 ‑ 1.2, which allows for the protection of trade secrets as defined in NCGS 66 ‑ 152. Any information claimed as confidential must be accompanied by a written explanation citing the specific statutory basis for the exemption. Information that is not properly marked and supported with statutory justification will be considered public and may be released in response to a public records request. The Town will make reasonable efforts to protect properly identified proprietary information; however, the final determination of whether materials are exempt from disclosure rests with the Town in accordance with North Carolina law. Iran Divestment Act As mandated by North Carolina General Statute 147-86.59(a), the firm hereby certifies that it is not listed on the Final Divestment List created by the North Carolina State Treasurer pursuant to North Carolina General Statute 147-86.58. The firm further certifies that in accordance with North Carolina General Statute 147-86.59(b) that it shall not utilize any sub-consultant found on the State Treasurer's Final Divestment List. The firm certifies that the signatory to this Contract is authorized by the firm to make the foregoing statement. E-Verify Firms hereby acknowledges that “E-Verify” is the Federal E-Verify program operated by the US Department of Homeland Security and other Federal agencies which is used to verify the work authorization of newly hired employees pursuant to Federal law and in accordance with Article 2, Chapter 64 of the North Carolina General Statutes. Firms further acknowledges that all employers, as defined by Article 2, Chapter 64 of the North Carolina General Statutes, must use E-Verify and after hiring an employee to work in the United States, shall verify the work authorization of the employee through E-Verify in accordance with North Carolina General Statutes §64-26(a). Firms hereby pledges, attests, and warrants through execution of this Agreement that the firm complies with the requirements of Article 2, Chapter 64 of the North Carolina General Statutes and further pledges, attests and warrants that any sub-consultants currently employed by or subsequently hired by the firm shall comply with any and all E-Verify requirements. Failure to comply with the above requirements shall be considered a breach of this Agreement. Questions Written questions shall be submitted under OpenGov portal by the date and time specified in the RFQ schedule. Questions received prior to the submission deadline date, responses, and any additional information deemed necessary will be posted in the form of an addendum to OpenGov and shall become an Addendum to this RFQ. No information, instruction, or advice provided orally or informally by any Town of Mooresville personnel, whether made in response to a question or otherwise concerning this RFQ, shall be considered authoritative or binding. Firms shall rely only on written material contained in an Addendum to this RFQ. Inquiries should be submitted no later than the date and time noted in the RFQ schedule. Questions answered verbally will be followed up by written addenda as deemed necessary; oral interpretations shall have no effect. If an Addendum is issued that requires acknowledgment, signature, or submission, it must be included with the firm's Statement of Qualifications (“SOQ”). Firms are responsible for incorporating any required information from the Addendum into their response. However, acknowledgment and submission of the Addendum are only required if the Addendum specifies such requirements. Failure to comply with these instructions may result in disqualification of the SOQ. Firms are responsible for ensuring that all issued Addendums are received and reviewed as part of their submission. Vendor Questionaire
Published attachments
Addenda and notices
Addendum #1 · 1
Insurance Requirements document has been uploaded under Attachments. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Town Facility/Property list has been uploaded under Attachments. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Property list with approximate square footage has been attached. Please note that these measurements are estimates and are provided for planning purposes only. Thank you.
Public questions and answers
1. Section 3.4 states that no additional information will be provided prior to award, while Section 5.7 states that written questions will be answered by addendum. a. Please confirm that questions submitted through OpenGov will be answered by addendum before the SOQ deadline. [3.4, 5.7]
Questions submitted through OpenGov by the Question Submission Deadline will be answered prior to the SOQ submission deadline. All official clarifications will be issued through the addendum process, if necessary.
2. The RFQ refers to an "RFQ schedule" for the question deadline, but no schedule is included in the document. a. Please confirm the deadline for questions, the anticipated shortlist and interview dates, the anticipated award date, and the target notice-to-proceed date. [4.1, 4.2, 5.7]
As stated in the Project Overview, the project timeline is as follows: Project Release Date: November 6, 2026 Question Submission Deadline: November 13, 2026, by 5:00 PM Question Response Deadline: November 20, 2026, by 5:00 PM Response Submission Deadline: December 4, 2026, by 5:00 PM Additionally, interviews are tentatively scheduled for the week of December 7, 2026, and the Notice of Intent to Award is tentatively scheduled to be issued during the week of December 14, 2026.
5. The RFQ requests Certificates of Insurance but does not state minimum coverage limits. a. What are the required limits for General Liability, Automobile, Workers' Compensation, and Professional Liability? [3.1]
A document laying out Town insurance requirements has been uploaded under Attachments.
Please confirm if utilities (utility plants) are included in this scope.
Utility plants are not included in the scope of this study. Administrative or operational building space associated with utility functions is included where identified on the Town’s property list.
Please confirm if there is any existing facility condition data and if so, if that can shared in an addendum to help provide estimation of the data gathering lift the project would require.
The Town does not have a comprehensive facility condition inventory covering the facilities included in the study. Available records and documentation, to the extent they exist, will be made available to the selected consultant. The consultant should identify information gaps as part of the work.
Will staffing analysis and projections be included as part of this needs assessment?
A separate staffing analysis or staffing forecast is not included in the scope. The Town will provide available staffing estimates and related information to the selected consultant for use in evaluating space needs.
3. What is the Town's target completion date for the full engagement? a. Are there fixed drivers (e.g., FY2028 budget cycle, CIP adoption, bond referendum, Board retreat) that the final deliverables must align with? [2.3, 3.3]
There are no fixed timelines at this time. Firms should provide a realistic project schedule identifying tasks, milestones, Town review periods, and anticipated completion dates. The final schedule will be coordinated with the Town following selection.
51. Should individual facility condition reports be issued as standalone documents, as appendices to the master plan, or both? [2.1, 2.2]
The format and level of detail for facility condition reports will be determined collaboratively with the selected consultant during project initiation. The Town is open to recommendations regarding whether the reports are provided as standalone documents, included as appendices to the final master plan, or both, provided the approach meets the project's objectives and supports effective decision-making.
50. Section 1.3 references resident and community needs. Will the Town provide a list of the referenced residents and communities? a. Or is the selected consultant selecting the residents and communities to be part of this engagement? b. Is public engagement expected (e.g., resident surveys, open houses, online engagement), or will engagement be limited to Town staff and leadership? [1.3, 2.4]
The Town anticipates that the selected consultant will assist in identifying and recommending appropriate stakeholder groups as part of the engagement process. Specific participants, outreach methods, and the scope of engagement will be determined collaboratively with the selected consultant following contract award.
49. How many presentations to Town staff, stakeholders, and the Board of Commissioners should be assumed?
The number, timing, format, and intended audiences for project presentations will be determined collaboratively with the selected consultant following contract award.
7. Are evaluation criteria weighted? a. If so, please share the weighting or scoring rubric the committee will use. [4.2, 5]
Statements of Qualifications will be reviewed by a committee of Town personnel and evaluated based on the criteria outlined in the RFQ. Firms will be ranked according to the information provided in their submissions and their demonstrated ability to meet the needs of the project. The Town has not established a publicly available weighting or scoring rubric for the evaluation criteria.
8. Section 3.2 requires NC-licensed professionals for services requiring licensure. a. Please confirm which services the Town considers to require licensure (e.g., FCA reports, structural observations, cost estimates). b. Is a North Carolina firm license required for the prime consultant, or is individual licensure of responsible professionals sufficient? [3.2]
The consultant is responsible for ensuring that all services requiring professional licensure are performed under the supervision of, and signed and sealed as necessary by, appropriately licensed professionals. This may include architects, engineers, planners, or other professionals required to perform the services proposed. It is the responsibility of the consultant to determine which project services require licensure and to ensure compliance with all applicable North Carolina laws, regulations, and professional licensing requirements. The Town does not prescribe specific licensure requirements beyond those mandated by law.
9. Are interviews expected to be in person in Mooresville, or may they be held virtually? [4.2]
If Town elects to conduct interviews, the interviews will be in person at one of the Town's administrative sites.
13. For parks, should the assessment cover buildings only (e.g., restrooms, shelters, concessions, recreation centers), or also site amenities such as playgrounds, athletic fields, courts, field lighting, trails, and parking lots? [1.1, 2.2]
The assessment should include both buildings and site amenities within the parks system. This includes, but is not limited to, restrooms, shelters, concession facilities, recreation centers, playgrounds, athletic fields, courts, field lighting, trails, parking lots, and other related park infrastructure and amenities, as applicable. The Town expects the consultant's evaluation to provide a comprehensive assessment of park facilities and assets.
14. What site elements are included in "relevant site conditions" (e.g., paving, sidewalks, curbs, site lighting, fencing, stormwater, site utilities)? [1.1]
Relevant site conditions should include observable site elements associated with the facility that materially affect condition, access, safety, accessibility, or operations. This may include, but is not limited to, paving, sidewalks, curbs, site lighting, fencing, stormwater infrastructure, site utilities, and other related site features.
47. Are there specific cybersecurity or data handling requirements (e.g., approved file transfer methods, data storage location) the consultant must follow? [5.3]
Any specific cybersecurity, data handling, file transfer, storage, or related information security requirements will be discussed and finalized with the selected consultant following contract award. The Town may establish project-specific requirements at that time, and the selected consultant will be expected to comply with any applicable Town policies and requirements.
46. Is asset tagging or barcoding of equipment expected during the assessments? [1.5, 2.1]
Asset tagging or barcoding of equipment is not specifically included within the scope of services identified in the RFQ. However, the Town is open to discussing additional scope elements with the selected consultant following contract award. Any such services, if deemed beneficial to the project, may be further defined and negotiated at that time.
45. Does the Town use ArcGIS? a. Should facility and asset data be linked to the Town's GIS? [1.5]
The Town currently utilizes a GIS platform. However, integration of facility or asset data into the Town's GIS system is not included within the scope of this project. Should the Town determine that GIS integration would be beneficial, additional services may be discussed with the selected consultant following contract award.
44. Is an editable Excel/Access database acceptable, or does the Town expect a hosted software platform? a. If hosted, are there licensing, ownership, or data-hosting requirements? [1.5, 5.3]
An editable Excel workbook or similar editable file format is acceptable and preferred for project deliverables. The Town does not require, and does not anticipate accepting, a hosted software platform as part of this project. As such, licensing, ownership, and data-hosting requirements associated with a hosted system are not applicable.
42. Are any capital projects already funded or committed that the plan should account for? [2.3]
Any existing or planned capital projects that may impact the study will be discussed with the selected consultant following contract award. The Town and consultant will work collaboratively to determine how such projects should be incorporated into the assessment and planning process.
41. Does the Town have existing project prioritization criteria, or should the consultant develop criteria with Town staff (e.g., through a prioritization workshop)? [2.3]
The project prioritization approach will be determined collaboratively with the selected consultant following contract award. The Town is open to the consultant's recommendations regarding the development and application of prioritization criteria.
39. Are any consolidation, co-location, or public-private partnership opportunities already under discussion? [2.2]
Any existing or potential consolidation, co-location, or public-private partnership opportunities will be discussed with the selected consultant following contract award as part of the overall planning process.
37. For the evaluation of renovation, expansion, replacement, and new construction options, what level of detail is expected: program-level comparison, conceptual blocking and stacking, test fits, or site capacity studies? [1.3, 2.2]
The level of analysis and evaluation will be determined collaboratively with the selected consultant following contract award. The Town is open to recommendations regarding the most appropriate level of detail necessary to support the project's goals and decision-making needs.
30. Does the Town want staff surveys or questionnaires in addition to interviews or a combination of both? [1.3]
The specific engagement methods, including the use of surveys, questionnaires, interviews, workshops, or a combination thereof, will be determined collaboratively with the selected consultant following contract award.
29. Which departments and divisions should be engaged? a. Approximately how many department leadership interviews or workshops does the Town anticipate? [1.3]
The specific departments, divisions, stakeholders, and level of engagement will be determined collaboratively with the selected consultant following contract award. The Town will work with the consultant to identify the appropriate participants and engagement approach to support the project's objectives.
27. Is an energy, sustainability, or resilience review expected as part of the condition assessment? [1.1]
Any energy, sustainability, or resilience evaluation requirements will be discussed with the selected consultant following contract award.
26. What cost basis should be used for estimates: current-year dollars or escalated to the year of need? a. Should soft costs, contingencies, and general conditions be included, and does the Town have standard markups? [1.2, 2.1]
Specific systems to be evaluated, estimate format requirements, and the desired level of detail will be discussed post-award with the selected consultant.
Is a pre-proposal meeting planned to provide additional information about the project? If so, please confirm the date, time, and whether the meeting will be held in person or virtually via Microsoft Teams. Could you please provide a list of all facilities included in the project scope and confirm the total number?
No pre-proposal meeting is planned for this project. A list of all facilities included within the project scope has been added under the Attachments section for reference. The attached list identifies the facilities included in the project scope and confirms the total number of facilities to be assessed.
Would like to ask if the City could provide a time for interested parties to come to Town Hall and to be able to tour facilities and ask questions about current needs/issues they are having.
No pre-proposal meeting or group facility tour is planned. Several Town properties are accessible to the public during normal operating hours; however, no organized site visits, tours, or question-and-answer sessions will be conducted as part of this solicitation process.
Can you please provide a list of all facilities to be included with the scope of work?
Facility list has been uploaded under Attachments.
Can you please provide square footage for what should be included in the scope, to help estimate size.
Square footage information for the facilities included in the project scope is currently being compiled and will be uploaded under the Attachments section no later than the end of next week.
4. Does the 20-page limit include the two-page Letter of Transmittal and the resumes/bios? May resumes be placed in an appendix outside the page count? [3.1, 3.2, 3.4]
The 20-page limit applies to the entire Statement of Qualifications submission, including the Letter of Transmittal and resumes/bios. Resumes, bios, and any other supporting materials may not be included as appendices outside of the page limit.
6. Has the Town established a budget or funding source for this project? a. Is a fee proposal expected only from the top-ranked firm during negotiation? [4.2]
This is a qualifications-based selection process under N.C.G.S. 143-64.31. The Town will attempt to negotiate with the highest-ranked firm and may request a detailed fee proposal and staffing plan from the selected firm prior to contract execution. If an agreement cannot be reached, the Town may proceed to negotiate with the next-ranked firm. No project budget has been established for release as part of this solicitation.
10. Please provide the list of Town-identified facilities to be included, with address, primary use/department, year built, and gross square footage for each. [1.1, 2.1]
A list of Town-identified facilities has been provided under the Attachments section. Available information, including facility addresses, primary use/department, and year built, has been provided to the extent currently available. Gross square footage information is currently being compiled and will be uploaded under the Attachments section by the end of next week.
11. What is the total number of facilities and total gross square footage to be assessed? [1.1]
The total number of facilities to be assessed is identified in the facility list provided under the Attachments section. Gross square footage information is currently being compiled and will be uploaded under the Attachments section by the end of next week.
12. Are all facility types listed in Section 2.2 (administration, public operations, public safety, health clinics, libraries, parks, recreation, community spaces) owned and operated by the Town? a. Please confirm which are Town-owned versus leased or operated by others. [2.2]
The facility list provided under the Attachments section identifies the facilities included in the project scope. Ownership information for each facility is reflected on the attached facility list.
15. Are there facilities currently in design, under construction, recently renovated, or planned for disposal that should be excluded or treated differently? [1.1, 1.3]
At this time, the Town has not identified any facilities that are to be excluded from the assessment due to being in design, under construction, recently renovated, or planned for disposal. Any facility-specific considerations, including projects that may be underway during the course of the study, will be discussed with the selected consultant following award. Proposers should assume that all facilities identified on the attached facility list are included within the project scope.
16. Are utility facilities (water/wastewater treatment plants, pump/lift stations) or other infrastructure included, or is the scope limited to buildings and grounds? [1.1]
The scope of this project includes the facilities identified on the attached facility list.
17. How many public safety facilities (fire stations, police headquarters/substations, emergency operations) are included? a. Are there security, escort, or background-check requirements for access to these facilities? [1.1, 2.2]
Please reference the attached property list for the facilities included in the project scope. Access to secured or operational areas will be coordinated with the Town and the applicable department once the firm is selected. The selected firm should anticipate advance scheduling and comply with any escort, security, or screening requirements communicated by the Town.
18. Does the Town currently lease space from others to accommodate operations? a. Should those leased spaces be included in the space needs assessment? [1.3, 2.2]
Yes, the Town currently leases some properties and those will be included in the study.
20. The scope specifies non-destructive assessments. a. Are any specialized assessments expected (e.g., roof cores, infrared thermography, hazardous materials, elevator inspection, structural evaluation), or should these be identified as recommendations only? [1.1]
Relevant site conditions should include observable site elements associated with the facility that materially affect condition, access, safety, accessibility, or operations.
19. Please confirm the building systems to be assessed (e.g., substructure, building envelope, roofing, interiors, conveying, plumbing, HVAC, fire protection, electrical, communications/security). a. Should cost and condition data be organized using Uniformat II? [1.1, 2.1]
Specific systems to be evaluated, assessment methodology, data organization requirements, estimate format requirements, and the desired level of detail will be discussed post-award with the selected consultant. The Town will work with the selected firm to establish the appropriate framework and reporting format for the assessment deliverables.
22. What level of ADA review is expected: high-level observation of major barriers, or a detailed accessibility survey against the 2010 ADA Standards and NC Building Code accessibility provisions? a. Does the Town have an existing ADA self-evaluation or transition plan? [1.1]
The scope and level of ADA review will be determined collaboratively with the selected consultant following contract award. Any existing documentation relevant to accessibility planning will be discussed with the selected consultant as part of project initiation.
21. Does the Town have a preferred condition rating scale or index (e.g., FCI, 1–5 rating) or an existing standard that results must align with? [1.1, 2.1]
The specific condition rating methodology, systems to be evaluated, reporting format, and desired level of detail will be discussed post-award with the selected consultant. The Town does not prescribe a specific condition rating scale or index at this time and will work with the selected firm to establish an appropriate assessment and reporting framework for the project.
23. What level of code review is expected: identification of observed life safety and code concerns, or a formal code analysis of each facility? [1.1]
The scope and level of code review will be discussed and finalized with the selected consultant following contract award. The Town will work with the consultant to establish an approach that is appropriate for the project's objectives.
24. Are previous FCAs, facility studies, roof surveys, or capital plans available? a. Please indicate their dates and the facilities covered. [1.1, 1.5]
The Town does not have a comprehensive facility condition inventory covering the facilities included in the study. Available records and documentation, to the extent they exist, will be made available to the selected consultant. The consultant should identify information gaps as part of the project.
25. Can the Town provide maintenance histories, work order data, equipment inventories, and recent capital project records for each facility? [1.1, 1.2]
The availability of maintenance histories, work order records, equipment inventories, capital project documentation, and other facility-related information varies by facility and department. Relevant information that is available and deemed beneficial to the project will be shared with the selected consultant following contract award. The specific records to be provided and their applicability to the assessment will be discussed during project initiation.
28. Will Town facilities staff be available to escort assessors and provide access to roofs, mechanical rooms, and secured areas? a. Are any facilities only accessible after hours or with advance scheduling (e.g., 24/7 operations, clinics)? [1.1]
Town facilities staff will be available to assist with access to facilities, including roofs, mechanical rooms, and other secured areas, as needed. The selected consultant should anticipate advance scheduling and coordination with Town personnel during regular operating hours. Some facilities or areas may require additional scheduling or coordination based on operational needs, security requirements, or occupancy considerations. Specific access requirements will be discussed with the selected consultant following contract award.
31. What growth projections should be used (population, service demand, staffing/FTE)? a. Does the Town have a current Comprehensive Plan, Strategic Plan, or departmental staffing forecasts to draw from? [1.3, 2.2]
The Town does not prescribe specific growth projections for this project. Available records and documentation, to the extent they exist, including planning, staffing, demographic, and related information, will be made available to the selected consultant following contract award. The consultant will work collaboratively with the Town to determine the appropriate planning assumptions, projections, and data sources to support the project's objectives.
32. Section 1.2 uses 0–5, 5–15, and 15+ year horizons, while Sections 1.3 and 2.2 use 5-, 10-, and 15-year horizons. a. Please confirm the horizons to be used for space needs and for capital planning, and whether they should be reconciled into one framework. [1.2, 1.3, 2.2]
The specific planning horizons to be utilized and whether they should be consolidated into a single framework will be determined collaboratively with the selected consultant following contract award. Proposers may describe their recommended approach in their Statement of Qualifications.