Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3E - Design and Engineering Services During Construction
Description
The County of DeKalb, GA (the "County"), is requesting Proposals for Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3E - Design and Engineering Services During Construction . Proposals are to be submitted via the County's eProcurement Portal via https://procurement.opengov.com/portal/dekalbcountyga PRIOR TO 3:00 p.m. ET on January 20, 2027. Late Proposals will not be accepted. The DeKalb County Department of Watershed Management (DWM) is requesting qualified firms to submit proposals to provide design and engineering services during the construction of Phase 3E facilities at the Snapfinger Advanced Wastewater Treatment Facility. The Project is Phase 3E of the ongoing expansion at the Snapfinger Advanced Wastewater Treatment Facility (SFAWTF) as part of the County’s $ 4.27 billion Capital Improvement Projects (CIP) Program . The Project’s anticipated work includes: the evaluation of alternatives design, permitting, and engineering services during construction post-construction services for the following Project elements: (1) adding a primary clarification unit process and (2) r eplacing dewatering centrifuges. Snapfinger AWTF Expansion - Phase 3E (Table One) Project Management, Engineering, and Design Costs Permitting Field Survey and Other Testing Geotechnical Investigation Permitting Fees Project Management, Engineering, and Design Costs Project Management, Engineering, and Design Costs Project Management, Engineering, and Design Costs Owner's Allowance (Table Two) To be filled in by the County Owner-Controlled Allowance: 15% will be added to the total of Table One SUMMARY STATEMENT OF WORK A. PERFORMANCE TIME The services required for this RFP shall commence within ten (10) calendar days after Engineer’s acknowledgement of receipt of a written Notice to Proceed (NTP) and shall be completed within 3,014 days. Any additional time that may be required must be approved in writing by the County. No additional remuneration will be allowed for an extension of time other than approved contract extensions. B. SCOPE OF WORK Engineer shall prepare Preliminary Design Report(s) (PDRs) with evaluation of alternatives, the Basis of Design Report (BODR) detailing selected alternatives, a Design Development Report (DDR) for submission to regulatory agency, drawings, specifications, permit applications and supporting documentation to obtain all permits necessary, and coordination with regulatory agencies and utility companies, to Bid and construct the Project in accordance with applicable regulations. Engineer shall provide engineering services during construction, including post-construction services, to construct and successfully commission the Project. Final Project reports, drawings and specifications, and intermediate deliverable submissions as noted, shall be signed and sealed by a Professional Engineer licensed in the State of Georgia. The Project shall be implemented in four parts, as defined in Attachment A, SCOPE OF WORK. GENERAL INFORMATION Support Resources Please find vendor guides from OpenGov to support vendor registration and submittal efforts at the following link: https://opengov.my.site.com/support/s/article/ca6d1285-1e48-4a21-bb0d-715edb7794ed If you are still having issues, please reach out to the OpenGov Support Team at support@opengov.com or (650) 336-7167 from 7 AM to 10 PM Eastern. This Request for Proposal (RFP) for D esign and E ngineering S ervices D uring C onstruction for the Project invites P roposals (defined as the submission prepared in response to this RFP) from qualified Proposers ( refers to any firm or team submitting a response; also called the “Responder ”, “Respondent ”, “ Contractor ” and “Engineer” herein) according to the requirements set forth in this RFP, including the format and content guidelines. The Proposals will be reviewed and evaluated using the evaluation process described i n Section 5, Criteria For Evaluation . An evaluation committee will review and rate all proposals and shall determine if interviews are necessary. If interviews are conducted, firms will be scheduled for an oral presentation to the evaluation committee, not to exceed one hour’s duration, to respond to questions from the evaluation committee relevant to the firm’s proposal. The evaluation committee will make its recommendation for award to the DeKalb County Board of Commissioners, who will make the final decision as to award of contract. The awarded Responder is also called the “ Contractor ” and “ Engineer ” herein . This RFP is subject to revision after the date of issuance only via written addenda . Addenda will be posted on the County’s website (not distributed directly to potential Responders) . It is each Responder’s responsibility to obtain all RFP addenda prior to submitting its proposal. All requests for clarification, interpretation, or questions regarding the requirements of this RFP must be submitted in writing during the designated question and answer (Q&A) period, as specified in the RFP timeline. Pr oposers should use the Q&A phase to clarify any terms, conditions, requirements, or potential exceptions to the scope of work. The County reserves the right to reject any exceptions or exclusions not identified prior to the proposal due date and to evaluate proposals based on the requirements and scope set forth in this RFP. Proposers who have attended all mandatory meetings (Pre-Proposal, LSBE, and Site Visit) may request from the Project Contact copies of all RFP Reference Documents , including specifications and drawings for the Snapfinger Advanced Wastewater Treatment Facility. In no event will County be liable for any costs incurred by any Responder or any other party in developing or submitting a P roposal. THE COUNTY RESERVES THE RIGHT TO REJECT ANY AND ALL PROPOSALS, TO WAIVE INFORMALITIES, AND TO RE-ADVERTISE. BACKGROUND & OBJECTIVES BACKGROUND Project Site : Snapfinger Advanced Wastewater Treatment Facility (SFAWTF), 4124 Flakes Mill Road, Decatur, GA 30034, located along the South River in DeKalb County. The original Snapfinger facility was constructed in the early 1960’s and expanded on four (4) separate occasions over the subsequent twenty (20) years . The majority of the existing , older structures that are now abandoned with a few remaining in use , were added in 1983 and ha d a permitted capacity of thirty-six (36) million gallons per day (MGD) maximum month average daily flow (MMADF) . An equalization tank was added in 2003. Currently, t he SFAWTF is being expanded in multiple phases to bring the permitted capacity to fifty-four (54) MGD MMADF . The phases , except for Phase 3E, are summarized under heading “Other Planned Works” below. Phase 3E is the subject of this Project . Phase 3E will add a primary solids handling unit process and make associated changes to the dewatering centrifuge process that will improve membrane operation and prepare the SFAWTF for the eventual permitted capacity of 54 MGD MMADF with construction completion of the other phases. Flow Rates Engineer shall design facilities for flow rates consistent with the SF AWTF design plant flows rates and associated peaking factors listed in Se c tion 4.2 of the Design Development Report Rev. 2 for “Snapfinger Advanced Wastewater Treatment Plant Expansion ” dated February 8, 2013 ( Reference Document A ) fo r the 54 MGD MMADF facility . Engineer’s recommendations shall incorporate updated flow projections resulting from County’s ongoing Water and Wastewater Capacity Master Plan effort. Flood Plain Levels Engi neer shall evaluate both current and projected higher floodplain levels than those considered in the Reference Documents (may be requested from 11. PROJECT CONTACT ), prepare and submit a flood plain study to the County and permitting and regulatory agencies, and design to mitigate associated risks. Other Planned Works The following completed, ongoing, or planned projects are not within the scope of this RFP: Phase 1 – Site Work : Completed Phase 2 – Expanded and Upgraded Facilities : Online . Brings the permitted capacity to 44 MGD MMADF . I ncludes demolition of existing facilities and construction of new facilities, including: headworks, biological reactors (i.e., anoxic , anaerobic and aerobic tanks), membrane bio-reactors (MBRs), ultraviolet (UV) disinfection channels, biosolids dewatering, odor control and a new administration building , and provides tankage for the eventual permitted capacity of 54 MGD MMADF. Phase 3A – IPS + Grit Refurbishment + Equalization Basin + WAS : Design is complete , construction expected to begin late 2027 . Includes a new 160 MGD influent pump station, refurbishment of abandoned grit facilities, conversion of abandoned process tanks to an influent equalization basin and upgraded and expanded waste activated sludge (WAS) facilities. Phase 3B – UV Disinfection : Ongoing Design/Build project with c ompletion around December 2026 . Includes adding a UV disinfection process in the channel s constructed in Phase 2 . Phase 3C – Optimize Phase 2 Facilities : Ongoing construction project with completion by December 2027 . Includes r eplacement of equipment and addition of membranes in the MBR facility to i mprove reliability of the Phase 2 facilities . Phase 3D – Hydraulic Buildout : Design-Bid-Build project, d etailed engineering design has not started . Includes e xpansion of the headworks and membrane bioreactor (MBR) unit processes to bring the peak hydraulic plant flow to one hundred (100 MGD) for the eventual permitted capacity of 54 MGD MMADF . Exhibit s , Additional Information Proposers who have attended all mandatory meetings (Pre-Proposal, LSBE, and Site Visit) may request from the Project Contact copies of all RFP Reference Documents , including specifications and drawings for the Snapfinger Advanced Wastewater Treatment Facility. Phase 2 design specifications ( Reference Document B.1 ) and drawings ( Reference Document B.2 ) are provided in the Conformed version. Phase 2 as-built drawings will be made available to Engineer during the Phase 3E design. Phase 2, Volume 3, Reference Drawings and Information (included in Reference Document B.1 ) inclu des: Investigative reports, including Geotech Reports Design drawings for “Snapfinger Creek Advanced Wastewater Treatment System” dated 1977 Design drawings for “Snapfinger Creek Water Pollution Control Plant, Wet Weather Influent Flow Equalization” dated 2001 Design drawings for “ Dechlorination Facilities At Pole Bridge and Snapfinger Water Pollution Control Plants” dated 1992 Design drawings for “Lime Slaker Replacement Snapfinger Creek AST Facility” dated 2003 A preliminary design was performed for Phase 3 with preliminary design specifications and drawings for “Snapfinger Phase 3” dated September 201 1 ( Reference Documents C.1, C.2, and C.3 ). E ngineer can consider the “Snapfinger Phase 3” drawings, however it should not limit Engineer’s creativity in design, and the Engineer is fully responsible for the Engineer’s design. OBJECTIVES By selecting the design-bid-build delivery method for this Project, the County is committed to working in close collaboration with the awarded Engineer throughout each part of the Project to achieve the objectives for successful delivery. The County’s objectives for delivery of the Project are as follows: 1. Community : Project facilities shall not visually impair or increase noise or odor to the surrounding communities. 2. Schedule : Achieve mutually agreed upon milestone dates for design and construction of the Project. 3. Quality : Provide reliable and efficient treatment facilities that result in plant effluent that is in full compliance with applicable PROPOSAL FORMAT Responders are required to submit their proposals in the following format: Cost Proposal The cost proposal must be completed in the County's eProcurement Portal. DO NOT INCLUDE FEES OR COSTS IN ANY AREA OUTSIDE OF COST PROPOSAL SECTION. Including fees in any area outside of the Cost Proposal section shall result in Responder’s proposal being deemed non-responsive. Responders are required to submit their costs within the 8. COST PROPOSAL Section of the RFP. Responders shall not alter the cost proposal form. Technical Proposal DO NOT INCLUDE ANY COSTS OF ANY KIND IN THE TECHNICAL PROPOSAL. 1. Submittals : Technical Proposals must be submitted electronically via the County's eProcurement Portal under the 9. VENDOR QUESTIONNAIRE Section of the RFP at https://procurement.opengov.com/portal/dekalbcountyga . 2. Technical Approach : The Technical Proposal shall include responses to all the information requested in this RFP, except the information specifically required for the Cost Proposal Form. Brevity and specificity are encouraged. Concise presentation of pertinent information and organization of the submittal is imperative. The County prefers a well-planned, straight-forward business presentation with brief explanation. 3. Format : The Technical Proposal must not exceed a total of 50 single-sided pages, including the Transmittal Letter. Page sizes must be 8 ½ x 11-inch paper with 1 inch or greater margins, excluding the index or table of contents, front and back covers, title pages or separation tabs, resumes, and appendices. Of the 50 pages, a maximum of ten (10) of the total pages may be 11 x 17-inch tri-fold format. Eleven-point font or larger must be used. 4. Content : The content requirements set forth in this RFP represent the minimum content requirements for the Proposal. It is the Responder’s responsibility to include information in its Proposal to present all relevant qualifications and other materials. The Proposal, however, shall not contain standard marketing or other general materials. It is the Responder’s responsibility to modify such materials so that only directly relevant information is included in the Proposal. The Technical Proposal response shall be submitted in the order listed below: Transmittal Letter Section 1 – Executive Summary Section 2 – Engineer’s Corporate Profile Section 3 – Experience and Qualifications of Team Members Section 4 – Experience and Qualifications of Key Personnel Section 5 – Project Approach Appendix A – Required Documents (Licenses/certifications) and Acknowledgements Appendix B – Resumes (limited to two pages per individual) Appendix C – Financial Statements A. Transmittal Letter : Responders must submit a Transmittal Letter on the Responder’s letterhead. It must be signed by a representative of the Responder or the managing member within a teaming arrangement (partnership or joint venture) who is authorized to sign such material and to commit the Responder to the obligations contained in the Proposal. At minimum, the Transmittal Letter must specify: Responder Firm's Name Physical Address Contact Name, Address, Phone Number and Email Address Engineer’s signatory to contract documents executed with County Former Firm Names, Joint Venture Information, Out of State Offices, if applicable Statement that, if awarded , Responder shall negotiate in good faith with the County A clear and concise response as to why the County should award your firm for this Project B. Section 1 - Executive Summary : The Executive Summary must include a concise overview of the key elements of the Proposal and must summarize and refer to information in the Proposal concerning satisfaction of the experience and qualification requirements. The Executive Summary shall not be used to convey additional information not found elsewhere in the Proposal. C. Section 2 - Engineer's Corporate Profile : A detailed and complete description of the Engineer shall be provided in Section 2 of the Proposal. (The term “company” can refer to either a single entity or a joint venture.) The Engineer’s Corporate Profile must include the following information: General : Provide general information about the Engineer, such as lines of business and service offerings, locations of home office, office from which this Project will be managed, office where most of this Project’s work will be performed, other offices associated with the Project, number of employees (professional and non-professional), years in business, and evidence of required licenses. Legal Structure : Identify whether the Engineer is organized as a corporation, limited liability company (LLC), general partnership, joint venture, limited partnership, or other form of legal entity. As applicable, identify the owners of the Engineer (e.g., shareholders, members, partners, etc.) who hold an interest of ten percent or more. Licensing and Registration : Engineer and each of its Subconsultant and Subcontractor firms must be licensed in the State of Georgia for the type of work to be performed by each firm. Engineer must include in responsible charge an Engineer licensed in the State of Georgia. Financial Condition : In the Proposal ( Appendix C, Financial Statements ) provide satisfactory evidence that Responder has the necessary financial resources to furnish services to perform the Project. Responder must provide financial statements (audited statements are preferable, minimum of balance sheet, income statement, and cash flow statement) for the last three (3) years as evidence that the Responder has the financial capacity to perform the scope of work. If the Responder is a joint venture, LLC, or partnership, such financial statements must be provided for each partner or member. Material Adverse Condition : Engineer must not be subject to a material adverse condition, such as pending litigation, insufficient liquidity, weak operating net income or cash flow, or excessive leverage, that gives rise to reasonable doubt concerning its ability to continue to operate as an ongoing concern, to provide payment bonds, performance bonds, insurance, or to maintain sufficient financial strength to undertake and successfully complete the Project and to mitigate/absorb Project risks. If the firm is subject to a material adverse condition, complete information pertaining to the nature and duration of the impact shall be disclosed to the County (not counted towards t DeKalb First Ordinance It is the objective of the Chief Executive Officer and Board of Commissioners of DeKalb County to provide maximum practicable opportunity for all businesses to participate in the performance of government contracts. The current DeKalb County List of Certified Vendors may be found on the County website at https://dekalbcountyga.gov/departments/purchasing-and-contracting/lsbe-program . It is required that all responding Responders attend a mandatory LSBE meeting stated in the Project Timeline; and comply, complete, and submit all LSBE forms with the Responder’s response to remain responsive. Attendance can be in person, via video conference, and teleconference. Video conferencing is available through Zoom. Instructions for attendance via video conference can be found on the County’s website at https://www.dekalbcountyga.gov/purchasing-contracting/dekalb-first-lsbe-program . For further details regarding the DeKalb First Local Small Business Enterprise Ordinance, contact the LSBE Program representative, at DeKalbFirstLSBE@dekalbcountyga.gov . DeKalb County Government is committed to ensuring that small businesses are provided adequate opportunities to succeed. Please see The DeKalb First – LSBE Ordinance for details. Federal Work Authorization Program Contractor and Subcontractor Evidence of Compliance All qualifying contractors and subcontractors performing work with DeKalb Coun
Published attachments
Addenda and notices
Addendum #1 · 1
This addendum amends and/or modifies Request for Proposals (RFP) No. 2026-135 SFAWTF Expansion - Phase 3E - Design and Engineering Services During Construction. The following have been amended and/or modified: 1) Section 4.5: Timeline The location of the Site Visit has been corrected. 2) Section 8: Cost Proposal The electronic cost proposal form has been simplified. 3) Section 9: Vendor Questionnaire Several questions have been clarified. 4) The responses to two (2) questions have been posted. All other conditions remain in full force and effect. It is the responsibility of each proposer to ensure that they are aware of all addenda issued under this RFP. Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #1: Attendance Registers · 1
The sign-in sheets for the mandatory pre-proposal meeting and mandatory site visit are being posted for public reference and documentation purposes.
Public questions and answers
Page 2 of the RFP lists the Site Visit location as "Snapfinger Advanced Wastewater Treatment Facility Administrative Building" at "4124 Flat Shoals Pkwy". However, the plant is located at 4124 Flakes Mill Rd, Decatur, GA 30034, as indicated on page 30 of the RFP. Please confirm the address of the Mandatory Site Visit.
The address of the Site Visit has been corrected to 4124 Flakes Mill Road, Decatur, GA 30034, as part of Addendum No. 1.
Is a firm that is currently part of the DeKalb County Consent Decree PM Team eligible to participate in this procurement, either as the Prime Consultant or as a Subconsultant? If not, please explain any conflict-of-interest or eligibility restrictions that would apply. We respectfully request a response as soon as possible, as this determination will directly affect our decision whether to pursue this opportunity and our team formation strategy. Thank you.
Firms that are the sub-consultants of the Consent Decree PM Team are eligible to participate in this solicitation, either as the Prime or Sub-consultant for this project.
OpenGov categories
- 91107 · C.I.P., Architectural/Engineering Services
- 92064 · System Implementation and Engineering Services
- 92515 · Chemical Processing and Storage/Engineering
- 92517 · Civil Engineering
- 92522 · Control Systems Engineering
- 92524 · Desalinization (Process and Facilities)/Engineering
- 92535 · Environmental Engineering
- 92536 · Engineering Services (Not Otherwise Classified)
- 92537 · Facilities Design Services, Engineering
- 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering
- 92546 · Geotechnical Engineering
- 92553 · Industrial Engineering
- 92557 · Instrumentation/Engineering
- 92558 · Irrigation; Drainage; Flood Control/Engineering
- 92570 · Municipal Engineering
- 92577 · Pollution Control Engineering
- 92578 · Power Generation, Transmission, Distribution - Engineering
- 92587 · Sewage Collection, Treatment, and Disposal/Engineering
- 92596 · Waste Water Treatment Engineering
- 92597 · Water Supply, Treatment, and Distribution/Engineering