Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Smart Fault Indication Solution

Description

The City of Naperville Electric Utility is issuing this Request for Information (RFI) to obtain industry information regarding commercially available smart fault current indicators (FCIs) for the Utility’s underground and overhead 12.47kV mainline distribution system. The RFI is intended to assist the Utility understand available technologies, communication architectures, installation requirements, operating limitations, integration approaches, preliminary cost estimates, lifecycle costs, and current market capabilities before developing a potential future procurement. The Utility is particularly interested in solutions that can provide remote fault indication to the Utility’s SCADA system while operating without a local external power source at every FCI location for device operation or signal transmission. Respondents are encouraged to identify solutions that meet this objective as well as alternative approaches that may provide equal or improved operational value. This RFI is for market research and planning purposes only. It is not a Request for Qualifications, Request for Proposals, or any other solicitation document. This RFI does not commit the City to contract for any supply or service, nor will any response to this be considered in the evaluation of any response to any future solicitation. Information received may be used in the development of specifications for future Request for Proposals. The city will not pay for any information or administrative costs incurred in response to this RFI. Introduction Project Overview Summary Title: Smart Fault Indication Solution Bid No: 26-274 Bid Due Date/Time: Wednesday, January 27, 2027 , 2:00 pm Timeline Timeline Delivery Instructions Proposals must be submitted electronically. Proposals are due no later than 2:00 pm on Wednesday, January 27, 2027 . Proposers shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic proposal. Any incomplete submittals may be rejected as non-responsive. Infrequent or first-time users of electronic submissions are encouraged to load their proposals 24 hours prior to the Closing Date and Time. No Submission If you choose not to respond, please select NO SUBMISSION on https://procurement.opengov.com/portal/naperville . Disclaimer - Document Distribution The City of Naperville Procurement Services and its e-Procurement Portal https://procurement.opengov.com/portal/naperville are the only authorized sources of solicitation documents. Solicitation documents and forms obtained from any other source may be an incomplete set of documents. Reproduction of these documents without the express permission of the City of Naperville is prohibited. Civic Access Portal for Vendors The City of Naperville has developed a new portal for vendors to register and update existing information within Civic Access. The City of Naperville will only accept vendor forms from vendors currently working with the Procurement and/or Accounts Payable teams. It will allow you to: Register as a new vendor. Sign up for ACH payments. Update existing vendor information (e.g. new mailing address, new TIN/W9, new banking information). How do I register? 1. To create an account, please visit the City of Naperville Civic Access portal . 2. Once you have created an account, submit your vendor information Accounts Payable – Vendor Form Submission application. Vendors can find step-by-step instructions in the Knowledge Center . An accounts payable staff member will verify your submission and follow up if there are any questions on your submission. Please send an email message to FSDAccountsPayable@naperville.il.us for assistance if needed. General Information The City of Naperville Procurement Services and its service provider OpenGov are the only authorized sources of bidding documents/proposal forms. Bidding documents/proposal forms obtained from any other source may be an incomplete set of documents. Reproduction of these documents without the express permission of the City of Naperville is prohibited. General Information The goal of this Request for Information is to obtain information about the industry so that City staff can decide if it should conduct a Request for Proposals to obtain industry information regarding commercially available smart fault current indicators (FCIs) for the Utility’s underground and overhead 12.47kV mainline distribution system. The RFI is intended to assist the Utility understand available technologies, communication architectures, installation requirements, operating limitations, integration approaches, preliminary cost estimates, lifecycle costs, and current market capabilities before developing a potential future procurement. The Utility is particularly interested in solutions that can provide remote fault indication to the Utility’s SCADA system while operating without a local external power source at every FCI location for device operation or signal transmission. Respondents are encouraged to identify solutions that meet this objective as well as alternative approaches that may provide equal or improved operational value. This RFI is for market research and planning purposes only. It is not a Request for Qualifications, Request for Proposals, or any other solicitation document. This RFI does not commit the City to contract for any supply or service, nor will any response to this be considered in the evaluation of any response to any future solicitation. Information received may be used in the development of specifications for future Request for Proposals. The city will not pay for any information or administrative costs incurred in response to this RFI. BACKGROUND The Electric Utility operates an di Pre-Proposal Meeting There will be no Pre-Proposal Meeting for this RFI. Questions During the Process All questions concerning this bid shall be submitted in writing prior to the question due date. The deadline for questions is Monday, January 18, 2027 , 12:00 pm If required, a written response in the form of an addendum will be issued no later than Wednesday, January 20, 2027 , 12:00 pm . No contact with the Public Utilities (Electric) | DPU-E shall be made during the bid process. Questions asked after the deadline are not guaranteed a response. Freedom of Information Act Proposer acknowledges that the Freedom of lnformation Act, 5 ILCS 140/1 et seq. (the "ACT") places an obligation on the City to produce certain records that may be in possession of the Proposer. Proposer shall comply with the retention and documentation requirements of the Local Records Retention Act 50 ILCS 205/1 et seq. and the Act and shall maintain all records relating to this Agreement in compliance with the Local Records Retention Act (complying in all respects as if the Proposer was, in fact, the City). Upon notice from the City, Proposer shall review its records promptly and produce to the City within two business days of said notice from the City the required documents which are responsive to a request under the Act. If additional time is necessary to comply with the request, the Proposer may request the City to extend the time to do so, and the City will, if time and a basis for extension under the Act permits, consider such extensions. In the event Proposer fails to produce the requested records or fails to produce the requested records within the time period required above and the City is assessed a fine, fee or penalty for failure to timely comply with Act do to Proposer's actions, Proposer shall reimburse City for all fines, fee or penalties, including reasonable attorney’s fees, paid by the City. Background and Solution Opportunities Background The Electric Utility operates an distribution network serving more than 64,000 residential, commercial, and industrial customers. The distribution system operates at 12.47 kV and is approximately 95% underground and 5% overhead. The Utility currently has non-communicating fault indicators installed on underground and overhead mainline and branched feeders. Existing devices provide local visual trip indication only and do not transmit fault information to SCADA or another remote monitoring platform. Existing indicators are installed at single-phase transformers, threephase transformers, mainline switchgear cabinets, and overhead conductors. When a mainline fault occurs, operations personnel currently may need to dispatch field crews to patrol the circuit, access manholes or splice points, and visually inspect indicators to determine which device has operated. This can increase fault-location time, crew requirements, and customer outage duration, particularly at night, during adverse weather, or on circuits with long distances between access points. The Utility is therefore investigating smart FCI technologies capable of providing timely remote fault-status information and improving fault-location and restoration operations. Desired Outcome The Utility is interested in determining whether the marketplace can provide a smart fault indication solution to the Utility’s underground & overhead 12.47kV mainline distribution system. This Request for Information (RFI) will aid the development of specifications/requirements for a future Request for Proposal (RFP). The mainline 12.47kV distribution system consists of ~150 feeders comprising of (684) 2-Way Switchgears (PME-9) and (179) 3-Way Switchgears (PME-11) with the need of monitoring 3,126 conductors. Preliminary System Information Preferences and Solution Considerations To help respondents understand the Utility’s long-term objectives, the following solution characteristics are generally not preferred:  Near-Term Obsolescence: Solutions that are scheduled for End-of-Life (EOL) or End-ofSale (EOS) by the manufacturer within the next 10 years.  Excessive Local Power Connections: Solutions requiring external local power at each monitoring location will impose too heavy of a burden on the Utility to implement the solution.  Systems requiring 2.4 Ghz or 5Ghz wireless routers for data transferring. City Terms and Conditions Equal Opportunity The City will make every effort to ensure that all proposers are treated fairly and equally throughout the entire advertisement, review and selection process. The procedures established herein are designed to give all parties reasonable access to the same basic information. Questions Proposers shall submit all inquiries regarding this solicitation via the City's eProcurement Portal, located at https://procurement.opengov.com/portal/naperville . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City's eProcurement Portal. Proposers may also click “Follow” on this solicitation to receive an email notification when answers are posted. It is the responsibility of the proposer to check the website for answers to inquiries. Addendum Proposers are required to register for an account via the City's eProcurement Portal hosted by OpenGov. Once the proposer has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each proposer to periodically check the site for any addenda at https://procurement.opengov.com/portal/naperville. Samples Samples or drawings requested shall be delivered free of charge with the proposal. Rejected samples shall be removed by the proposer at his own expense after receiving the receipt of same. Accepted samples will be retained during the life of the contract. Proposal Preparation Costs All costs directly or indirectly related to preparation of a response to the RFP, any oral presentations required to supplement and/or clarify a proposal, and or reasonable demonstrations which may be, at its discretion, required by the City shall be the sole responsibility of and shall be borne completely by the proposer submitting a proposal. Proposal Ownership All proposals, including attachments, supplementary materials, addenda, etc., shall become the property of the City and will not be returned to the proposer. Illinois Freedom of Information Act 1. Cooperation with disclosure under t he Illinois Freedom of Information Act . The Illinois Freedom of Information Act (“FOIA” or “Act”)) (5 ILCS 140/1, et seq. ), provides that records in the possession of others whom the City has contracted with to perform a governmental function are covered by the Act and subject to disclosure within limited statutory timeframes (5 working days with a possible 5 working day extension, or within such other time frame as agreed upon in writing by the requester). Upon notification from the City that it has received a FOIA request that calls for records within the proposer’s control, the proposer shall promptly provide all requested records to the City so that the City may comply with the request within the required timeframe. The City and the proposer shall cooperate to determine what records are subject to such a request and whether or not any exemptions to the disclosure of such records or part thereof, are applicable. 2. Information that may be exempt from disclosure under FOIA . The underlying principle of FOIA is that public records should be available to the public. However, there are many exemptions under FOIA which permit specific information to be withheld from disclosure for certain reasons. ( See 5 ILCS 140/7 and 7.5). If the City receives a FOIA request which calls for production of any or all of the materials you have submitted in response to the City’s request for proposal, the City will consider whether any of the exemptions are applicable. To assist us in that regard please review and comply with the following: a. Trade Secret/Proprietary information/(7(1)(g)) . You may seek to have information submitted by it to the City withheld from disclosure to third parties to the extent that such information constitutes trade secrets or commercial or financial information that is proprietary, privileged or confidential, the disclosure of which would cause competitive harm to a person or business. Please clearly indicate, specifically, any portions of your proposal that you believe fall within this exemption. i. Note: Please be careful to designate only those sections of your submittal that you believe, in good faith, fall within this exemption. If entire documents or submittals are designated as exempt, the City may determine that you have not complied with this direction and may not respect your claim for the exemption. b. Security measures/ 7(1)(v)) . You should clearly designate, with specificity, any portions of its submittal which falls within the following exemption: Vulnerability assessments, security measures, and response policies or plans that are designed to identify, prevent, or respond to potential attacks upon a community's population or systems, facilities, or installations, the destruction or contamination of which would constitute a clear and present danger to the health or safety of the community, but only to the extent that disclosure could reasonably be expected to jeopardize the effectiveness of the measures or the safety of the personnel who implement them or the public. *Information exempt under this item may include, such things as details pertaining to the mobilization or deployment of personnel or equipment, to the operation of communication systems or protocols, or to tactical operations. [*Note: The examples provided above are not exclusive.] c. Maps/Locations/(7(1)(x)). You should clearly designate, with specificity, any portions of its submittal which falls within the following exemption: Maps and other records regarding the location or security of generation, transmission, distribution, storage, gathering, or switching facilities owned by a utility, by a power generator, or by the Illinois Power Agency. In light of this standard, please note with a red P in the upper right hand corner of only those pages containing information that you are seriously requesting to be considered as Confidential and Proprietary and a red S in the upper right hand corner of only those pages containing information that you are seriously requesting be considered to contain Security Related information, thereby meeting the applicable exemption criteria of the Illinois Freedom of Information Act ( www.ilga.gov/legislation/ilcs/ilcs3.asp?ActID=85&ChapterID=2 ). You also must highlight in yellow the specific information you claim to be exempt on that page. The City will evaluate only appropriately marked pages and highlighted sections. SUBMITTALS THAT ARE GLOBALLY MARKED CONFIDENTIAL WILL BE CONSIDERED SUBJECT TO FULL DISCLOSURE UNDER THE ILLINOIS FREEDOM OF INFORMATION ACT WITHOUT REDACTION. Laws Governing This contract shall be governed by the laws of the State of Illinois, both as to interpretation and performance, except that Sections 2 through 8 of the Local Prompt Payment Act (50 ILCS 505/2-8) shall not be applicable. Venue for any action related to this agreement shall be in the Circuit Court for the 18 th Judicial Circuit, DuPage County, Illinois. RFI Response Elements Provide minimum qualifications and expectations of what would be needed if the project was to be moved forward. The RFI Responses should specifically address each of the following elements in the same sequence and with the same numbering scheme and headings shown in this section. If the Respondent believes that a subject has been adequately addressed in another part of the RFI Response, then a cross-reference to the appropriate part of the narrative must be provided. 1. Company Background Company name, headquarters, relevant offices & primary points of contact. Company’s experience providing smart fault indicators for underground & overhead distribution and years providing smart fault indicators. Identify the number of approximate units that have been deployed of the proposed product and the time in service the product has. List of utilities that are using the proposed product. 2. Solution Overview Identify the manufacturer, product name, model number, product version, and current commercial availability. If a new product version will be released within the next 5 years provide the available information. Provide the service life of the product and warranty time. Identify how many locations the Utility must provide external power for the solution to work or information that can aid the Utility in estimating this number. Describe the proposed FCI solution and all major components necessary for the data to travel from the FCI to the Utility’s SCADA system. Describe the solution’s principal advantages, limitations, and requirements for the unit to operate effectively. 3. Communications and Network Architecture Describe the communication technology and frequency band(s) used Describe the complete communications path from FCI to SCADA, including gateways, collectors, repeaters, antennas, cellular services, cloud services, or other components. Identify all recurring communications services, subscriptions, cellular plans, licenses, or cloud services required for the solution. 4. Pricing / Cost Estimate Provide a non-binding estimate for the Utility to understand the order-of-magnitude cost of the proposed solution. Pricing should be estimated at 2028 projected prices. Identify each item’s cost structure (one-time, recurring, etc.) and the quantity needed to meet the Utility’s section DESIRED OUTCOME. Separately identify cost of FCI hardware, gateways/collectors/repeaters, antennas, mounting hardware, software licenses, cloud services, communication services, or other required components. Software lic

Plain text

OpenGov categories

  • 26100000 · Power sources
  • 72121509 · Underground Electrical Services
  • 72141126 · Underground utilities construction service
  • 81102402 · High voltage overhead line maintenance and repair
  • 83000000 · Public Utilities and Public Sector Related Services
  • 83100000 · Utilities
  • 83101600 · Oil and gas utilities
  • 83101800 · Electric utilities