State and local · OpenGov
Slurry Seal Materials
Description
The County of Wayne, NY is soliciting sealed responses for Slurry Seal Materials . Responses are due , on or before 1:00 pm prevailing time on Thursday, January 7, 2027 . Late responses will not be accepted. Slurry Seal Materials Pricing reflects product being delivered and applied Under 5,000 Square Yard 5,000 - 10,000 Square Yard 10,000 - 25,000 Square Yard Over 25,000 Square Yard Project Details / Scope of Work Detailed Specifications The slurry seal surface shall consist of a mixture of emulsified asphalt, mineral aggregate, and water; properly proportioned, mixed and spread evenly on the surface as specified. The cured slurry shall have a homogeneous appearance, adhere firmly to the surface and have a skid resistant texture. APPLICABLE SPECIFICATIONS The following specifications, as to methods, and material, form a part of this overall specification. AASHO - AMERICAN ASSOCIATION OF STATE HIGHWAY OFFICIALS. ASTM - AMERICAN SOCIETY OF TESTING METHODS. ISSA - INTERNATIONAL SLURRY SEAL ASSOCIATION. AASHO T 2 ASTMD 75 - Sampling stone, slag, gravel, sand and stone block for use as highway materials AASHO T 27 ASTM C 136 - Sieve analysis of fine or coarse aggregate. AASHO T 11 ASTM C 117 - Amount of material finer than No. 200 Sieve in Aggregate. AASHO T 176 ASTM D 2419 - Plastic fines in graded Aggregate and soils by use of the Sand Equivalent Test. AASHO T 84 ASTM C 128 - Specific Gravity and Absorption of Fine Aggregates. ASSHO T 19 ASTM C 29 - Unit weight of Aggregate. AASHO T 96 ASTM C 131 - Abrasion of Coarse Aggregate, by use of the Los Angeles Machine. AASHO T 127 ASTM C 183 - Sampling of Hydraulic Cement. AASHO T 37 ASTM D 546 - Sieve analysis of Mineral Filler. SPECIFICATIONS FOR MINERAL FILLERS AASHO M 17 ASTM D 242 - Mineral Filler for Bituminous Paving Mixture. TEST METHODS FOR ASPHALT EMULSION AASHO T 40 ASTM D 140 - Sampling Bituminous Material. AASHO T 59 ASTM D 244 - Testing Emulsified Asphalt. TEST METHODS FOR BITUMINOUS SLURRY SURFACES ASTM D 3910 - Design, Testing, and Construction of Slurry Seal AASHO T 164 - Bitumen Content of Paving Mixture by Centrifuge. AASHO T 30 - Mechanical Analysis of Extracted Aggregate. ISSA - TB-A 105 - Guide Specifications SPECIFICATIONS FOR ASPHALT EMULSIONS AASHO M 140 ASTM D 977 - Specifications for Anionic Emulsified Asphalt. AASHO M 208 ASTM D 2397 - Specifications for Cationic Emulsified Asphalt. ISSA - TB #116 - Specifications for Quick-Set Emulsified Asphalt Slurry Seal Systems. Design, Certifications, and Demonstrations Prior to Construction: Sources of all materials shall be selected prior to the time the materials are required for use in the work. All materials shall be pre-tested, in a qualified laboratory, as to their suitability for use in slurry. A job mix formula for the slurry mixture shall be prepared prior to construction. More specifically: The contractor shall furnish the Superintendent of Highways with, five (5) days prior to the start of work, a certified statement from the emulsion manufacturer giving analysis of the base asphalt used in the manufacture of the emulsion. The statement shall also certify that the material represented is a true Quick Set Emulsion, passing all above procedures. The contractor shall furnish the Superintendent of Highways with, five (5) days prior to the start of work, a certified testing data sheet from a qualified laboratory. The data sheet will show that their test methods and results on the emulsion and the aggregate, conform to the requirements of these specifications. The contractor shall furnish the Superintendent of Highways with, at least three (3) days prior to the start of work, a job mix formula for the slurry mixture. Acceptance of the formula by the Superintendent is solely for the purpose of quality control, and in no way releases the contractor from his responsibilities. Sieve Analysis of aggregate used; Percent of mineral filler; Percent of water, Percent of asphalt emulsion; Unite weight of dry aggregate in lbs./cu. ft. loose and compacted; Sample mixes should be evaluated by acceptable testing procedures as to their setting time, mixing characteristics, resistance to rain and abrasion. The results of the wet track abrasion should also be included in this report; Observed effects of moisture content on the specific weights of the test aggregate; Application rate of dry aggregate in lbs./s.y. Acceptance of the mix formula by the Superintendent must be done prior to construction start-up. If not, the contractor takes full responsibility for all costs incurred if application of slurry is done prior to this acceptance. This acceptance will be provided in writing by the Superintendent. The contractor shall submit along with the required written materials analysis and proposed Job Mix Formula the following physical specimens: 5 kg. of the proposed aggregate selected. 4 liters of the proposed emulsion selected. ½ kg. of the filler selected, if applicable. 3 series of consistency tests as 100, 85, and 70% BR and at 2-3, 4-5, and 6-7 cm consistencies. 2 each of abraded Wet Track Abrasion Test specimens of 100, 85, and 70% BR. Each specimen shall be indelibly identified with the date and source. The Superintendent of Highway shall waive the design submittals provided the bidder has previously applied a satisfactorily designed and applied slurry with substantially the same materials proposed for this work. In any case, untried materials may not be introduced into this work without complete analysis and design of a Job Mix Formula for each new material approved by the Superintendent of Highways. During Construction: contractor shall provide extraction tests by a qualified laboratory as required by the engineer. At least one test per day or every 25,000 s.y. of work shall be performed and results documented. If asphalt content or other parameter is found to be out of specifications and not in conformance with job mix, immediate corrections shall be taken on remainder of work and all work already in place shall be evaluated for possible re-application of slurry, at no additional cost to the Highway Department. The Superintendent of Highways shall also have authority to make equitable adjustment in contract price for deficient work based upon test results. Test results are not be submitted to the Superintendent of Highways within on week after the sample is taken. Samples of materials and of the finished slurry surface shall be furnished by the contractor as directed by the Superintendent of Highways during progress of the work. Test reports may be requested from the contractor by the Superintendent as additional materials arrive. Guarantee The bidder shall guarantee that all material and equipment used to fulfill this contract meets the enclosed specifications. The County shall be responsible for all structural, subgrade, and drainage of the pavement structure. Any failures caused by pavement structure deficiencies shall be the responsibility of the County. Equipment, Tools, and Machines The equipment, tools, and machines needed in the performance of the work shall be provided by the contractor, shall be subject to approval by the Superintendent of Highways, and shall be maintained is a satisfactory working condition at all times. Mixing and Application Machines: The slurry mixing and application machine shall be a self-propelled continuous flow unit capable of interlocking and accurately delivering a predetermined proportion of aggregate, water, and asphalt emulsion to the mixing chamber and of discharging the thoroughly mixed product on a continuous basis. No violent mixing shall be permitted. Each material function of the machine (fines, aggregate, emulsion, and water) shall be accurately metered. The machines shall be automated with time delays so that all functions can be controlled by one switch. Fines Feeder: The slurry seal machine shall be equipped with a fines feeder that provides an accurate metering device or method to introduce a predetermined proportion of mineral filler into the mixer at the same time and location as the aggregate. The fines feeder shall be used whenever mineral filler is a part of the aggregate blend. Fogging: The slurry seal machine shall be equipped with a water pressure system and fog-type spray bar adequate for application of 0.05 gal/yd.2. The spray bar shall be so mounted on the mixing machine that fogging will immediately precede application of the slurry seal mix. Storage Capacity on Machine: Slurry mixing equipment shall have a minimum 8 cu. yd. hopper, 400 lb. cement hopper, with a 600 gal. emulsion tank and a 600 gal. water tank. Slurry Spreading Equipment: A variable-width mechanical type squeegee spreader box shall be attached to the slurry seal mixing machine. The spreader box shall be attached to the slurry seal mixing machine. The spreader box shall be equipped and maintained with flexible material in contact with the pavement surface to prevent loss of slurry from the spreader box on varying grades and crown. The spreader box shall be equipped for lateral distribution of the slurry mixture within the spreader box regardless of spreader box width or crown or bank of the pavement surface. The spreader box shall be kept clean, and build- up of asphalt and aggregate on either squeegee or spreader box shall not be permitted. Burlap drags or other drags shall be provided and shall be approved by the Superintendent of Highways. The drag shall be cleaned or replaced as needed to prevent accumulations or crusts of slurry seal mix on the drag. Equipment Requirements: The contractor must own and have available a minimum of (3) continuous flow (5) cubic yard slurry machines, so that the delay or inconvenience to the public will be held to a minimum. Auxiliary Equipment: Hand squeegees, shovels, and other hand equipment shall be provided by the contractor as necessary to perform work. Composition and Application of Slurry Mix Composition/Rate of Application: The amount of asphalt emulsion to be blended with the aggregate shall be that determined by the laboratory report provided by the contractor, subject to final adjustment in the field, per Superintendent’s recommendation, to allow for absorption by the existing surface. The amount of water added must be controlled accurately to insure production of a readily spreadable, yet completely to insure production of a readily spreadable, yet completely stable slurry. The slurry shall be a homogeneous mixture, sufficiently stable during the entire mixing spreading period that the emulsion does not break; that there is no segregation of the fines from the coarser aggregate and the liquid portion of the mix does not float to the surface. Total time of mixing, from introduction of emulsion to spreading, shall be two minutes or less. The rate of application per unit shall be minimum, 12 lb./sq. yd., maximum, 15 lb./sq. yd. Mixtures shall be adjusted as required on grades of 8% or more. Application: Sufficient quantities of the slurry seal mixture shall be fed into the spreader box such that a uniform and complete coverage of the pavement is obtained. The slurry seal machine shall be operated at such a speed that amount of slurry in the spreader box shall remain essentially constant. The slurry mixture shall be of the desired consistency as it leaves the mixer and no additional elements shall be added. A sufficient amount of slurry shall be carried in all parts of the spreader at all times so that complete coverage is obtained. No lumping, balling, or unmixed aggregate shall be permitted. No segregation of the emulsion and aggregate fines from the coarse aggregate will be permitted. If the coarse aggregate settles to the bottom of the mix, the slurry will be removed from the pavement, and shall be replaced with a proper mix an no additional cost to the Highway Department. No excessive breaking of the emulsion will be allowed in the spreader box. No build-up of cured slurry seal mix shall be allowed to collect in spreader box. No streaks caused by oversized aggregate particles of build-up of slurry mix on squeegees shall be left in the finished surface. Joints: The longitudinal joint between adjacent lanes shall have no visible lap, pinholes, or uncovered areas. Thick spots caused by overlapping shall be smoothed immediately with hand squeegees before the emulsion breaks, so that a uniform surface is obtained which contains no breaks, or discontinuities. Hand Work: Approved squeegees shall be used to spread slurry in nonaccessible areas to the slurry mixer. Care should be exercised in leaving no unsightly appearance from hand work. Hand work will also be required on radii, along curb and gutter lines and around fixtures. Curing: Completed slurry seal shall be protected from traffic by barricaded and markers for at least 4 hours, and longer when weather conditions and thickness of slurry seal require additional time for proper drying. Protection of Fixtures: Special care shall be taken around road fixtures, such as catch basins, manholes, water boxes, gas valves, etc., so as not to cover, or impair from operation. All structures, which may become marred by the slurry shall be marked prior to slurry application and cleaned immediately after application by sweeping, shoveling, wiping, etc., and all disturbances to the uncured surface caused by this activity shall be touched up by hand work. Utmost care shall be taken by the Contractor to keep asphalt materials off equipment, building, etc. Buildings, etc., shall be covered when spraying adjacent to them. If noticeable amounts of the materials should be deposited on any building wall, etc., it shall be removed by the Contractor. Weather Limitations: No slurry shall be applied, a) when there is any danger that the finished product will freeze before it cures completely: b) when the pavement or air temperature is 55 degrees Fahrenheit or above and raising; or c) in the period following a rain while puddles of water remain on the surface to be coated. Slurries that cure by evaporation should not be layed during periods of abnormally high humidity, or when rain may fall within a few hours. Time: No slurry will be applied before 7:00 a.m. or after 2:30 p.m. unless directed by the Superintendent of Highways. An anticipated plan of slurry application shall be submitted ten (10) days prior to commencement of operation. The plan shall be approved by the Highway Superintendent. Traffic Control: Contractor shall provide maintenance and protection of traffic. Suitable methods such as barricades, flagmen, pilot cars, etc., shall be used to protect the uncured slurry surface from all type of traffic. Any damage to the uncured slurry will be the responsibility of the Contractor. The County shall give final approval to the method used. If damage occurs where suitable means have been made to protect the uncured slurry, violators will be prosecuted and the Contractor will be reimbursed for the amount of damages. County/Town Responsibilities Furnish loader and operator to charge slurry machine. Furnish water. Sweep and patch area before slurry sealing. Provide stockpile site and stockpile aggregate; if required. Measurement and Payment Work prescribed by this item will be measured by the square yard surface area. The yard calculations will be based on dimensions determined from measurements of the actual area slurry sealed as authorized. The work performed as prescribed by this item, measured as provided above will be paid for at the unit price bid per square yard for “Slurry Sealed Pavement Surface”/ Measurement and payment will be limited to the longitudinal length and width of which there is a definite texture present. The payment per square yard shall include aggregate, emulsion, equipment, and necessary labor to complete the work as specified. Asphalt Price Adjustments Asphalt Price Adjustments allowed will be based on the November 1, 2026 average of the F.O.B terminal price per ton of unmodified PG 64-22 binder without anti-stripping agent (base average F.O.B. terminal price). The new monthly average terminal price will be determined by the New York State Department of Transportation based on prices of pre-approved primary sources of performance graded binder in accordance with the New York State Department of Transportation Standard Specification. The November 1, 2026 average is $803.00 per English Ton. Note: The same grade of asphalt cement used in establishing the base average F.O.B. terminal price shall be used in establishing the new average F.O.B. terminal price. In the event that one or more of the New York State Department of Transportation pre-approved sources discontinue posting a price for asphalt cement, the base average F.O.B. terminal price shall not be recalculated. The new average F.O.B. terminal price will be determined based on the above F.O.B. terminal prices posted on the 20th of each month, hereafter known as the “Adjustment Date”, during the contract period starting with February 20th 2027. However, price adjustments, in accordance with the formula below, will be effective for deliveries made on and after the first of the month (i.e. March 1, 2027) following the adjustment date. The unit prices of bituminous materials purchased from any award based on the specification will be subject to adjustment based on the following formula: Price Adjustment Per Gallon = New Monthly Average FOB Terminal Price - Base Average Terminal Price X Total Allowable Petroleum 235 NEW MONTHLY AVERAGE F.O.B. TERMINAL PRICE: The average F.O.B. terminal price for unmodified PG 64-22 binder without anti-stopping agent as determined by the New York State Department of Transportation Standard Specifications. BASE AVERAGE F.O.B. TERMINAL PRICE: The average F.O.B. terminal price of unmodified PG 64-22 binder without anti-stopping agent has been determined by the New York State Department of Transportation as of November 1, 2026. TOTAL ALLOWABLE PETROLEUM: The percentage of total allowable petroleum for each item is as follows: Material Designation Grade Asphalt % Petroleum Allowance Total Allowable Petroleum % 702-0700 18-60 100 0.2 100.20 702-3001 RS-1 55 1.7 56.70 702-3002 RS-1h 55 1.7 56.70 702-3101 RS-2 63 2.7 65.70 702-3102 HFRS-2 63 2.7 65.70 702-3201 MS-2 65 8.2 73.20 702-3301 HFMS-2 65 8.2 73.2 702-3401 HFMS-2h 65 2.7 67.70 702-3402 HFMS-2s 65 8.2 73.20 702-3501 SS-1 57 0.2 57.20 702.3501 SS-1 (Cold Recycle) 65 0.2 65.20 702-3601 SS-1h 57 0.2 57.20 702.3601 SS-1h (Cold Recycling) 65 0.2 65.20 702-3701 RS-2p 63 2.7 65.70 702-3801 HFRS-2p 63 2.7 65.70 702-4001 CRS-1 60 2.7 62.70 702-4002 CRS-1h 60 2.7 62.70 702-4101 CRS-2 65 2.7 67.70 702-4201 CMS-2 65 10.2 75.20 702-4301 CMS-2h 65 10.2 75.20 702-4401 CSS-1 57 0.2 57.20 702.4401 CSS-1 (Cold Recycling) 65 0.2 65.20 702-4501 CSS-1h 57 0.2 57.20 702.4501 CSS-1h (Cold Recycling) 65 0.2 65.20 702-4601 CQS-1h 62 0.2 62.20 702-4701 CRS-1p 60 2.7 62.70 702-4702 CRS-2p 65 2.7 67.70 702-4801 CQS-1p 62 0.2 62.20 702-90 Diluted Tack Coat 40 0.2 40.20 Asphalt Price adjustments will not be allowed for materials which do not have an asphalt cement base. Example: Item 702-3101 $600 – $638 x 0.657 = -$0.106 per gal Base Avg. Price = $638.0 235 New Avg. Price = $600.0 Total Allowable Petroleum + 0.657% Positive Price Adjustment number shall be added to original per gallon Bid Price Negative Price Adjustment number shall be subtracted from original per gallon Bid Price. Work performed after the expiration of the contract, where no extension has been granted, resultant from purchase orders placed prior to expiration of the contract will receive the price adjustments applicable in effect during the last month of the contract. Price adjustments for any contracts that are extended will be based on the new average for the month in which the work is done applying the same base established for that contract. Price adjustments allowed by t
Published attachments
OpenGov categories
- 15010 · Construction Materials (Not Otherwise Classified)
- 74500 · Road And Highway Building Materials (Asphaltic)
- 74584 · Slurry Seal
- 91371 · Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)