Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

RFQ: Seattle Center Master Planning Consultant

Description

The City of Seattle is seeking qualifications for RFQ: Seattle Center Master Planning Consultant . Qualifications are due no later than 3:00 pm on Thursday, January 7, 2027 . All questions are to be submitted through the e-procurement portal at https://procurement.opengov.com/portal/seattle no later than 3:00 pm on Tuesday, December 8, 2026 . Scope of Work Overview The Consultant will lead the development of a new master plan for the Seattle Center campus, working in close partnership with Seattle Center staff, partner organizations, City departments, and the public. The plan will succeed the Century 21 Master Plan as the City’s long-range guide for the campus. The Consultant will synthesize what is already known, generate new ideas to respond to current and future needs, test them rigorously, and deliver a plan that is both inspiring and implementable. The plan will address the campus as a whole and its relationship to the surrounding neighborhoods, including perimeter properties and the streets that frame the campus. The scope is organized in two parts: Part A: Master Planning Services Part B: Implementation Services What Base services: master plan, campus design framework, and bond readiness roadmap. Additional services: detailed guidelines and bond readiness work streams (Section 6.3) Public realm design and construction administration for selected areas of the campus (Section 6.4) When Q1 2027 through Q4 2028 As early as 2028, through approximately 2038 Contract Status Base contract, with additional services added by amendment in accordance with Section 8.13 Anticipated additional services, added by amendment in accordance with Section 8.13 Trigger Contract execution Bond funding approval, satisfactory Part A performance, and City authorization, which may occur before master plan adoption If the bond measure fails Complete the master plan, campus design framework, and bond readiness roadmap Scaled to available funding or deferred City team and decision-making. Seattle Center’s Planning and Capital Development team will manage this contract and coordinate with partner organizations and City departments. Seattle Center will lead all communications about the bond measure, and the Consultant will prepare factual planning materials to support the bond. Seattle Center leadership will set direction and approve the final master plan, in collaboration with the Seattle Center Advisory Commission and a steering committee composed of Seattle Center department directors. Key Planning Topics The master plan is expected to address the following topics. Their relative emphasis will be refined with the selected Consultant during negotiations. Vision and Blue Sky Ideation. Lead a collaborative process with campus stakeholders and the public that fosters bold, unconstrained thinking about what Seattle Center could become. Explore big ideas, grounded in the guiding principles under Section 4, before narrowing to what is feasible, and carry the most compelling ideas forward into the plan. Landscape, Public Realm, and Open Space . Treat landscape and the public realm as the organizing system of the campus. Preserve and maximize open space for flexible programming while protecting its character and sense of place. Address tree canopy, ecology, stormwater, shade, comfort in all seasons, and the “green heart” called for in the Strategic Vision and 10-Year Action Plan, and leverage the public realm to support climate and heat resilience and biodiversity. Events, Programming, and Operations. Understand how the campus operates. Account for festivals, concerts, sporting events, and daily public life. Address event staging, load-in and service access, crowd movement, security perimeters, power and water at event sites, maintenance operations, and the needs of production staff. Plan waste, compost, and recycling collection, storage, and hauling that work reliably and out of public view, including during event surges, consistent with the City’s recycling and composting requirements. Partners, Facilities, Relocation, and Surge Planning. Consider impacts to more than 30 partner organizations and their operations throughout the plan. Key questions the Consultant will help address include which programs remain, are relocated, or consolidated, whether functions are better centralized or distributed, which uses belong on or off campus, and how surge and swing space can minimize program disruptions during construction. Infrastructure, Utility Corridors, and Sustainability . Integrate findings from prior facility condition and infrastructure studies. Identify utility corridors and opportunities for dual-use spaces, such as service routes that also serve as public promenades or event infrastructure. Chart a path to carbon-neutral operations in partnership with Seattle City Light and Seattle Public Utilities, and strengthen the campus’s resilience and emergency role. Mobility, Transit, and Gateways . Consider connections to Waterfront Park, the future light rail station on the Ballard Link Extension (BLE), the Monorail, King County Metro, potential future streetcar connections, and existing and planned bicycle and pedestrian networks. Create clear, welcoming gateways and wayfinding. Address parking, rideshare, micromobility, curb management, and loading in a transit-rich future. Strengthen connections to major thoroughfares and edges. Topography and Accessibility. Work with the campus’s hilly terrain, which shapes nearly every connection on site. Treat grade changes as both a constraint and an opportunity. Plan clear, accessible routes for people of all abilities, manage service and loading access across changing grades, reduce modal conflicts, and resolve how buildings meet the ground at their entries and edges. Explore how terraces, overlooks, and level changes can enrich the campus experience. Real Estate, Revenue, and Perimeter Properties. Identify real estate development opportunities, public and private partnership models, and density transfer potential. Consider perimeter properties and opportunities for compatible uses that activate campus edges. Explore revenue-generating opportunities that support Seattle Center’s role as a social enterprise and the long-term operation of the campus. Heritage, Landmarks, and Design Review. Respect the campus’s designated landmarks and World’s Fair legacy. Plan for early and ongoing engagement with the Landmarks Preservation Board, the Seattle Design Commission, and other review bodies. Historic Resource Assessments and landmark nominations are not part of this scope. Phasing and Implementation. Propose a plan that is buildable over time. Key questions include how projects should be sequenced, how their cost, dependencies, and operational impacts compare, and which investments belong in the near-term bond program and which in the long-range vision. Part A: Master Planning Services Services may include, but are not limited to: Review and synthesize the Century 21 Master Plan, the Strategic Vision and 10-Year Action Plan, facility condition assessments, bond planning studies, and the related plans listed in Section 6.8. Document existing conditions, including land use, open space, public realm, circulation, utilities, building conditions, topography and grade changes, event operations, service and waste operations, and the regulatory framework. Facilitate visioning and blue sky ideation sessions with Seattle Center leadership, partners, and the community. Develop and evaluate campus-wide alternatives against agreed criteria. Prepare a preferred master plan, including an open space and landscape framework, mobility and access framework, land use and facilities framework, infrastructure and utility framework, and event operations framework. Prepare campus-level , relocation, consolidation, highest and best use, and surge planning strategies, with test-to-fit studies for priority facilities. Prepare real estate, revenue, partnership, and density transfer analyses, supported by market and financial expertise. Prepare phasing and implementation strategies with order-of-magnitude cost estimates. Coordinate with Sound Transit, King County Metro, Seattle Public Schools (SPS), and City of Seattle departments, such as Seattle Department of Transportation (SDOT), Seattle City Light (SCL), Seattle Public Utilities (SPU), Department of Neighborhoods (DON), etc. Assist in presentations to elected officials, City leadership, the Seattle Center Advisory Commission, the Seattle Design Commission, the Landmarks Preservation Board, partner organizations, and community groups, at the direction of the City. Support environmental review under the State Environmental Policy Act (SEPA) as needed. Prepare a campus design framework that carries the master plan into individual projects, with design principles for the public realm, frontages, buildings, and utility corridors. Prepare a bond readiness roadmap that identifies the work streams, sequence, and estimated level of effort needed to prepare bond-funded project to proceed quickly after the vote. Produce a clear, highly visual master plan document, along with factual summary materials suitable for public education. Prepare factual public information about the master plan and its relationship to the bond program. Additional Services. The City may add the following services by amendment, in 2027 or after bond approval, as funding becomes available. The bond readiness roadmap will help the City define their scope, sequence, and fee. Bond project briefs for each anticipated project or package, defining scope, limits of work between building and public realm, dependencies, and preliminary cost. Validation of the relocation and surge sequence for partner organizations and Seattle Center functions, through test-to-fit studies of potential swing spaces. An interim utility strategy so early projects align with the long-term campus utility and energy plan. Detailed campus design guidelines for the public realm, buildings, and infrastructure, including frontages, materials, planting, lighting, and signage. Part B: Implementation Services The City may retain the selected Consultant to design and implement selected public realm improvements of the campus through construction. The City currently anticipates that the first area will be the gathering spaces in the southeast quadrant of the campus. Final selections for individual public realm improvement projects remain at the City’s discretion, based on the Consultant’s performance during Part A, program needs, and available funding, and the City may assign more, fewer, or different areas. Part B services may be authorized after bond funding is approved, including before the master plan is adopted, and are anticipated to continue through approximately 2038. Part B services may include: Public realm design and construction administration for the selected areas, from design through construction completion. Design guidelines stewardship. Maintain and update the campus design guidelines as projects move forward, at the City’s direction. Relationship to building projects . Seattle Center will hire architects for building improvements through separate solicitations. The City anticipates two types of building projects: Buildings with open space connections . The building architect designs the building improvements and the building’s immediate site connections, consistent with the campus design framework and any design guidelines. Where the building adjoins public realm improvements assigned to the master plan Consultant, the two firms will work together under separate City contracts to coordinate their designs and bid documents. Buildings with major outdoor spaces. Where a building and a significant outdoor space are best designed and built together, those public realm space improvements will be included in the building solicitation and designed by the selected building team. For either type, each contract will define the limits of the work, the firm that assembles and issues the bid documents, shared document standards, and construction-phase responsibilities. Competing for other work. The Consultant and their subconsultants may compete for other bond-funded work, including as the prime building architect or as a subconsultant on a building team whose scope includes adjoining public realm, subject to the safeguards in Section 6.9. All public realm improvements not selected for the Consultant, along with buildings, will be procured competitively through separate solicitations. Part B services will be authorized by amendment in accordance with Section 8.13, in phases matched to available funding. The City is not obligated to authorize these services or to assign any minimum amount of campus public realm to the Consultant. Community and Stakeholder Engagement Public engagement is essential to a plan that belongs to all of Seattle. The Consultant team must include a public engagement lead, as required in Section 10, who will work with Seattle Center to design and carry out an inclusive engagement program. The program should reach residents across the city, the surrounding neighborhoods, partner organizations, event producers, the business community, and communities that have historically been underrepresented in civic planning. The City will lead engagement with Tribal Nations, with support from the public engagement lead. The engagement program should also include urban Native and other Indigenous communities. Engagement should use both in-person and digital methods and should make the planning process itself visible and inviting on campus. Team Composition and Subconsultant Participation The City anticipates a multidisciplinary team that may include expertise in urban design and master planning, campus planning, landscape architecture (including design and construction administration of public realm improvements), architecture and facility planning, transportation and mobility, structural, mechanical, electrical, and plumbing engineering, civil and utility engineering, solid waste and recycling logistics, accessibility, sustainability and energy, event and venue operations planning, real estate and economic analysis, cost estimating, historic preservation, public engagement, and graphic communication and wayfinding. Teams may add other specialties or propose a team composition they believe will strengthen the plan. Seattle Center’s programs and events staff manage the logistics of campus events and will work closely with the Consultant. The City may also engage an events programming consultant to help imagine new uses and events for the campus and plan their logistics. Respondents are not required to include this expertise on their team. The City may later ask the Consultant to add an events programming consultant as a subconsultant or may contract with one directly. Subconsultants may be listed on more than one Respondent’s team. By submitting, each Respondent certifies that any agreement with a listed subconsultant does not prevent that subconsultant from contracting with another Respondent selected under this RFQ. The City reserves the right, during negotiations or at any time during the contract term, to request that the selected Consultant engage a specialty subconsultant identified in any Respondent’s submittal, or to request substitution of a listed subconsultant. City Policies Sustainability is a core value of the City of Seattle. The plan should advance the City’s climate goals, including the Green New Deal for Seattle and the City’s Sustainable Buildings Policy, and the Strategic Vision goal of a carbon-neutral campus. The master plan will define the path and phasing toward the Action Plan’s goal of a net-zero cultural campus. The plan should also advance the City’s Race and Social Justice Initiative, inclusive design, and universal accessibility. The Seattle Design Commission will review the master plan and make recommendations before City adoption. Related Planning Documents The following documents provide essential context. Items marked with an asterisk will be provided in Attachment E or on the Procurement Portal. Available site information includes base maps, topogr aphic survey, utility mapping, and partial as-built drawings. These records are not a complete account of campus conditions. Document Lead Relevance Century 21 Master Plan (2008)* Seattle Center Current governing plan for the campus Seattle Center Strategic Vision and 10-Year Action Plan (2025)* Seattle Center and Seattle Center Foundation Vision, goals, and Big Moves the plan will implement Seattle Center Economic Impact Analysis (2026) and 2025 Community Impact Report* Seattle Center Visitation, economic role, and community programs Organizational Conflicts of Interest The selected Consultant and its subconsultants may compete for other design contracts for bond-funded buildings and public realm improvements, subject to the following safeguards: Bond project briefs, design guidelines, and other Part A work products the City uses to define a solicitation will be made available to all respondents to that solicitation. The Consultant will not advise on, evaluate, or participate in the selection of firms for any solicitation in which it or any of its subconsultants is a respondent. The City retains final authority over design guideline conformance for all bond-funded projects, and makes all decisions on how building and public realm work is packaged. The City may limit the Consultant’s participation in a specific solicitation where it determines that a conflict of interest cannot be mitigated. Procurement Contact Information Procurement Contact: Christian Mower , Planning and Project Finance Coordinator , christian.mower@seattle.gov , (206) 719-3706 Qualifications are to be submitted through the e-Procurement portal at https://procurement.opengov.com/portal/seattle , no later than 3:00 pm on Thursday, January 7, 2027 . Unless authorized by the Procurement Contact, no other City official or employee may speak for the City regarding this solicitation until award is complete. Any Respondent contacting other City officials or employees does so at Respondent’s own risk. The City is not bound by such information. Purpose and Background 2.1 The Opportunity Seattle Center seeks a multidisciplinary planning and design team to update and reenvision a master plan for its 74-acre campus. This plan will shape Seattle’s most beloved civic place for the next generation. It will also guide the most significant public reinvestment in the campus since the 1962 World’s Fair. Seattle Center is a living campus that has grown and evolved over six decades in response to changing needs, while keeping its sense of play, wonder, and discovery. Today, it welcomes more than 11 million visits a year, hosts more than 30 partner organizations, and carries generations of civic memory. The selected team will honor that legacy while rethinking how the campus works, how it connects to a rapidly growing city, and how it inspires the people who use it. Seattle Center is looking for big thinkers who are also good listeners. We seek a team that can synthesize a deep body of existing plans and studies, imagine bold and unexpected possibilities, and then ground those ideas in the realities of funding, phasing, operations, and partnership. The result should be a plan that uniquely belongs to this place, one that grows from Seattle Center’s history, landscape, and people and looks to future generations. The master plan will serve three purposes: A long-range vision for the campus, its open space, its buildings, and its connection to Uptown, South Lake Union, Queen Anne, Belltown, Downtown, and the region. A practical framework for capital investment over time, includin

Plain text

OpenGov categories

  • 5413 · Architectural, Engineering, and Related Services
  • 54131 · Architectural Services
  • 541310 · Architectural Services
  • 54132 · Landscape Architectural Services
  • 541320 · Landscape Architectural Services
  • 54133 · Engineering Services
  • 541330 · Engineering Services