AGRICULTURE, DEPARTMENT OF
- Posted
- Nov 10, 2026
- Due
- Dec 9, 2026, 11:00 AM EST
- Place of performance
- South Fork, CO
- NAICS
- 237110
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
Derrick A Dodson
Primary contact
Cathleen Christensen
Secondary contact
AGRICULTURE, DEPARTMENT OF
AGRICULTURE, DEPARTMENT OF
AGRICULTURE, DEPARTMENT OF