Sienna Area Corridor Plan

Description

The Houston-Galveston Area Council (H-GAC) seeks a qualified contractor to perform a corridor planning study for Sienna Parkway and the surrounding roadway network. In partnership with the City of Missouri City and Fort Bend County, H-GAC will be conducting this planning study to address recent safety concerns, traffic incidents, and increasing transportation demands along Sienna Parkway and the surrounding roadway network. The ultimate goal of the study is to improve regional connectivity, reduce congestion, enhance safety for all users, and support future residential and commercial growth throughout the Sienna community and surrounding areas. Scope of Work Overview The planning study area encompasses the Sienna master-planned community and surrounding transportation network within the City of Missouri City, the City of Arcola, and Fort Bend County’s extraterritorial jurisdiction (ETJ). It generally extends from State Highway 6 and FM 521 on the west to the eastern portions of the Sienna development, and from Sienna Ranch Road on the north to Miller Road and the southern portions of Sienna. Sienna Parkway is the area’s primary transportation corridor and a critical connection for residents, businesses, schools, and emergency services. Recent incidents and temporary roadway closures have highlighted the area’s reliance on a limited transportation network, causing significant congestion, delays, restricted residential access, and potential impacts on emergency response. Continued residential and commercial growth throughout the Sienna area increases the need to evaluate transportation resiliency, network redundancy, safety, and future mobility needs. The planning study will identify transportation improvements and alternative connections to enhance safety, improve travel reliability, strengthen emergency access, and support the community’s long-term growth. Emphasis will be placed on following focus areas: 1. The proposed Bees Passage Bridge crossing and associated connections 2. The McKeever Road Connector, Sienna Lakes roadway network, and future north-south transportation connections between State Highway SH 6 and FM 521 3. The proposed Miller Road Connector extending south of Waters Lake Blvd The selected Contractor must identify potential solutions, in addition to or in lieu of, the three focus areas listed above. The Sienna Area planning study will evaluate existing and future traffic conditions, roadway safety, multimodal transportation opportunities, connectivity needs, operational deficiencies, and planned growth within the Sienna area. The resulting Sienna Area Corridor Plan will identify and prioritize feasible mobility and safety projects, develop planning-level cost estimates, and recommend implementation strategies and funding opportunities to improve regional connectivity, reduce congestion, enhance safety for all users, and support future residential and commercial growth throughout the Sienna community and surrounding areas. Key activities will include: Traffic and crash analyses Roadway and intersection assessments Travel demand forecasting Stakeholder and public engagement Environmental and right-of-way screening Development of short, mid, and long-term transportation improvement alternatives Contractor execution of the planning study must be creative and suited for the specific needs of the project sponsors and the plan areas. The project is expected to last approximately eighteen (18) months, estimated to begin January 2027. H-GAC reserves the right to extend and/or expand the scope of this contract, subject to H-GAC Board of Directors approval and/or additional funding availability. All materials developed for H-GAC related to this project will belong to H-GAC and must feature H-GAC branding (See Attachments Section for guidance document). All deliverables must be submitted to H-GAC on a flash drive containing original files in an editable format (i.e., Word, Excel, Power Point, GIS (Geographic Information System), etc.) and will be reviewed and approved by H-GAC prior to distribution. The final decision on project deliverables and content will remain with H-GAC. Note: This is a planning study; no engineering services or stamped drawings are required. Task 1 - Project Management and Coordination Project Management Plan (PMP) Prepare a PMP describing the overall approach and methodology for completing the corridor planning study. The PMP will include work organization, responsibilities, coordination, communication procedures, memorandum and report formats, graphic production standards, quality assurance/quality control plan (QA/QC), and project schedule. The PMP is a living document and will be updated throughout the project. Project Administration Conduct activities as detailed within the PMP. Progress reports, and updated project schedules must be submitted to H-GAC’s Project Manager monthly and are required whether or not the Contractor submits an invoice for that month. Monthly progress reports will include a summary of: Activities, ongoing or completed, during the reporting period Activities planned for the following month Problems encountered and remedial actions taken Project status report detailing milestones completed and a tabulation of percent complete by task Coordinate and hold bi-weekly progress meetings, either in person or via conference call, with H-GAC to discuss outstanding issues and necessary preparations for upcoming events and activities. Provide continuous quality assurance and quality control throughout the duration of the plan. Whether bi-weekly or monthly reporting is required will be confirmed at kickoff with project manager and included in final contract. Sub-Contractor Management Execute and administer separate agreements with each subcontractor Ensure that all subcontractor work is performed in accordance with the approved scope of work, schedule, and contract requirements Monitor subcontractor staff activities and ensure their adherence to schedules. Review and recommend approval of subcontractor invoices and include such invoices and supporting documentation as part of the Contractor’s monthly invoice submittal to H-GAC H-GAC will have no direct contractual relationship with any subcontractor and will rely on the Contractor for all subcontractor management and payment administration. Provide H-GAC with copies of all executed subcontractor agreements within thirty (30) days of execution. Task 1 Deliverables PMP within 30 days of contract start date Monthly invoices are due by the 10th of each month Monthly progress reports and schedules Project schedule (Gantt Chart) updated as needed Project status report, detailing milestones completed, and a tabulation of percent completed by task. Copies of Sub-contractor contracts within 30 days of execution Task 2 - Existing Conditions, Needs, and Gaps Assessment Establish a clear, data-supported understanding of existing and anticipated transportation conditions within the plan area. Using relevant local-agency, stakeholder, and field-collected information, identify and document mobility, safety, connectivity, resiliency, multimodal access, and emergency-response needs and gaps. The resulting assessment will provide the technical foundation for the alternatives analysis, recommendations, and implementation plan developed in the subsequent tasks below: Examine the three priority planning study areas identified in the City’s Major Thoroughfare Plan, including the Bees Passage Bridge crossing over Briscoe Canal to Sienna Ranch Road, the Sienna Lakes network, and the Miller Road Connector. Utilize GIS, aerial imagery, and existing planning documents to establish a comprehensive transportation baseline and identify mobility constraints, connectivity gaps, and future growth patterns. Conduct planning-level feasibility assessments considering right-of-way impacts, environmental constraints, utility conflicts, drainage considerations, and constructability Identifying feasible alternate routes that enhance connectivity, mobility, safety, and overall corridor performance, including any additional route options identified during the planning process. Compile, review, and organize available transportation, safety, land use, demographic, development, and environmental data. Evaluate the community's reliance on Sienna Parkway as the primary access corridor and identify opportunities for additional network redundancy and emergency access routes c oordinating closely with emergency service providers to identify critical access needs and improve transportation network reliability during emergencies and roadway incidents. Assess current and future travel demand utilizing H-GAC regional travel demand forecasts, approved development data, demographic projections, and land use assumptions, including roadway extensions, new corridor connections, bridge crossings, intersection improvements, access management strategies, and operational enhancements. Analyze transportation system performance under normal operating conditions, documenting existing and anticipated conditions for roadway operations, peak-period congestion, incident-related roadway closures, emergency evacuation scenarios, and future growth conditions. Identify and evaluate opportunities to improve east-west and north-south connectivity throughout the Sienna area and surrounding ETJ. Prioritize transportation improvements using objective criteria that consider safety benefits, multimodal access, connectivity, emergency access, and network resiliency, implementation feasibility, cost-effectiveness, environmental impacts, and community support. Evaluate environmental factors including floodplains, wetlands, waterways, and potential permitting considerations associated with proposed transportation improvements. Task 2 Deliverables: Attend kickoff meeting to confirm the plan vision, goals, and evaluation considerations with H-GAC and the Steering Committee. Data collection and data-source summary Summary of the existing conditions (highly graphical) List and graphic of the issues identified by the Steering Committee, Stakeholders/Focus Groups, and the public to include needs and gaps in the plan area Online data dashboard Shapefile format of data available Data Appendix The selected consultant will propose a timeline for developing and delivering the dashboard as part of their overall project approach and schedule. Task 3 - Public Outreach Develop and implement a robust public engagement program utilizing stakeholder meetings, public workshops, surveys, online engagement tools, and coordination with homeowner associations and community organizations to foster meaningful and equitable participation within the community. Incorporate these concepts into the Public Involvement Plan (PIP). H-GAC will: Coordinate all meetings and expected frequency/timeline of meetings. Meetings will be in-person and virtual. Secure facilities for all meetings, including any required coordination with local partners. Host and maintain a project website throughout the duration of the plan’s effort. Establish the Steering Committee in coordination with the city, county, and Contractor team. Identify key Focus Groups or Stakeholders with the assistance of the Steering Committee (e.g., partner agencies, public health agencies, social service agencies, Community Based Organizations). Develop the base map. Develop and print, if necessary, public outreach materials such as flyers, yard signs, postcards and social media blasts. Approve all Contractor-developed content before posting or distributing. Develop and post notices for Public Meetings. Retain copies of all documents for each meeting, as required. Contractor will: Develop a public outreach program. Prepare for all meetings. Minimum meetings to be performed: A Steering Committee will be established to guide the technical development of the plan. At a minimum, the Steering Committee will be composed of Missouri City, Fort Bend County, Texas Department of Transportation (TxDot) and H-GAC staff. At least one (1) Focus Group will be formed consisting of representatives of directly impacted community members. At a minimum there will be three (3) Steering Committee meetings, two (2) “rounds” of Focus Group or Stakeholder meetings and two (2) public events. Each “round” of meetings may include more than one meeting depending on if there is more than one (1) Focus Group. The maximum number of meetings will be stated in the proposal. Contractor will also give updates at City Council and/or Commissioners Court meetings, if necessary, and present the Final Plan at City Council and/or Commissioners Court. Recommend the number and type of meetings needed to successfully develop Sienna Area Corridor Plan. Provide a team member with effective communication and presentation skills to engage a wide variety of audiences and facilitate meetings. Develop branding for the project and content for the project website. Provide appropriate staffing, including translation services (Spanish) if necessary and other display materials as needed for each meeting. Prepare meeting notices, agendas, presentations, meeting materials, sign-in sheets, displays, handouts, comment cards, surveys, and meeting summaries. Provide all meeting materials to H-GAC in fully editable native/source file formats, along with PDF versions, at an established interval prior to all public meetings. All materials are subject to H-GAC review and approval. H-GAC must receive the materials sufficiently in advance to complete its review and approve all meeting materials no later than one (1) week prior to each public meeting. Print handouts and display materials for all meetings. Provide a summary report of the outcomes of Public Engagement efforts. Note: H-GAC encourages proposers to identify opportunities to coordinate with existing community meetings and other agencies’ outreach efforts. Proposers may recommend efficient engagement approaches that achieve the project’s objectives and should describe those approaches in their proposal. The meeting schedule will be determined as the project progresses and coordination with stakeholders and the public takes place. Task 3: Deliverables Public Involvement Plan (PIP) within 45 days of contract execution date Meeting summary for all meetings including handouts, exhibits/display boards, sign-in sheets, and presentation within ten (10) days of the meeting TxDOT meeting exhibits forms updated monthly as needed Survey tool and results Community outreach contact list Task 4 - Analysis of Identified Issues, Needs, and Gaps Using the collected data on mobility needs and challenges, the Contractor will determine appropriate methods for analyzing the identified issues. The resulting alternatives will be presented to the Steering Committee for review and feedback. The Contractor will also conduct a comprehensive analysis of the roadway network and develop at least two scenarios for improving mobility in alignment with regional goals. Task 4: Deliverables • Presentation of Scenarios for improving mobility with summary of analysis results • Summary of the alternative analysis with recommendations on the chosen or eliminated alternatives. Note: H-GAC will perform the travel demand analysis, as needed. The need for a travel demand analysis will be determined based on the mobility issues identified through the existing conditions assessment, data collection, and evaluation of proposed alternatives. If the proposed scenarios involve significant changes to roadway capacity, traffic patterns, or regional travel demand that require additional modeling to evaluate their impacts, a travel demand analysis may be warranted. H-GAC will coordinate with the consultant to determine whether this analysis is necessary and, if needed, H-GAC will be responsible for performing the analysis. Task 5 - Alternative Recommendations Alternative recommendations will be evaluated based on the Plan’s vision and goals and input from the Steering Committee. The benefits of the projects/plan and funding mechanisms must also be incorporated. Estimate the measurable transportation, safety, mobility, and community benefits expected from implementing the plan’s recommendations. Include multimodal transportation opportunities in corridor recommendations that are consistent with the community’s character, including pedestrian, bicycle, and school access connectivity improvements. Develop planning-level cost estimates for all recommended alternatives. Task 5: Deliverables Actionable recommendations supported by technical analysis, stakeholder input, and planning-level feasibility evaluations that position Missouri City, Fort Bend County, and H-GAC for future transportation investments and grant funding opportunities. Prioritized list of all recommended projects with estimated cost Maps of recommended projects Presentation of recommended Solutions and Strategies Proposed recommendations that are eliminated from further consideration with an explanation of why. Task 6 - Implementation Plan Develop an Implementation Plan for the Sienna Area Corridor Plan recommendations. At a minimum, the Implementation Plan must include the following: List of roadway projects for a future mobility plan. Established planning-level priorities and phasing recommendations, as appropriate. Short (0-5) years), medium (6-10 years), and long-term (11+ years) implementation actions. Established performance measures and monitoring strategies to track progress over time. Federal, state, regional, and local funding opportunities to support implementation of recommended transportation projects. Prioritization, funding identification, phasing, grant readiness, and actionable recommendations, combined into one implementation strategy. Prioritized strategies based on feedback from the community Corridor and Intersection Summary Sheets List of strategies eliminated from further analysis and why Task 6: Deliverable Implementation Plan Final Contract Deliverables Provide the following minimum deliverables: A completed Public Involvement Plan (PIP) Online Interactive project map An Executive Summary of the Final Plan capturing major concepts and recommendations, overarching issues, needs, gaps and solutions in the Sienna Area Corridor Plan. Final Sienna Area Corridor Plan will be highly graphical and must be included in the Appendix along with any data collected, public outreach, and other deliverables mentioned in the above tasks. H-GAC Project Tracker populated (table for use on the web-based platform to house recommendations, itemized cost, identification of funding sources and opportunities, identification of most actionable catalyst or quick win projects) All deliverables must be submitted on a flash drive. All files must be original and in an editable format, including graphics, schematics, and GIS files (to include .shp, gdb, and .mxd files) utilized to make illustrations. All documents must be submitted to H-GAC in an editable format (i.e. Word, Excel, Power Point, GIS, etc.) and will be reviewed and approved by H-GAC prior to distribution. The final decision on project deliverables and content will remain with H-GAC. Inquiries and Clarifications Respondents must submit questions by the Questions deadline indicated in this Solicitation. Telephone/email inquiries are not accepted. H-GAC will respond as completely as possible to each question. Questions and answers will be posted as soon as available. The names of respondents who submit questions will not be disclosed. All clarifications will be available in the Question and Answer and/or Addenda Sections in OpenGov, only the information in these sections should be used in preparing a response; verbal communications and other written documents intended to clarify and interpret will not legally b

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Estimated Interviews date updated to January 14, 2027.

Public questions and answers
  • Section 9.1 references participation by small and minority businesses, while Section 9.2 states that only businesses listed in the Texas Unified Certification Database are qualified to meet the stated goal for U.S. DOT-funded work. Please confirm whether SBE-certified firms listed in the TUCP directory may be counted toward the 26% DBE goal, or whether firms must specifically hold an eligible DBE certification and be listed in the TUCP directory to receive credit toward the goal.

    Please refer to the applicable funding source in 9.2 DBE Supplemental Guidance.

  • Could H-GAC clarify whether a pre-proposal conference will be held, and if so, provide the scheduled date, time, and access link?

    No pre-proposal conference is planned for this solicitation.

  • On page 6, Section 3.1 states that the project duration is approximately 18 months beginning January 2027, and Section 7.1 also references an 18-month term. However, Section 8.1 (B) under Pre-Award Audit specifies a "12-month project Schedule/Timeline". Could H-GAC confirm whether the contract term and baseline schedule should span 12 or 18 months?

    As per the scope of work, the project is expected to last approximately eighteen (18) months.

  • On page 6, Section 3.1 lists key activities including "Travel demand forecasting", whereas page 11 under Task 4 includes a note stating: "H-GAC will perform the travel demand analysis, as needed... and, if needed, H-GAC will be responsible for performing the analysis". Please confirm the division of responsibilities for travel demand forecasting between the Consultant and H-GAC.

    H-GAC will be responsible for conducting Regional Travel Demand Model runs, as needed, based on modeling scenarios developed and provided by the Consultant. The Consultant will be responsible for identifying and developing appropriate modeling scenarios based on the mobility needs and potential transportation improvements identified during the study, defining scenario assumptions and providing necessary inputs to H-GAC, and reviewing and analyzing the model results provided by H-GAC. The Consultant will incorporate the modeling findings into the corridor planning analysis, evaluation of alternatives, and development of recommendations

  • On page 7, Section 3.2 indicates that "Whether bi-weekly or monthly reporting is required will be confirmed at kickoff with project manager", while deliverables for Task 1 stipulate "Monthly progress reports and schedules". Should respondents budget for bi-weekly or monthly progress reports and QC/QA reporting?

    Monthly progress reports, project schedules, and QA/QC reporting will be required. Respondents should budget for monthly reporting throughout the project duration. Additionally, bi-weekly progress meetings are recommended to facilitate project coordination and address any issues in a timely manner.

  • On page 9 and page 10, Section 3.4 states H-GAC will "Develop and print, if necessary, public outreach materials such as flyers, yard signs, postcards and social media blasts", yet page 10 specifies that the Contractor will "Print handouts and display materials for all meetings" Could H-GAC define production responsibilities assigned to the Consultant versus H-GAC?

    H-GAC will be responsible for developing promotional materials for public meetings, including flyers, postcards, and other outreach materials to support public awareness and participation. The Consultant will be responsible for developing and preparing public meeting materials, including presentation boards, exhibits, surveys, handouts, and other materials necessary to facilitate public engagement and collect feedback.

  • Will H-GAC provide access to models, data, traffic studies, traffic models, data, roadway schematics, etc. completed along Sienna Parkway by the City of Missouri City and Fort Bend County?

    H-GAC will not provide the requested models, data, traffic studies, roadway schematics, or other related information. H-GAC shall not be responsible for obtaining or providing information maintained by third parties to which it does not have access. The selected Contractor shall be responsible for identifying and obtaining additional information necessary to complete the study. H-GAC may assist in coordinating with the City of Missouri City, Fort Bend County, and other relevant entities to facilitate access to available information.

  • Can H-GAC confirm what information, if any, will need to be provided for sub consultants for this submittal? Forms, Resume, Firm Bio, etc.

    Please refer to Section 11 – Submission Uploads/Required Documents of the RFP and follow the criteria outlined in that section for all required submission materials, including information pertaining to subconsultants.

  • Can H-GAC provide clarification on any page restrictions, and/or graphic requests such as margins, font, or font size?

    The maximum allowable page size is 11" x 17", with a minimum margin of 1 inch on all sides. There is no specific font size requirement; however, all text, including graphics, tables, and figures, must remain clear and legible.

  • Is it permissible to use larger pages to show content for this proposal if needed?

    Yes, it is acceptable to use larger pages to present proposal content, provided that the page size does not exceed 11" x 17".

  • Is H-GAC able to provide a more specific sample engineering services contract?

    H-GAC will not be providing a sample engineering services contract, as this project is a planning-level study that will include schematic-level drawings rather than detailed engineering design services.

  • Please confirm if consultants are to provide a DBE form with their submittal and if so, can you reference where it can be found?

    Yes, consultants are required to submit the DBE form with their proposal. Please see Section 11.2.4. Small and Minority Business, Women's Business Enterprise, and Labor Surplus Affirmation.

  • If there is a font size requirement, can the font size be smaller for graphics to promote legibility?

    Yes, it is acceptable to use a smaller font size for graphics to improve legibility, provided that all text remains clear and readable.