Sleepy Hollow Road Bridge Replacement Project
Description
The Sleepy Hollow Road Bridge Replacement Project is located on a rural road in the Town of Richmond located approximately .4 miles east from the intersection of ST 41 and Sleepy Hollow Road. See Location Map below. The bridge crosses Cone Brook, a designated Cold-Water Fishery to the south of the crossing; therefore, construction must protect the stream and restore it to its natural state. Work shall be done, according to the Order of Conditions, Ma Division of Fish & Wildlife NHESP and the Army Corp of Engineers General Permit. The project will require wildlife specialist as part of the turtle protection plan and requirements with the Richmond’s Conservation Order of Conditions. The existing culvert is considered too small to convey high stream flows which has caused significant road overtopping and erosion. The proposed replacement project will replace the culvert with a precast concrete frame structure with precast concrete wingwalls and restore the stream channel to its natural state. The Town will keep the gravel road and not pave it. Bid Pricing Sheet Please provide a unit price for each of the following line items. 115.11 - DEMOLITION OF SLEEPY HOLLOW ROAD CULVERT 140. - BRIDGE EXCAVATION 151. - GRAVEL BORROW 151.2 - GRAVEL BORROW FOR BACKFILLING STRUCTURES AND PIPES 156. - CRUSHED STONE 156.1 - CRUSHED STONE FOR BRIDGE FOUNDATIONS 170. - FINE GRADING AND COMPACTING - SUBGRADE AREA 402.01 - DENSE GRADED CRUSHED STONE FOR SURFACE 620.12 - GUARDRAIL, TL-2 (SINGLE FACED) 620.131 - GUARDRAIL, DEEP POST (SINGLE FACED) 627.1 - TRAILING ANCHORAGE 657. - TEMPORARY FENCE 698.3 - GEOTEXTILE FABRIC FOR SEPARATION 751. - LOAM FOR ROADSIDES 751.7 - COMPOST BLANKET 755.77 - TURTLE MONITORING PLAN 765. - SEEDING 767.121 - SEDIMENT CONTROL BARRIER 852. - SAFETY SIGNING FOR TRAFFIC MANAGEMENT 853.1 - PORTABLE BREAKAWAY BARRICADE TYPE III 859. - REFLECTORIZED DRUM 983.1 - RIPRAP 983.4 - STEP ROCK STRUCTURE 983.6 - STREAMBED RESTORATION 991.1 - CONTROL OF WATER - STRUCTURE NO. R-06-016 904.1 - 5000 PSI, ¾ IN.,705 HP CEMENT CONCRETE (CIP HEADWALLS, FOOTING CLOSURES, AND WINGWALL CLOSURES) 904.3 - PRECAST 3-SIDED FRAME, INGALLS, AND FOOTING MINIMUM 5000 PSI HP CEMENT CONCRETE 910.1 - STEEL REINFORCEMENT FOR STRUCTURES - EPOXY COATED 910.4 - MECHANICAL REINFORCING BAR SPLICER 965. - MEMBRANE WATERPROOFING FOR BRIDGE DECKS 970. - DAMP-PROOFING 975.6 - METAL BRIDGE RAILING TEXAS TYPE 631LS W-BEAM Required Fixed Costs The following fixed costs will be included in the vendor's lump sum bid price. 999.001 - TRAFFIC POLICE 999.300 - MATERIALS INSPECTION, SAMPLING AND TESTING SERVICES 999.800 - ADDITIONAL MATERIALS 999.801 - ADDITIONAL ARTISANS LEGAL AD (Pre-Bid Conference and Site Visit) Sealed bids for furnishing the following item will be received through the OpenGov online bidding platform until the time specified below at which time the bids will be publicly opened and read. Specifications and bid forms may be obtained through the OpenGov online bidding platform at any time during the period the bid is open. Bids will be opened via a teleconference meeting on December 17, 2026 at 1:00 PM . Each bid must be accompanied by a bid security consisting of a BID BOND, or, CERTIFIED CHECK issued by a responsible back or trust company in the amount of 5% of the bid price. The Pre-Bid Conference and Site Visit will be held at the Sleepy Hollow Road Bridge located at .4 miles east from the intersection of ST 41 and Sleepy Hollow Road , on December 3, 2026 at 11 AM . It is imperative that all prospective bidders have a representative in attendance. A performance bond in an amount to 50 percent of the total amount of the contract price with a surety company qualified to do business in the Commonwealth of Massachusetts will be required for the faithful performance of the contract, as well as a labor and materials bond in an amount equal to 50 percent of the total contract price. All bids for this project are subject to applicable public bidding laws of Massachusetts, including, but not limited to G.L. c.30, §39M. Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of Massachusetts General Laws, Chapter 149, Section 26 through 27D inclusive. Selection of the contractor will be based upon bidder qualifications, including evidence of past performance in similar projects, and bid price. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids. The Town reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town. The Town of Richmond By: Pete Beckwith Title: Public Works Director SECTION 00100 - INSTRUCTIONS TO BIDDERS Receipt and Opening of Bids The Town of Richmond , Massachusetts, herein called the owner, acting by and through its Select Board, will receive sealed Bids for the project known at the Sleepy Hollow Road Bridge Replacement Project Project. General bids shall be submitted through the OpenGov online bidding platform and must be submitted by 1:00 PM on December 17, 2026 at which time the bids will be opened and real aloud via a teleconference. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified will not be considered. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids. Location and Work to be Done The work consists of Complete replacement of the undersized existing corrugated HDPE culvert pipes with a proposed precast concrete 3-sided frame bridge, on precast spread footings and precast concrete wingwalls. The work will take place .4 miles east from the intersection of ST 41 and Sleepy Hollow Road. of and all work incidental thereto, in accordance with the Specifications and conceptual plans attached hereto. Additional drawings showing details in accordance with which the work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer, and shall then become a part of the Contract Documents. The Contractor shall furnish all labor, services, materials, equipment, plant machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work as herein specified. The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item. Preparation of Bid Each bid must be submitted through the OpenGov online bidding platform and all documents requested of the bidder must be downloaded, completed in full, and uploaded through the platform. All blank spaces for bid prices must be filled in. Bid Opening Procedure The following list of requirements shall apply to each filed bid. Bids not meeting all the requirements for timeliness and security will be rejected; bids not meeting signature and addenda requirements will be rejected prior to checking of bid amounts. Bids shall be filed through the OpenGov online bidding platform by the time and date specified in Receipt and Opening of Bids , above. Properly executed bid security shall be submitted alongside the completed bid through the OpenGov online bidding platform. Bid signatures will be checked. All addenda will be released via the OpenGov online bidding platform. All bidders shall acknowledge receipt of these addenda through the platform. The total dollar amount of each bid will be read, and the three apparent lowest bids will be selected for further consideration. These three apparent low bids will be read aloud for the benefit of the other bidders and the bid opening procedure will be closed. All those present at the bid opening may examine all bids after the bid opening and after the reading of the three apparent low bids. Modification Any bidder may modify his bid at any time prior to the scheduled time and date for the receipt of bids specified in Receipt and Opening of Bids , above. Any modification shall be made through the OpenGov online bidding platform. Modifications to bids will not be accepted after the bid opening. Ability and Experience of Bidder No award will be made to any bidder who cannot satisfy the Owner that he has sufficient ability and experience in this class of work and sufficient capital and plant to enable him to prosecute and complete the work successfully within the time named. The Owner's decision or judgement on these matters will be final, conclusive, and binding. The Owner may make such investigations as it deems necessary, and the bidder shall furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner my request. Conditions of Work Each bidder must familiarize himself fully with the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor. Addenda and Interpretations No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. All information given other than by means of the plans, specifications, or by addenda, as described below, is given informally and shall not be used as the basis of a claim against the Owner. Every request for such interpretation should be submitted using the Question & Answer utility on the OpenGov online bidding platform. Any and all such interpretations and any supplemental instructions will be in the form of addenda released through the OpenGov online bidder platform. Failure of any bidder to acknowledge any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents. Security for Faithful Performance Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor and materials under this contract. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth and satisfactory of the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contactor from the obligation sooner. Power of Attorney Attorneys-in-fact who sign Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney. Laws and Regulations The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances or bylaws, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the Contract the same as though written out in full. Liquidated Damages for Failure to Enter into Contract The successful bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within 10 days after presentation thereof by the owner, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his/her bid, but the amount forfeited shall not exceed the difference between his/her bid price and the bid price of the next lowest responsible and eligible bidder. In case of death, disability, bona fide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the bidder, his/her bid deposit will be returned. Obligation of Bidder At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of this bid. Information Not Guaranteed All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner. All such information is furnished only for the information and convenience of bidders and is not guaranteed. It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents. It is further agreed and understood that no bidder or Contractor shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the Owner or the Architect/Engineer, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents. Bid Security Each bid and sub-bid must be accompanied by bid security in the form of a certified check, a bid bond, cash, or a treasurer's or cashier's check, payable to the Owner, in the amount of five (5) percent of the value of the bid. Such security of general bidders will be returned to all except the three lowest responsible and eligible bidders within five days, Saturdays, Sundays, and legal holidays excluded, after the opening of the bids, and the remaining securities will be returned promptly after the Owner and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to the selected contractor within 30 days, Saturdays, Sundays, and holidays excluded, after the date of the opening of the bids, upon demand of the bidder at any time thereafter. Right to Reject Bid The Owner reserves the right to waive any informalities in bids and to reject any and all bids, should the Owner deem it to be in the public interest to do so. The Owner may also reject bids which in its sole judgement are either incomplete, conditional, obscure or not responsive or which contain additions not called for, erasures not properly initialized, alterations, or similar irregularities. Comparison of Bids Bids will be compared on the basis of prices set forth in the bid forms. Award of Contract The Contract will be awarded to "the lowest responsible and eligible bidder" pursuant to General Laws Chapter 30, Section 39M, as amended. Such a bidder shall possess the skill, ability, and integrity necessary for the faithful performance of the work, shall be able to furnish labor that can work in harmony with all other elements of labor employed or to be employed, in the work, and shall otherwise comply with all applicable provisions of law. Contract award shall be subject to availability of an appropriation for funding. States Regulating Competitive Bidding Any bid which does not comply with the provisions of Massachusetts General Laws Chapter 30, Section 39M, as amended, need not be accepted and the Owner may reject every such bid. Wage Rates Prevailing Wage Rates as determined by the Commissioner of Department of Labor and Workforce Development under the provisions of the Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the bidder, before bid opening, to request any additional information on Prevailing Wage Rates for those tradespeople who may be employed for the proposed work under the contract. Prevailing Wage Rates for the project are in the attachments section at the end of this bid. Contractor Records The Contractor shall comply with the provisions of Massachusetts General Laws, Chapter 30, Section 39R concerning Contractor records. Insurance The Contractor shall keep in force at all times during the life of the contract, liability insurance in the amount of at least two (2) million dollars ($2,000,000) combined single limit, including bodily injury and property damage with the Town of Richmond , named as Additionally Insured. In the event of policy cancellation or non-renewal (for other than non-payment of premium), thirty (30) days' notice to the Town of Richmond is required. For cancellation by reason of non-payment of premium, ten (10) day notification is required. A binding letter from the insurance company stating that this coverage will be in effect must be submitted as a part of the bid as well as at any point in time during the duration of the contract and when any given insurance policy is modified and/or renewed. Upon execution of the contract, the contractor shall submit a copy of the coverage selections page and a copy of the policy when issued. Project Manager The Owner may utilize the services of a project manager, whose duties shall be as set forth in an Agreement for Project Manager Services. SPECIFICATIONS Project Specifications Please refer to the Special Provisions in the attachments section of the bid. MA DOT Standard Specifications Construction specifications | Mass.gov PRICING PROPOSAL BID RESPONSE
Published attachments
- SECTION 00500 – OWNER-CONTRACTOR AGREEMENT FOR PUBLIC WORKS CONSTRUCTION
- SECTION 00610 - PERFORMANCE BOND
- SECTION 00620 - PAYMENT BOND
- WageSchedule_20261021131936 Sleepy Hollow
- 3-24-95 R-06-016 SIGNED PLANS
- 20261006 R06016 Special Provisions_Final
- Conservation Commission Memo
- Sleepy_Hollow_Road_Bridge_Replacement_Project_(Addendum_#2_Revision).pdf
Addenda and notices
Addendum #1 · 1
Attention all bidders. The MA DOT prequalification class of work has been changed from BRIDGE - CONSTRUCTION to BRIDGE - CULVERTS. Attached is the revised DOT Prequalification approval.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Did documents note: "Please refer to the project timeline in this document for all important deadlines" which is not provided.
Hi Dulce, The project timeline with deadlines is: Release Project Date:November 12, 2026 Pre-Proposal Meeting (Non-Mandatory):December 3, 2026, 11:00am .4 miles east from the intersection of ST 41 and Sleepy Hollow Road Question Submission Deadline:December 10, 2026, 4:00pm Question Response Deadline:December 15, 2026, 4:00pm Response Submission Deadline:December 17, 2026, 1:00pm Contractor Selection Date:January 8, 2027 The construction will need to take place in during the spring/summer months. According the the special provisions: "A detailed schedule outlining the tasks and timeline to perform the culvert replacement during the closure shall be prepared by the Contractor and submitted for approval." Hopefully this answers your question.
Please provide completion date for this project and confirm liquidated damages are $1000 per day
Yes, liquidated damages are $1,000 per day. The town stated the Construction can happen April to October. Turtle fencing must be installed by May 15th and remain in place through construction.
Is this project a DCAM or Mass Highway Prequalifications project if so, what is the category?
Hi Tracy, The contractor needs to be MA DOT prequalified and I just issued an addendum with the class of work revision.
States no change at the top. This is not a printable version. Can you make printable