Rose Bowl Stadium Architectural Services

Description

1.1 Request For Proposals The Rose Bowl Operating Company (“RBOC”) is seeking to retain a qualified architectural firm to serve as its Venue Architect, a long-term design partner capable of providing site condition assessments, conceptual planning, pre-design and concept design, schematic design, design development, construction documents, bidding, and construction administration, together with budget construction estimates throughout, for anticipated improvements, as well as providing presentation materials for visual and oral presentations to RBOC Board. RBOC’s current architectural services agreement expires December 31, 2026; this procurement will establish a successor agreement and position the organization to advance future capital improvements throughout the Rose Bowl campus. The selected firm will be considered to provide architectural services in connection with the various capital improvement projects that the RBOC may undertake, under multiple potential delivery methods, including Design-Bid-Build, Construction Manager at Risk (CMAR), and Design-Build. At this time the RBOC does not have identified funding for all such projects, but nonetheless must secure such services at this time so as to be able to move quickly when and if funding is secured. Any and all capital improvement projects are subject to the availability of funds and the approval of the RBOC. RBOC anticipates issuing a written Notice to Proceed to the selected firm on or about January 4, 2027, authorizing the firm to begin performance of services while the definitive Services Contract is finalized; any services performed prior to full execution of the definitive Services Contract will be performed at the selected firm's own risk, subject to and governed by the terms of that contract upon execution. Scope of Work Scope of Work The selected architect is to play an active role in the RBOC’s Project Team, consisting of the architect, RBOC staff, outside consultants, and other members deemed appropriate by the RBOC (the “Project Team”). The Architect will, or in some instances assist the RBOC to, provide conceptual planning, concept drawings, develop project construction estimates; analyze alternative designs; provide value engineering; and coordinate/communicate the activities of the Project Team through all phases of the project. Program management procedures, which will be established through the Architect efforts with the RBOC’s input and approval during design phases, will allow for the integration of all design and construction phase components of any project. The Architect shall strive for project delivery that is timely, cost effective and consistent with the standards set by the RBOC. The Architect will utilize its skill and knowledge of design and construction to provide for, but not be limited to: A. General Requirements Design to Budget. Design to RBOC's established construction budget; track the estimated construction cost against the budget at each milestone and reconcile with RBOC's cost estimates, surfacing variances and proposed corrections before the next phase begins. If, at any milestone, the estimated construction cost exceeds the established budget by more than five percent (5%), the Architect shall prepare and present a value-engineering analysis identifying cost-reduction alternatives sufficient to bring the estimate back within budget, prior to proceeding to the next phase. Proactively identify value-engineering and cost-saving alternatives, with trade-offs made visible to RBOC before decisions are locked. Schedule Adherence. Perform in accordance with the project schedule and treat milestone dates and design-phase durations as commitments, including RBOC review turnaround. Sequence deliverables to support permitting and long-lead procurement. Design Team Leadership & Coordination. Lead the design team, manage sub-consultants, and fully coordinate the design and documentation across all disciplines into a single, conflict-free set, including coordination of any Owner-contracted consultants under a single-prime structure. Local Availability. To the extent practicable, key personnel assigned to this engagement should be based within, or readily available from, the City of Pasadena or greater Los Angeles County, in light of the frequency of site visits, Board presentations, and event-day coordination anticipated under this engagement. Additional Services Requests. If the Architect identifies the need for additional services beyond the scope of this Agreement, the Architect shall notify RBOC in writing within five (5) days of the occurrence giving rise to the additional services, and shall submit a written request describing the scope, basis, and estimated fee for the additional services within ten (10) days of the occurrence. No additional services shall be billed or invoiced, and the Architect shall not be entitled to compensation for any additional services, unless and until RBOC has approved the request in writing. Scope Exclusions. Any scope, service, or cost item that the Architect assumes will be furnished, procured, or contracted directly by RBOC or others must be expressly identified as an exclusion in the Architect's Fee Schedule. Any scope not expressly excluded shall be deemed included within the Architect's fixed fee, and no additional compensation shall be allowed for such items absent RBOC's prior written approval of an Additional Services Request under the Additional Services Requests provision above . Delivery-Method Flexibility. Support multiple project delivery methods, including Design-Bid-Build, Construction Manager at Risk (CMAR), and Design-Build, and provide bid- and procurement-phase support appropriate to the method selected for each project. Code, Accessibility & Sustainability. Deliver fully code-compliant projects, including all applicable building, fire / life-safety, and accessibility requirements under Title II of the Americans with Disabilities Act (ADA), Section 504 of the Rehabilitation Act, the California Building Code (Title 24, Part 2, including Chapter 11B), and, for any pedestrian or right-of-way improvements, the U.S. Access Board's Public Rights-of-Way Accessibility Guidelines (PROWAG). Certify that each project's design complies with applicable accessibility standards prior to permit submission, and coordinate correction of any non-compliance identified during plan check, construction, or post-occupancy review. Coordinate Title 24 energy compliance and sustainable design strategies. Permitting & Jurisdiction. Develop and support the permitting strategy with RBOC and The Cooperative LA, prepare and stamp all required architectural permit documents, and carry the documents through plan check with the City of Pasadena (the Authority Having Jurisdiction) to permit issuance. Historic Preservation Coordination. The Rose Bowl Stadium is designated as a National Historic Landmark and a California Historic Civil Engineering Landmark. Coordinate with RBOC, the City of Pasadena, and applicable state and federal historic preservation authorities, including compliance with the Secretary of the Interior's Standards for Rehabilitation as applicable, to preserve the stadium's landmark status and manage any additional regulatory review that may be triggered by the proposed improvements. Community Outreach & Public Engagement. The Architect shall be responsible for leading any community outreach or public engagement required for the Projects, including public presentations as needed. RBOC does not anticipate retaining a separate outreach consultant for this purpose. CONCEPTUAL PLANNING The Architect's duties, under the Conceptual Planning Phase (i.e. pre-referendum phase and program planning phase) will include, but not limited to: Assess the cu Compensation 6.1 Fees and rates negotiated and made part of the contract document are to remain firm for the original performance period. For any renewal year, fees and rates may be adjusted to reflect changes in the Consumer Price Index (Urban Consumers Index for the Consumer Price Index for All Urban Consumers (CPI-U) for the Los Angeles-Long Beach-Anaheim, CA Metropolitan Statistical Area, as published by the U.S. Bureau of Labor Statistics, or any successor index issued by the Federal Government for the six (6) months immediately preceding the renewal year, in comparison to the previous year, but shall not exceed 3% annually. 6.2 Invoices and Payment 6.2.1 Invoices are to be submitted no later than 30 days after services have been rendered. 6.2.2 All charges are to be identified by assignment, areas, hours, and reimbursable expenses itemized and listed separately. 6.2.3 Payment for the RBOC approved invoice will be paid within 30 days of approval. 6.2.4 Services performed pursuant to a Notice to Proceed shall be invoiced in accordance with this Section 2.4 and, upon execution of the definitive Services Contract, shall be deemed performed thereunder Fee Schedule Fee Schedule The Proposer's Cost Proposal must be submitted using the Architect Fee Schedule (Excel workbook) provided as a separate attachment to this RFP. Do not submit cost information in any other format. The workbook consists of: A Scope Fee Schedule, to be completed separately for each of the two anticipated capital projects identified in Section 1.2.1 (East / West Seating Improvement Project and North Videoboard Expansion Project), consisting of fixed design fees broken out per Project by Concept, Schematic Design, Design Development, Construction Documents, Bidding, and Construction Administration; any Add-Alternate services the Proposer recommends; and any items the Proposer assumes will be furnished, procured, or contracted directly by RBOC or others (excluded from the Proposer's fee). An Hourly Rate Schedule, providing billing rates by staff role for general on-call architectural services outside the two named capital projects, for both the Architect and its sub-consultants. All fees are subject to the terms of the Scope of Work’s General Requirement, including the Additional Services Requests provision and the CPI-U (Los Angeles-Long Beach-Anaheim MSA) 3% annual escalation cap. Introduction Summary Background The City of Pasadena is an ethnically diverse community that is home to approximately 142,017 people. Pasadena is the ninth-largest city in Los Angeles County. It is one of the primary cultural centers of the San Gabriel Valley. The City covers approximately 22.5 square miles, with an average of ten residents per acre. The median age of its residents is approximately 36.9 years. There are over 100,000 jobs in a wide variety of industries in the City of Pasadena. Contact Information Deadline for Questions The deadline to submit questions related to this solicitation is Tuesday, October 20, 2026 , prior to 5:00 pm . Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered. Timeline General Instructions NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses to this Request for Proposal (RFP) accepted by the Rose Bowl Operating Company (RBOC) City of Pasadena (City) shall become the exclusive property of the RBOC/City. At such time as the RBOC Chief Executive Officer recommends a contractor to the RBOC Board of Directors, and such recommendation, with any recommended contract appears on the RBOC Board agenda, all proposals accepted by the RBOC/City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the RBOC/City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the RBOC/City shall not in any way be liable or responsible for the disclosure of any such records or part thereof. Electronic Submission and Delivery Instructions Parties interested in responding are required to submit proposals electronically through the City of Pasadena's eProcurement Portal no later than 3:00 pm on Tuesday, November 10, 2026 . Please upload sufficiently early electronically through the city's eProcurement Portal before the time and day listed in the Notice Inviting Proposals. Proposals must be received in the system prior to the deadline. The entire proposal must be formatted on standard-size 8½”x11” pages; 12 point font only. The "Technical Proposal," "Additional Data," and "Statement of Qualifications" can be no more than 50 grand total pages. The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ #Proposer's Submittals/Checklist .” The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and #Proposer's Submittals/Checklist . No Pricing shall be included in this part. Proposals received after the Proposal Deadline may not be accepted by the RBOC/City. Technical Proposal The proposal must be prepared in two parts: a "Technical Proposal" and a "Price Proposal." Each of the parts shall be separate and complete in itself so evaluation of one may be accomplished separate from the evaluation of the other. The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and Submittals/Checklist . No Pricing shall be included in this part. Separate Price Proposal The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ Submittals/Checklist .” Parties interested in responding are required to submit their Price Proposal with their Technical proposal through the City's eProcurement Portal. The pricing must include the total price proposed to accomplish all the performance and deliverables requested in this RFP, and offered by your firm. Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The price proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The price proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for all materials and supplies. The fee information is relevant to a determination of whether the fee is fair and reasonable in light of the services to be provided. Costs shall include the proposed costs and, if necessary, the approximate number of hours to provide the services as described in your proposal. Any additional fees outside the scope of the agreement must be approved in writing before commencing services for said fees. Vendor’s RFP response must be inclusive of all costs and expenses associated with travel, lodging, and any other incidental costs. The City will not separately reimburse costs not included in the proposal. Reference PRICE PROPOSAL. Reimbursable cost schedules shall depict only those expenditures that are exclusive to and in support of the scope of services. The proposed reimbursable cost schedule shall include a detailed list of reimbursables. Each Proposer must submit a PRICE Proposal containing all costs associated with the technical proposal. Using the attached Price Proposal in this RFP, provide Proposer’s lump-sum price for performing all services and work called for in the SCOPE OF WORK. The Proposer’s lump-sum price shall include, without limitation: all designs, equipment, materials, labor, insurance and bond premiums, home office, jobsite, and other overhead, profit and services relating to the Proposer’s performance of its obligations under the Contract (including all work, equipment, materials, labor, and services provided by subcontractors and intellectual property rights necessary to perform the work); performance of each and every portion of the work all costs of obtaining Government approvals other than Government approvals that are the responsibility of the City of Pasadena; all costs of compliance with Government rules, except to the extent such compliance is the responsibility of the City of Pasadena; all taxes, duties, permits, and other fees or royalties incident to the performance of the SCOPE OF WORK; payment of all salaries, wages, benefits, and expenses of the Proposer’s employees; compensation for all risks, liabilities, and contingencies assigned to the Proposer; and all other costs needed or incurred to complete the Project. all ProForma Submission Requirements (if required) Pre-Proposal Meeting See the "Timeline" in the Introduction section ( #Introduction) . If there is a Mandatory pre-proposal meeting, bidders/proposers are required to attend at the time, date, and location included in the Timeline. If there is a Non-Mandatory pre-proposal meeting, bidders/proposers are not required to attend. Each bidder/proposer will have the opportunity to clarify and ask questions regarding the Specifications. The Pre-Proposal Meeting will be held at the time, date, and location in the Timeline of this solicitation. Definitions The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this RFP, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract. General Requirements Standard terms and conditions Prior to the award of any work hereunder, RBOC/City and contractor shall enter into a written contract in substantially the form attached hereto with such revisions thereto as the RBOC/City may determine necessary and appropriate. PROPOSERS responding to this RFP are strongly advised to review all the terms and conditions of the contract, and shall be deemed to have accepted them. Firm commitment of availability of service Once a proposal is opened, a PROPOSER is expected to maintain an availability of service as set forth in its proposal for at least four months after date for opening proposals. RELEVANT EXPERIENCE Provide experience with with professional or collegiate stadium projects (new and/or renovated) completed within the past ten (10) years for five (5) projects/contracts of similar scope and size. Complete and submit the attached Relevant Experience Form with your proposal to demonstrate experience with projects/contracts of similar scope and size to that which is to be performed. Reservations The RBOC/City reserves the right to reject any or all bids or proposals and any item or items therein, and to waive any non conformity of proposals with this RFP, whether of a technical or substantive nature, as the interest of the RBOC/City may require. Documents to be construed together The Request for Proposa

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Addendum No. 1 revises the due date for submitting the Notice of Interest Form to September 25th . Additionally, the form has been revised to reflect current requirements. Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #1: ADDENDUM 4- Rose Bowl Stadium Architectural Services, 2026-RFP-0531 · 1

    EXTENSION OF PROPOSAL DUE DATE Due to technical issues with the City's eProcurement Portal, the proposal due date is extended. Proposals are now due Tuesday, November 10, 2026, at 12:00 PM Pacific Time. All other dates in the Timeline remain subject to change at the discretion of RBOC. FEE SCHEDULE - PERSONNEL CLASSIFICATIONS The Price Proposal table titled "Fee Schedule - Personnel Classifications" requests hourly billing rates, but the portal field is labeled for percentages. Proposers shall enter each hourly billing rate as a dollar amount in the field provided for the corresponding personnel classification. Proposers may also attach a supplemental rate schedule to their submittal. PROPOSALS ALREADY SUBMITTED Proposers that have already submitted a proposal may, but are not required to, revise and resubmit it through the portal on or before the new due date. A proposal that is not revised will remain on file as submitted. ALL OTHER TERMS UNCHANGED All other terms, conditions, and requirements of the RFP remain in effect.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #4 · 4

    Addendum includes attachments P, Q & R, pricing table updated by removing the percentage, and extended the due date to November 10, 2026. Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Do front and back covers, table of contents and tab pages count toward the 50 page limit?

    It applies only to the Technical Proposal, Additional Data and Statement of Qualifications combined. Covers, TOC and tab dividers are not included in the count as long as these pages carry no technical or project content.

  • Would it be acceptable to include a consultant project as one of our five comparable projects?

    Yes, if the project was performed by a firm or key personnel on the proposed team and the proposer's role is stated clearly on Attachment I. The project will need to meet the eligibility criteria as set forth in the qualifications.

  • The RFP states that the document must be formatted on 8.5x11 pages. Would it be acceptable to format schedules and other large diagrams on 11x17 sheets?

    Yes, for schedules and large diagrams only. Each 11x17 sheet counts as one page toward the 50-page limit. All other content must remain on 8.5x11 pages in 12-point font.

  • Pg 6 of the RFP document states "The entire proposal must be formatted on standard-size 8½”x11” pages; 12 point font only." Would it be acceptable to use 8.5x11 landscape format?

    Yes. 8.5x11 landscape orientation is acceptable provided pages are standard 8.5x11 size and text is 12-point font or larger.

  • Can you confirm if a table of contents is required to upload with the cover letter and if so, what contents should the table of contents contain (section breakout of the technical proposal, additional data, statement of qualifications, price proposal, required forms)? Would this require sequential numbering?

    Yes, a table of contents is required with the cover letter. It should list each section as submitted (required forms, Technical Proposal, Additional Data, Statement of Qualifications and Price Proposal) with sequential page numbers.

  • Are we allowed to reformat the Relevant Experience Form to include photos and additional project details for our 5 projects as long as the original requested information is included?

    Attachment I should be submitted as provided with all requested information. Project photos and additional project detail may be added as a supplement within Additional Data, which counts toward the 50-page limit.

  • It is our understanding that "The entire proposal must be formatted on standard-size 8½”x11” pages; 12 point font only. The "Technical Proposal," "Additional Data," and "Statement of Qualifications" can be no more than a grand total of 50 combined." Is the 50-page limit mentioned above only applies to the files to be uploaded in those 3 sections? This would exclude the cover letter, price proposal, and required forms.

    Please see the response to Question 2. The same answer applies.

  • Can you confirm if we need to address evaluation criteria numbers 1-7 and 9 within our technical proposal?

    Yes. Criteria 1 through 7 and 9 should be addressed in the technical proposal. Criterion 8 (Cost) is addressed in the Price Proposal, and Criterion 10 (Small or Micro-Business) is addressed through the required forms.

  • Will the City revise the indemnity terms contained in the sample Master Services agreement to comply with the limitations of CA Civil Code 2782.8? We respectfully request the following revisions to align Section 9.13 with the limitations of California Civil Code § 2782.8. 9.13 INDEMNITY. 9.13.1 Contractor agrees to indemnify, hold harmless, and defend [Strike: “(even if the allegations are false, fraudulent or groundless),”] to the maximum extent permitted by law, the City, its City Council and each member thereof, its officers, employees, commission members, and representatives, from any and all liability, loss, suits, claims, damages, costs, judgments, and expenses (including [Add: “reasonable”] attorney’s fees and costs of litigation) which [Strike: “in whole or in part result from, arise out of, or are claimed to result from] [Add: “to the extent arising out of, pertaining to, or relating to:”] [Strike: “A. any activity on or use of City's premises or facilities or any performance under this Contract; or”] B. any [Add: “negligent“] acts, errors, or omissions (including, without limitation, professional negligence) of Contractor, its employees, representatives, subcontractors, or agents in connection with the performance of this Contract. [Add: “In no event shall the cost to defend charged to the Contractor exceed the Contractor’s proportionate percentage of fault.”] 9.13.2 This agreement to indemnify includes, but is not limited to, personal injury (including death at any

    The sample Master Services Contract will be updated as needed to comply with applicable California law, including Civil Code §2782.8. The City and RBOC will consider the proposed revisions to Section 9.13 during negotiation with the selected firm. Please submit any exceptions with your proposal.

  • Does RBOC currently anticipate retaining any consultants directly for either identified project? If so, please identify the anticipated Owner-contracted disciplines so proposers can consistently distinguish coordination services from consultant services to be included in their fixed fees.

    RBOC does not anticipate retaining any consultants directly for either project. The Venue Architect is to retain, manage and coordinate all consultants required to complete the Scope of Work. The fees of all of them are to be included in the Venue Architect’s fixed fees.

  • For fee-development purposes, what level of community outreach and public engagement should proposers assume for each of the two identified capital projects, including the anticipated number and type of community meetings, public presentations and RBOC Board presentations?

    The Venue Architect, in collaboration with RBOC, will conduct community outreach and public engagement for both projects. RBOC will participate in planning, attend and help convene community meetings, and coordinate with its stakeholders and Board. The Venue Architect leads preparation of presentation materials and any facilitation, and carries any support it needs within its fixed fee. RBOC does not anticipate a separate outreach consultant. For fee purposes, assume up to 4 community meetings and 4 RBOC Board presentations per project.

  • The Scope of Work identifies Architect assistance with the CEQA process during Conceptual Planning and Pre-Design. Please clarify the anticipated level of CEQA support and whether RBOC will separately retain an environmental/CEQA consultant, with the Venue Architect providing design information and coordination only.

    The Venue Architect provides design information, exhibits and coordination to support the CEQA process, and carries any environmental or CEQA technical consultant it considers necessary within its fixed fee. RBOC/the City remains the lead agency and decision maker.

  • To what extent should proposers include field verification, existing-condition documentation, surveying, scanning and/or dimensional verification of the seating bowl and videoboard areas in the base scope? Please identify any existing survey, scan, BIM/CAD or record-document information that RBOC intends to make available to the selected team.

    The base scope includes field verification and existing-condition documentation sufficient to design the work in the seating bowl and videoboard areas. Any surveyor, scanning or testing subconsultant is carried by the Venue Architect in its fixed fee. RBOC is not aware of an existing 3D scan or BIM model for these areas.

  • The pricing workbook requires fixed fees by phase for both confirmed projects and says you need to identify exclusions. Meanwhile, the scope says anything not expressly excluded is deemed included in the fixed fee. The workbook itself asks for fees across Architecture, Structural, Civil, Landscape, MEP, AV/Low Voltage/Security, Historic Preservation, Cost Estimating, Code/Fire Life Safety/Accessibility, Signage/Wayfinding and other disciplines. Given that portions of the project scope remain subject to further definition, please confirm the assumptions proposers should use as the basis for fixed fees for the East / West Seating Improvement Project and North Videoboard Expansion Project. Specifically, should proposers price the full Scope of Work through Construction Administration based on the information presently available and clearly identify assumptions and exclusions in the Fee Schedule?

    Yes. Proposers should price the full Scope of Work through Construction Administration for both confirmed projects, based on the information available. They should clearly list assumptions and exclusions in the Fee Schedule. All consultants are held by the Venue Architect, so each discipline line in the workbook is to be priced and included in the fixed fee. There are no Owner-direct consultants. Work outside the stated assumptions is handled as additional services at the hourly rates submitted.

  • For the East / West Seating Improvement Project, should proposers assume a generally uniform replacement seating product throughout the designated pink-seat areas, or should the design scope include evaluation of differentiated seating products, including potential premium or enhanced seating offerings in selected locations? If differentiated seating is to be studied, will RBOC provide market, revenue, pricing, or program criteria to inform the appropriate mix?

    Proposers should assume a generally uniform replacement seat throughout the designated pink-seat areas as the base scope. Within the Approach and Methodology, proposers may identify opportunities for differentiated or enhanced seating in selected locations. If differentiation is proposed, accessible seating must be provided in each tier. See also the response to Question 8.

  • The Sample Master Services Contract included with the RFP appears to contain provisions oriented toward construction/public works contracting rather than professional architectural and engineering services. On other City of Pasadena professional services engagements, we have encountered agreement forms tailored specifically to professional design services. Please confirm whether the attached Master Services Contract is the intended form of agreement for the Venue Architect, or whether RBOC/City intends to utilize or issue a Professional Services Agreement appropriate to architectural and engineering services.

    Attachment A, the Master Services Contract, is a sample showing the City’s standard terms. RBOC and the City will use the agreement form applicable to a professional service contract.

  • How much creatively within or beyond the scope, are you looking for? The scope is pretty clear – but we didn’t know if the design team could think/propose beyond the scope or should it be very specific to the scope?

    Please see the response to Question 8. The same answer applies.

  • Is the design team expected to coordinate with RBOC's historic preservation consultant or is it required to contract with the RBOC's historic preservation consultant?

    The Venue Architect is to retain a qualified historic preservation consultant (meeting the Secretary of the Interior’s Professional Qualifications Standards) as part of its team and include the fee in its fixed fee. RBOC will not contract with a historic preservation consultant directly. Proposers may propose any qualified firm, including one with prior Rose Bowl experience.

  • Will the City revise the indemnity terms contained in the sample Master Services agreement to comply with the limitations of CA Civil Code 2782.8? We respectfully request the following revisions to align Section 9.13 with the limitations of California Civil Code § 2782.8. 9.13 INDEMNITY. 9.13.1 Contractor agrees to indemnify, hold harmless, and defend [Strike: “(even if the allegations are false, fraudulent or groundless),”] to the maximum extent permitted by law, the City, its City Council and each member thereof, its officers, employees, commission members, and representatives, from any and all liability, loss, suits, claims, damages, costs, judgments, and expenses (including [Add: “reasonable”] attorney’s fees and costs of litigation) which [Strike: “in whole or in part result from, arise out of, or are claimed to result from] [Add: “to the extent arising out of, pertaining to, or relating to:”] [Strike: “A. any activity on or use of City's premises or facilities or any performance under this Contract; or”] B. any [Add: “negligent“] acts, errors, or omissions (including, without limitation, professional negligence) of Contractor, its employees, representatives, subcontractors, or agents in connection with the performance of this Contract. [Add: “In no event shall the cost to defend charged to the Contractor exceed the Contractor’s proportionate percentage of fault.”] 9.13.2 This agreement to indemnify includes, but is not limited to, personal injury (including death at any

    The sample Master Services Contract will be updated as needed to comply with applicable California law, including Civil Code §2782.8. The City and RBOC will consider the proposed revisions to Section 9.13 during negotiation with the selected firm. Please submit any exceptions with your proposal.

  • The Rose Bowl Lasting Legacy website lists Phase 2 costs of $45M-$50M. Please clarify the following: 1) Does this range represent the all-in cost of Phase 2, including soft costs (design, engineering, permitting, project management, contingency) as well as hard construction costs? If not, please identify what is excluded. 2) Is the $45M-$50M a current estimate or an approved budget?

    The $45M-$50M range shown on the Rose Bowl Lasting Legacy website is a published planning target for Phase 2. It is not an approved budget or a current cost estimate, and funding is still being determined. Proposers should not use this figure to size scope or fees. Proposers should develop their proposals and fixed fees from the Scope of Work and the information provided in the RFP and its addenda. RBOC will share budget information for the two identified projects when it is available.