State and local · OpenGov
South Field Industrial Waste System Improvements
Description
1.01 Project Summary Contract Number: 11822.61 Project Title: South Field Industrial Waste System Improvements Delivery Type: Design-Bid-Build Funding: Local Funding Source 1.02 Project Description: The South Field Industrial Waste System Improvements Project (Project) will install Cure-In-Place-Pipe (CIPP) between the inbound and outbound roads including South McDonnell Road, replace submersible pumps at one (1) pump station, and upgrade the Supervisory Control and Data Acquisition (SCADA) panels at two (2) pump station locations in the South Field area of the Airport to improve reliability and remote monitoring and control capabilities. 1.03 Contract Duration: The Contract Time is 365 total consecutive calendar days after the effective date indicated in the Notice to Proceed. See Document 00 54 39 (Contract Time and Liquidated Damages) for additional details. 1.04 Estimate: The estimated cost of construction is $2,500,000 - $2,900,000 . 1.05 License Requirements: California Class “ "A" ” license is required at the time of Bid. 1.06 LBE Subcontracting Requirement: The Local Business Enterprise (LBE) subcontracting requirement is 20% of the Contract Sum. 1.07 Pre-Bid Meeting: A virtual pre-bid meeting will be held at 10:00 am , Pacific Time, on Monday, November 9, 2026 , using Microsoft Teams video conferencing. Participation in the virtual pre-bid meeting is not mandatory but recommended. To participate in the virtual pre-bid meeting using Microsoft Teams or Microsoft Teams web app, please use the following link: https://bit.ly/3W4tAu1 To join by phone, call (650) 466-0290 and use the Conference ID: 844 645 252# 1.08 Bid Opening Date: Bidders shall submit their Bids through the Airport's e-Procurement portal found at: https://procurement.opengov.com/portalsfoconstuction no later than 2:00 pm , Pacific Time, on Monday, December 7, 2026 . Completed Bids and required documents must be uploaded in Portable Document Format (PDF). Bids received after the Bid opening time will not be considered. All details for the preparation of Bids are set forth in Document 00 21 13 (Instructions to Bidders). Bidder shall transmit their original Bid Forms (Document 00 41 00) and original Bid security by U.S. Mail in a sealed envelope addressed to Tiffany Gonzalez-Ruiz , Contract Administrator, San Francisco International Airport, P.O. Box 8097, San Francisco, CA 94128, postmarked no later than Monday, December 7, 2026 . Bids will be opened and read virtually using Microsoft Teams video conferencing. To participate in the virtual bid opening using Microsoft Teams or Microsoft Teams web app, please use the following link: https://bit.ly/4e15ZR1 To join by phone, call (650) 466-0290 and use the Conference ID: 974 268 045# 1.09 Project Site Visit: Please see the Timeline for more information about the Site Visit. 1.10 Contact Information: CONTRACT MANAGER: Nnaemeka Onyebuenyi (650) 821-7818 nnaemeka.onyebuenyi@flysfo.com CONTRACT ADMINISTRATOR: Tiffany Gonzalez-Ruiz (650) 821-7863 tiffany.gonzalez-rui@flysfo.com ATTACHMENTS AND FORMS Attachments BIDDING AND CONTRACTING REQUIREMENTS Table of Contents Division Section Title 02 EXISTING CONDITIONS 02 01 00 General Site Work 02 21 01 Safety Plan Compliance Document (SPCD) 02 22 25 Underground Utilities Locating 02 22 26 Potholing 02 41 19 Preparation/Removal of Existing Pavements (FAA Item P-101) 03 CONCRETE 03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcement 03 30 00 Concrete 09 FINISHES 09 90 00 Painting and Coating 26 ELECTRICAL 26 05 00 General Electrical Requirements 26 05 01 Basic Materials and Methods 26 05 03 Equipment Connections and Coordination 26 05 05 Selective Demolition for Electrical 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 23 Control-Voltage Electrical Power Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 33.13 PVC Coated Rigid Steel Conduit 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 48 Vibration and Seismic Controls or Electrical Systems 26 05 53 Identification for Electrical Systems 26 08 00 Commissioning of Electrical Systems 26 27 26 Wiring Devices 26 28 00 Switches and Circuit Breakers 26 28 13 Fuses 27 TELECOMMUNICATIONS 27 00 00 Communications General Requirements 31 EARTHWORK 31 11 00 Clearing and Grubbing (FAA Item P-151) 31 23 00 Excavation, Subgrade, and Embankment (FAA Item P-152) 31 23 19 Dewatering 31 23 23 Backfill and Geotextiles 31 32 16.16 Soil Stabilization and Dust Control 31 40 00 Shoring and Bracing 32 EXTERIOR IMPROVEMENTS 32 11 23 Crushed Aggregate Bases 32 12 16.15 Hot Mix Asphalt (HMA) Pavements 32 12 16.16 Asphalt Binder 32 17 23 Pavement Markings 32 23 23.33 Controlled Low-Strength Material (CLSM) (FAA Item-153) 33 UTILITIES 33 01 30.16 Closed Circuit Television Inspections of Pressurized Mains 33 01 30.72 Cured-in-Place Pipe (CIPP) Rehabilitation of Pressurized Industrial Waste Main 33 11 37 Submersible Industrial Waste Pump 33 32 20 Panels and Enclosures 33 32 30 Instrumentation and Control System 33 32 40 Liquid Level Controls 33 32 50 Programmable Logic Controller (PLC) and Remote Terminal Unit (RTU) 33 32 60 SCADA System Remote Sites and Control Descriptions 33 32 70 Supervisory Control and Data Acquisition System Start-Up and Field Testing 33 34 00 Pressurized Industrial Waste System END OF DOCUMENT Certification Page Various portions of the Specifications and other Contract Documents for Project South Field Industrial Waste System Improvements , San Francisco International Airport Contract No. 11822.61 , have been prepared under the direction of the following design professionals, licensed in the State of California. MECHANICAL ENGINEER Name: COLTON YEE Company: SAN FRANCISCO INTERNATIONAL AIRPORT ELECTRICAL ENGINEER Name: YUNBAE KIM Company: AURIGA CORPORATION END OF DOCUMENT List of Drawings, Tables, and Schedules Sequence Sheet Number Title 1 G0.00 TITLE SHEET 2 U2.01 SITE LOCATION PLAN 3 U2.02 CURE-IN-PLACE-PIPE LINE AND CURVE 4 U2.11 CURE-IN-PLACE-PIPE PLAN 1 5 U2.12 CURE-IN-PLACE-PIPE PLAN 2 6 U2.13 CURE-IN-PLACE-PIPE PLAN 3 7 U8.01 IWPS-A1 PUMP SCHEDULE 8 U8.02 IWPS-A1 PUMP PLAN AND DETAIL 9 U8.03 UTILITY DETAILS 10 E0.00 ELECTRICAL NOTES AND ABBREVIATIONS 11 E1.01 SITE 1 AND SITE 2 AERIAL VIEW 12 E1.10 IWPS-A1/SDPS-1D PLAN VIEW (SITE 1) 13 E1.11 IWPS-A2 PLAN VIEW (SITE 2) 14 E1.12 COMMUNICATION SYSTEM CONDUIT LAYOUT - GF (SITE 2) 15 E6.10 SCADA PANEL ARRANGEMENT (SITE 1) 16 E6.11 SCADA PANEL WIRING DIAGRAM (SITE 1) 17 E6.12 MASTER AND SALVE SCADA SYSTEM CONNECTIONS (SITE 1) 18 E6.13 DIGITAL INPUT BOARD WIRING I (CONTROL ROOM) 19 E6.14 DIGITAL INPUT BOARD WIRING II (CONTROL ROOM) 20 E6.15 DIGITAL INPUT BOARD WIRING III (CONTROL ROOM) 21 E6.16 DIGITAL OUTPUT BOARD WIRING (CONTROL ROOM) 22 E6.17 ANALOG INPUT AND ANALOG OUTPUT BOARD WIRING (CONTROL ROOM) 23 E6.18 I/O INTERCONNECTION TABLE I (SITE 1) 24 E6.19 I/O INTERCONNECTION TABLE II (SITE 1) 25 E6.20 I/O INTERCONNECTION TABLE III (SITE 1) 26 E6.21 (E) BUBBLER PANEL FOR DEMOLITION 27 E6.22 (N) SCADA PANEL ARRANGEMENT (CONTROL PANEL) 28 E6.23 WATER LEVEL SENSOR SYSTEM CONNECTIONS (SITE 1) 29 E6.24 CONTROL PANEL WIRING DIAGRAM (SITE 1) 30 E6.25 I/O BOARD WIRING DIAGRAM (CONTROL PANEL) 31 E6.26 I/O INTERCONNECTION TABLE (CONTROL PANEL) 32 E6.27 WATER LEVEL SENSOR SYSTEM CONNECTIONS (SITE 2) 33 E6.28 SCADA PANEL WIRING DIAGRAM (SITE 2) 34 E6.29 (E) RTU PANEL COMPONENTS FOR DEMOLITION (SITE 2) 35 E6.30 SCADA PANEL ARRANGEMENT (SITE 2) 36 E6.31 I/O BOARD WIRING I (SITE 2) 37 E6.32 I/O BOARD WIRING II (SITE 2) 38 E6.33 I/O INTERCONNECTION TABLE (SITE 2) 39 E6.34 WATER LEVEL SENSOR INSTALLATION DETAILS I 40 E6.35 WATER LEVEL SENSOR INSTALLATION DETAILS II 41 E6.36 PUMP SEQUENCE CONTROL AND SEQUENCING 42 E6.37 PUMP CONTROL SCHEMATIC (TYPICAL) 43 E6.38 ELECTRIC ACTUATOR WIRING DIAGRAM I (TYPICAL) 44 E6.39 ELECTRIC ACTUATOR WIRING DIAGRAM II (TYPICAL) 45 E6.40 CONTROL SCHEMATIC LEAD/LAG OPERATION (TYPICAL) END OF DOCUMENT Advertisement For Bids ADVERTISEMENT FOR BIDS Contract Number: 11822.61 Project Title: South Field Industrial Waste System Improvements VIRTUAL PRE-BID MEETING A virtual pre-bid meeting will be held at 10:00 am , Pacific Time, on Monday, November 9, 2026 , using Microsoft Teams video conferencing. Participation in the virtual pre-bid meeting is not mandatory but recommended. To participate in the virtual pre-bid meeting using Microsoft Teams or Microsoft Teams web app, please use the following link: https://bit.ly/3W4tAu1 . To join by phone, call (650) 466-0290 and use the Conference ID: 844 645 252# . VIRTUAL BID OPENING Bidders shall submit their Bids through the Airport's e-Procurement portal found at https://procurement.opengov.com/portal/sfoconstruction . Bids must be received by the Airport no later than 2:00 pm , Pacific Time, on Monday, December 7, 2026 . Completed Bids and required documents must be uploaded in Portable Document Format (PDF). Bids received after the Bid opening time will not be considered. All details for the preparation of Bids are set forth in Document 00 21 13 (Instructions to Bidders). Bidders shall transmit their original Bid Form (Document 00 41 00) and Bid security by U.S. Mail in a sealed envelope addressed to Tiffany Gonzalez-Ruiz , Contract Administrator, San Francisco International Airport, P.O. Box 8097, San Francisco, CA 94128, postmarked no later than the Bid opening date. Bids will be opened and read virtually using Microsoft Teams video conferencing. To participate in the virtual Bid opening using Microsoft Teams or Microsoft Teams web app, please use the following link: https://bit.ly/4e15ZR1 . To join by phone, call (650) 466-0290 and use the Conference ID: 974 268 045# . The Airport Commission specifically reserves the right, in its sole discretion, to reject any or all Bids or to waive technical defects in bidding. Bidders are solely responsible for the cost of preparation of Bids. PROJECT SITE VISIT: A site visit is available at 1:00 PM PST on Monday, November 9, 2026 and will meet at: San Francisco International Airport Building 674, Level 1, Lobby Area 674 West Field Road San Francisco, CA 94128 https://maps.app.goo.gl/kVUUJrs5Xe1Q9MTm9 Please bring a valid government-issued ID. Refer to the Timeline found on the Overview page of the Project found on the e-Procurement portal for the time and date of the site visit. Due to limited space, be sure to contact the Airport Contract Manager to reserve attendance for the Site visit no later than three (3) calendar days prior to the pre-bid meeting. Attendance at the Site visit may be denied if advance notice is not provided. PROJECT DESCRIPTION The South Field Industrial Waste System Improvements Project (Project) will install Cure-In-Place-Pipe (CIPP) between the inbound and outbound roads including South McDonnell Road, replace submersible pumps at one (1) pump station, and upgrade the Supervisory Control and Data Acquisition (SCADA) panels at two (2) pump station locations in the South Field area of the Airport to improve reliability and remote monitoring and control capabilities. CONTACT INFORMATION CONTRACT MANAGER: Nnaemeka Onyebuenyi (650) 821-7818 nnaemeka.onyebuenyi@flysfo.com CONTRACT ADMINISTRATOR: Tiffany Gonzalez-Ruiz (650) 821-7863 tiffany.gonzalez-rui@flysfo.com CONTRACT DURATION The Contract Time is 365 consecutive calendar days after the effective date indicated in the Notice to Proceed. ESTIMATED COST OF CONSTRUCTION The estimated cost of construction is between $2,500,000 - $2,900,000 . LICENSE REQUIREMENTS A California Class "A" Contractor’s License is required at the time of Bid. CONTRACT MONITORING DIVISION REQUIREMENTS Obtain the Contract Monitoring Division (CMD) Attachment 1 – Requirements for Construction Contracts. Refer to Document 00 43 11 (Contract Monitoring Division Forms). Inquiries concerning CMD requirements and CMD forms should be directed to Seth Benkle , CMD Contract Compliance Officer for the Airport, by telephone at (415)554-0659 or by email at seth.benkle@sfgov.org . Bid discounts may be applied in accordance with San Francisco Administrative Code Chapter 14B, Local Business Enterprise Utilization and Non-Discrimination in Contracting Ordinance. The Local Business Enterprise (LBE) subcontracting requirement is 20% . BID DOCUMENTS Contract Documents, plan holders lists, Addenda, and Bid results will be available to download at no cost from the Airport's e-Procurement portal. BID SECURITY Pursuant to San Francisco Administrative Code Section 6.21(a)(4), Bidder must submit a corporate surety bond or an irrevocable standby letter of credit on forms provided by the Airport, or a certified check in an amount equal to 10% of amount bid, including all allowances and Alternates, if applicable, with its Bid. CONTRACT REQUIREMENTS (See Project Manual for complete list) In accordance with San Francisco Administrative Code Chapter 6, Public Works Contracting Policies and Procedures, no Bid is accepted, and no contract in excess of the Threshold Amount (currently $1,170,000) is awarded, by the City and County of San Francisco until such time as the Airport Commission approves the contract for award. Pursuant to San Francisco Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds. BONDS San Francisco Administrative Code Section 6.22(a) requires all construction contracts awarded by the City and County of San Francisco in excess of $25,000 to include performance and payment bonds. The bonds shall each be in an amount equal to 100% of the Contract Sum. For information on the City’s Surety Bond Program visit https://sf.gov/information/surety-bond-assistance-program . INSURANCE Contractor shall maintain the insurance coverage as required under Article 10 of Document 00 72 00 (General Conditions) and Document 00 73 16 (Insurance Requirements). WAGES Minimum wage rates for this Project must comply with the current General Prevailing Wage as determined by the California Department of Industrial Relations (DIR). Minimum wage rates other than applicable General Prevailing Wage must comply with San Francisco Administrative Code Chapter 12P, Minimum Compensation. This Contract is subject to compliance monitoring and enforcement of prevailing wage requirements by the DIR and the San Francisco Office of Labor Standards Enforcement. No Contractor or Subcontractor may be listed in a bid for a public works project unless registered with the DIR per California Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under California Labor Code Section 1771.1(a)]. LABOR PEACE/CARD CHECK RULE In submitting a Bid, Bidder agrees that if awarded the Contract it will comply with the requirements of the Airport Commission’s Rules and Regulations, Rule 12.1, Labor Peace/Card Check Rule. A copy of the Airport Commission’s Rules and Regulations can be found at: http://www.flysfo.com/about-sfo/the-organization/rules-and-regulations . LIMITATIONS ON COMMUNICATIONS From the date this Advertisement for Bids is issued until the date the competitive process for this Advertisement for Bids is completed (either by cancellation of the Advertisement for Bids or by final action of the Airport Commission), Bidders and prospective Bidders, Subcontractors, vendors, and/or their representatives or other interested parties, shall communicate soley with the Airport Contract Administrator to request Bid Documents, submit a question on Bid Documents, and otherwise obtain general information about this Contract that is available or will be made available to all Bidders. Any attempt to communicate with or solicit any person involved in the evaluation, selection, award, or approval process, except as instructed in Document 00 21 13 (Instructions to Bidders), is prohibited. The persons with whom communication is prohibited includes, but is not limited to, any City and County of San Francisco elected official, member of the Airport Commission, or City or Airport Commission personnel. Failure to comply with this communications protocol of this Advertisement for Bids shall, at the sole discretion of the Airport, result in the disqualification of the Bidder or prospective Bidder from the competitive process. Prohibited communications made on behalf of a Bidder or prospective Bidder shall be imputed to the Bidder. This protocol does not apply to communications with the City regarding business not related to this Advertisement for Bids. DEBARMENT AND SUSPENSION Bidders are advised that this Contract is subject to the provisions of San Francisco Administrative Code Chapter 28, Administrative Debarment Procedure. San Francisco Administrative Code Section 28.11 prohibits any Subcontractor, of any tier, or Supplier that is subject to an Order of Debarment or Order of Suspension issued by the City from participating in the procurement process for this Contract. Bidders are advised that any participation in the Bid by a Subcontractor or Supplier subject to an Order of Debarment or Order of Suspension issued pursuant to San Francisco Administrative Code Chapter 28 may make the submission non-responsive. Any Order of Debarment or Order of Suspension issued pursuant to Chapter 28 of the San Francisco Administrative Code shall be a public record. Chapter 28 requires the City’s Office of the Controller to maintain a list of such contractors subject to Orders of Debarment or Orders of Suspension. The debarred or suspended contractor list is available on the City’s Controller website at https://sf.gov/resource/2022/suspended-and-debarred-contractors . HOW TO REGISTER AS A CITY SUPPLIER The following requirements pertain only to Proposers not currently registered with the City as a Supplier. There is no requirement to be a City Supplier to submit a Proposal. • Step 1: Register as a BIDDER at City’s Supplier Portal: https://sfcitypartner.sfgov.org/pages/index.aspx • Step 2: Follow the instructions for converting your BIDDER ID to a SUPPLIER ID. This will require you to register with the City Tax Collector’s Office and submit the online 12B Declaration for Article 131 (Equal Benefits Program) compliance through the Supplier portal. Once these forms have been completed, submitted, and processed, you will be notified via email with your organization's new Supplier ID. That email will also provide instructions for completing your Supplier registration. City Business Tax Registration Inquiries: For questions regarding business tax registration procedures and requirements, contact the Tax Collector’s Office at (415) 554-4400 or, if calling from within the City and County of San Francisco, 311. Equal Benefits Program Inquiries: For questions concerning the San Francisco Labor and Employment Code Articles 131 and 132, go to www.sfgov.org/cmd . NOTICE OF NEW REQUIREMENTS Bidders are advised of the following new requirements used in this Contract: N/A END OF DOCUMENT Instructions to Bidders CONTENTS 1.02 DEFINITIONS 1.03 DRAWING INDEX 1.04 BIDDING CONTACT INFORMATION 1.05 LIMITATIONS ON COMMUNICATIONS 1.06 ISSUANCE OF BID DOCUMENTS 1.07 EXAMINATION OF BID DOCUMENTS AND SITE 1.08 BID SECURITY 1.09 QUESTIONS AND ADDENDA 1.10 STATUTORY BIDDING REQUIREMENTS 1.11 BIDDER QUALIFICATIONS 1.12 DEBARMENT AND SUSPENSION CERTIFICATION REQUIREMENTS 1.13 LOCAL BUSINESS ENTERPRISE PROGRAM 1.14 LOCAL HIRING REQUIRMENTS 1.15 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA 1.16 BID FORM 1.17 SUBMISSION AND OPENING OF BIDS 1.18 INFORMATION TO BE SUBMITTED AFTER BID OPENING 1.19 WITHDRAWAL OR REVISION OF BID 1.20 BID PROTESTS 1.21 AWARD OF CONTRACT 1.22 CONTRACT SECURITY 1.23 EXECUTION OF CONTRACT DEFINITIONS The Bid Document
Published attachments
Addenda and notices
Addendum #1 · 1
A. MODIFICATIONS TO THE CONTRACT DOCUMENTS The following changes, additions or deletions as set forth herein shall apply to the Contract Documents and shall be made a part thereof and shall be subject to all of the requirements thereof as though originally shown and/or specified. All other conditions remain unchanged. MODIFICATIONS TO THE ADVERTISEMENT FOR BIDS. The Site Visit has been updated from Monday, November 9, 2026 at 2:00PM PST to Monday, November 9, 2026 at 1:00PM PST. The site visit requirements have been revised to include instructions that all attendees must present a valid government-issued photo ID.
Official Notice #1: Pre-Bid Meeting - Presentation and Sign-In · 1
Attached you will find the Pre-Bid Presentation, Sign-In sheet of the attendees, and the SFO Local Hiring Policy.
Addendum #2 · 2
This Addendum is being issued to modify the requirements in the Advertisement for Bids. Please review the terms of the Advertisement for Bids, and this Addendum carefully. If there are any inconsistencies between the Advertisement for Bids and the terms of this Addendum, then the terms of this Addendum shall prevail. Section references below are to the Advertisement for Bids and are provided for convenience of reference only and are not necessarily correct or complete. MODIFICATIONS TO THE ADVERTISEMENT FOR BIDS. Document 33 32 30 - Instrumentation and Control System, is hereby deleted in its entirety and replaced with Document 33 32 30 - Instrumentation and Control System, Issued for Addendum No.2
Official Notice #2: Reference Photos from IWPS-A2 at the Firehouse · 2
Attached are the photos to include as reference for the Project.
Official Notice #3: Second Site Visit · 3
A second Site Visit is scheduled for Wednesday, November 18, 2026 at 10:00AM. Please meet at: San Francisco International Airport Building 674, Level 1, Lobby Area 674 West Field Road San Francisco, CA 94128 Valid government-issued ID is required. For those who are planning to attend, please contact the Contract Administrator to RSVP. For those who do not RSVP ahead of time, we will not be able to accommodate you.
Addendum #3 · 3
The Bid Due Date has been extended to Monday, December 7, 2026 at 2:00PM.
Official Notice #4: As-Builts_5601E for Question #5 · 4
As-Built records for the existing 20-inch casing.
Official Notice #5: Question #9 Photos · 5
Photos for Question #9
Official Notice #6: Question #10 Photo · 6
Photo for Question #10
Official Notice #7: November 9th Site Visit Clarification · 7
During the site visit held on November 9, 2026, information was given that "two pump stations at Site 1 will remove the two PLCs and combine the stations into 1 PLC controller." The information provided was incorrect. The correct information is as follows : The design calls for two (2) controllers: 1PLC at SDPS-1D and 1 PLC at IWPS-A1
Public questions and answers
Per section 33 32 30 Instrumentation and Control System, can you please advise if Telstar Instruments can be listed as a preapproved System Integrator?
Any System Integrator that meets the qualifications listed in the Technical Specifications is preapproved. Please see Addendum No.2
CIPP hydrostatic test pressure (Spec 33 01 30.72 §2.02.D and §3.03; Spec 33 34 00 §4.02.A) The CIPP specification gives an internal design pressure of 80 psi and a 40 psi surge, and §3.03 requires a one-hour hydrostatic test, but no test pressure is stated. Spec 33 34 00 §4.02.A tests pressure piping at 1.5 times the working pressure. Typically this would be 1.5 x 80 psi = 120 psi, which also equals the design pressure plus surge. Please confirm that 120 psi is the test pressure for the lined sections.
120 psi is the test pressure for the lined sections.
Chemical exposure (Spec 33 01 30.72 §2.01.A.4) This section requires the cured tube to resist internal exposure to drinking water with common chemical additives, but the lines convey industrial waste. Please provide the constituents, concentrations, pH range, and temperature range of the industrial waste (including any periodic cleaning or chemical dosing) that the liner and resin must be qualified against.
The only constituents are tire residue, stormwater, groundwater, and wash and wax concentrate used in cleaning fire trucks. The pH is neutral.
Bypass pumping and shutdowns No specification section or bid item addresses bypass pumping or flow management on the industrial waste force mains during lining. (a) Is bypass pumping the Contractor's responsibility, and if so, should its cost be included in Bid Item U1? (b) Please provide design flows and the pump station capacities. (c) Please state the allowable shutdown windows and durations for each force main, including any limits for work in the AOA that requires airside escort. The documents reference only a 72-hour notice.
This will not require any bypass pumping by the Contractor. The only consideration should be shutdowns which shall be coordinated as stated in Contract documents. The work on the pipelines is all on landside. The pipeline can be shut down for 90 calendar days.
Existing 20-inch casing (Sheet U2.11, Sheet 4 of 45) The drawings show an existing 20-inch casing at the Inbound/Outbound Road crossing. Is the 8-inch DIP continuous through the casing? What is the known condition of the casing and carrier pipe, and is the annulus filled or are spacers present? Please provide any CCTV, as-built, or inspection records.
The 8-inch DIP is continuous through the casing. There are spacers/insulators present. The condition of the casing pipe is unknown. (See Notice Number 4 for As-built records).
Start manhole and pressure cleanouts (Sheet U2.11) The 8-inch alignment begins at existing manhole IW-2518 (Sta 0+00), which is not shown as an access pit. Please clarify whether the liner is intended to start at this manhole. In addition, PCO IW-2434 is noted "to be replaced after lining pipe" without an access pit callout. Please clarify the intent for this PCO and how it is to be accessed.
For this section, the design intent is to line the pipe using PCO IW-2344 as the access point to the downstream and the upstream of this PCO. The manhole is going to be the termination point on the downstream end and PCO IW-2788 is going to be the termination point on the upstream side. Then, dig to the fitting, and replace PCO IW-2434.
Service connections (Spec 33 01 30.72 §3.04.A.1) The specification requires two working cutter units on site before each inversion. Please confirm that there are no service connections or branches on the 8-inch and 6-inch force mains to be lined, or identify any that exist.
There are no service connections or branches on the 8-inch and 6-inch force mains that need to be lined. There are no branches on the 8-inch force main but the 6-inch force main has a 2-inch discharge line that ties into it from industrial waste pump station IWPS-A2 at STA13+18. There are no other service connections.
End terminations (Spec 33 01 30.72 §3.04.B) Section 3.04.B permits either an internal end seal (WEKO or equal) or an FRP spool termination. To our knowledge, internal end seals of this type are not available for 6-inch pipe. Please confirm that FRP spool terminations are acceptable for the 6-inch segments, and state any City preference for the 8-inch segments.
FRP spool terminations are acceptable for both pipe segments.
OpenGov categories
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91400 · Construction Services, Trade (New Construction)
- 96800 · Public Works And Related Services