State and local · OpenGov
Rose St Streetscape Improvements
Description
The City of Lakeland Community Redevelopment Agency (CRA) invites qualified contractors to submit sealed proposals for the construction of the Rose Street Streetscape Project. The City intends to select a contractor through a best-value procurement process that considers qualifications, technical approach, project experience, project team, schedule, and proposed price. The City seeks a contractor with demonstrated experience delivering complex roadway and streetscape improvements while maintaining public access, coordinating with utilities and adjacent stakeholders, and completing construction in accordance with applicable federal, state, and local requirements. The successful proposer shall furnish all labor, supervision, materials, equipment, permits, testing, maintenance of traffic, utility coordination, railroad coordination, project management, and incidental services necessary to complete the Rose Street Streetscape Project as described in this Request for Proposals and the accompanying construction documents. The project scope includes roadway improvements, pedestrian accessibility enhancements, drainage improvements, decorative streetscape features, landscape restoration, lighting, signing, pavement markings, and associated public infrastructure improvements within the Rose Street corridor. Proposals shall be submitted electronically through the City’s designated procurement portal before the date and time established in the Procurement Schedule. Late proposals will not be accepted. Pricing proposal must be completed entirely, including total lump sum of the entire project and submitted Review attachment I specifically for the items the City of Lakeland will perform SUMMARY OF PAY ITEMS PLEASE PROVIDE TOTAL LUMP SUM OF ENTIRE PROJECT MOBILIZATION (INCLUDES SURVEY, TESTING ETC MAINTENANCE OF TRAFFIC COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE WORK ZONE SIGN CHANNELIZING DEVICE-PEDESTRIAN LCD PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY SEDIMENT BARRIER, SILT FENCE SOIL TRACKING PREVENTION DEVICE INLET PROTECTION SYSTEM CLEARING AND GRUBBING(INCLUDES PIPE REMOVAL) CONCRETE REMOVAL REGULAR EXCAVATION EMBANKMENT TYPE B STABILIZATION (PAVER AREAS) CONCRETE CURB, TYPE NEW ROADWAY CURB AND BACK OF PAVER CURB SIDEWALK CONCRETE 4" THICK SIDEWALK CONCRETE 6" THICK(DRIVEWAYS) DETECTABLE WARNING SINGLE COLUMN GROUND ASSEMBLY F&I 12.0-20.0SF SINGLE COLUMN GROUND ASSEMBLY RELOCATE LIGHTING BOLLARD BOLLARD BASE STREET LIGHT POLES POLE BASE 2 INCH ELECTRICAL CONDUIT 1113 CONDUCTORS PULLBOXES FLEXIPAVE TREE WELL PAVERS, ARCHITECTURAL (CONCRETE BEDDING PAVERS) LANDSCAPE COMPLETE-LARGE PLANTS ROOT BARRIER 18" BIKE RACK REPLACEMENT BENCH REPLACEMENT IRRIGATION SYSTEM SCOPE OF WORK Rose St Streetscape Improvements The project generally consists of roadway and streetscape improvements within the Rose Street corridor. Work includes, but is not limited to, mobilization; maintenance of traffic; maintenance of access to adjacent properties; erosion and sediment control; clearing and removal; earthwork; roadway restoration and resurfacing; curb and concrete improvements; sidewalks and pedestrian accessibility improvements; signing and pavement markings; decorative paving; street lighting; landscaping; irrigation; site furnishings; restoration; and other associated improvements necessary to provide a complete and functional project. The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits, testing, temporary facilities, traffic control, coordination, and incidental work necessary to complete the project, except for work specifically identified in the Contract Documents as being performed by the City or others. City-Performed Work. Certain utility, stormwater, and other infrastructure improvements will be performed by City departments prior to commencement of the Contractor’s work. Such work is not included in the Contractor’s scope unless specifically identified in the Contract Documents. The Contractor shall coordinate its work with existing conditions resulting from the City-performed improvements and shall perform required restoration and associated improvements as shown in the final construction plans. The Contractor shall maintain safe and reasonable access to adjacent businesses and properties throughout construction to the extent practicable and shall coordinate construction activities with the City, affected property owners, utilities, CSX/railroad representatives when applicable, and other stakeholders as required. The Contractor shall be responsible for verifying existing conditions and coordinating the sequencing of its work with the City prior to commencing construction. Work shall be performed in a manner that minimizes disruption to traffic, pedestrians, adjacent businesses, and surrounding properties. The attached schedule of work/pay items summarizes the anticipated improvements and estimated quantities. Quantities are subject to the final construction plans and Contract Documents. The Contractor shall review the complete Contract Documents and shall not rely solely upon this table in determining the work necessary to complete the project. Evaluation Criteria: Each Proposal Submittal will be evaluated on a total score basis, with a maximum score of one hundred (100) points per Evaluation Committee member. Firm Qualifications Similar Project Experience Technical Approach Project Team Project Schedule Public Communication & Traffic Maintenance Quality Control & Safety Local Experience / CRA Experience Cost Proposal Please review attachment M for a complete breakdown of evaluation grading criteria NOTICE REQUEST FOR PROPOSAL Rose St Streetscape Improvements FOR THE CITY OF LAKELAND Tuesday, October 20, 2026 RFP No. 2026-RFP-132 Sealed proposals will be received electronically by the Purchasing Manager via OpenGov, the City’s e-Procurement Portal (“Portal”), until 4:30 pm – Wednesday, December 2, 2026 . Proposals received after this specified time and date will not be considered. The sealed proposals will be publicly opened and read aloud on the same date and time in the office of the Purchasing Manager for the following: RFP Documents may be accessed by visiting our Website at https://procurement.opengov.com/portal/lakelandgov or by contacting the City of Lakeland Purchasing Division @ (863) 834-6780. RFP Documents are Required for Submittal . Proposers are required to submit their response through the Portal. Proposers shall sign up on the Portal if an account does not exist. THE CITY OF LAKELAND IS SOLICITING SEALED PROPOSALS FROM QUALIFIED VENDORS TO PROVIDE: Rose St Streetscape Improvements . THE PROPOSALS SUBMITTED SHALL BE IN COMPLETE ACCORDANCE WITH, WITHOUT LIMITATION, THIS REQUEST FOR PROPOSAL, THE ATTACHED CITY OF LAKELAND SPECIFICATIONS, ALL CODES AND REQUIREMENTS REFERENCED THEREIN. All Questions regarding this request for proposals shall be in writing and submitted electronically via the Portal through the Question and Answer tab before 5:00 pm on Friday, November 20, 2026 . Responses will be released on the Question and Answer Tab. CLARIFICATION AND/OR EXCEPTIONS OF DOCUMENTATION Proposer requiring clarification or having a dispute with these documents must advise the City Purchasing Division of the nature of the required clarification or basis of the dispute, in writing, no later than 5:00 pm on Friday, November 20, 2026 via the Portal's Question and Answer tab. If no written contact has been made by this specified date, the Proposer waives the right to any future consideration and accepts the documents as published and/or revised by the City. Additionally, submitting a signed bid shall be construed as a total compliance statement. Note: Any use of brand names (manufacturer) in this invitation and specification is for Proposer convenience only and shall not limit this offering. Equal or better equipment and alternate bids may be given consideration. FLORIDA PUBLIC RECORDS LAW IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS: KELLY S. KOOS – CITY CLERK AT: PHONE: 863-834-6210, E-MAIL: cityclerk@lakelandgov.net , MAIL: ATTN: CITY CLERK 228 S. MASSACHUSETTS AVE., LAKELAND, FLORIDA 33801. In accordance with Florida Statute §119.0701, the Contractor shall keep and maintain public records required by the City in performance of services pursuant to the contract. Upon request from the City’s custodian of public records, Contractor shall provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided pursuant to Florida Statute Chapter 119 or as otherwise provided by law. Contractor shall ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. Contractor shall, upon completion of the contract, transfer, at no cost, to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform services pursuant to the contract. If the Contractor transfers all public records to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City’s custodian of public records, in a format that is compatible with the information technology systems of the City. EXPARTE COMMUNICATION Please note that to insure the proper and fair evaluation of a proposal the City of Lakeland prohibits exparte communication (i.e., unsolicited) initiated by the Proposer to the City Official or Employee evaluating or considering the proposals prior to the time a bid decision has been made. Communication between Proposer and the City will be initiated by the appropriate City Official or Employee in order to obtain information or clarification needed to develop a proper and accurate evaluation of the proposal. Exparte communication may be grounds for disqualifying the offending Proposer from consideration or award of the proposal, then in evaluation, or any future proposal. BONDING A certified check or bid bond shall accompany each submittal. The certified check or bid bond shall be for an amount not less than five percent (5%) of the price and shall be made payable to the Owner as a guarantee that the Proposer will not withdraw for a period of sixty (60) days after RFP closing time. In the event the contract is awarded to the Proposer, he/she will, within ten (10) days thereafter, enter into a written contract with the City of Lakeland, or accept a City of Lakeland purchase order. The successful Proposer shall also furnish within ten (10) days; a PUBLIC CONSTRUCTION BOND IN COMPLETE ACCORDANCE WITH SECTION 255.05 OF THE FLORIDA STATUTES in an amount equal to the contract price as a guarantee of good faith that the Proposer will execute the work in accordance with the terms of the contract and that the Proposer shall make payments for all labor, material and supplies used directly or indirectly for the work. Failure to do so will constitute forfeiture of the bid security as liquidated damages. The Public Construction Bond shall be secured from and countersigned by an agency of a surety company recognized in good standing, licensed and authorized to do business in the State of Florida and found to be acceptable to the City of Lakeland. INSURANCE AND SAFETY REQUIREMENTS All insurance shall be secured from or countersigned by an agent or surety company recognized in good standing and authorized to do business in the State of Florida. The Contractor shall, within ten (10) days of notification of award and prior to commencement of work, take out and maintain in full force and effect minimum insurance coverage as specified in the attached requirements. This insurance shall remain in force and effect throughout the duration of the contract. A certificate of existing insurance coverage should be submitted with the proposal as proof of insurability. If the current coverage does not meet the RFP requirements, then the Proposer should request an affidavit of insurability from the Proposer's insurance agent that certifies the requirements can and will be met. Failure to provide adequate insurance coverage may be cause for disqualification as non-responsive to the RFP requirements. The Contractor agrees to accept and abide by the City of Lakeland safety regulations in complete accordance with the attached requirements. INDEMNIFICATION AGREEMENT The Contractor agrees to indemnify and hold harmless the City of Lakeland in complete accordance with the attached requirements. This agreement shall be signed, notarized and returned with the RFP submittal. Failure to provide the Hold Harmless Indemnification Agreement may be cause for disqualification as non-responsive to the RFP requirements. HUMAN TRAFFICKING -- F.S. 787.06(14) In compliance with Section 787.06(14), Florida Statutes, the attached Affidavit must be completed by an officer or representative of a non-governmental entity that is executing, renewing, or extending a contract with the City of Lakeland, Florida (the “Governmental Entity”). This attests under penalty of perjury that the nongovernmental entity does not use coercion for labor or services when a contract is executed, renewed or extended between a governmental entity. DRUG-FREE WORKPLACE CERTIFICATION By submitting a proposal in response to this Request for Proposal, you are certifying that your company is a drug-free workplace in accordance with Florida Statute 287.087. SUSPENSION AND DEBARMENT CERTIFICATION By submitting a proposal in response to this Request for Proposals you are certifying that your company, pursuant to 49 CFR Part 29: (1) is not presently suspended or debarred as, and/or listed on the U.S. General Services Administration’s System for Award Management (SAM) as such; and (2) will at all times remain eligible to bid for and perform the services subject to the requirements set forth herein and other applicable laws. Proposer agrees that any contract awarded to Proposer will be subject to termination by the City if Contractor or its subcontractors fail to comply or maintain such compliance. PUBLIC ENTITY CRIMES A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal on a contract to provide any goods or services to a public entity, may not submit a proposal on a contract with a public entity for the construction or repair of a public building or public work, may not submit proposals on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list. CONFLICT OF INTEREST / STATEMENT OF NON-COLLUSION The award hereunder is subject to Chapter 112, Florida Statutes. All proposers must disclose with their proposal the name of any officer, director, or agent who is also an employee of the City of Lakeland. Further, all proposers must disclose the name of any City of Lakeland employee who owns, directly or indirectly, an interest of five percent (5%) or more of the Proposer's firm or any of its branches. The Proposer shall certify that he/she has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the proposal and that the Proposer is not financially interested in, or otherwise affiliated in a business way with any other Proposer on the same land or improvements. E-VERIFY CERTIFICATION Vendor/Contractor shall utilize the U.S. Department of Homeland Security’s E-Verify system, in accordance with the terms governing use of the system, to confirm the employment eligibility of: All persons employed by the Vendor/Contractor during the term of the Contract to perform employment duties within Florida; and All persons, including subcontractors, assigned by the Vendor/Contractor to perform work pursuant to the Contract with the City. VENDOR/CONTRACTOR CERTIFICATION REGARDING SCRUTINIZED COMPANIES Section 287.135, Florida Statutes, as may be amended, prohibits agencies or local government entities from contracting with companies for goods or services of $1,000,000.00 or more, that are on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, the Scrutinized Companies that Boycott Israel List or is engaged in a boycott of Israel and that it does not have business operations with Cuba or Syria. As the person authorized to submit proposals on behalf of the Proposer, I hereby certify that the company identified above in the section entitled “Proposer Vendor Name” is not listed on either the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, the Scrutinized Companies that Boycott Israel List. I further certify that the company is not engaged in a boycott of Israel or has business operations in Cuba or Syria. I understand that pursuant to section 287.135 , Florida Statutes, as may be amended, the submission of a false certification may subject company to civil penalties, attorney’s fees, and/or costs. SCRUTINIZED COMPANIES OR OTHER ENTITIES Pursuant to Florida Statute §287.135(3)(b)2., as may be amended, the City may terminate its contract with Contractor if Contractor is found to have been placed on the Scrutinized Companies or Other Entities that Boycott Israel or is engaged in a boycott of Israel. PROHIBITION AGAINST CONSIDERING SOCIAL, POLITICAL OR IDEOLOGICAL INTERESTS IN GOVERNMENT CONTRACTING -- F.S. 287.05701 Proposers are hereby notified of the provisions of section 287.05701, Florida Statutes, as amended, that the City will not request documentation of or consider a Proposer's social, political, or ideological interests when determining if the Proposer is a responsible Proposer. Proposers are further notified that the City's governing body may not give preference to a Proposer based on the Proposer's social, political, or ideological interests. ADDENDA It is the Proposer's responsibility to review all available project documents including Addenda, Notices and Questions & Answers prior to submitting a proposal. Proposer shall acknowledge all addenda electronically within their submission via the Portal. The failure of a Proposer to submit acknowledgement of any addenda that affects the proposal price(s) may be considered an irregularity and may be cause for rejection of the proposal. LOCAL VENDOR PREFERENCE Please refer to the City’s Local Preference Policy, Ordinance No. 5912 dated January 3, 2022, located on the Purchasing Department page, www.lakelandgov.net . A Local Business shall be defined as a vendor, supplier or contractor that: (i) conducts business within the jurisdictional limits of Lakeland Electric&rs
Published attachments
- Indemnification 2026 Contractor
- Human Trafficking Affidavit
- ATTACHMENT - Utility Work Schedules
- ATTACHMENT Summary of pay items
- ATTACHMENT - Specifications
- ATTACHMENT -ROSE STREET CSX CROSSING - BID SET 2026-09-24
- ATTACHMENT -ROSE STREET ROW IMPROVEMENTS - BID SET UPDATED 2026-10-01
- Rose_Street_Evaluation_Scoring_Guide
- PRE BID SIGN IN SHEET -2026-RFP-132
- Rose_St_Streetscape_Improvements_(Addendum_#2_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #1: BE ADVISED "BOLLARD BASE" HAS BEEN ADDED TO THE PRICE SHEET. ALSO, ATTACHMENT "N PRE-BID SIGN IN SHEET HAS BEEN ADDED " · 1
BE ADVISED "BOLLARD BASE" HAS BEEN ADDED TO THE PRICE SHEET. ALSO, ATTACHMENT "N PRE-BID SIGN IN SHEET HAS BEEN ADDED "
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Please provide the exact address or map pin for the October 28, 9:00 a.m. pre-proposal meeting under the Rose Street overpass.”
808 E Rose St Lakeland 33801
Can you provide the engineer’s estimate for this Project? Thank you
Good afternoon $2,401,056.86
Is there an Engineers Estimate?
Good afternoon $2,401,056.86
Could you please clarify all the components included under Pay Item 29 (e.g., 4-inch concrete slab, 1-inch sand setting bed, and pavers)?
Yes, it includes the pavers, 4" concrete, and 1" sand setting per the detail on C-400. The detail was adapted from the City of Lakeland's detail Index No. 108 for reference.
What are the number of days for substantial and final completion?
Anticipated construction duration is 150 calendar days to substantial completion and 181 calendar days to final completion, calculated from the commencement of contract time
What is the amount of liquidated damages for this project?
Original contract amount expected $2,000,000 but less than $5,000,000 ......................$2,529 per day
On Site Plan C-101, there are multiple areas that exceed the standard 10-foot and 6-foot wide Streetscape Modules. Could you please provide a detail or additional guidance regarding the required paver pattern transitions or layout approach for these non-standard width sections?
Contractor shall keep 2'-0" from each edge ( back of curb or internal walk edge ) as designed. If sidewalk width varies, contractor shall utilize the center width of pavers (4 rows) and repeat as needed to expand the overall walk width.
Sheet C-403 indicates two different details for paver installation surrounding tree wells. Could you please clarify which specific detail should be utilized for bidding and construction purposes?
It is intended to have a concrete curb around the trees. The Module E.1 should be the one to bid.
Could you please specify the required thickness for the Belgard Moduline pavers? As these pavers are available in multiple thicknesses, this information is necessary to ensure accurate pricing for our bid.
The city standard pavers in their detail is 2 1/4" thick. Belgard has a thickness option of 2 3/8".
Sheets E-101, E-102, and E-103 contain references to sheet E-105 for additional light pole information; however, sheet E-105 does not appear to be included in the provided plan set. Could you please confirm if this sheet is missing and provide it, or clarify if the reference is incorrect, so that we may ensure our bid reflects the correct project requirements?
The correct Electrical Reference should be "E400", not "E105".
Sheet L-101 references two different tree species for the project: the Flame Tree and the Kurrajong. Could you please clarify which species is intended for the installation, or if specific locations are designated for each, so that we may accurately account for material costs in our bid?
There are three treewells on L-100. Either Kurrajong or Flame Tree are acceptable
The summary of pay items includes an entry for 8 Bike Rack Replacements. However, the provided plans do not explicitly identify the locations for bike rack removal, replacement, or relocation, nor do they specify the model or product requirements for these units. Could you please provide the location plan, details, and specifications for the bike racks to ensure we include the correct costs in our bid?
The intent was to reuse those benches and bike racks that are currently under the bridge and place them back in the same place.
The summary of pay items includes an entry for 8 EA Bench Replacements. However, the provided plans do not explicitly identify the locations for bench removal, replacement, or relocation, nor do they specify the model or product requirements for these units. Could you please provide the location plan, details, and specifications for the benches to ensure we include the correct costs in our bid?
The intent was to reuse those benches and bike racks that are currently under the bridge and place them back in the same place.
Could you please clarify if there is a specific Bid Bond form provided for this project, or if we should use a standard industry Bid Bond form?
Use a standard industry Bid Bond form.
There is no place in the electronic submission area to place the Bid Bond. Do you have a place where you would like the Bid Bond to be placed?
9.3 vendor questionnaire 9.3
Can you please identify where the "Hold Harmless/Indemnification Agreement" form can be found in the City's documents for this project?
Attachment A
Regarding Section 1.1, will equivalent lighting fixtures be considered for types P1 and B1? May PRIMELEDLIGHT, as a fixture supplier, submit the substitution package directly, or must it go through a bidding contractor? Please confirm the submission method, deadline, required documentation, and whether approval is required before bidding. Thank you,
The bidding contractor will submit to the City’s Construction Engineering & Inspection firm. Please review FDOT Specification 5-1.4 and 715-5 for the required documentation. There is no specific deadline, but the bidding contractor should be aware of the durations for shop drawing submission and review, and procurement period in order to furnish and install the roadway lighting and bollards within the contract duration.
Does the pipe removal scope include all associated asphalt and curb demolition?
Removal of the pipe, asphalt, and curb should be included in the clearing and grubbing or concrete removal pay items.
What condition should the pipe removal area be left in, given that the City will perform the new pipe installation and roadway restoration?
The area where the existing storm pipe is to be removed should be restored as necessary to complete the project as shown in the plans.
Will the City’s work occur before, during, or after the contractor’s work?
The City is currently installing the stormwater and expected to be done before the contractor’s work. The City will mill and resurface the roadway after the contractor’s work is complete. The utility relocation is expected to occur before the contractor’s work. All relocations except for Lakeland Electric and Charter/Spectrum have been relocated.
Will the contractor be responsible for providing maintenance of traffic (MOT) for the City’s work?
No, the contractor will not be responsible for MOT on City performed work.
Is a schedule available for the City’s work so we can anticipate impacts to production for the new D-curb and other overlapping work?
Refer to the question above.
Will the City or the contractor be responsible for payments to CSX for work associated with this project?
The Contractor is responsible for payments to CSX and should estimate a minimum of $1500/day for protective services. Please note that protective services will also be required if the contractor’s MOT requires traffic to travel in the opposite direction of travel, where there is not a gate to stop vehicles when trains are approaching and traversing this crossing. Please carefully consider the approach and incorporation of costs into the pay item 102-1, such as the use of flagmen outside of CSX R/W, detours, etc., to minimize the need for protective services.
What are the rates and minimum charges for CSX flagging services?
Refer to the question above.
The MOT plans show lane closures when working on the north or south side. Will all lanes need to reopen at the end of each shift?
The intent is to reopen at the end of each shift.
Are there any time restrictions for lane closures or MOT operations?
The intent is for this work to be performed during normal work hours and not during nighttime hours. The selected contractor can propose an alternate work plan to the City or for case-by-case work activities.
Will a full road closure with a detour be permitted for portions of the work?
This may be considered on a case-by-case basis and require advanced approval by the City. A minimum of 2 weeks’ notice for any requests shall be provided to the City.
Are Davis-Bacon prevailing wage requirements applicable to this project?
No
Will the contractor be responsible for quality control (QC) testing?
Yes, the contractor is responsible for QC sampling and testing, as needed, based on the applicable specifications.
Regarding the pavement section, could you please clarify the necessity of Type B Stabilization in areas where a 4-inch concrete slab is already specified beneath the pavers? Please confirm if this stabilization is intended for the subgrade below the concrete slab or if there is a conflict in the specifications.
The stabilization item should have been removed. The pavers do not require Type B, just compaction per typical sections on C-050