State and local · OpenGov
Royce Road Force Main Replacement
Description
The work as shown on the Plans and as specified herein includes the construction of approximately 900’ of 3” directionally drilled high-density polyethylene (HDPE) force main pipe, installation of bypass vault and air release valve vault, and providing temporary support for the lift station shutdown. The project is located at Royce Rd and Apple River Dr in Naperville. HDPE DR11 SANITARY FORCE MAIN, 3" IPS (DIRECTIONALLY DRILLED) CONNECTION TO EXISTING MANHOLE, SPECIAL SANITARY MANHOLE REHABILITATION ADDITIONAL ACCESS PIT TEST HOLES SANITARY FORCE MAIN, ABANDON IN PLACE, 3" AIR RELEASE VALVE AND VAULT PREFABRICATED FIBERGLASS BYPASS VAULT EQUIPMENT CONCRETE PAD TRENCH BACKFILL ADDITIONAL GRANULAR BACKFILL CLASS D PATCHES, 14" ADDITIONAL ASPHALT PAVEMENT REMOVAL AND REPLACEMENT PORTLAND CEMENT CONCRETE SIDEWALK, REMOVAL AND REPLACEMENT COMBINATION CONCRETE CURB AND GUTTER REMOVAL & REPLACEMENT COLD-MIX ASPHALT SODDING, SPECIAL SUPPLEMENTAL WATERING TREE ROOT PRUNING TREE PROTECTIVE FENCING TREE REMOVAL INLET FILTERS EXPLORATORY EXCAVATION TRAFFIC CONTROL AND PROTECTION CONSTRUCTION STAKING AND RECORD DRAWINGS INVESTIGATION, SOIL TESTING, CERTIFICATION FOR IL EPA 415 REMOVAL AND DISPOSAL OF CONTAMINATED SOIL TEMPORARY SHUTDOWN SUPPORT MOBILIZATION SPECIAL WORK ALLOWANCE Scope of Work Scope of Work A detailed Scope of Work can be found in the Attachments section, as well as project plans. Introduction Timeline Release Bid Date / Advertised: November 13, 2026 Pre-Bid Meeting (Mandatory): November 30, 2026, 10:00am 1200 W Ogden Ave Naperville, IL 60563 Question Submission Deadline: January 4, 2027, 5:00pm Question Response Deadline: January 7, 2027, 5:00pm Bid Opening: January 14, 2027, 2:00pm Project Overview The work as shown on the Plans and as specified herein includes the construction of approximately 900’ of 3” directionally drilled high-density polyethylene (HDPE) force main pipe, installation of bypass vault and air release valve vault, and providing temporary support for the lift station shutdown. The project is located at Royce Rd and Apple River Dr in Naperville. Title: Royce Road Force Main Replacement Bid No: 26-155 Bid Due Date/Time: Thursday, January 14, 2027 , 2:00 pm Virtual Bid Opening To attend the Virtual Bid Opening on your computer or mobile app: Click here to join the meeting Or call in (audio only) +1 630-733-1095. Phone Conference ID: 115 712 999# ap proximately 5 minutes prior to the Due Date/Time. Attendees should join approximately 5 minutes prior to the Due Date/Time. Due at Bid Opening: Affidavit of Compliance Responsible Bidder Ordinance Form Bid Worksheet Bid Deposit (10% of Total Bid) References Subcontractor Bid Form IDOT Prequalification Certificate Due Before Award: Certificate of Insurance (with signed endorsements) Performance and Labor and Material bond Substance Abuse Prevention Program Due within thirty (30) days of Award: Contractors Safety Checklist (before work begins) If you choose not to respond, please select NO BID on https://procurement.opengov.com/portal/naperville . Disclaimer Document Distribution The City of Naperville Procurement Services and its e-Procurement Portal https://procurement.opengov.com/portal/naperville are the only authorized sources of solicitation documents. Solicitation documents and forms obtained from any other source may be an incomplete set of documents. Reproduction of these documents without the express permission of the City of Naperville is prohibited. Instructions to Bidders The City of Naperville Procurement Services and its service provider OpenGov are the only authorized sources of bidding documents/proposal forms. Bidding documents/proposal forms obtained from any other source may be an incomplete set of documents. Reproduction of these documents without the express permission of the City of Naperville is prohibited. Description of Work Contractor shall perform all Work in accordance with this Contract. Contractor shall furnish all materials, equipment, tools, and labor which is reasonably and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in this Contract. Pre-Bid Meeting A Mandatory Pre-Bid Meeting will be held on Monday, November 30, 2026 at 10:00 am at the Water Service Center 1200 W Ogden Ave, Naperville, Illinois. Bidders must send a representative to attend the Pre-Bid meeting in-person. This is your only opportunity to speak directly with staff from the Public Utilities (Water) | DPU-W regarding the project. Site location: 1200 W Ogden Avenue Naperville, IL 60563 Questions During the Bid Process All questions concerning this bid shall be submitted in writing prior to the question due date. The deadline for questions is Monday, January 4, 2027 5:00 pm If required, a written response in the form of an addendum will be issued no later than Thursday, January 7, 2027 5:00 pm . No contact with the Public Utilities (Water) | DPU-W shall be made during the bid process. Questions asked after the deadline are not guaranteed a response. Civic Access Portal for Vendors The City of Naperville has developed a new portal for vendors to register and update existing information within Civic Access. The City of Naperville will only accept vendor forms from vendors currently working with the Procurement and/or Accounts Payable teams. It will allow you to: Register as a new vendor. Sign up for ACH payments. Update existing vendor information (e.g. new mailing address, new TIN/W9, new banking information). How do I register? To create an account, please visit the City of Naperville Civic Access portal . Once you have created an account, submit your vendor information Accounts Payable – Vendor Form Submission application. Vendors can find step-by-step instructions in the Knowledge Center . An accounts payable staff member will verify your submission and follow up if there are any questions on your submission. Please send an email message to FSDAccountsPayable@naperville.il.us for assistance if needed. Insurance Requirement (A) Commercial General Liability: Coverage shall be at least as broad as Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) and include Premise/Operations, Products/Completed Operations, Independent Contractors, Contractual and Personal Injury/Advertising Injury. Limits: General Aggregate $2,000,000.00 Products/Completed Operations $2,000,000.00 Each Occurrence $2,000,000.00 Personal Injury $2,000,000.00 (B) Automobile Liability: Coverage shall be at least as broad as Insurance Services Office Form CA 00 01 to include all Owned, Hired, Non-owned vehicles. Limits: Combined Single Limit Per Accident $2,000,000 (C) Workers’ Compensation: Coverage shall be as required by the State of Illinois, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease. (D) Employers’ Liability Limits: Each Accident $1,000,000 Each Employee Bodily Injury by Disease $1,000,000 Policy Limit Bodily Injury by Disease $1,000,000 (E) Other Insurance Provisions The Commercial General Liability and Automobile Liability policies are to contain, or be endorsed to contain, the following provisions: 1. The City, its officers, officials, employees and volunteers are to be covered as insured’s with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. General Liability coverage shall be provided in the form of an Additional Insured endorsement to the Contractor’s insurance policy, or as a separate owner’s policy. 2. For any claims related to this project, the Contactor’s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors. The Contractor understands that the acceptance of Certificates of Insurance, policies and any other documents by the City in no way releases the contractor from the requirements set forth herein. Illinois Prevailing Wage Act This contract calls for the construction of a “public work” within the meaning of the Illinois Prevailing Wage Act (820 ILCS 130/1-12 et seq.). Contractors and subcontractors shall comply with the requirements of the Illinois Prevailing Wage Act including, but not limited to, all wage requirements and notice and recordkeeping duties including paying laborers, workers and mechanics performing work under this contract no less than the currently prevailing rate of wages in the county where the work is performed and filing a copy of the certified payroll with the public body in charge of the project as well as the State; see link below for additional details. The Contractor is advised that the Illinois Department of Labor (IDOL) revises the prevailing wage rates and the Contractor/subcontractor has an obligation to check the IDOL website for revisions to prevailing wage rates. For information regarding the current prevailing wage rates, please refer to the DOL website: https://www2.illinois.gov/idol/laws-rules/conmed/pages/prevailing-wage-rates.aspx . If IDOL revises the prevailing rates of wage during the term of the contract, the Contractor/subcontractor is required to pay the then current prevailing rate of rages. Any increases in costs to the Contractor due to changes in the prevailing rate of wage during the term of any contract shall be at the expense of the Contractor and not at the expense of the Owner. The Contractor shall defend and hold harmless the City, for any claim, suit or action, including costs of defense, expert witness and attorney fees, either at law, equity or in an administrative proceeding, arising from any alleged violation of the Prevailing Wage Act. The requirements of this Section shall survive the termination of the Agreement formed hereunder. Pursuant to PA 100-1177 and in accordance with 820 ILCS 130/5.1, the Illinois Department of Labor (DOL) launched the Certified Transcript of Payroll Portal and contractors are now required to submit all of their certified payroll documentation to the State rather than local government agencies. Certified Payroll must have the bid number clearly identified. The link to the DOL portal is below: https://www2.illinois.gov/idol/Laws-Rules/CONMED/Pages/certifiedtranscriptofpayroll.aspx Employment of Illinois Workers on Public Works Act Contractor agrees to comply with the Employment of Illinois Workers on Public Works Act ( 30 ILCS 570/0.01 et seq.) and employ Illinois laborers if, at the time this contract is executed or during the term of this contract, there is excessive unemployment in Illinois as defined in the Act. To review the statute, please click on the link found here . Substance Abuse Prevention on Public Works Projects Act The successful bidder must be in compliance with State of Illinois HB-1855 ( Public Act 095-0635 ), which amends the Prevailing Wage Act. Before an employer commences work on a public works project, the employer shall have in place a written program which meets or exceeds the program requirements in this Act, to be filed with the public body engaged in the construction of the public works and made available to the general public, for the prevention of substance abuse among its employees. The testing must be performed by a laboratory that is certified for Federal Workplace Drug Testing Programs by the Substance Abuse and Mental Health Service Administration of the U.S. Department of Health and Human Services. Responsible Bidders Ordinance (RBO) Section 1-9B of the Naperville Municipal Code requires that bidders for City of Naperville construction contracts in excess of $34,999.99 must participate in active apprenticeship and training programs approved and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training to be considered a responsible bidder. A bidder must affirm such participation with a signed Responsible Bidder Affidavit submitted with any bid. Freedom of Information Act Contractor acknowledges that the Freedom of lnformation Act, 5 ILCS 140/1 et seq. (the "ACT") places an obligation on the City to produce certain records that may be in possession of the Contractor. Contractor shall comply with the retention and documentation requirements of the Local Records Retention Act 50 ILCS 205/1 et seq. and the Act and shall maintain all records relating to this Agreement in compliance with the Local Records Retention Act (complying in all respects as if the Contractor was, in fact, the City). Upon notice from the City, Contractor shall review its records promptly and produce to the City within two business days of said notice from the City the required documents which are responsive to a request under the Act. If additional time is necessary to comply with the request, the Contractor may request the City to extend the time to do so, and the City will, if time and a basis for extension under the Act permits, consider such extensions. In the event Contractor fails to produce the requested records or fails to produce the requested records within the time period required above and the City is assessed a fine, fee or penalty for failure to timely comply with Act do to Contractor’s actions, Contractor shall reimburse City for all fines, fee or penalties, including reasonable attorney’s fees, paid by the City. Contractor Safety Orientation Checklist Prior to the start of any work, the Contractor and the Jobsite Manager/Supervisor will be required to complete the City’s Contractor Safety Orientation Checklist at a pre-construction meeting. No work can begin until the completed form has been received and signed by the Jobsite Manager/Supervisor. A sample of the Contractor Safety Orientation Checklist is included as part of the bid document. Basis of Award The City of Naperville intends to award a contract to the responsible bidder submitting the lowest responsive bid. Lowest price shall be determined by the Total Bid amount listed on the Bid Worksheet resulting from multiplying the actual number of acceptable units by the unit price items incorporated into the work or service, all as set forth in bid worksheet. In addition, if requested within bid documents , the City may elect to include, within the Total Bid, any combination of additive, alternate, or optional Bid items for which the City determines funds will be available at the time of award. The City will review and make adjustments associated with arithmetic errors to ascertain whether the order of bids is correct. In the event of arithmetic errors in any of the line items, the unit price will be the controlling factor to correct the arithmetic error. The City will not assume that the error exists in the unit price. Bids submitted are offers only and the decision to accept or reject is a function of quality, reliability, capability, reputation, and expertise of the bidders. The City reserves the right to reject any and all bids or to waive any non-conformity in bids received whenever such rejection or waiver is in the best interests of the City. The City also reserves the right to reject the bid of a bidder who has previously failed to satisfactorily perform a contract, has not completed contracts on time, or whom investigation shows is not in a position to perform the contract. The City of Naperville reserves the right to award individual bids to more than one vendor if it is deemed to be in the best interest of the City. The City reserves the right to increase or decrease the contract quantity without penalty from the contractor to the City. City of Naperville General Terms and Conditions General Terms and Conditions and Instructions to Bidders THE GENERAL TERMS AND CONDITIONS WHICH FOLLOW APPLY TO ALL PURCHASES AND BECOME A DEFINITE PART OF EACH FORMAL INVITATION TO BID, PURCHASE ORDER, OR CONTRACT ISSUED BY THE CITY OF NAPERVILLE, UNLESS OTHERWISE SPECIFIED. BY SUBMITTING A BID, THE BIDDER AGREES TO BE BOUND BY THESE TERMS AND CONDITIONS. BIDDERS OR THEIR AUTHORIZED REPRESENTATIVES ARE EXPECTED TO FULLY INFORM THEMSELVES OF THE CONDITIONS, REQUIREMENTS, AND SPECIFICATIONS BEFORE SUBMITTING BIDS, FAILURE TO DO SO WILL BE AT THE BIDDER'S OWN RISK AND HE CANNOT SECURE RELIEF ON THE PLEA OF ERROR. BIDDING PROCEDURES The first three items must be performed by the bidder in order for the bid submittal to qualify for consideration by the City. Bidding Forms Bids must be accompanied by an Affidavit of Compliance, provided in this package, and shall be submitted on the forms provided or in an identical format typed by the bidder, properly signed in the appropriate places, and submitted electronically via the City’s e-bidding service. Bid Security Deposit When a bid deposit is required as indicated on the Invitation to Bid, each bid must be accompanied by a bid bond signed by a surety company authorized to do business in Illinois. For construction projects the bid deposit shall be in an amount equal to at least 10% of the amount of the bid. Any bid deposit shall be in an amount equal as indicated in the Invitation to Bid. Submission of Bids This is an “electronic bid,” meaning that bids must be submitted via the City’s e-bidding service, OpenGov, in electronic format. All bids submitted must be received electronically via the City’s e-bidding service before the time specified for opening the bid. A link to the City’s e-bidding service is available on the City’s website at https://www.naperville.il.us/government/city-finances/purchasing-and-bids/ . Downloading documents and submitting bids requires registration with OpenGov. If you aren’t already a member, you can get a FREE SUBSCRIPTION to the City of Naperville account by going to https://procurement.opengov.com/signup . Any incomplete submittals may be rejected as non-responsive. The Procurement Manager, or their designated agent, will decide when the specified time for the bid opening has arrived (as determined by the clock on the e-bidding system), and bids will be opened precisely at the assigned time. Formal sealed bids, amendments thereto, or requests for withdrawal of bids after the time specified for the bid opening will not be considered. Addendum Bidders shall acknowledge the receipt of any addendum interpreting the specifications. Samples Samples or drawings requested shall be delivered free of charge with the bid. Rejected samples shall be removed by the bidder at his own expense after the bid opening. Accepted samples will be retained during the life of the contract. No Bid Response In the event you cannot submit a bid, please submit the no bid section within the City’s e-procurement platform. Questions All questions concerning the bid shall be submitted to the Procurement Services Team. Questions requiring a clarification or interpretation of the specifications shall be submitted to the Procurement Department in writing at least five working days prior to the bid opening so that the Procurement Department can issue a written response to all bidders in the form of an addendum. Whenever the answer to a question is contained in the bid documents, the bidder shall be directed to the provision in the specifications which responds to the question. The City of Naperville,
OpenGov categories
- 72141120 · Sewer line construction service
- 83101500 · Water and sewer utilities