Secondary Sedimentation Basins Upgrades Project - Short- term Improvements for Basins (1) & (2)
Description
West County Wastewater District (WCW) is soliciting bids from qualified contractors to provide construction services for the Secondary Sedimentation Basins 1 and 2 Short-Term Improvements Project at the Water Quality & Resource Recovery Plant (WQRRP). WCW identified the need to rehabilitate and upgrade all four secondary sedimentation basins at the WQRRP to maintain reliable operation and treatment performance and retained Black & Veatch to provide engineering design services for the improvements. The work under this contract is limited to Secondary Sedimentation Basins (SSB) 1 and 2 and generally includes demolition, concrete repairs, coatings, mechanical improvements, site restoration, and all other work necessary to complete the improvements in accordance with the Contract Documents. West County Wastewater District will directly procure and furnish the replacement collector chains and flights for SSB-01 and SSB-02; however, the Contractor shall be fully responsible for receiving, handling, storing, protecting, coordinating, and installing the owner-furnished equipment as part of the Work. Contractors shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the project and place the rehabilitated facilities into successful operation in accordance with the Plans and Specifications. Scope of Work Work Covered By Contract Documents The Work to be performed under these Contract Documents is generally described as follows: 1. Sedimentation Basin No. 1 (SSB No. 1): Procurement of the equipment for SSB No.1 will be covered by the Owner under a separate Procurement Contract. Contractor shall install Owner procured equipment for SSB No.1. Removal and replacement of the No. 3 water system, including piping, valves, supports, hose reel system, and appurtenances. installation, inspection and testing of chains-and-flight mechanism and accessories including drivers, motors, wall bearing supports, sprockets, flights, shafts, and chains. Removal and replacement of 18 precast concrete walkway panels along SSB Nos. 1 and 2 (as shown on the Drawings), replaced in kind. Removal and replacement of two sluice gates along SSBs Nos. 1 and 2 (as shown on the Drawings). Miscellaneous concrete surface restoration and crack repair. Upgrades to electrical components, including modifications to existing electrical systems to support new collector equipment and integration with the existing control system. 2. Sedimentation Basin No. 2 (SSB No. 2): Procurement of the equipment for SSB No.2 will be covered by the Owner under a separate Procurement Contract. Contractor shall install Owner procured equipment for SSB No.2. Removal and replacement of existing chain-and-flight mechanisms and accessories, including drives, motors, wall bearing supports, sprockets, flights, shafts, and chains. installation, inspection and testing of chains-and-flight mechanism and accessories including drivers, motors, wall bearing supports, sprockets, flights, shafts, and chains. Removal and replacement of the No. 3 water system, including piping, valves, supports, hose reel system, and appurtenances. Removal and replacement of 18 precast concrete walkway panels along SSB Nos. 1 and 2 (as shown on the Drawings), replaced in kind. Removal and replacement of two sluice gates along SSBs Nos. 1 and 2 (as shown on the Drawings). Miscellaneous concrete surface restoration and crack repair. Upgrades to electrical components, including modifications to existing electrical systems to support new collector equipment and integration with the existing control system. Please refer to the attachments section (Attachment A) for the entire Bid Documents and Design Drawings. Work Seasons Work on the secondary sedimentation basins shall conform to the operational requirements of the Water Quality and Resource Recovery Plant (WQRRP)’s Dry and Wet Seasons. These seasons are defined as: 1. Dry Season – From May 15th to September 30th, the Owner must have at least two sedimentation basins in full operation to operate the facility and meet treatment requirements. 2. Wet Season – From October 1st to May 14th, the Owner must have at least three sedimentation basins in full operation to operate the facility and meet treatment requirements. Intermediate Milestones Milestone 1: SSB No.1 Work Approved for District use. This sedimentation basin must be complete and all installation, inspection, startup, functional testing, and commissioning activities must be complete in order for the Owner to take occupancy/utilization of the sedimentation basin. The first sedimentation basin must be accepted for occupancy/utilization by the Owner and treating wastewater by May 15th, 2027 . Delay of specific ancillary or remaining items to be completed regarding this sedimentation basin approval may be approved by the Owner in writing. Milestone 2: SSB No.2 Work Approved for District use. This sedimentation basin must be complete and all installation, inspection, startup, functional testing, and commissioning activities must be complete in order for the Owner to take occupancy/utilization of the sedimentation basin. This sedimentation basin must be accepted for occupancy/utilization by the Owner and treating wastewater by September 30th, 2027 . Delay of specific ancillary or remaining items to be completed regarding this sedimentation basin approval may be approved by the Owner in writing. Milestone 3: Final Completion: All remaining punch list work, site restoration, project closeout, and all activities not related to previously completed milestones must be completed prior to the expiration of the number of days listed in the Contract. Following completion of Milestone 3, Contractor may request Engineer’s final inspection and Contract acceptance. Work By Owner Owner shall perform certain activities in connection with the Project with its own personnel as follows: Drain and transfer contents of SSBs prior to the work. Process liquid and sludge will be removed and the SSB hosed down. WCW will directly procure and furnish the replacement collector chains and flights for SSB-01 and SSB-02 and will coordinate the anticipated delivery schedule with the Contractor. Items Furnished By Owner A. Shop and installation drawings pertaining to the equipment and materials will be furnished to Contractor upon completion of review by Engineer B. Equipment: Complete chain and flight system associated with SSB’s No. 1 and 2. C. After delivery, Contractor shall be responsible for the unloading, handling, storage, and installation of the equipment and materials, all in accordance with the Contract Documents. D. Owner and Engineer shall be responsible for coordination and scheduling of the services provided by the Procurement Vendor. Items Furnished By Contractor Contractor shall be fully responsible for all materials and equipment which it has furnished. This includes but not limited to all labor, equipment, materials, supervision, and coordination necessary to: Receive and unload the WCW-furnished collector chains and flights upon delivery. Inspect the equipment upon receipt and promptly notify WCW of any visible damage, shortages, or discrepancies. Properly handle, store, secure, and protect the equipment from the time of receipt through installation. Coordinate the installation of the owner-furnished equipment with all other Work. Install, adjust, test, and place the collector chains and flights into service in accordance with the Contract Documents and manufacturer requirements. Perform all associated demolition, concrete repairs, coatings, mechanical improvements, site restoration, and other work necessary to provide complete and operational improvements to SSB-01 and SSB-02. the Contractor shall not include the purchase cost of the replacement collector chains and flights in its Bid. All costs associated with receiving, unloading, handling, storage, protection, coordination, and installation of the owner-furnished equipment shall be included in the Contractor's Bid. Delivery and Handling of Items Furnished by Owner Equipment and materials shall be protected from exposure to the elements. All equipment shall be stored in accordance with the requirements of the Contract Documents. All equipment shall be arranged and installed as indicated on the Drawings, and in conformity with installation drawings and instructions furnished to Owner by the manufacturer of the equipment. The chain and flight mechanism components previously ordered to be furnished by Owner shall be installed under the supervision of an experienced erection supervisor whose services are included as a part of the equipment procurement contract and will be provided by Owner at no expense to Contractor. The extent to which the services of the erection supervisor will be furnished will be determined by Owner. Contractor shall be required to coordinate and schedule this supervision and inspection by the Supplier in order to align with their schedule. Any delay as a result of lack of coordination or communication will be the responsibility of the Contractor. Before being placed in operation, all equipment furnished by Owner and installed by Contractor will be inspected, checked, and adjusted by an experienced and competent technical representative of the equipment manufacturer. The technical representative will also place the equipment in initial operation under both trial and full load conditions and determine whether its operation is satisfactory and proper. This service is included as part of the equipment procurement contract and will be provided by Owner at no cost to Contractor, as set forth in the Quality Control section. Notice to Bidders Notice INVITING SEALED BIDS WEST COUNTY WASTEWATER Secondary Sedimentation Basins Upgrade Project - Short-term Improvements For Basin (1) & (2) PROJECT NO. 24PP505 NOTICE IS HEREBY GIVEN THAT the Board of West County Wastewater, Richmond, California, invites and will receive sealed bids for furnishing all labor, equipment, materials and services specified for the construction of WCW Project No. 26-IFB-040 , Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2) , in conformance with the approved Contract Documents. The work covered by this contract will be performed at 2377 Garden Tract Road, Richmond, CA 94801 . The work includes, but is not necessarily limited to, the following:\ Sedimentation Basin No. 1 (SSB No. 1): a. Procurement of the equipment for SSB No.1 will be covered by the Owner under a separate Procurement Contract. Contractor shall install Owner procured equipment for SSB No.1. b. Removal and replacement of the No. 3 water system, including piping, valves, supports, hose reel system, and appurtenances. c. Removal and replacement of 18 precast concrete walkway panels along SSB Nos. 1 and 2 (as shown on the Drawings), replaced in kind. d. Removal and replacement of two sluice gates along SSBs Nos. 1 and 2 (as shown on the Drawings). e. Miscellaneous concrete surface restoration and crack repair. f. Upgrades to electrical components, including modifications to existing electrical systems to support new collector equipment and integration with the existing control system. 2. Sedimentation Basin No. 2 (SSB No. 2): Procurement of the equipment for SSB No.2 will be covered by the Owner under a separate Procurement Contract. Contractor shall install Owner procured equipment for SSB No.2. Removal and replacement of existing chain-and-flight mechanisms and accessories, including drives, motors, wall bearing supports, sprockets, flights, shafts, and chains. Removal and replacement of the No. 3 water system, including piping, valves, supports, hose reel system, and appurtenances. Removal and replacement of 18 precast concrete walkway panels along SSB Nos. 1 and 2 (as shown on the Drawings), replaced in kind. Removal and replacement of two sluice gates along SSBs Nos. 1 and 2 (as shown on the Drawings). Miscellaneous concrete surface restoration and crack repair. Upgrades to electrical components, including modifications to existing electrical systems to support new collector equipment and integration with the existing control system. Contractor shall perform all cleaning of SSBs No. 1 and 2 necessary to achieve sanitary working conditions and to prepare surfaces for required tasks. Contractor shall include sufficient time in the schedule to perform the cleaning, and no delay shall be claimed. The existing facility must be always kept in operation. The Engineer’s estimate for the work is $ 5,625,000 . A pre-bid conference to discuss the project will be held at 10:00 am , local time on Tuesday, November 10, 2026 at 2377 Garden Tract Road, Richmond, CA 94801 . A mandatory site visit shall be conducted by all prime contractors interested in bidding the project. This site visit can be done immediately after the pre-bid conference. The alternate time for the mandatory site visit is at 10:00 AM local time on 09/12/2026 at the 2377 Garden Tract Road, Richmond, CA 94801 . Bid opening date: WCW will receive sealed bids via WCW’s e-Procurement Portal, OpenGov, ( https://www.opengov.com ) until 3:00 pm , local time, Wednesday, December 16, 2026 . At that time, accepted bids will be publicly opened. Contract Documents are available on WCW's e-Procurement Portal, without charge. Inquiries regarding further information about the project shall be submitted in writing through the OpenGov Question/Answer Tab via WCW's e-Procurement portal, on or before, Question & Answer Submission Date by Question & Answer Submission Time. Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on WCW's e-Procurement Portal. Bidders are directed to submit their bids in accordance with requirements of the Invitation for Bids (IFB) No. 24PP505, Secondary Sedimentation Basin Upgrade Projects – Short-term Improvements for Basins (1) and (2), which is included as an attachment on OpenGov . IFB No. 24PP505 supersedes and controls over the OpenGov version of the IFB. In order to submit a bid, OpenGov requires Bidders to complete a Schedule of Bids. This Schedule of Bids is identical to the one included in IFB No. 24PP505. Bidders should submit their pricing information using OpenGov’s Schedule of Bids, rather than the hard-copy Schedule of Bids included in IFB No. 24PP505. Bidders must submit all other forms included in IFB No. 24PP505. The WCW Board of Directors reserves the right to reject any or all bids for the work and waive any irregularity in bids received. Dated at Richmond, California, this 26th day of October 2026 Mohammed Masoud , Project Manager West County Wastewater County of Contra Costa, State of California Introduction Summary Background Contact Information Timeline Instruction to Bidders PREPARATION AND SUBMISSION OF PROPOSALS Proposals shall be submitted via WCW’s e-Procurement Portal, ProcureNow as required by this solicitation. All proposal forms shall be properly executed and all information shall be provided as required. Failure to comply may be cause for rejection of the proposal. The quantities included in the bid proposal are estimates of the work to be completed. WCW may add work of the same nature to this Contract if the addition is in the best interests of WCW. Partial or incomplete proposals will not be accepted. Proposals shall be in strict conformity with the approved Contract Documents for Project No. 26-IFB-040 , Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2) , and any Addenda thereto. The bidder shall submit its proposal prior to the stated closing time. Any proposal received after the stated closing time for receipt of proposals will not be accepted through the e-Procurement Portal. The preparation of a proposal shall be by and at the expense of the bidder. Changes in or additions to the bid form, recapitulation of the work bid upon, alternative bids or any other modifications of the bid form which are not specifically called for in the Contract Documents may result in rejection of the bid by WCW, as not being responsive to the Notice to Contractors. No oral or telephonic modification of any bid submitted will be considered. Proposals shall be firm for sixty (60) calendar days from and after the stated closing time, or until a Contract is fully executed by WCW and a bidder, whichever is earlier. EXAMINATION OF DOCUMENTS AND EXPLANATION TO BIDDERS Any bidder planning to submit a proposal is responsible for examining with appropriate care the complete Contract Documents, including all Addenda, and is also responsible for being informed with respect to all conditions which might in any way affect the cost or the performance of any work. Failure to do so will be at the sole risk of the bidder, and no relief can be given for errors or omissions by the bidder. All questions relative to the Contract Documents shall be in writing and shall be submitted in writing through the ProcureNow Question/Answer Tab via the WCW's e-Procurement portal, on or before, Thursday, November 26, 2026 by 3:00 pm . Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on WCWs e-Procurement Portal. Should the bidder find discrepancies in or omissions from the Contract Documents, or should the intent or meaning of the documents appear unclear or contain patent ambiguities, the bidder shall at once notify WCW of such findings. Questions received less than ten (l0) calendar days prior to the date for opening of the bids may not be answered. The bidder making such request shall be solely responsible for its timely receipt by WCW. Replies to such findings may be made in the form of addenda which shall be posted on WCW's e-Procurement Portal. Addenda notifications will be emailed to all persons on record as following this ITB. Failure of any bidder to receive any such addenda or interpretation shall not relieve such bidder from any obligation under their bid as submitted. All addenda so issued shall become part of the contract documents. Only questions answered by formal written addenda will be binding. Copies of the Contract Documents are available for examination without charge via the e-Procurement portal. Copies of the Contract Documents may be obtained for a non-refundable fee of $110.00 per set if requested by mail. Payment must be made prior to the time any documents are mailed. Make check and/or money order payable to West County Wastewater (WCW). West County Wastewater 2910 Hilltop Drive Richmond, CA 94806 SITE INSPECTION AND CONDITIONS It is the intent of WCW to provide a safe working environment under normal conditions. BECAUSE OF POTENTIALLY HAZARDOUS CONDITIONS SUCH AS CONFINED SPACES, POTENTIALLY EXPLOSIVE ATMOSPHERES, AND POSSIBLE EXPOSURE TO PATHOGENS, SPECIALIZED EQUIPMENT MAY BE NECESSARY AND STRICT CONFORMANCE WITH SAFETY REGULATIONS WILL BE REQUIRED. Attention is further directed to Section titled "Article GC-20, Laws and Regulations". In addition to examination of the Contract Documents, each prospective bidder shall become fully informed regarding all existing and expected conditions and matters which could affect any work or performance of any work in any way, and especially the cost of performing any work. The project may be visited and conditions discussed at the pre-bid conference set forth in, “Notice to Contractors”. Any failure to fully investigate the sites or the foregoing conditions shall not relieve the bidder from responsibility for estim
Published attachments
- Secondary Sedimentation Basins Upgrade - Shor-term Improvements For Basin (1) & (2) Bid Documents
- Exhibit A - Secondary Sedimentation Basins Upgrade Project - Short-term Improvements For Basins (1) & (2)
- Secondary_Sedimentation_Basins_Upgrades_Project_-_Short-term_Improvements_for_Basins_(1)_&_(2)_(Addendum_#5_Revision).pdf
Addenda and notices
Addendum #1 · 1
Addendum No. 1 has been issued for this project. The addendum includes revisions and clarifications to the Contract Documents, including corrections to procurement deadlines as well as the Liquidated Damages. Please review the attached Addendum No. 1 in its entirety. All bidders shall acknowledge receipt of the addendum in accordance with the bid requirements.
Addendum #2 · 2
Addendum No. 2 has been issued for this project. The addendum includes revisions and clarifications to the Contract Documents, including the Mandatory Pre-Bid Meeting Agenda as well as the PPE Requirements for the Mandatory Pre-Bid Meeting Attendees. Please review the attached Addendum No. 2 in its entirety. All bidders shall acknowledge receipt of the addendum in accordance with the bid requirements.
Addendum #3 · 3
Addendum No. 3 has been issued for this project. The purpose of this addendum is to provide the attendance sheets for the two Mandatory Pre-Bid Meetings held on November 10, 2026, at 10:00 AM and November 12, 2026, at 10:00 AM . Please review the attached attendance sheets in their entirety. The attendance sheets are being issued for informational purposes and shall be considered part of the Contract Documents. All bidders are responsible for reviewing the information contained in this addendum and acknowledging receipt in accordance with the bid requirements.
Addendum #4 · 4
Addendum No. 4 has been issued to provide revised drawing sheets G-00-002 (Drawing List), S-00-005 (Miscellaneous Details), E-00-607 (Equipment Control Schematics), and E-00-101 (Electrical Site Plan), which were referenced but inadvertently omitted from Addendum No. 1. All bidders shall acknowledge receipt of the addendum in accordance with the bid requirements.
Addendum #5 · 5
Addendum No. 5 has been issued to provide clarification regarding the DBE Solicitation Requirement and Bid Submittal Checklist, furnish additional information related to Owner-furnished Flights and Chains equipment, and establish revised project milestones and basin access requirements for the project. The addendum also includes the final Brentwood Industries proposal for the Owner-furnished Flights and Chains equipment. All bidders shall acknowledge receipt of the addendum in accordance with the bid requirements.
Public questions and answers
Please note, the Invitation to bid (Page 2 of 3) states "All bids must be received through the West County Wastewater’s e-Procurement Portal, OPENGOV at https://www.opengov.com by 03:00 p.m. on Day October 23rd, 2026.". Please confirm if the bid date is in fact Wednesday, December 16, 2026 3:00pm
Thank you for bringing this to our attention. The date referenced on Page 2 of 3 of the Invitation to Bid is a typographical error. The correct bid submission deadline is Wednesday, December 16, 2026, at 3:00 p.m. PST. All bids must be submitted through West County Wastewater's e-Procurement Portal (OpenGov) no later than that date and time. An addendum will be issued to correct the discrepancy in the bid documents.
Please confirm the Question Submission Deadline is November 26, 2026 (Thanksgiving Day).
Thank you for your question. Yes, the Question Submission Deadline remains November 26, 2026, at 3:00 p.m. PST. Bidders may submit questions at any time on or before the deadline through the OpenGov procurement portal. The fact that the deadline falls on Thanksgiving Day does not change the deadline or prevent bidders from submitting questions electronically via OpenGov.
Can you please post the attendance list from the pre-bid conference held on November 10th and the mandatory site visit held on the 10th and alternatively the 12th? Thank you!
The attendance sheets for the Mandatory Pre-Bid Meetings held on November 10, 2026 and November 12, 2026 were issued and made available to all prospective bidders through Addendum No. 3. Please refer to Addendum No. 3 for the attendance sheets and related information. Thank you.
Addendum #1 Drawing Revisions: Item 1 refers to Figure 1 Item 6 refers to Figure 2 Item 16 refers to Figure 3 Item 17 refers to Figure 4 The Addendum does not appear to include the Figures, please provide.
Those figures have since been provided as part of Addendum No. 4 and are included as the following revised drawing sheets: Figure 1 – Drawing No. G-00-002, Drawing List Figure 2 – Drawing No. S-00-005, Miscellaneous Details Figure 3 – Drawing No. E-00-607, Equipment Control Schematics Figure 4 – Drawing No. E-00-101, Electrical Site Plan Bidders shall refer to Addendum No. 4 for the complete drawings associated with the revisions identified in Addendum No. 1. Thank you for bringing this omission to our attention.
Addendum 1 Drawing Revision 16) Sheet E-00-607 states "a) See Figure 3 for revision. Addendum 1 Drawing Revision 17) Sheet E-00-101 states "a) See Figure 4 for revision. No revised revised drawings were included and we are unable to location Figure 3 or Figure 4. Please clarify.
The requested figures have been provided as part of Addendum No. 4 and are included as the following revised drawing sheets: Figure 1 – Drawing No. G-00-002, Drawing List Figure 2 – Drawing No. S-00-005, Miscellaneous Details Figure 3 – Drawing No. E-00-607, Equipment Control Schematics Figure 4 – Drawing No. E-00-101, Electrical Site Plan Bidders shall refer to Addendum No. 4 for the complete drawings associated with the revisions identified in Addendum No. 1.
Item 14 of the Bid Submittal Checklist (Section 00 43 93) requires proof of a posted 30-day minimum DBE solicitation per Section 00 45 27, noted as “[SRF PROJECTS ONLY].” Section 00 45 27 is not in the Contract Documents, and we found no reference to State Revolving Fund (SRF) or other federal funding for this project. Please confirm that: -This project is not SRF or federally funded. -The 30-day DBE solicitation and Section 00 45 27 do not apply, and bidders may mark Item 14 as N/A without affecting responsiveness. If the project is SRF-funded, please issue Section 00 45 27 and any related federal requirements (DBE, Davis-Bacon, AIS/BABA) by addendum. Please also confirm the bid date will be adjusted so bidders have time to meet the 30-day solicitation period.
West County Wastewater confirms that this project is not a State Revolving Fund (SRF) project and is not federally funded. The reference contained in Item 14 of the Bid Submittal Checklist (Section 00 43 93) regarding proof of a posted 30-day minimum DBE solicitation and Section 00 45 27 is included as part of the WCW's standard bidding checklist template, which is used for a variety of projects, including SRF-funded projects. As such, this requirement is not applicable to this project. Accordingly: - This project is not SRF-funded and is not subject to federal funding requirements. - Section 00 45 27 does not apply to this project. - The 30-day DBE solicitation requirement does not apply to this project. - Bidders may mark Item 14 of the Bid Submittal Checklist as "N/A" (Not Applicable) without affecting the - responsiveness of their bid. No adjustment to the bid submission deadline is necessary, as there is no requirement for bidders to complete a 30-day DBE solicitation period for this project.
Can you please confirm the L.D. amount
Please refer to Addendum No. 01, issued on October 29, 2026, which clarified the Liquidated Damages provisions for this project. As stated in the addendum, the Liquidated Damages amount is $5,000 per calendar day. Contractors are advised to review Addendum No. 01 and incorporate this clarification into their bid preparation.
Please provide pre-purchased equipment vendor submittals and vendor commercial proposals to allow Contractors to evaluate installation and startup/commissioning costs.
Please refer to Addendum No. 5, which includes the final technical proposal submitted by Brentwood Industries and utilized by West County Wastewater (WCW) for the procurement of the Owner-furnished Flights & Chains equipment for Secondary Sedimentation Basin No. 1 and Secondary Sedimentation Basin No. 2. The attached proposal is provided to assist bidders in evaluating all costs associated with receiving, unloading, storage, installation, startup, testing, and commissioning of the Owner-furnished equipment. Bidders shall review the proposal and all related Contract Documents and incorporate all applicable costs into their bid pricing.
Instructions to Bidders Section 00 21 13, Subsection 1, PREPARATION AND SUBMISSION OF PROPOSALS states that proposals shall be mailed to West County Wastewater. Notice to Bidders states that WCW will receive bids via WCW’s e-Procurement Portal. Please confirm that mailed Proposals are not required.
Per the Notice to Bidders, all bids for this project shall be submitted electronically through West County Wastewater's e-Procurement Portal (OpenGov). Mailed hard-copy proposals are not required and will not be accepted as the official bid submission. Bidders shall submit their complete proposals through the OpenGov portal prior to the bid due date and time specified in the solicitation documents.