Invitation For Bids-Construction Sarasota County seeks a contractor to renovate and improve the existing South County Fleet maintenance and support facilities. The County anticipates awarding a contract to run the duration of the project. Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements. Table 1 - South County Fleet Renovation Bidders must provide a Unit Cost for each line item for their bid to be considered responsive. Labor and materials required to complete project as described in the technical specifications and plans. Table 2 - Contingency Bidder must enter 10% of the total from Table 1- South County Fleet Renovation. Any use of contingency funds is subject to the written approval of the County project manager, and any unused contingency shall not be paid out as a part of any final payment. 10% Contingency Table 3 - Bat Abatement Allowance County will add $10,000.00 allowance for bat abatement to each Bidder's Total Bid Price. Bat Abatement Allowance Table 4 - Permit Allowance County will add $30,000.00 permit allowance to each Bidder's Total Bid Price. Permit Allowance Introduction Summary Background Contact Information Timeline All conferences and site visits will take place at the time, date and location specified below. This timeline is subject to change. Failure by a Bidder to attend a mandatory pre-bid conference or site visit will result in their bid being considered non-responsive. When applicable, Bidders are advised to visit each location to familiarize themselves with all work areas. Failure to do so will in no manner relieve the Bidder from furnishing materials or services that may be required to carry out and complete the contract in accordance with the intent of the specifications listed herein. Questions asked at a pre-bid conference will be formally answered via an addendum. Bidders shall not rely on oral communications. Submittal Instructions Bids may be received up to but not later than 2:30 pm on Wednesday, December 16, 2026 via the County eProcurement Portal located at https://procurement.opengov.com/portal/scgov . Bids submitted by any other method will not be accepted. The County eProcurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. Sarasota County strongly recommends completing your response well ahead of the response deadline. The County assumes no responsibility for any bids received after the bid end date. Bids submitted cannot be viewed by anyone other than the Bidder until the official bid opening occurs. Submitted bids will be made public in accordance with Florida Public Record laws found in Ch. 119, F.S. It is the responsibility of the bidder to check OpenGov for answers to questions. To receive email notifications regarding addenda and responses to questions, Bidders must click “Follow” on this bid. All bidders must complete the required forms and information included in the Vendor Questionnaire section of this solicitation. Bidders who fail to complete and upload required forms and documents may be found non-responsive. General Terms & Conditions of Solicitations Revised 07/01/2026 DEFINITIONS County shall mean Sarasota County. Offer shall mean the response submitted by an offeror to the County’s solicitation. Offeror shall mean the legal entity or individual submitting an offer to the County in response to a solicitation. Offeror may also be referred to in solicitation documents as bidder, consultant, firm, proposer, respondent, vendor, or contractor. Evaluation Committee shall mean those individuals approved by the Procurement Official, or designee, to evaluate offers. OpenGov shall refer to the County’s electronic procurement (eProcurement) portal OpenGov Procurement. OpenGov is located at https://procurement.opengov.com/portal/scgov . Solicitation shall refer to the Invitation for Bids, Invitation for Quotes, Invitation to Negotiate, Request for Qualifications, Request for Professional Services, Request for Proposals, or any other procurement method used to obtain bids, quotes, proposals, or replies from Offerors. AVAILABILITY OF DOCUMENTS All documentation related to Sarasota County solicitations is available via OpenGov. It is solely the responsibility of each offeror to ensure they have obtained current copies of all documents issued by the County in relation to any solicitation. Only documents obtained directly via OpenGov are official versions. Offerors who rely on any other sources for such documents, do so at their own risk. QUESTIONS & ADDENDA Any inquiries, suggestions or requests concerning interpretation, clarification or additional information pertaining to the solicitation shall be submitted electronically via OpenGov. All questions must be received no later than the deadline for questions specified in the solicitation. No verbal requests for information will be honored. All responses to inquiries will be posted in OpenGov. The electronic response posted in OpenGov or the posting of an addendum in OpenGov are the only official methods whereby interpretation, clarification or additional information will be provided. It shall be the responsibility of each offeror, prior to submitting their offer, to visit OpenGov and determine if addenda were issued and to make such addenda a part of their offer. The County shall not be responsible for oral interpretations or representations made by County employees, representatives or third parties. Any questions raised at a pre-solicitation meeting will be formally answered in an addendum. By submitting an offer, offerors acknowledge receipt of any and all issued addenda, and agree to the provisions of each. PUBLIC MEETINGS Notice of any public meetings pertaining to this solicitation shall be posted on the County calendar at www.scgov.net. RESPONSIVENESS TO SOLICITATION REQUIREMENTS To be responsive, an offeror shall submit an offer that conforms in all material respects to the requirements set forth in the solicitation. Failure to submit the required forms and information in the manner specified may result in the offer being found non-responsive, at the sole discretion of the County. When applicable, offerors are required to submit pricing on forms supplied by the County. Offers, may be deemed non-responsive if required forms or methods are not used. Offerors submitting more than one bid form or price proposal in response to a solicitation may be deemed non-responsive. The County objects to and shall not consider any additional terms or conditions submitted by an offeror, including any appearing in documents attached as part of an offeror’s offer. In submitting its offer, offeror agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect. Failure to comply with terms and conditions, including those specifying information that must be submitted with an offer, shall be grounds for rejecting an offer. QUALITY GUARANTEE Unless otherwise specifically provided in the specifications, all equipment, materials and articles incorporated in the work covered by any resulting contract shall be new and of the most suitable grade for the purpose intended. If any product/service delivered does not meet performance representations or other quality assurance representations as published by manufacturers, producers or distributors of such products or the specifications listed in this solicitation, the offeror shall pick up the product from the County at no expense to the County. The County reserves the right to reject any or all materials if, in its judgment, the item reflects unsatisfactory workmanship or manufacturing or shipping damage. Also, the offeror shall refund to Sarasota County any money which has been paid for same. RESPONSIBILITY To be responsible an offeror shall have the demonstrated capability in all respects to perform fully the contract requirements, and the tenacity, perseverance, experience, integrity, reliability, capacity, facilities, equipment, and credit which will ensure good faith performance. The County reserves the right to make such investigation as it deems necessary to determine the ability of any offeror to deliver the goods or services requested in accordance with the solicitation documents to County’s satisfaction within the prescribed time. The offeror shall provide information the County deems necessary to make this determination. Such information may include, but shall not be limited to: project references, current financial statements, projected project schedule(s), verification of availability of equipment and personnel, evidence of authority to conduct business in the jurisdiction where services are being provided, and past performance records. The County may review any scope of work with an offeror before accepting the offer. Before award of the contract, the offeror shall furnish to the County an analysis of its prices, if requested to do so. RETENTION OF OFFER All offers submitted in response to this solicitation shall be retained by the County. IRREVOCABLE OFFER Any offer may be withdrawn up until the due date and time specified on the solicitation summary. Any offer not so withdrawn shall, upon opening, constitute an irrevocable offer for a period of 120 days, unless specifically provided by the solicitation, in which event that time period will prevail. INSURANCE Before performing any work, offeror shall procure and maintain insurance listed in the solicitation. The offeror shall submit proof of insurance per the County's specifications, including additional insured, upon request by the County. Failure to submit proof of required insurance within ten (10) business days of request by the County may result in an award being rescinded. RESERVED RIGHTS The County reserves the right to accept or reject any or all offers, to waive irregularities and technicalities, and to request clarifications or additional information from offerors. The County reserves the right to accept all or any part of the offer and to increase or decrease quantities to meet additional or reduced requirements of the County. Any sole offer received by the submission date may be accepted or rejected by the County Administrator or designee. In the event the County rejects the sole offer, it may elect to negotiate with any responsible provider. The County reserves the right to cancel a solicitation at any time and to cancel any recommended award or recommended contract at any time prior to execution. Offerors are advised that any person, firm, or other party to whom they propose to award a subcontract must meet all minimum qualifications as stated in the specifications. Unless otherwise stated in the specifications, any contracts resulting from this solicitation are non-exclusive. The County reserves the right, in its sole opinion, to direct purchase items listed in this solicitation. The County reserves the right to request price justification, if, in its sole opinion, offeror has submitted a bid or quote that appears to be unbalanced. Offerors submitting unbalanced bids or quotes (e.g., excessively high or excessively low line items) may be deemed non-responsive by the County. The County may remove materials from a contract and make direct purchases of those materials when the County determines it is in the best interest of the County. The contract price shall be adjusted based on the price of the materials removed and any related indirect costs The County reserves the right to correct formula errors on forms provided by the County for use by the offeror. Any resulting contract may be terminated for convenience by Sarasota County by giving written notice to the offeror thirty (30) days in advance of termination, unless otherwise specified in the contract. ADDITIONAL INFORMATION The County reserves the right to request clarifications or additional information from any offeror. Specific questions may be addressed to each of the offerors as applicable. PROTESTS Protests are processed in accordance with the procedures set forth in the Sarasota County Procurement Code. In the event of a protest of the terms, conditions and specifications, the County may issue an addendum indicating that a protest has been filed and extending the due date. CONTACT WITH COUNTY STAFF After the issuance of the solicitation, prospective offerors or any agent, representative or person acting at the request of such offeror shall not contact, communicate with or discuss any matter relating in any way to the solicitation with any officer, agent or employee of Sarasota County, including members of evaluation committees, other than the Procurement Official or Procurement Analyst named in the solicitation. Failure to comply with this provision may result in the disqualification of the offeror, at the option of the County. This prohibition begins with the issuance of any solicitation and ends upon issuance of a purchase order or execution of the contract, whichever comes first, or upon cancellation of the solicitation. Violation of this prohibition may result in the offeror being considered non-responsible. Notwithstanding the forgoing, during the negotiation period, offeror may communicate with those members of County staff, consultants, or third parties designated by the County. CODE OF ETHICS Offeror covenants and agrees to the Ethical Standards set forth in the Sarasota County Procurement Manual. The Florida Code of Ethics regulates the ability of the County to contract with its public officers (including board members), employees, and their immediate relatives. Offerors shall disclose any such potential conflicts on the provided Conflict of Interest Form. Offerors are responsible for reviewing § 112.313, F.S. to determine whether they may have a conflict. If offeror is in doubt as to their ability to contract with the County, they shall seek a conflicts of interest opinion from the County prior to submittal of an offer. COLLUSION By submitting an offer to a solicitation, the offeror certifies that it has not divulged to, discussed or compared its offer with other offerors and has not colluded with any other offeror or parties to this offer whatsoever. Also, offeror certifies, and in the case of a joint offer, each party thereto certifies, as to its own organization that in connection with the offer: Any prices and/or data submitted have been arrived at independently, without consultation, communication or agreement, for the purpose of restricting competition, as to any matter relating to such prices and/or cost data, with any other offeror or with any competitor; Any prices and/or cost data quoted for this offer have not been knowingly disclosed by the offeror prior to the scheduled opening directly or indirectly to any competitor; No attempt has been made or will be made by the offeror to induce any other person or firm to submit, not to submit, or withdraw an offer for the purpose of restricting competition; The only person or persons interested in this offer as principal or principals is/are named therein and that no person other than therein mentioned has any interest in this offer; and No person or agency has been employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee except bona fide employees or established commercial agencies maintained by the offeror for the purpose of doing business. An offer may be disqualified if an offeror submits more than one offer or if there is evidence of collusion. PUBLIC ENTITY CRIMES Pursuant to § 287.133, F.S., a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in § 287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. Additionally, pursuant to County policy, a conviction of a public entity crime may cause the rejection of an offer. The County may make inquiries regarding alleged convictions of public entity crimes. The failure of an offeror to promptly supply information in connection with an inquiry may be grounds for rejection of an offer. PUBLIC RECORDS By participating in this solicitation process and submitting an offer, an offeror acknowledges the requirements of the Florida Public Record laws found in Ch. 119, F.S., and s. 24(a), Art. I of the Florida Constitution (the “Public Record Laws”) and agrees to the provisions set forth in this section. Sarasota County is a public entity subject to the Public Record Laws. All offers and written communications regarding this solicitation become public records upon receipt by Sarasota County and therefore are subject to public disclosure. If an offeror asserts that any portion of its offer or written communication is exempt from disclosure under the Public Record Laws (a “Protected Record”) then the offeror MUST comply with the following process. Failure to do so may lead to waiver of protections available under Public Records Laws. Clearly identify each portion of its Protected Record(s) that it believes is statutorily protected from disclosure and identify such statute(s); In accordance with solicitation requirements, submit a separate electronic copy of offeror’s offer or written communication with only the protected portions redacted. In response to a public records request Sarasota County may produce offeror’s entire non-redacted offer or communication unless offeror submits a redacted copy in compliance with Section 18.B. If offeror has complied with the provisions of this section by identifying certain documents as offeror’s Protected Record(s) and Sarasota County receives a public record request for a Protected Record, then Sarasota County will produce the redacted copy provided by offeror in response to the public record request to the extent the redactions reasonably reflect protections available under applicable law. In the event a records requestor is seeking the entire un-redacted offer and offeror continues to assert in good faith that offeror’s Protected Record(s) are confidential or exempt from disclosure or production pursuant to Chapter 119, F.S., then offeror shall be solely responsible for defending its position, seeking a judicial determination of exempt status of the Protected Record and defending Sarasota County in any action brought by a third party. Notwithstanding the provisions of this section, in accordance with Federal or State law, Sarasota County will comply with any court order or government agency directive to produce a Protected Record. EQUAL EMPLOYMENT OPPORTUNITY Offeror shall comply with all federal, state, and local laws, regulations and ordinances applicable to the work or payment for work thereof, and shall not discriminate on the grounds of race, color, religion, sex, or national origin in the performance of work under the resulting contract or purchase order. NON-DISCRIMINATION AND PUBLIC ACCOMMODATIONS Sarasota County prohibits discrimination in all services, programs or activities on the basis of ra

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Added Attachments H, I, and J. Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #1: Site Visit Sign-In Sheets · 1

    Sign-in sheets from the site visit on 10/16/26.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Procurement is currently working on providing answers to all pending vendor questions. The submission deadline has been extended until December 16, 2026. Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Sheet M3.1, keynote 7, calls for two carbon monoxide (CO) sensors and two nitrogen dioxide (NO2) sensors in the repair garage. Sheet E3.0 shows six detector locations labeled "INDUSTRIAL CO2 DETECTOR APPROVED FOR AUTOMOTIVE REPAIR SHOP APPLICATION." Please clarify the required gas types, detector quantities and locations, and which requirement governs for bidding.

    Both systems are required. Gas detection system shown on Mechanical sheets shall interface with the exhaust fan controls. Provide two (2) CO and two (2) NO2 detectors as indicated on sheet M3.1 for the fan control system. Detectors noted on Electrical drawings shall be CO detectors (in lieu of CO2 as shown) and shall interface with the Fire Alarm system per NFPA 72 requirements.

  • The mechanical gas-detection note specifies a system equal to Intec Controls or Honeywell. Will a Macurco system be considered as an equivalent if its submitted configuration meets the clarified gas types, quantities, controls and performance requirements? Please identify the required equivalency documentation, submission process and approval deadline for bidding.

    Macurco would be considered an equivalent (or equal) manufacturer. Substituted equipment would need to meet minimum performance equivalent to basis of design equipment. Contractor shall provide equipment product submittals for review for final acceptance. Substituted equipment should include controller, detectors, relays, A/V devices, and all devices required for fan interface/control of exhaust fan GEF-1 and associated intake damper. Minimum two (2) points of detection and minimum ON/OFF control of GEF-1 are required. Detector activation levels shall be adjustable, initially set to 25-35 ppm (CO) and 2.0-2.5 ppm (NO2) per manufacturer installation instructions.

  • M3.1, keynote 7, requires the gas-detection controller to modulate fan capacity to maintain CO at or below 25 ppm, with a VFD and manual override. M5.0 also calls for gas-detection interlock and VFD/manual bypass for GEF-1. Please provide the required sequence of operation, including the NO2 ventilation/alarm setpoints and the required controller-to-VFD control signal, so the detection equipment can be selected and priced correctly.

    Detection controller shall, at a minimum, start exhaust fan GEF-1 upon rising gas level reaching adjustable setpoint as indicated above and shall shut down GEF-1 upon gas level falling below setpoint. Signal shall be 4-20mA (or 0-10V) as required by controller manufacturer to provide on/off control of GEF-1.

  • The project documents do not have the plumbing drawings included. Please, provide the plumbing drawings. Thank you,

    Please see Addendum 1.

  • The structural drawings and plumbing drawings indicated on Sheet Index / G0.0 are not included in project documents. Please provide them. Thank you,

    Please see Addendum 1.

  • Please confirm the anticipated Notice to Proceed (NTP) date, required construction start date, and required substantial and final completion dates for this project.

    Notice to Proceed (NTP) will be based on selection and vetting process. No specific date has been developed. Please provide schedule with timelines (days/weeks) based on a construction start date as day 0.

  • Please provide the anticipated construction phasing and schedule for HVAC demolition and new installation, including the available duration of each phase, coordination with other trades, and whether the HVAC work may be performed continuously or will require separate mobilizations.

    The office area will be vacated; therefore, this work can be completed without phasing. The garage area will still be utilized but coordination with garage personnel will allow construction work to progress. There is no need for separate mobilizations.

  • Please confirm permitted working days and hours, whether the facility will remain occupied and operational during construction, and any restrictions on noise, HVAC shutdowns, roof access, and crane or equipment lifting operations.

    Working hours can be from 7am to 4:30pm – Monday through Friday. The garage area will still be occupied/operational.

  • Please clarify the anticipated submittal review and approval time and how equipment procurement and delivery lead times are to be accommodated in the construction schedule. Will procurement time be allowed before demolition or before the required HVAC installation period begins?

    Submittal review times will be a maximum of 10 working days. Procurement and delivery lead times are part of contractor’s means and methods.

  • Sheet index G0.0 lists S-001 through S-300, but structural sheets were not included in the posted bid set. Please issue them (stairs, raised slab, CMU wall, canopy and PEMB openings).

    Please see Attachment J, which was included in Addendum #1.

  • The General Conditions, Item 2.1 states (Page 9 and 10) "The Contractor may subcontract a portion of the work but shall perform with its own organization work amounting to not less than 51% of the total Contract Price." This clause will significantly reduce the number of GCs that can bid the project. Please confirm if this requirement will be enforced.

    Please see Section 2.0 of Attachment C - Supplemental General Conditions.

  • The bid documents include conflicting bid security requirements. Please confirm which one applies to this solicitation: IFB Part I, Section 7.0 Bond Requirements (page 3 of 8) states that the bond requirements “are applicable only if checked.” In the posted PDF, we cannot tell which items are checked. Section 7.1 Bid Bond (pages 3–4 of 8) requires a bid bond or certified cashier’s check equal to 5% of the total bid. Bidders must upload a copy in the Vendor Questionnaire section, and the apparent low bidder must deliver the original within five business days (7.1.a and 7.1.b). Section 7.2 Letter of Bondability (page 4 of 8) states: “This bid does not require a Bid Bond, however the Bidder must upload a copy of a Letter of Bondability from their Surety Company… showing their bonding capacity which shall not be less than $1,000,000.00” (7.2.a). Section 11.0 Failure to Execute Contract (page 7 of 8) states that the County “may retain his bid bond,” and the County has also provided a Bid Bond Form (pages BB-1 and BB-2) for this IFB. Both indicate that a bid bond is required. Please confirm whether bidders must submit (a) the 5% bid bond on the County’s Bid Bond Form, (b) the $1,000,000 Letter of Bondability or (c) both. Also, the Bid Bond Form binds the principal and surety “unto the sponsor.” Please confirm that the obligee should be the Sarasota County Board of County Commissioners, as stated in Section 7.1.b, and whether bidders should write that name on the form.

    Per Part I, Section 7.0 of the Solicitation Documents, Bidders must submit a Bid Bond in accordance with subsection 7.1 and a Performance and Payment Bond in accordance with subsection 7.3. The obligee for the Bid Bond is the Sarasota County Board of County Commissioners, as stated in subsection 7.1.b. Bidders do not need to write "Sarasota County Board of County Commissioners" on the Bid Bond Form.

  • If a bid bond is requirement, what is the estimated project budget?

    The Bid Bond must be equal to 5% of the Bidder's Total Bid Price.

  • Table 3 - "Bat" abatement Allowance 10k Please clarify the intention of "Bat". Does this stand for something or is this a living animal?

    "Bat" refers to the flying mammal.

  • Has testing or a survey been completed for asbestos, mold, or other hazardous materials been completed? If so, please provide. Or are we to include the survey/testing in our cost? If we are to include the survey/testing in our cost and we do not know if any hazardous materials are existing at this time, please clarify how we are to include the cost of the removal of unknown hazardous materials. Or should we assume there is no presence of asbestos, mold, or other hazardous materials?

    Asbestos survey is available by copying and pasting the following address into your browser: https://secure.scgov.net/WebClientNew/index.html/?ShareToken=66AA58C628873F6573E836433DD308A80AB4D1C7 For bidding purposes, assume no other hazards.

  • Please confirm Builders Risk Insurance is not required.

    Confirmed. Please see Part II of the Solicitation Documents for additional information about each type of insurance coverage.

  • Due to the project is within existing fencing around the facility is the project sign noted in the general conditions page 18 of 64 and and page 64 required?

    The project sign is optional and not required.

  • Has an asbestos survey been completed on the building? This will be required for the demolition permit.

    Asbestos survey is available by copying and pasting the following address into your browser: https://secure.scgov.net/WebClientNew/index.html/?ShareToken=66AA58C628873F6573E836433DD308A80AB4D1C7

  • Are we to include the bid bond based on the amount of the total of Table 1 , 2, 3, and 4?

    Yes, the Bid Bond must be equal to 5% of the Bidder's Total Bid Price, which would be the total of Tables 1 through 4.

  • Will asbestos, lead and mold testing be supplied by owner? There is no insulation called out on the plans for the business area of the building. During the pre-bid walkthrough, it was noted that there is none existing above the ACT. Will this area need to be insulated?

    Asbestos survey is available by copying and pasting the following address into your browser: https://secure.scgov.net/WebClientNew/index.html/?ShareToken=66AA58C628873F6573E836433DD308A80AB4D1C7 For bidding purposes, assume no other hazards. For the business area of the building, do not bid any insulation above the ACT.

  • Detail 9 on E6.0 Please confirm the owner equipment includes the access control panel, power supply, mag locks, timer, switch, door cord, electric strike, card reader, and low voltage wire. The contractor will provide power and conduit/boxes and FA connection.

    Correct. Contractor will provide power and conduit/boxes and FA connection. Owner will provide access control panel, power supply, mag locks, timer, switch, door cord, electric strike, card reader and low voltage wire.

  • Are additional pre-bid site visits allowed? If so, please provide contact information for scheduling.

    No additional pre-bid site visits are planned at this time.

Plain text

OpenGov categories

  • 90922 · Building Construction, Non-Residential (Office Bldg., etc.)
  • 90930 · Building Construction (Not Otherwise Classified)
  • 90961 · Maintenance and Repair, Non-Residential Building
  • 90963 · Maintenance and Repair, Commercial and Institutional Building
  • 91052 · Maintenance and Repair Services, Building (Not Otherwise Classified)
  • 91065 · Remodeling and Alterations