State and local · OpenGov
Spanaway Lake Aquatic Vegetation and Algae Management
Description
Pierce County Surface Water Management (SWM) Division seeks multi-year services from a lake management firm qualified to implement strategies necessary to address noxious plant growth and cyanobacteria in the lake. This includes the use of chemical and mechanical methods for controlling excess aquatic vegetation (including, but not limited to, Curlyleaf Pondweed and White/Fragrant Waterlily) and to reduce phosphorus levels to reduce the occurrence of harmful algal blooms. It also includes services related to surveying and mapping the nature and extent of noxious aquatic plant growth, post treatment evaluation, posting of public notices necessary to satisfy applicable regulatory and permit conditions, and pre- and post-treatment monitoring as required by permits. The contractor will also be expected to produce a written project report at the end of each season, attend at least one (1) public meeting each year, and maintain active communications with Pierce County staff. Specific treatment strategies may vary over time, depending on budgetary factors and feedback from County Council and the public. SWM will develop an annual workplan that includes select lake management strategies from the Integrated Aquatic Vegetation Management Plan (IAVMP) and Lake Cyanobacteria Management Plan (LCMP). The Annual Workplan is subject to Council approval. The need for these services is expected to begin in March of 2027 and last the duration of the Lake Management District, which is currently authorized to operate through 2031. Contractor must be a Washington State Licensed aquatic herbicide applicator. If the contractor does not perform the work, they are responsible for hiring and direct the licensed applicator to ensure compliance with all conditions of the permits. Contractor must demonstrate the ability to transmit spatial data in a GIS-compatible format, including but not limited to industry standard file types (e.g., shapefiles, geodatabases, or other interoperable formats) that allow for seamless integration with the County’s GIS environment. The project is estimated to cost $1,400,000.00, not including WA State Sales Tax. Objective/Scope of Work Scope of Work Task 1: Pretreatment Vegetation Survey The IAVMP recommends annual survey work be done prior to treatment to ensure accurate assessment of the extent and location of the two primary plants of concern (Potamogeton crispus, aka Curlyleaf Pondweed and Nymphaea odorata, aka White/Fragrant Waterlily) and to monitor new potentially harmful species (Eurasian watermilfoil, etc.). Plant survey work will use existing bathymetry data and assume a littoral area extending the 20ft contour line. The contractor shall be prepared to accommodate County staff during all survey operations. Pretreatment survey work includes: Written notice to County staff no less than five business days in advance of survey work. Mapping density and distribution of aquatic vegetation within the littoral zone. Surface observations using sampling rakes or similar techniques to classify plant species present. Identify shape and location of noxious plant species beds and quantify overall extent of noxious populations. Communicating survey results to County staff, including recommended actions and estimated costs that may serve as the basis for developing annual workplans and work assignments under this contract. Data products will be packaged in a format compatible with standard ESRI GIS software (geodatabase or shapefile) and contain appropriate metadata. Task 2: Pretreatment Phosphorus Monitoring Implement a comprehensive pretreatment phosphorus monitoring program to support effective lake management and treatment planning, as identified in the LCMP. The selected contractor will coordinate closely with County staff, provide advance notice of field activities, and conduct all monitoring in accordance with regulatory permit requirements. This task ensures the routine collection of key water quality parameters, the evaluation of treatment effectiveness, and the determination of appropriate dosing through jar and bucket testing. The results will directly inform and optimize subsequent phosphorus sequestration treatments. This work includes, but is not limited to, the following deliverables: Written notice to County staff no less than five business days in advance of survey work. Conduct pretreatment lake monitoring as required by permits. Routinely measure and report parameters for evaluating treatment effectiveness: At a minimum temperature profile, total phosphorus (TP), DO, soluble reactive phosphorus (SRP), chlorophyll-a, secchi depth and turbidity form at least one location (maximum depth). Perform jar/bucket tests to determine phosphorus sequestration product dosing requirements. Perform treatments based on require dosing/application. Task 3: Pretreatment Notification Provide all required public notifications preceding lake treatment activities. The contractor will provide to staff with an annual treatment plan outlining the proposed treatment schedule, including estimated application dates and the specific chemicals intended for use. The plan shall be submitted to staff for review and approval prior to implementation and updated as needed to reflect any changes in timing or product selection. The contractor will provide timely, permit-compliant notices to shoreline residents, businesses, and lake users to ensure awareness, safety, and effective treatment conditions including, but not limited to the following deliverables: Provide shoreline signage and direct mail treatment notifications to shoreline businesses and residences in accordance with permit requirements and provide county staff with copies of each. Post "limited boat use" requests at public boat launches, if needed, to reduce boat traffic for 24 hours before treatment and provide more effective plant control. Visibly post notices on docks, shorelines and boat launches at least 24 hours prior to treatment. Provide an annual treatment plan outlining the proposed treatment schedule, including estimated application dates and the specific chemicals intended for use. Task 4: Aquatic Vegetation Control Implement noxious vegetation management compliant with the Aquatic Plant and Algae Management General Permit (APAM) coverage held by the Spanaway Lake Management District. The contractor will be responsible for complying with all conditions of the permit, and all contractor personnel applying aquatic herbicides shall be a Washington State licensed aquatic herbicide applicator. This work includes, but is not limited to, the following deliverables: Notify County Staff no less than five business days in advance of performing plant management tasks, including the techniques planned and the nature and duration of any required or recommended water use restrictions. Comply with all state and local public notification requirements for herbicide treatments and provide County staff with copies of each. Post “limited boat use” requests at public boat launches, if needed, to reduce boat traffic for 23 hours before treatment and provide more effective plant control. Visibly post notices on docks, shorelines, and boat launches at least 23 hours prior to treatment. Conduct any pre- and post-treatment water quality monitoring. Apply herbicides indicated for use in the adopted IAVMP to control noxious plant species. Strictly adhere to all label specifications and APAM permit conditions during herbicide application. Adhere to permit requirements for removing notices after herbicide treatments are applied. Maintain herbicide application records and provide copies to County staff following treatment. This includes maps detailing types of treatments and areas applied. Take precautionary measures and protect existing population of any state-listed sensitive plants located near the treatment site from harm. Task 5: Cyanobacteria Management Implement Cyanobacteria management strategies as identified in the LCMP as needed including application of 1) phosphorus inactivation products (lanthanum) to sequester excess nutrients and 2) emergency algae control using peroxide-based algaecides Introduction Pierce County's eProcurement System Welcome to Pierce County's eProcurement System. This system is inclusive to the procurement process, including submission of any questions and/or clarifications, the release of any addenda/notices, and submission of proposals. It is strongly encouraged that organizations responding to any procurement first read the entire procurement, paying close attention to the timelines, scope of work, eligibility, submission requirements, and specifically to the questionnaire section, which may include required attachments ( when applicable ), and ask for any clarifications regarding content and instructions early in the process. Summary Pierce County Surface Water Management (SWM) Division seeks multi-year services from a lake management firm qualified to implement strategies necessary to address noxious plant growth and cyanobacteria in the lake. This includes the use of chemical and mechanical methods for controlling excess aquatic vegetation (including, but not limited to, Curlyleaf Pondweed and White/Fragrant Waterlily) and to reduce phosphorus levels to reduce the occurrence of harmful algal blooms. It also includes services related to surveying and mapping the nature and extent of noxious aquatic plant growth, post treatment evaluation, posting of public notices necessary to satisfy applicable regulatory and permit conditions, and pre- and post-treatment monitoring as required by permits. The contractor will also be expected to produce a written project report at the end of each season, attend at least one (1) public meeting each year, and maintain active communications with Pierce County staff. Specific treatment strategies may vary over time, depending on budgetary factors and feedback from County Council and the public. SWM will develop an annual workplan that includes select lake management strategies from the Integrated Aquatic Vegetation Management Plan (IAVMP) and Lake Cyanobacteria Management Plan (LCMP). The Annual Workplan is subject to Council approval. The need for these services is expected to begin in March of 2027 and last the duration of the Lake Management District, which is currently authorized to operate through 2031. Contractor must be a Washington State Licensed aquatic herbicide applicator. If the contractor does not perform the work, they are responsible for hiring and direct the licensed applicator to ensure compliance with all conditions of the permits. Contractor must demonstrate the ability to transmit spatial data in a GIS-compatible format, including but not limited to industry standard file types (e.g., shapefiles, geodatabases, or other interoperable formats) that allow for seamless integration with the County’s GIS environment. The project is estimated to cost $1,400,000.00, not including WA State Sales Tax. Background NO VALUE Minimum Qualifications Proposer Eligibility To be considered for evaluation and award, proposals must demonstrate that the proposer and its key partners meet the following minimum qualifications: 1. Contractor must demonstrate experience performing aquatic vegetation management and lake treatment projects of similar scope, including aquatic plant surveying, water quality monitoring, regulatory permit compliance, treatment implementation, and technical reporting. 2. Contractor must demonstrate the ability to transmit spatial data in a GIS-compatible format, including but not limited to industry standard file types (e.g., shapefiles, geodatabases, or other interoperable formats) that allow for seamless integration with the County’s GIS environment. 3. Contractor must be a Washington State Licensed aquatic herbicide applicator. If the contractor does not perform the work, they are responsible for hiring and direct the licensed applicator to ensure compliance with all conditions of the permits. 4. Work shall be performed in accordance with recognized sound safety standards and any equipment, supplies and products shall be used in accordance with the manufacturer’s technical specifications. Anticipated Contract Details and Expectations Term The initial period of performance of any contract resulting from this procurement is anticipated to begin on or around March 2027. Amendments extending the period of performance, if any, shall be at the sole discretion of the County. The County reserves the option to extend contracts for four (4) additional terms of twelve (12) months each. However, no Contractor will be guaranteed an extension. Value The total value of this procurement is $1,450,000.00. The County anticipates awarding a single contract from this procurement. The County reserves the right to make fewer awards or no awards, based on the quality and scope of proposals received, available funding, and identified service needs. Additional federal, State, or local funds may become available during the contracting cycle and allocated through this solicitation. Funding may only be awarded for the same scope of services as described in this solicitation. It is important to note, any contract awarded as a result of this procurement is contingent upon the availability of funding. If at any time during the term of the contract the funding relied upon for the contract is reduced, modified, or eliminated, or if the funding terms are modified, Pierce County reserves the right to amend the contract as appropriate or to terminate the contract. Definitions “Apparently Successful Proposer (ASP)” means a proposer selected as an entity to perform the anticipated services, subject to completion of contract negotiations and execution of a written contract. "Applicant," "Bidder," and "Proposer" mean an organization, agency or provider that submits a formal response to this procurement. "Application," "Bid," or "Proposal" mean a formal response to this solicitation. “CFR” means Code of Federal Regulations. “Client,” "Participant," "Household," or "Member" means an individual (or individuals) who receives services, or is eligible to receive services, under this procurement. “Contractor” means an individual or organization whose proposal has been accepted by the County and has been awarded a fully executed, written contract. “Procurement” means the process by which the County obtains services. “Request for Proposal (RFP)” or "Solicitation" means this document and its attachments in which needed goods and/or services are identified and organizations are invited to provide information as to how they propose to meet the County's needs. “RCW” means Revised Code of Washington. “WAC” means Washington Administrative Code. ADA The County complies with the Americans with Disabilities Act (ADA). Bidders should contact the RFP Coordinator to request an accommodation. General Information for Proposers RFP Coordinator The RFP Coordinator is the sole point of contact in the County for this procurement. All communications between the Proposer and the County upon release of this RFP shall be with the RFP Coordinator. Joel Stanger Procurement & Contracts Specialist Email: joel.stanger@piercecountywa.gov Phone: (253) 798-4250 Department: Procurement and Contract Services Until the County has completed the evaluation process and issued notices to Proposers, the following communication restrictions apply to this RFP: Proposers are to rely solely on written statements issued by the RFP Coordinator. Any communications other than written statements issued by the RFP Coordinator will be considered unofficial and non-binding on the County. Communication directed to parties other than the RFP Coordinator may result in disqualification of the Proposer. Timeline Proposal Release Date: November 25, 2026 Question Submission & Concern Resolution Request Deadline: December 11, 2026, 4:00pm Proposal Submission Deadline: December 18, 2026, 4:00pm Interview Dates: Within two (2) weeks of the proposal submission deadline. Estimated Date of Contract Execution: March 2027 The County reserves the right to revise the above timeline. Procurement Documents and RFP Holder's List PROPOSERS WHO REGISTER AND DOWNLOAD RFP DOCUMENTS will be automatically added to the FOLLOWERS' list in the County's eProcurement Portal . Notifications for solicitation updates, addendum and other procurement information will be sent to all who register on the Pierce County eProcurement Portal. Questions and Answers Proposers may submit questions through the County's eProcurement Portal, under the Question & Answer Section, no later than 4:00 pm on the date set forth in Section 2.2. Proposers must be registered in the eProcurement Portal software to submit questions, receive addendums and notifications, and ultimately submit a proposal. Proposers may only rely on written statements issued by the County. Any oral communications are unofficial and are not binding on the County. Submission of Proposals Deadline The proposal must be received by the time/date as indicated in Section 2.2. Attachments Follow instructions carefully - if attachments are provided under this solicitation, they are to be utilized as part of the proposal - do not replace or use the organization's own format, as the proposal may be deemed "non-responsive" or "not eligible." Instructions All proposals are evaluated on the completeness and quality of the content. Only those Proposers providing complete information as required will be considered for evaluation. The County is not obligated to contact the organization for correction of proposals and Proposers are strongly encouraged to carefully review their proposals for completeness and accuracy before submitting. For proposals to be considered responsive and move to the review process, the Proposer must, under Section 3, RFP Questionnaire: Acknowledge all required “confirmations.” Complete all required attachments, to include uploading any supplemental documents requested in attachments; and Upload proposal document: The proposal document must address all requirements in Section 1.5, Minimum Qualifications. No specific organization or length of the proposal is required, but clear identification of proposal sections will assist evaluators with scoring the proposal. Additional Resources/Helps This section provides a curated list of help articles addressing common questions and challenges proposers may encounter during the Request for Proposal process. The resources below are intended to offer clear guidance, practical solutions, and relevant information to support a smooth and successful submission. Proposers are encouraged to review these materials as needed to better understand requirements, resolve issues, and navigate the process with confidence. Vendor Registration Following a Project Getting Started with Subscriptions How to Submit a Question in OpenGov How to Submit a Proposal Response in OpenGov How to Edit or Withdraw a Proposal after Submission in OpenGov Electronic Submissions Only Only electronic submittal via the County's eProcurement Portal shall be accepted for this procurement. No hard copies, emails, or fax submittals shall be accepted. The accepted forms of submitted materials are .pdf, png., jpeg., and MS Office formats such as docx. and xlsx. Addenda & Notices Proposers must acknowledge and confirm each addendum and notice issued under this solicitation. The system will not allow final submission unless all required confirmations are checked. No Exceptions for Late Responses Proposers should allow sufficient time to ensure timely receipt of the proposal by the County’s e-procurement System, OpenGov. Late responses will not be accepted and will be automatically disqualified. The County assumes no responsibilit