Skywest Pump Station AC Unit Replacement
Description
The City of Hayward is seeking an experienced and qualified contractor who is specially trained, experienced, and competent to perform HVAC equipment replacement and installation services in accordance with the terms, conditions, and specifications contained in this Request for Quote (RFQ). The City of Hayward is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. https://procurement.opengov.com/portal/hayward-ca Base Bid Complete Skywest Pump Station HVAC Replacement in accordance with the Scope of Work and Contract Documents Scope of Work Scope of Work The City of Hayward is seeking a qualified HVAC contractor to provide all labor, equipment, materials, tools, transportation, supervision, testing, and incidentals necessary to remove the existing HVAC equipment serving the Skywest Pump Station and furnish and install a complete and operational replacement HVAC system. The work shall include, but is not limited to, the following: A. Existing Conditions and Field Verification Prior to ordering equipment, the Contractor shall field verify existing site conditions, equipment dimensions, electrical requirements, ductwork connections, refrigerant piping routes, equipment access, existing concrete slab, and all other conditions affecting the Work. The Contractor shall coordinate the replacement equipment and installation with existing conditions. B. HVAC Equipment Furnish and install one new 20-ton split-system HVAC system consisting of an indoor fan coil unit and outdoor condensing unit. The replacement system shall utilize R-454B refrigerant and shall comply with applicable codes and manufacturer requirements. Provide refrigerant detection and related safety features required for the proposed equipment and refrigerant. Provide phase-monitoring protection for the condensing unit. Provide factory-applied protective coating on the condenser and evaporator coils suitable for the operating environment. Replacement equipment shall be York or approved equal and shall provide performance and features equal to or better than the specified system. Contractor shall verify that the proposed equipment is compatible with the existing electrical service, ductwork, space constraints, and other existing conditions prior to procurement. C. Demolition and Disposal Remove the existing indoor fan coil unit, outdoor condensing unit, existing refrigerant piping being replaced, and associated materials necessary to complete the Work. Remove demolished equipment and materials from the site and legally dispose of or recycle them in accordance with applicable requirements. Recover and properly handle existing refrigerant in accordance with applicable regulations. D. Ductwork Fabricate and install all required galvanized sheet-metal supply and return-air transitions necessary to connect the new fan coil unit to the existing ductwork. Provide new flexible duct connectors at equipment connections and all required supports, fasteners, sealants, and incidental materials necessary for a complete installation. E. Refrigerant Piping Remove the existing refrigerant piping and provide new Air Conditioning and Refrigeration (ACR) copper refrigerant piping between the indoor and outdoor units. Refrigerant piping shall be sized and installed in accordance with the equipment manufacturer’s requirements. Provide all required fittings, supports, hangers, valves, accessories, refrigerant, pressure testing, evacuation, charging, and other incidental work necessary for a complete and operational refrigerant system. F. Insulation Provide new insulation for all new refrigerant piping and repair existing insulation disturbed or damaged by the Work. New insulation shall be suitable for the application and shall match existing insulation where practicable. G. Electrical Work Disconnect electrical power from the existing equipment as required for removal. The existing electrical disconnect is intended to be reused. Contractor shall field verify its condition, rating, location, and compatibility with the proposed equipment prior to submitting its bid. Provide all electrical work required between the existing disconnect and the new equipment, including extension or modification of conduit and conductors as necessary for a complete and code-compliant installation. Any required electrical modifications beyond the existing disconnect shall be identified by the bidder prior to award. H. Equipment Installation Install the new indoor and outdoor equipment in accordance with the manufacturer’s written instructions and applicable codes. Contractor shall field verify the condition and dimensions of the existing cement slab prior to bidding. Install and securely anchor the new condensing unit to the existing slab. Provide all equipment supports, vibration isolation, fasteners, seals, miscellaneous hardware, and incidental work necessary for a complete installation. I. Startup, Testing, and Commissioning Perform manufacturer-required startup and commissioning of the new equipment. Test, adjust, and balance the HVAC system and verify proper operation of the completed installation. Verify proper operation of refrigerant detection, controls, safety devices, phase monitoring, and other equipment furnished as part of the Work. Label new equipment and associated components as appropriate. Correct deficiencies identified during startup, testing, or commissioning prior to final acceptance. J. Closeout and Warranty Provide equipment manufacturer's literature, warranty documentation, startup records, testing and balancing documentation, and operating and maintenance information for the installed equipment. Provide a minimum one-year warranty on labor, workmanship, materials, and installation, commencing upon City acceptance of the Work. During the warranty period, the Contractor shall correct defects in the Work at no additional cost to the City. Provide and assign to the City all applicable manufacturer's warranties for the equipment and components furnished under the Contract. The compressor shall be provided with a minimum five-year manufacturer's parts warranty. Contractor shall complete all required manufacturer warranty registrations and provide warranty documentation to the City prior to final acceptance. Contractor Qualifications Contractor shall possess a current and active California C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor license and current DIR Public Works Contractor Registration. Personnel performing refrigerant-related work shall possess the appropriate EPA Section 608 Technician Certification. Any subcontractors shall possess the appropriate licenses and registrations for the work performed. Prevailing Wage The Work is subject to California prevailing wage requirements pursuant to Labor Code Section 1770 and related provisions. The Contractor and all subcontractors shall pay not less than the applicable prevailing rates of wages, including applicable overtime and holiday rates, as determined by the California Department of Industrial Relations (DIR). The Contractor and all subcontractors shall be currently registered with the DIR pursuant to Labor Code Section 1725.5 and shall maintain such registration for the duration of the Work. The Contractor shall comply with all applicable provisions of the California Labor Code relating to public works, including prevailing wages, certified payroll records, apprenticeship requirements, and overtime. Applicable prevailing wage determinations are available from the California Department of Industrial Relations. Project Schedule and Coordination The Contractor shall coordinate the Work with the City to minimize impacts to operation of the Skywest Pump Station. Following award and execution of the Contract, the Contractor shall promptly submit manufacturer product data for the proposed HVAC equipment, including model numbers, capacities, dimensions, electrical requirements, refrigerant requirements, and manufacturer installation requirements. Equipment shall not be ordered until the submittal has been reviewed and accepted by the City. The project schedule will generally consist of the following phases: Equipment Procurement: Following City acceptance of the equipment submittal, the Contractor shall promptly order the equipment and provide the City with the anticipated delivery date and any subsequent changes to the delivery schedule. Field Installation: Following delivery of the equipment, the Contractor shall coordinate the installation schedule with the City. The Contractor shall provide advance notice of the proposed start date and anticipated duration of field work. The Contractor shall coordinate all equipment shutdowns and interruptions to HVAC or electrical service with the City in advance. The Skywest Pump Station shall remain operational throughout the Work unless otherwise approved by the City. The Contractor shall protect existing facilities and equipment during construction and coordinate access to the site with City staff. Payment Payment shall be made through progress payments based on an approved schedule of values and acceptance of the associated Work by the City. Following execution of the Contract, the Contractor shall submit a proposed schedule of values for City review and approval. The schedule of values shall separately identify major project components, including equipment procurement and delivery, installation, startup and testing, and project closeout. Invoices shall include sufficient documentation to demonstrate completion of the applicable Work or payment milestone. Payment for equipment or materials not yet incorporated into the Work shall be subject to prior City approval and any documentation requirements established by the City. Progress payments, retention, and final payment shall be made in accordance with the Contract Documents and applicable law. Introduction Summary Background Contact Information Timeline Project Details Pre-Bid Meeting and Site Walk A non-mandatory pre-bid meeting and site walk will be held at the Skywest Pump Station at the date and time identified in the RFQ Timeline. Prospective bidders are strongly encouraged to attend to familiarize themselves with the existing HVAC equipment, site conditions, access constraints, and other conditions that may affect the work. Bidders are responsible for verifying existing conditions affecting their proposed work. Questions arising from the site walk shall be submitted through OpenGov by the question deadline identified in the RFQ Timeline. Important Instructions for Electronic Submittal The City of Hayward is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Link to City’s procurement portal: https://procurement.opengov.com/portal/hayward-ca Communication Regarding this RFQ All communication from prospective bidders regarding this RFQ must be submitted in the Question & Answer portal within the City's project posting . Please submit each question SEPARATELY. Questions not submitted separately will be rejected. Communication by telephone or in person will not be accepted. Attempts by or on behalf of a prospective or existing vendor to contact or to influence any member of the selection committee, any member of the City Council, or any employee of the City of Hayward with regard to the acceptance of a proposal may lead to elimination of that vendor from further consideration. All questions must be submitted by the deadline listed in the RFQ timeline. Award of City Contract and City Rights The City reserves the right to reject any and all proposals, to contract work with whomever and in whatever manner the City decides, to abandon the work entirely and to waive any informality or non-substantive irregularity as the interest of the City may require and to be the sole judge of selection process. The City further reserves the following rights: The City reserves the right to select the proposal which in its sole judgment best meets the needs of the City. Selection will be based on the lowest proposed cost proposal that also meets the specified experience clause in Section 4.3, and who has the capacity to perform the work as specified in Section 4.4. Award to the Contractor is also subject to review and approval by the City Council. The City reserves the right, in its sole discretion, to reject any or all proposals and to waive technicalities and minor informalities in any proposals received when such waiver is determined by the City to be in the City’s best interest. The City reserves the right to retain all accepted proposals, including proprietary documentation, regardless of which proposal is selected. No proposals will be returned to vendors. The City reserves the right to request any supplementary information it deems necessary to evaluate proposer’s experience or qualifications. The City reserves the right to reconsider any proposal submitted at any stage of the procurement. The City reserves the right to cancel, in part or in its entirety, this RFQ. If the City cancels or revises this RFQ, all proposers will be notified in writing by the City. The City reserves the right to revise the RFQ prior to the date that proposals are due. The City will communicate changes through addenda to this RFQ. All registered proposers will be notified of revisions to the RFQ. The City reserves the right to extend the date by which the proposals are due. The City reserves the right, in its sole discretion, to reject any and all proposals and to waive informalities and minor irregularities in any proposals received. Failure to furnish all information requested or to follow the format requested herein may disqualify the proposer, in the sole discretion of the City. False, incomplete, misleading or unresponsive statements in a proposal may also be sufficient cause for a proposal’s rejection. This RFQ does not commit the City to award a contract. All proposals submitted in response to this RFQ become the property of the City and public records, and as such, may be subject to public review. The City shall not be liable for any pre-contractual expenses incurred by prospective vendors or selected contractors, including but not limited to costs incurred in the preparation or submission of proposals. The City shall be held harmless and free from any and all liability, claims, or expenses whatsoever incurred by, or on behalf of, any person or organization responding to this RFQ. If the successful proposer defaults, the City may award this RFQ to the next best proposal and may recover the loss occasioned by the successful proposer against a surety bond, if any, or by suit against the successful proposer. The City reserves the right to cancel, in part or in its entirety, this RFQ including, but not limited to: submittal date, and submittal requirements. If the City cancels or revises the RFQ, all interested firms will be notified. Protest Should any proposer question or protest the award of the contract, such question or protest must be furnished in writing to the Purchasing Manager within three (3) calendar days after the City notifies all proposers of its intent to award. Such submittal must fully explain the basis of the objection supported by all relevant information facts and details. Letter must be signed by an authorized representative stating specific reason(s) for the protest including all relevant facts (law, rule, regulation, and criteria). Questions or protests not furnished in writing as prescribed will not be accepted. Bonds The successful Proposer, simultaneously with the execution of the contract, shall furnish a Labor and Materials bond and a Performance bond in the amount of 110% of the contract price. The bonds shall be secured from a surety company issued by a corporation duly and legally licensed to transact business in the State of California and approved by the City. The contract shall be in the form of the Construction Contract Template in Attachment B. Submission Format To ensure the fair and accurate consideration of all submissions, bids must contain the following information. Cover Letter The cover letter should be on company letterhead and include the following: Company name, address, phone and fax numbers. Designation of primary contact within the company who is authorized to answer questions regarding the assigned work, including their name, contact phone number and e-mail. Signature of an officer of the prime contractor. In case of joint venture or other joint-prime relationship, an officer of each venture partner shall sign. Contact & Customer Service Please describe all support services available from your company/business, specifically addressing the following issues: Normal hours of availability Quality assurance program(s) Guaranteed response time Other support services Reference and Experience Provide a list of three (3) references for current or past contracts for which the Contractor has performed work of similar type, scope, and complexity within the past five years. The list shall include the name, address, e-mail address, and phone number of the contracting party, along with a description of the work performed and the contract amount. The City may request additional references as part of its evaluation. Capacity to Perform the Work Describe other major work commitments and/or capacity to perform the requested Work within the anticipated project schedule. Projects completed within the past three years, particularly in Alameda, Contra Costa, Santa Clara or San Mateo Counties, are of particular interest. Project Scope & Approach Provide a brief description of the Contractor's approach to completing the Work as described in the Scope of Work , including anticipated coordination, equipment procurement, installation, startup, and testing activities. Prices The bidder shall complete the electronic Bid Sheet in Section 5. The Total Base Bid shall be an all-inclusive lump-sum price for completion of the Work and shall include all labor, equipment, materials, freight, taxes, supervision, overhead, profit, insurance, testing, startup, closeout, and incidental costs required by the RFQ. The bidder shall also provide the proposed HVAC equipment manufacturer and model numbers, and anticipated equipment lead time as requested in the Vendor Questionnaire. Insurance The bidder shall carry, or be able to obtain, the insurance required for this project, including: Commercial General Liability, Automobile Liability, Workers' Compensation and Employer's Liability, and Professional Liability, if applicable to the services provided. The selected Contractor shall provide all required certificates of insurance and endorsements in accordance with the RFQ, General Provisions, and Construction Contract prior to execution of the Contract. Current City Business License The contractor selected for this project shall obtain or provide proof of having a valid City of Hayward business license prior to execution of the contract. If the bidder currently holds a valid City of Hayward business license, the bidder is encouraged to provide a copy with its bid. Required Forms Attach the following required forms: Cover Letter Reference and Experience Statement including proof of the Contractor's current C-20 license Capacity to Perform the Work Project Scope & Approach Proof of Insurance Attachment C - Forms to be Submitted with Bid Noncollusion Affidavit Nondiscriminatory Employment Practices a
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
The attendees for the pre-bid meeting/site walk on 11/19/26 were: Steven Wolfe — City of Hayward, Public Works & Utilities Alex Knop — Galaxy Construction Services, Inc. Mauricio Jimenez — ACCO Jerrad Durbin — A&B Mechanical Yoel Hanegbi — Various Energy
Public questions and answers
Do we have to replace the refrigerant piping or can we reuse?
Existing refrigerant piping shall be removed and replaced with new ACR copper piping as specified in the Scope of Work.
Can we reuse all the existing hangers. Correct?
Existing hangers and supports may be reused where suitable and compatible with the new installation. Provide any new or modified supports required for a complete installation.
The only new ductwork required is the flex connectors and the transition pieces. Correct?
Yes. The anticipated new ductwork is limited to the required supply and return-air transitions, flexible duct connectors, and incidental materials required to complete the connection to the existing ductwork.
What equipment manufacturers are you considering as approved equal to the existing York?
The City has not pre-approved specific alternate manufacturers. The York KD240/GM240 20-ton split system is the basis of design. Proposed equivalent equipment will be evaluated based on comparable cooling capacity, efficiency, airflow, electrical compatibility, required features, and compatibility with existing conditions. All proposed equipment shall comply with the requirements of the RFQuote.
Is duct cleaning required?
No. Duct cleaning is not included in the Scope of Work.
Can you please post the attendance list from the non-mandatory pre-bid meeting/site walk held on November 10th? Thank you!
The following representatives attended the November 10, 2026 non-mandatory pre-bid meeting/site walk: Steven Wolfe — City of Hayward – Public Works & Utilities Peter Villalobos — City of Hayward – Public Works & Utilities Bryan Martin — Environmental Systems Inc. Timothy Mello — Monterey Mechanical Co. Raul Jaime — Monterey Mechanical Co. Gerard Borromeo — All Air Mechanical Rakesh Rao — All Air Mechanical Rafiq Muhammad — SN Heating and AC
Please confirm the units are controlled by existing thermostats, and no other controls are involved.
Yes, the units are controlled by existing thermostats. No other controls are involved.
Please advise the duration of this project after Notice to Proceed is issued.
The RFQuote does not establish a fixed number of contract days following Notice to Proceed. The overall project duration will depend in part on equipment lead time following City approval of the equipment submittal. Following award, the Contractor shall submit the proposed equipment for City review prior to purchase and provide an updated equipment delivery and installation schedule. Installation shall be coordinated with the City to minimize disruption to pump station operations.
Can you provide more information on the type of refrigerant detection you want us to provide?
The City is not specifying a separate refrigerant detector manufacturer or model. Provide the refrigerant detection system and related safety features required for the proposed R-454B equipment and by applicable codes.
Hi we missed the planned optional site tour on 11/10/2026 , can you please arrange for us a visit we are local and flexible and need one hour notice. Thank you
The City will hold an additional non-mandatory site visit on Thursday, November 19, 2026, at 9:00 a.m. The site visit will be available to all prospective bidders. Individual site visits will not be scheduled.
Could the City provide the manufacturer/model numbers, approximate dimensions, and photographs of the existing indoor fan coil and outdoor condensing unit?
Bidders are responsible for field verification of existing equipment dimensions and site conditions. Manufacturer/model information, equipment dimensions, and photographs of the existing equipment will not be provided for bidding purposes.
Can the existing electrical service, breakers, disconnects, and wiring be reused if compatible with the replacement equipment, or should contractors include electrical modifications or upgrades in their proposals?
The existing electrical disconnect is intended to be reused, subject to field verification of its condition, rating, and compatibility with the proposed equipment. The Contractor shall include all electrical work required from the existing disconnect to the new equipment, including any necessary conduit and conductor modifications. If the proposed equipment requires electrical modifications beyond the existing disconnect, those modifications shall be identified in the bidder’s response.
Is the existing supply and return ductwork expected to remain in place, with modifications limited to the equipment transitions? Are there any known deficiencies or duct repairs that should be included?
Yes. The existing supply and return ductwork are intended to remain in place, with modifications limited to the required transitions, flexible duct connectors, and incidental materials necessary to connect the new fan coil to the existing ductwork. The City is not aware of any additional duct deficiencies requiring repair.
The specifications identify York or approved equal. Will equivalent equipment from other major manufacturers be considered if it meets the specified capacity, efficiency, protective coating, and operational requirements? Is advance approval required? Is a R32 System able to be quoted?
The City has not pre-approved specific alternate manufacturers. The York KD240/GM240 20-ton split system is the basis of design. Proposed equivalent equipment will be evaluated based on comparable cooling capacity, efficiency, airflow, electrical compatibility, required features, and compatibility with existing conditions. Advance approval is not required prior to bidding; proposed equipment shall be identified in the bidder’s response and is subject to City review following award and prior to purchase. R-32 equipment is not acceptable.
Are there restrictions on working hours, temporary shutdowns, or maintaining HVAC service during construction? Is there a required completion date following the notice to proceed?
Work is generally expected to occur during normal working hours, 8:00 a.m. to 5:00 p.m., Monday through Friday. All equipment shutdowns and interruptions to HVAC or electrical service shall be coordinated with the City in advance. The Skywest Pump Station shall remain operational throughout the Work unless otherwise approved by the City. The RFQuote does not establish a fixed completion date.
Is independent third-party testing and balancing required, or may the installing contractor perform and document the required airflow testing, startup, and commissioning? Or can we utilize our own airflow testing for before/after requirements?
The RFQuote does not require independent third-party testing and balancing. The Contractor is responsible for performing and documenting the required startup, commissioning, testing, adjusting, and balancing of the completed HVAC system.
Are there existing controls or building monitoring systems that must be integrated with the replacement equipment? Are there any City-specific requirements for R-454B refrigerant detection, alarms, or ventilation beyond applicable code and manufacturer requirements?
No additional building monitoring system integration is required. The City is not specifying additional R-454B refrigerant detection, alarm, or ventilation requirements beyond the RFQuote, applicable codes, and manufacturer requirements.
What is the approximate length and routing of the existing refrigerant line set? Are there any concealed or difficult-to-access piping sections, wall penetrations, or underground portions?
The City does not have verified dimensions or routing information for the existing refrigerant piping. The Contractor is responsible for field verification of the refrigerant piping route and existing conditions.