Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Description

The Delaware Valley Regional Planning Commission (DVRPC) is seeking proposals from qualified vendors for: TCDI Project Number: 27-67-108 TCDI Project Category: Category 5 – Transportation and Infrastructure Planning Project Title: Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study Project Sponsor: West Conshohocken Borough TCDI Prequalified Consultants DVRPC REQUIRES ALL CONSULTANTS TO BE PREQUALIFIED TO COMPETE TO WORK ON TCDI-FUNDED PROJECTS. ONLY CONSULTANTS WHO HAVE MET DVRPC’S PREQUALIFICATION REQUIREMENTS ARE ELIGIBLE TO WORK ON TCDI PROJECTS. PLEASE DO NOT SUBMIT A PROPOSAL IF YOU ARE NOT A PREQUALIFIED CONSULTANT UNDER TCDI CATEGORY 5: TRANSPORTATION AND INFRASTRUCTURE PLANNING. REFER TO ATTACHMENT B TO CONFIRM YOUR APPROVED CATEGORIES. Project Background Background West Conshohocken Borough, in partnership with Conshohocken Borough, seeks professional planning and engineering services to prepare the Schuylkill River Pedestrian and Cyclist Crossing Feasibility Study . This effort is funded through the Delaware Valley Regional Planning Commission’s (DVRPC) Transportation and Community Development Initiative (TCDI) funding program. The study will evaluate opportunities to improve pedestrian and bicycle connectivity across the Schuylkill River between West Conshohocken Borough and Conshohocken Borough. Although the communities have experienced significant residential, commercial, and employment growth over the past several decades, opportunities for safe and comfortable pedestrian and bicycle travel between them remain limited. The existing Matsonford Road Bridge provides the only direct connection between the two communities, but its narrow sidewalks and adjacent high-speed traffic create barriers to walking and bicycling. Improved pedestrian and bicycle connectivity would enhance access to the Conshohocken SEPTA Regional Rail Station, the Schuylkill River Trail, nearby commercial districts, major employment centers, and future development areas. A new or improved crossing could strengthen multimodal connections within this important employment and transportation hub. The study will build upon previous local planning efforts, including the West Conshohocken Vision Plan, which identified the concept of constructing a dedicated pedestrian and bicycle facility attached to or beneath the existing Matsonford Road Bridge. However, the study shall not be limited to this concept. To ensure the Borough has viable options if the Matsonford Road Bridge alternative is infeasible or otherwise undesirable, the consultant shall evaluate at least two additional pedestrian and bicycle crossing alternatives that do not use the Matsonford Road Bridge . The study shall compare the alternatives based on technical feasibility, accessibility, connectivity, safety, environmental and permitting considerations, constructability, cost, and implementation potential. The completed feasibility study will provide the technical foundation necessary to advance a preferred alternative toward future engineering, environmental review, permitting, and construction funding. The consultant shall complete all work, including the final feasibility study, no later than June 30, 2028. Project Goals The study shall: Evaluate the feasibility of improving pedestrian and bicycle connectivity across the Schuylkill River between West Conshohocken Borough and Conshohocken Borough. Evaluate the feasibility of a pedestrian and bicycle facility attached to or beneath the existing Matsonford Road Bridge. Identify and evaluate at least two additional river crossing alternatives that do not use the Matsonford Road Bridge. Improve multimodal access to the Schuylkill River Trail, SEPTA Regional Rail Station, employment centers, commercial districts, and other key destinations. Identify engineering, environmental, permitting, right-of-way, and implementation considerations associated with each alternative. Incorporate municipal, agency, stakeholder, and public input into the evaluation of alternatives. Develop implementable recommendations that can advance toward future design, engineering, and construction funding. Project Description (Scope of Work) Task 1. Project Initiation and Management, and TCDI Administration The consultant shall: Conduct a project kickoff meeting with project partners. Refine the project work plan, schedule, public engagement strategy, and communication protocols. Coordinate regularly with the project management team. Facilitate project meetings and provide progress updates throughout the study. Plan to attend two project status meetings with DVRPC and the project sponsor Draft and submit progress reports and invoices with a confirmation letter from the Borough to DVRPC as required (at least quarterly, but no more than monthly) for TCDI administration Deliverables: Final work plan and schedule Meeting agendas and summaries Progress reports Presentation materials for project meetings Task 2. Existing Conditions Assessment The consultant shall prepare a comprehensive assessment of existing conditions within the study area. The assessment should evaluate: Existing pedestrian and bicycle facilities and connections Existing bridge infrastructure and river crossing conditions Sidewalks, trails, and roadway characteristics Traffic operations and bicycle and pedestrian safety considerations Transit access and connectivity Land use, redevelopment activity, and major employment and community destinations Existing and planned transportation improvements Environmental resources and constraints Existing plans, studies, and transportation initiatives Right-of-way, property ownership, and potential access constraints The consultant shall identify opportunities, constraints, and key considerations that will inform the development and evaluation of river crossing alternatives. Deliverables: Existing Conditions Technical Memorandum GIS mapping and study area inventory Task 3. Community and Stakeholder Engagement The consultant shall develop and implement a public engagement program that meaningfully involves residents, businesses, major employers, community organizations, trail users, transportation agencies, and other stakeholders. The consultant shall coordinate, as appropriate, with: West Conshohocken Borough Conshohocken Borough PennDOT District 6-0 SEPTA Montgomery County Adjacent property owners Major employers and institutions At a minimum, the engagement program shall include three public engagement milestones corresponding to: Existing conditions and project goals Presentation and evaluation of crossing alternatives Presentation of draft final recommendations The consultant should also consider stakeholder interviews, public workshops, online engagement opportunities, surveys, and interactive mapping tools. Given the multi-municipal nature of this project, the consultant shall propose an outreach and engagement strategy that meaningfully engages the public and stakeholders from both Conshohocken and West Conshohocken Boroughs. This should include the locations and number of public engagement events. The consultant shall document public input and incorporate findings into the development and evaluation of alternatives. Deliverables: Public Engagement Plan Engagement materials and summaries Stakeholder and public input memorandum Task 4. River Crossing Alternatives Analysis The consultant shall identify, develop, and evaluate multiple alternatives for improving pedestrian and bicycle connectivity across the Schuylkill River. At a minimum, the study shall evaluate: Matsonford Road Bridge Alternative: The feasibility of constructing a dedicated pedestrian and bicycle facility attached to or beneath the existing Matsonford Road Bridge, including structural considerations, potential attachment methods, accessible approaches, and connections to existing transportation facilities. Alternative Crossing 1: A potential pedestrian and bicycle crossing that does not use the Matsonford Road Bridge. The consultant shall identify and evaluate a feasible location and crossing concept. Alternative Crossing 2: A second potential pedestrian and bicycle crossing that does not use the Matsonford Road Bridge. The consultant shall identify and evaluate a distinct location or crossing concept. No-Build Alternative: Existing conditions without construction of a new or improved river crossing. The consultant shall identify potential locations and concepts for the two additional crossings based on existing conditions, connectivity needs, engineering constraints, land use, environmental considerations, and input from the project partners and stakeholders. The two alternatives shall be sufficiently distinct to provide the Borough with meaningful options rather than minor variations of the same concept. For each build alternative, the consultant shall evaluate, as applicable: Potential crossing location and alignment Engineering and structural feasibility Conceptual bridge configuration and approach design ADA accessibility and accessible connections on both sides of the river Connections to existing pedestrian and bicycle facilities, trails, transit, employment centers, and community destinations Right-of-way requirements and property impacts Environmental resources and potential impacts Utility conflicts and other physical constraints Flooding considerations and relevant waterway constraints Anticipated permits, agency approvals, and regulatory requirements Constructability and anticipated construction considerations Maintenance requirements Planning-level costs Implementation challenges and opportunities The consultant shall coordinate with relevant agencies, including PennDOT District 6-0, SEPTA, and Montgomery County, as appropriate, to identify agency requirements and potential constraints associated with the alternatives. The consultant shall develop evaluation criteria and use a consistent methodology to compare the alternatives based on technical feasibility, safety, accessibility, connectivity, environmental considerations, cost, and implementation potential. The analysis shall identify the advantages, disadvantages, constraints, and rela TCDI Timeline TCDI Timeline Posting of Request for Proposal: Friday, October 30, 2026 Submission of Inquiries: Friday, November 6, 2026 , 5:00 pm Posting of Responses to Inquiries: Thursday, November 19, 2026 , 5:00 pm Proposal Deadline: Friday, December 4, 2026 , no later than 4:59 pm Anticipated Award of Project: January 20, 2027 Inquiries All inquiries related to this RFP should be submitted through the OpenGov portal and submitted no later than 5:00 pm on Friday, November 6, 2026 . Inquiries may not be considered if not received by then. DVRPC will respond to questions it considers appropriate to the RFP and of interest to all Proposers, but reserves the right, at its discretion, to amend or not respond to any question. Responses posted on DVRPC’s procurement portal become part of the RFP upon posting. DVRPC reserves the right, in its discretion, to revise questions and responses to questions after posting, by posting the modified response. No oral response to any Proposer question by any DVRPC employee or agent shall be binding on DVRPC or in any way considered to be a commitment by DVRPC. DVRPC considers any information submitted directly to DVRPC through a solicitation announcement to be confidential and proprietary. DVRPC’s Access to Records Policy may be viewed at www.dvrpc.org/Policies . Submission Information DVRPC will receive all proposals on behalf of the Project Sponsor. DVRPC will release all technical proposals to the Project Sponsor for their review and scoring following the submission deadline. The Proposer shall submit the following RFP proposal documents (Technical Proposal and Administrative "Budget" Proposal) in PDF format , as indicated below. Technical Proposal Submissions All elements of the Technical Proposal must be submitted in the OpenGov portal to their corresponding upload field (e.g., Cover Letter, Lead Consultant Staff, Project Teams, Project Schedule, etc). Administrative (Budget) Proposal Submissions The Administrative (Budget) Proposal must be submitted separately in the OpenGov portal to its respective upload field. The Administrative (Budget) Proposal shall remain separate and sealed until such time as the qualitative evaluation of all technical proposals is completed. In accordance with the Brooks Act, cost is not a factor of evaluation. Both the Technical and Administrative Proposal submissions are due no later than 4:59 pm EDT, Friday, December 4, 2026 . Technical and Administrative Proposals submitted after the submission deadline or that are non-responsive to any of the requirements of this RFP may be deemed disqualified and will therefore be ineligible for award. DVRPC assumes no responsibility for delays causing any proposal submission to be received after the above-referenced due dates and times. The Proposer bears all costs related to the preparation and submittal of its proposal(s). DVRPC reserves the right to award all or only part of the solicitation to one or more Proposers, and the right to cancel the RFP and make no award. Proposal Requirements Evaluation Criteria Negotiations for the award of the contract will be with the Proposer that best meets the evaluation criteria. DVRPC reserves the right to award in part or as a whole. DVRPC may reject all proposals. DVRPC further reserves the right to negotiate cost and scope elements with the leading Proposer(s). An evaluation committee consisting of representatives from the project sponsor will evaluate each responsive proposal and, at its discretion, recommend an awardee to the DVRPC Board. Criteria have been established to guide the evaluation of each responsive proposal. The following scoring criteria will be used to evaluate and rank proposals: Disadvantaged Business Enterprises The DBE subcontracting goal is removed from the project. Therefore, there is no subcontracting goal on the contract. Digital Accessibility DVRPC requires that all final deliverables funded through TCDI be in compliance with any relevant federal, state, and/or local digital accessibility laws at the time of publication.

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the updated Budget Proposal attached. Thanks.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum. The Posting of Responses to Inquiries is extended to November 19, 2026, 5:00pm .

  • Addendum #3 · 3

    Question#3: Can DVRPC please provide their standard contract language for consultants to review? DVRPC’s Standard Articles of Agreement for Contractors, which contain DVRPC’s standard contract terms and conditions, will be attached to a forthcoming addendum. The Standard Articles will be incorporated as Exhibit A to the Base Agreement executed with the awarded firm. The Base Agreement sets out the project-specific terms, including the period of performance, funding source, and contract amount. It is drafted after award and will not be shared before then. Please see attached DVRPC’s Standard Articles of Agreement for Contractors. Thanks.

Public questions and answers
  • Will recent bridge inspection reports for the Matsonford Road bridge be provided to the selected consultant?

    No bridge inspection reports are currently on file with the Borough. It is assumed that these types of reports, if available, will need to be obtained through coordination with PennDOT.

  • Does DVRPC or the municipalities have bike/ped counts for trail locations in the vicinity of the site area?

    DVRPC maintains a permanently installed bicycle and pedestrian counter on the Schuylkill River Trail at approximately the Spring Mill station area. Data from this counter is available.

  • Can DVRPC please provide their standard contract language for consultants to review?

    DVRPC’s Standard Articles of Agreement for Contractors, which contain DVRPC’s standard contract terms and conditions, will be attached to a forthcoming addendum. The Standard Articles will be incorporated as Exhibit A to the Base Agreement executed with the awarded firm. The Base Agreement sets out the project-specific terms, including the period of performance, funding source, and contract amount. It is drafted after award and will not be shared before then.

  • What is the total available project budget for the feasibility study, including all consultant services and reimbursable expenses?

    The anticipated project budget is $170,000. You may also access the funding amount via the TCDI webpage: https://www.dvrpc.org/funding-assistance/transportation-and-community-development-initiative-tcdi

  • Is there a minimum number of required public meetings, or can the engagement plan be flexible with the type and format of engagement techinques?

    The RFP establishes a minimum of three public engagement milestones, as outlined in Task 3 of the Scope of Work. The consultant is expected to review these requirements and develop an engagement strategy that addresses each of the three milestones. Beyond these minimum requirements, there is flexibility in the proposed engagement approach, including the type, format, location, and number of public engagement events and other outreach techniques. The consultant should propose an approach that is appropriate to the project's multi-municipal context and effectively engages residents and stakeholders in both Conshohocken and West Conshohocken Boroughs.

  • Have the boroughs identified preliminary locations for the two independent crossings, or should the consultant develop these locations entirely through the study?

    The Boroughs have not identified preliminary or preferred locations for the two additional crossings. The consultant is expected to identify and evaluate potential crossing locations and concepts through the study, in coordination with the Boroughs and other project partners. The intent is to develop two distinct alternatives that provide meaningful options beyond the Matsonford Road Bridge, should that alternative be determined infeasible or otherwise not preferred.

  • Are structural inspection reports, as-built drawings, load ratings, or other engineering records for the Matsonford Road Bridge available to the selected consultant?

    These types of materials are not currently on file with the Borough. It is assumed that these types of materials, if available, will need to be obtained through coordination with PennDOT.

  • What level of structural analysis is expected for the Matsonford Road Bridge alternative? Is a desktop-level assessment sufficient, or are field inspections and detailed calculations anticipated?

    The intent is for the consultant to undertake a preliminary structural assessment sufficient to evaluate the feasibility of accommodating a pedestrian and bicycle facility on or beneath the existing Matsonford Road Bridge. This should include consideration of the existing bridge configuration, structural characteristics, potential attachment opportunities, and any apparent constraints that could affect the feasibility of the concept. The assessment should draw upon available bridge documentation and other relevant information, supplemented by a site visit as appropriate. The consultant should use professional judgment to determine the level of structural evaluation necessary to support its findings and identify any additional investigation or analysis that may be warranted to advance the concept. Detailed structural design or a comprehensive bridge inspection is not the intended focus of this feasibility study.

  • Will the project sponsors provide existing GIS, property ownership, environmental, utility, and relevant transportation planning data?

    Availability of these materials has not yet been determined. Consultants should account for the potential need to obtain relevant data through their own research and coordination with project sponsors and applicable agencies.

  • Should the three required public engagement milestones be interpreted as three separate public events, or may they include a combination of in-person and virtual engagement activities?

    The three public engagement milestones identified in Task 3 are required and should each provide a meaningful opportunity for public participation and input at the corresponding stage of the project. However, the RFP does not prescribe that these milestones take the form of three separate, in-person public meetings. The consultant may propose in-person, virtual, hybrid, or other engagement formats, or a combination thereof, provided the proposed approach effectively engages the public and stakeholders through meaningful opportunities for public discussion and dialogue and facilitates substantive input at each of the three milestones.

  • Can you clarify the expected level of detail for the three alternatives and the preferred alternative? Would schematic alignments, representative bridge configurations, preliminary approach layouts, and planning-level cost estimates satisfy the feasibility study requirements? Or are more detailed engineering drawings, bridge elevations, cross-sections, and conceptual structural designs anticipated?

    TCDI funds cannot be used for engineering-level design. TCDI funds may be used for feasibility studies, and schematic, conceptual, and preliminary design.

  • Are there existing agency discussions or identified constraints involving PennDOT, SEPTA, river navigation, floodplain permitting, or adjacent property owners that should inform the scope?

    There have been preliminary discussions, but no formal agency coordination or specific constraints have been identified to date.

  • What level of conceptual engineering and cost estimating is expected for the two independent crossing alternatives?

    Conceptual or preliminary engineering sufficient to assess feasibility, supported by planning-level cost estimates for each alternative. Engineering-level design, including detailed design calculations and construction documents, is outside the scope of this study.

  • The RFP requires two distinct crossings beyond Matsonford Road Bridge, but does not define the study-area limits Can DVRPC and the project sponsors provide a defined study-area boundary and any known candidate crossing locations?

    DVRPC and the project sponsors have not identified preferred locations for the two additional river crossings. The intent of this task is for the consultant to identify and evaluate two distinct potential crossing locations and concepts, informed by existing conditions, connectivity needs, engineering and environmental constraints, land use, and input from the project partners and stakeholders. These alternatives are intended to provide the Borough with additional options should the Matsonford Road Bridge alternative be determined infeasible or otherwise not preferred. The consultant should propose appropriate study-area boundaries and candidate crossing locations as part of its approach, in coordination with the Borough and other project partners. The proposed study area should be sufficiently broad to allow for the identification and evaluation of meaningful alternatives beyond the Matsonford Road Bridge.

  • The RFP asks for structural considerations for a facility attached to or beneath Matsonford Road Bridge, but does not specify what inspection records, drawings, or prior engineering studies are available. What bridge plans, inspection reports, load ratings, and prior studies will be provided? Should the consultant’s assessment rely on available records and planning-level review, or include field inspection, surveying, or other investigations?

    These types of materials are not currently on file with the Borough. It is assumed that any available documentation will need to be obtained through coordination with PennDOT. The assessment should draw upon available bridge documentation and other relevant information, supplemented by a site visit and visual assessment as appropriate. The consultant should use professional judgment to determine the level of structural evaluation necessary to support its findings and identify any additional investigation or analysis that may be warranted to advance the concept.