Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Description

The project consists of a total of 3.27 miles of road improvements including 2.63 miles of Silverbell Rd., from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Rd., 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Dr. The construction consists of four lanes of roadway with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping and irrigation, utility work and drainage facilities. SCOPE OF WORK Silverbell Road, El Camino del Cerro to Goret Road The project consists of a total of 3.27 miles of road improvements including 2.63 miles of Silverbell Rd., from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Rd., 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Dr. The construction consists of four lanes of roadway with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping and irrigation, utility work and drainage facilities. Contractor shall construct all elements of the project according to City of Tucson Plan No. I-2016-002, as well as the PAG standard specifications and project Special Provisions. See attachments for additional project details. NOTICE CITY OF TUCSON NOTICE OF INVITATION FOR BID 270146 Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road PROJECT SITE: Silverbell Road from El Camino del Cerro to Goret Road PLAN NUMBER: I-2016-002 PRICE RANGE: More than $10,000,000 SBE/DBE GOAL: 5% SBE PRE-BID CONFERENCE DATE: Thursday, August 27, 2026 AT 1:00 pm LOCAL AZ TIME PRE-BID CONFERENCE LINK Meeting ID: 243 641 446 466 204 Passcode: NC9cV24P Dial in by phone +1 213-293-2303 Phone conference ID: 495 202 777# BID DUE DATE: Friday, December 18, 2026 AT 2:00 pm LOCAL AZ TIME BID OPENING MEETING LINK Meeting ID: 262 556 066 359 508 Passcode: 8oP2S6DZ Dial in by phone +1 213-293-2303 Phone conference ID: 337 828 788# QUESTIONS SHALL BE DIRECTED TO: Leticia Riesgo (520) 837-4138 leticia.riesgo@tucsonaz.gov Publication Dates: Friday, August 21, 2026 and Friday, August 28, 2026 in the Daily Territorial Posted Date: Wednesday, August 19, 2026 INTRODUCTION Summary Background Contact Information Timeline INSTRUCTIONS TO BIDDERS DEFINED TERMS For purposes of this Solicitation and subsequent Contract, terms used in the Instructions to Bidders will have the meanings as set forth below. Terms which are defined in the General Terms and Conditions for Construction will have the meanings as defined in the General Conditions. DEFINITIONS Apparent Low Bidder: Bidder/Offeror who has submitted the lowest Bid at the Bid Opening without correction of numerical discrepancies, consideration of alternates or determination of responsiveness and responsibility. The Apparent Low Bidder is not necessarily the Successful Bidder. Bidder/Offeror: Each individual or entity that submits a submittal in response to this Solicitation. Bidding Documents: Invitation to Bid, Instructions to Bidders, Proposal Form and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). Business Services Director: The contracting authority for the City authorized to sign contracts and addenda thereto on behalf of the City. City: The City of Tucson, Arizona. Contract: The legal agreement(s) executed between City and the Successful Offeror(s). The Contract will be deemed to include the conditions and requirements set forth in this IFB and any Addenda to the IFB, Attachments, Drawings, Specifications, the General Terms and Conditions for Construction, and all the terms of the Proposal submitted by Offeror as finally negotiated and accepted by the City. Contractor/Consultant: A Successful Offeror that enters into a Contract with the City. Contract Representative: The City employee or employees who have specifically been designated to act as a contact person or persons to the Contractor, and is responsible for monitoring and overseeing the Contractor's performance under this Contract. May: Indicates something that is not mandatory but permissible. Must: The action or condition is required. Should: Indicates something that is recommended but not mandatory. If the Bidder fails to provide recommended information, the City may, at its sole option, ask the Bidder to provide the information or evaluate the bid without the information. Successful Bidder: The lowest, qualified, responsible and responsive Bidder to whom the City intends to award a contract. Will: The indicated party is promising to take the action or abide by the condition. PRE-SUBMITTAL MEETING A Pre-Submittal Meeting will be held at the date and time stated on the cover page of this solicitation, if such a date and time is provided. Attendance at this meeting is not mandatory, but written minutes and/or notes regarding the meeting will NOT be provided, so attendance is encouraged. The purpose of this meeting will be to clarify the contents of this solicitation in order to prevent any misunderstanding of the City's position. INQUIRIES, INTERPRETATIONS, OMISSIONS, DISCREPANCIES, AND INTERPRETATIONS Any questions about this solicitation or the proposed Contract must be presented at the Pre-Submittal Meeting, if there is one (see above), or submitted in writing, via email, or through the online bidding system, to the Contract Officer by the Question Submission Deadline. The email must refer to the solicitation number and the paragraph number of the provision that the question concerns. The Contract Officer may respond by email or may, if they deem it appropriate, address the question in a solicitation addendum or response through the question and answer portal in the online bidding system. Offeror may not rely on oral interpretations or clarifications about the solicitation; only questions posted and answered through the online bidding system, or posted as a formal solicitation addendum will be binding. The bidder should take no advantage of any apparent error or omission in the plans, estimated quantities, or specifications. Should a Bidder find discrepancies in, or omissions from, the drawings or other Bidding Documents, or should the Bidder be in doubt as to their meaning, they should at once notify the Contract Officer who is identified in the proposed Bidding Documents. All requests for interpretations must be made in writing and the requestor must be responsible for the prompt delivery of the request. The Contract Officer will not make oral interpretations and will not be responsible for any explanations or interpretations except those duly issued in the form of written addendum directed to all Bidders known to be in possession of Bidding Documents. Questions received less than ten (10) days prior to the date of Bid Opening may not be answered. ADDENDUM OF SOLICITATION Solicitation Addenda will be posted on the City’s link to the online bidding website. Offeror is responsible for checking the webpage regularly for new solicitation addenda and must acknowledge each addendum to this solicitation in its submittal. Please note that vendors who have registered with the Business Services Department at https://procurement.opengov.com/portalucson-az and follow the City of Tucson will receive email notifications of solicitation addenda. Questions received less than ten (10) days prior to the date of Bid Opening may not be answered. UNDERSTANDING SCOPE OF WORK Before submitting an Offer to this solicitation, Contractor must familiarize itself with the Scope of Work, Plans and Specifications, laws, regulations, physical conditions, and other factors affecting the obligations – including the expense and difficulty of fulfilling those obligations – that Offeror will have under the Contract if awarded to Offeror. No adjustment to the financial or other terms of the Contract will be justified by Offeror’s failure to fully understand or appreciate the Contract requirements or other factors affecting Contract performance. It is the responsibility of each Bidder before submitting a Bid to: Examine the Bidding Documents thoroughly, Visit the site to become familiar with local site conditions that may affect cost, progress, performance or furnishing of the Work, Consider Federal, State and local laws and Regulations that may affect cost, progress, performance or furnishing of the Work, Study and carefully correlate Bidder's observations with the Bidding Documents, and Notify the Construction Administrator in writing of all conflicts, errors or discrepancies noted in the Bidding Documents. The failure or omission of a Bidder to receive or examine any form, instrument, Addenda or other document or to visit the site and acquaint themselves with conditions there existing, shall in no way relieve such Bidder from obligations with respect to their Bid or to the Contract. The submission of a Bid shall be taken as prima facie evidence of compliance with these instructions. Bidders wishing to conduct additional examinations, including site investigations and explorations, shall request approval from the City prior to commencing any on-site investigation or exploration. Approval shall be granted at the City’s sole discretion. If approved, Bidders shall observe all noise, dust and vegetation control restrictions, fill all holes and excavations and clean up and restore the site to its former condition upon completion. The submission of a Bid shall constitute an incontrovertible representation by Bidder that they have complied with every requirement of these Instructions to Bidders and that without exception, the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and that the Bidding Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. APPROVAL OF EQUAL ITEMS OF EQUIPMENT AND/OR MATERIALS Where an item or material is specified by the name of a manufacturer, distributor, supplier, or other proprietary name, it is done for the purpose of establishing a basis of quality and not for the purpose of limiting competition. The City's intent is to consider alternative products which have the desired essential characteristics. The City will consider any such product offered. Requests for approval of alternative products must be made through the Offeror. No approvals for substitutions will be granted directly to suppliers, distributors or subcontractors. Bidders desiring to submit alternative product proposals for prior approval must submit such proposals to the Contract Officer at least ten (10) days prior to the original deadline for receiving Bids or any published extension thereof. Each such request must include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute, including drawings, cuts, performance and test data, and any other information necessary for an evaluation. A statement setting forth any changes in other materials, equipment or other Work that incorporation of the substitute would require must be included. The City will consider and either approve or reject alternative product proposals submitted. If, by the close of the fifth (5th) day prior to the deadline for receiving Bids, the City has approved any alternative product proposals, an addendum will be issued to include the alternative products. The City's decision of approval or disapproval of a proposed substitution will be final. PREPARATION OF SUBMITTAL Form and Organization. If Offer forms are included in this Solicitation, Offeror’s Submittal must be on those forms. Supporting documentation must be arranged in a manner that follows and clearly refers to corresponding sections of the solicitation. Offeror may copy the submittal forms in order to complete them electronically but may not alter or rearrange them or change any paragraph designations. The completed forms shall be without interlineations, alterations or erasures, except where initialed by the person or persons signing the bid. Proposals shall not contain any recapitulations of the Work to be done. Alternate proposals, other than those called for in the Proposal form, will not be considered. No oral, telegraphic, telephonic or modified Proposals will be considered. Confidential Information. Any information in its submittal that Offeror wishes to be treated as confidential must be clearly marked “CONFIDENTIAL.” Offer Contents. Offeror’s submittal must contain responses to all sections of this solicitation, any Offer forms provided must be completed and any requested supporting documentation must be attached. Signatures. Offeror must include in their submittal signed copies of the Offer and Acceptance page. Any cover letter accompanying the proposal documents must be signed. Offeror must initial each erasure, interlineation or other modification in the submittal. The person signing and initialing on behalf of Offeror must be a person authorized to legally bind Offeror. Prices. Where a unit price is provided it will govern over any erroneous extension of the price. Numbers shall be stated both in writing and in figures (when applicable). The prices are to include the furnishing of all materials, plant, equipment, tools, and all other facilities, and the performance of all labor and services necessary or proper for the completion of the Work; except such as may be otherwise expressly provided in the Bidding Documents. In case of a discrepancy between written Words and figures in a Proposal, the amount stated in written words shall govern. If this is a unit price bid, then in the event of a discrepancy between unit bid prices and extensions, the unit bid price shall govern. All of the figures shall be in ink or typed. The Base Bid shall include all Work as set forth on the drawings and in the specifications. If alternatives are called for in the Proposal form, the blank spaces opposite correspondingly numbered alternatives shall be completed by inserting the exact amount to be deducted or added to the base Bid for that particular alternative only. Unbalancing of a Bid may be cause for rejection. Time Periods. Periods of time, stated as a number of days, will be calendar days unless specifically stated otherwise. Accuracy. Mistakes in preparation of its submittal confers on Offeror no right to modify or withdraw its submittal after the Submittal Deadline. Cost of Preparation. The City will not reimburse Offeror for the cost of developing, presenting, submitting or providing any response to this solicitation. Subcontractors. Offeror must, in their submittal, list any subcontractors that it will utilize in the performance of the Contract if they are awarded the Contract and must describe their qualifications in detail. Incomplete Information. Failure to include all requested information may have a negative impact on the evaluation of Offeror’s submittal. A partnership bidder shall clearly show the name and mailing office address of each member of the partnership and the signature of one or more members of the partnership. A joint venture bidder shall clearly show the name and mailing address of each member or officers of each firm represented by the joint venture. Bidders submitting falsified or fraudulent Bidding documents, and Contractors submitting falsified or fraudulent documents, including falsified Bidding Documents, payrolls, lien waivers, payment estimates and other documents may be subject to prosecution. BID SECURITY Proposals shall be accompanied by a Bid bond issued by a Surety Company authorized to do business in the State of Arizona and acceptable to the City, or by a certified check or cashier’s check on a bank doing business in the City of Tucson, payable to the City of Tucson, in an amount equal to at least ten percent (10%) of the total amount of the bid (including any alternates) as stated in the Proposal, as a guarantee that the Successful Bidder, if awarded the Contract, will promptly enter into a Contract to perform the Work in the manner and form required by the Contract Documents, and will the furnish the required Performance and Payment Bonds. Failure of the Successful Bidder to execute a contract and file the required bonds within the timeframe specified in the Notice of Intent to Award letter, shall be just cause for the cancellation of the award and may be cause for the forfeiture of the Bid Bond or other Bid securities, which shall become the property of the City of Tucson, not as a penalty, but as liquidation of damages sustained by the City. Award may then be made to the next lowest responsible and responsive Bidder, or the Work may be re-advertised or abandoned, as the City may decide. Unsuccessful Bidders’ Bid securities will be returned to them after execution of the Contract. SUBCONTRACTORS The City of Tucson does not support post-bid price competition among subcontractors (i.e. "bid shopping") in procurement of construction services. To assist in prevention of “bid shopping” on City construction projects, bidders shall submit, on the form provided, subcontractor lists for all first tier subcontractors that are above $5,000. Pursuant to Tucson Municipal Code, Section 28-48(2), bids not in compliance with this requirement shall be deemed non-responsive. If, however, failure to comply would result in the rejection of the lowest responsive bid, and the next lowest responsive bid is 5% higher (or more) than the lowest responsive bid, the Director shall allow the lowest responsive bidder an additional 2 days from the time of bid opening to submit the required subcontractor list. Submission of the subcontractor list shall act as bidder certification that the work shall be performed by either the bidder or the listed subcontractors. The contractor shall hold the required Registrar of Contractors license for any work that is to be performed by the subcontractor. TAXES The City is exempt from federal excise tax, including the federal transportation tax. The City is not tax exempt from sales tax, etc. Applicable taxes should be included Offeror's bid. PUBLIC RECORD Any documents submitted by Offeror in response to this solicitation will become the property of the City. Except as set forth below with respect to Confidential Information, the Submittal will be deemed to be a public record available for review by the public after the award notification. CONFIDENTIAL INFORMATION The City is obligated to abide by the Arizona Public Records Law, A.R.S. §§ 39-101 through 39-161. If Offeror believes that any portion of its proposal, offer, specification, protest or correspondence contains information that is confidential and subject to being withheld from disclosure in the event that the City receives a public records request to which the record is responsive, Offeror must, when the record is submitted, provide the Contract Officer written notification of that fact. The records or portions of records that Offeror wishes to be treated as confidential must also be clearly marked “CONFIDENTIAL” on their face. Pricing will not be treated as confidential. If the City, after award notification, receives a public-records request to which a Contractor record marked “CONFIDENTIAL” is responsive, City will notify Offeror in writing. Unless Offeror, within 10 days after the date of that notice, obtains and provides to City an order from a court of competent jurisdiction prohibiting the City from releasing the records, the City may release the records without any liability to Offeror. CERTIFICATION OF NONCOLLUSION; CONFLICTS OF INTEREST By submitting a response, Offeror warrants that: Preparation and submission of the submittal did not involve collusion or other anti-competitive practices. Offeror has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment,

Published attachments
Addenda and notices
  • Official Notice #1: Pre-Bid Conference Attendance · 1

    Pre-Bid Conference attendance sheet from the meeting held on Thursday, August 27, 2026.

  • Addendum #1 · 1

    Addendum includes the following: Due Date has been changed to Monday, October 5, 2026 @ 2:00 PM Local AZ Time Question Submission Deadline has been changed to Friday, September 25, 2026 @ 12:00 PM Local AZ Time Additional information will be issued in a forthcoming addendum

  • Addendum #2 · 2

    Addendum includes the following: Due Date has been changed to Tuesday, October 20, 2026 @ 2:00 PM Local AZ Time Additional information will be issued in a forthcoming addendum

  • Addendum #3 · 3

    Please use the See What Changed link to view all the changes made by this addendum. Bid Due Date has been CHANGED to Friday, October 30, 2026 @ 2:00 P M Local AZ Time

  • Addendum #4 · 4

    Addendum includes the following: Due Date has been changed to Friday, November 20, 2026 @ 2:00 PM Local AZ Time Additional information will be issued in a forthcoming addendum

  • Addendum #5 · 5

    Addendum includes the following: Due Date has been changed to Friday, December 4, 2026 @ 2:00 PM Local AZ Time Additional information will be issued in a forthcoming addendum

  • Addendum #6 · 6

    Addendum includes the following: Due Date has been CHANGED to Friday, December 18, 2026 @ 2:00 PM Local AZ Time Additional questions must be submitted via email to Contract Officer by Wednesday, December 2, 2026 . Any questions received after this date will not be accepted. Addendum No. 6 Questions & Answers/Clarifications Geotechnical Report Soil Nail Retaining Wall Report City of Tucson IT Pullbox Elevation Detail Water System Modifications - Revised Plans Cross Sections Artwork Structural Drawings Art Locations Revised Bid Schedule

Plain text

OpenGov categories

  • 91275 · Quality Control Testing Services for Construction
  • 91276 · Striping Streets, Parking Facilities, Lane Divisions, etc. (Paint)
  • 91371 · Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
  • 91396 · Paving/Resurfacing, Street (Major and Residential)
  • 96861 · Pavement Marking Services (Including Removal of Markings)
  • 96874 · Street Sweeping Services
  • 96884 · Traffic Control Services (To Include Placement and Removal of Control Devices)