Skip to content
← Back to search

State and local · OpenGov

OpportunityawardPending

Spare Bus Parts (2 Years IDIQ)

Description

The Southwest Ohio Regional Transit Authority (SORTA) is seeking bids from vendors who can supply and deliver on an as-needed basis various spare bus parts. These parts will support routine maintenance activities and help ensure the continued reliability, safety, and efficiency of equipment and systems. Spare Bus Parts Pricing Prices quoted shall include all items needed, labor, material, tools, equipment and other costs necessary to fully complete the manufacture, delivery and installation (if applicable) for the goods and/or services being procured pursuant to the specifications. Freight must be included in the kit/item price. Please note that SORTA will not pay freight charges separately. Award of this contract shall be to the responsible bidder submitting the lowest responsive bid as determined by SORTA. SORTA has the right to make award(s) on the basis of each individual item/kit, or any combination of items/kits, or in the aggregate of all items. This is an Indefinite Delivery Indefinite Quantity type contract (IDIQ). The quantities and deliveries cannot be determined at this time. SORTA estimates approximate quantities to be ordered over 24 months. Quantities are only an estimate and is not binding within the contract with the selected vendor. GEAR ASSM, STEERING PANEL KIT, RH/CS CONTROL CONTROL PANEL (FIRE BOX) PLATE ASSM, DL2 PIVOT (STANDARD) WINDSHIELD, LH/RS WINDSHIELD, RH/CS RACK, BLACK DL2 BIKE SLACK ADJUSTER, LH/RS FRONT SLACK ADJUSTER, RH/CS FRONT ASSM, HUB CAP (STEMCO&MERITOR ONLY) SLACK ADJUSTER, LH/RS REAR (HALDEX ONLY) SLACK ADJUSTER, RH/CS REAR (HALDEX ONLY) CARRIER ASSM, R-177 BAG SPRING, FRONT AIR (FIRESTONE) FILTER, 2010 ISL CRANKCASE BREATHER (FLEETGUARD ONLY) FILL ASM, FUEL (GILLIG LF) ABSORBER, FRONT SHOCK W/ MTG HARDWARE DIALLIGHT STEPWELL LIGHTS (WHITE OUTSIDE) ABSORBER, REAR SHOCK (KONI ONLY) ARM ASSM, WIPER WITH PANTOGRAPH HOSE ASSM, 24 VOLT DEF PRESSURE 5/16 x 5/16 EVAP MOTOR AND BLOWER (CW) CONTROLLER, DOOR KING PIN KIT-FASTSET NO REAM ABSORBER, SHOCK FRONT CS DEF SENSOR, LEVEL KIT BOOSTER PUMP BRAKE PEDAL MOVABLE ARM KIT CONTROLLER ASSY, DOOR OIL SEAL, WHEEL (MERITOR ONLY) WC BELT TENSIONER ASSEMBLY, CS SPRING, REAR AIR (USE ONLY SAF Holland) GEAR ASSM, STEERING PANEL KIT, RH/CS CONTROL CONTROL PANEL (FIRE BOX) PLATE ASSM, DL2 PIVOT (STANDARD) WINDSHIELD, LH/RS WINDSHIELD, RH/CS RACK, BLACK DL2 BIKE SLACK ADJUSTER, LH/RS FRONT Scope of Work General Information The awarded vendor(s) will supply and deliver on an as-needed basis the parts identified in the specifications. All quantities listed are estimates based on historical usage. This is an Indefinite Delivery Indefinite Quantity type contract (IDIQ). The quantities and deliveries cannot be determined at this time. SORTA estimates approximate quantities to be ordered over 24 months. Quantities are only an estimate and is not binding within the contract with the selected vendor. All shipments will be sent to : 1401 Bank Street (Receiving Door 71) Cincinnati, Ohio 45214 Receiving days/time: Monday – Friday, 8:00 a.m. – 4: 00 p.m. Eastern Time (EST) Requirements and Specifications The list below details the parts that will be included in this contract. Parts shall be packaged to prevent damage during shipping and storage. Each part shall have a unique part number and SORTA must be able to confirm the catalog # from the OEM. Suppliers may not substitute OEM Parts with non-approved components. In all cases, the items must be furnished as specified. All items must be new and meet OEM specifications. Spare bus parts Description Model # GEAR ASSM, STEERING TAS652289 TRW/ROSS PANEL KIT, RH/CS CONTROL 50870907 CONTROL PANEL (FIRE BOX) 413410-14 PLATE ASSM, DL2 PIVOT (STANDARD) 100252 WINDSHIELD, LH/RS 26-45747-001L/6348641NFA WINDSHIELD, RH/CS 26-45474-000R/6348640NFA RACK, BLACK DL2 BIKE 100352 SLACK ADJUSTER, LH/RS FRONT 30010041 SLACK ADJUSTER, RH/CS FRONT 30010042 ASSM, HUB CAP (STEMCO&MERITOR ONLY) A3262A1353/343-4176 SLACK ADJUSTER, LH/RS REAR (HALDEX ONLY) 30010174 SLACK ADJUSTER, RH/CS REAR (HALDEX ONLY) 30010175 CARRIER ASSM, R-177 B23200N2120538 BAG SPRING, FRONT AIR (FIRESTONE) 6351232 FILTER, 2010 ISL CRANKCASE BREATHER (FLEETGUARD ONLY) CV50628 (FLEETGUARD) FILL ASM, FUEL (GILLIG LF) 800725 (EMCO WHEATON) ABSORBER, FRONT SHOCK W/ MTG HARDWARE 99b3202sp1 DIALLIGHT STEPWELL LIGHTS (WHITE OUTSIDE) vswcc19w35808 Dialight ABSORBER, REAR SHOCK (KONI ONLY) 99B 3203 ARM ASSM, WIPER WITH PANTOGRAPH 41810-05-BW-3 HOSE ASSM, 24 VOLT DEF PRESSURE 5/16 x 5/16 GG4P2300AAFA230X1 EVAP MOTOR AND BLOWER (CW) 41-9387 (CW) MOTOR ONLY CONTROLLER, DOOR 5175005000 KING PIN KIT-FASTSET NO REAM R202008 ABSORBER, SHOCK FRONT CS 99b3202sp1 DEF SENSOR, LEVEL KIT 325-0150-18-k Shaw BOOSTER PUMP EMP 1030002351P001 BRAKE PEDAL MOVABLE ARM KIT Kongsberg 1000939351 CONTROLLER ASSY, DOOR 51650548-01 OIL SEAL, WHEEL (MERITOR ONLY) A 1205 L 2716 WC BELT TENSIONER ASSEMBLY, CS Q050096 SPRING, REAR AIR (USE ONLY SAF Holland) 90557435 SAF Holland Quality Inspection and Requirements Inspections SORTA reserves the right to inspect all parts supplied at any time during the duration of the Contract. If SORTA determines that any of the parts have been changed or are no longer in compliance with this specification, the parts shall be returned to the vendor at no cost to SORTA. Parts shall be provided within ten (10) calendar days of receipt of the defective parts so as not to delay maintenance at SORTA. SORTA reserves the right to return parts, at the supplier’s expense, that do not meet or exceed the performance of OEM parts. Quality Assurance: Conformance to OEM specifications. For consideration all submittals must be provided within the Vendor Questionnaire. Brand Name or Equal When products of a specific brand part number, material, construction, design, style, or size are named, they indicate the quality level or performance required for the product(s) in this invitation for bid. Only specified OEM products shall be considered. The brand name and manufacturer catalog number for each line item are provided. Orders SORTA will place orders with the awarded vendor(s) for items specified in the Scope of Work and/or Schedule of Prices. Order quantities will vary based on current inventory needs. If a vendor(s) is unable to fulfill and deliver an order within a reasonable timeframe, SORTA reserves the right to procure the items from the open market. Introduction Summary Background Contact Information Timeline Instructions to Bidders Bid Preparation Cost SORTA will not reimburse proposers for any costs incurred in the preparation and submittal of proposals or participation in the evaluation and negotiation process. Requests for Clarification/Questions Any questions regarding this solicitation shall be submitted through the e-Procurement Portal no later than 2:30 pm on Thursday, November 5, 2026 (EST). Telephoned questions will not be accepted. Proposers shall not contact any other SORTA personnel regarding any aspect of this solicitation. Any proposer found to have had such contact shall be barred from participation in this solicitation and any subsequent contract, either as a prime contractor or subcontractors. SORTA anticipates that responses to questions submitted will be provided to all known proposers by 2:30 pm on Thursday, November 12, 2026 . If the responses materially alter the terms of this solicitation, they will be incorporated in an amendment to the solicitation. No communication by SORTA or any of its Trustees, officers, employees, agents or representatives shall alter the terms of this solicitation or bind SORTA in any manner, unless incorporated in such an amendment. Revisions and Amendments to the Solicitation SORTA reserves the right in its absolute discretion to revise or amend this Solicitation, including the Scope of Work, up to the time set for receipt of Bids. Any such revision or amendment, if any, will be sent via email to all Bidders who have downloaded a copy of this Solicitation from the e-Procurement Portal . Bidders shall acknowledge any and all addenda electronically via the e-Procurement Portal as part of their bid package. Bid Preparation The complete bid package for this solicitation consists of an electronically completed Bid Pricing Form together with the documents specified here: Bid Pricing Form The Bidder shall complete the Bid Pricing Form, including submittal of pricing in the spaces provided. Use of any other form or format shall disqualify the bidder unless otherwise noted in this solicitation The prices submitted within the Bid Pricing Form shall include everything necessary to complete the project in accordance with the Scope of Work and the General Terms and Conditions set forth in this IFB. A detailed pricing sheet of all cost breakdown may be requested at any time. Pricing shall remain valid for no less than 120 days Certification Forms Certification Regarding Debarment, Suspension and Other Responsibility Matters Personal Property Tax Affidavit Certification of Restrictions on Lobbying Documents for Construction Projects Buy America if applicable Bid Bond if applicable Prevailing Wage Rates Acceptance of Terms and Conditions Submission of Bids Bid package must be received by SORTA via the e-Procurement Portal website ( https://procurement.opengov.com/portal/go-metro ) no later than the bid submission due date and time specified in the Introduction section or as amended. The Southwest Ohio Regional Transit Authority (SORTA) will accept only electronic submittals through the e-Procurement Portal at https://procurement.opengov.com/portal/go-metro in response to this solicitation. No hard copy submittals will be accepted. Any required notarizations shall be by a licensed notary or an online notary pursuant to Ohio Revised Code Section 147.60 et seq.; a listing of such notaries may be found on the Ohio Secretary of State website: Online Notary Search Proposals must be received no later than 2:30 pm on Monday, November 23, 2026 (EST). Late proposals will not be accepted, except as described below. Bid Modification or Withdrawal Prior to the bid submission due date, Bids may be modified or withdrawn by the Bidder electronically via the e-Procurement Portal. Any such modification must be delivered in the manner for submission of Bids as set forth above, and received by SORTA by no later than the bid submission due date and time specified in the Introduction Section. If withdrawal is timely received, SORTA shall acknowledge the request for withdrawal of Bid. If a modification is timely received by SORTA prior to the date and time set for the receipt of Bids, then that modification will be considered by SORTA as a part of the original Bid. Late Bids Any bid modification, or revision, that is received through after the exact time specified for receipt of bid is “late” and will not be considered. Any submission received after the exact date and time specified will not be considered unless it is received before award is made, the contracting officer determines that accepting the late proposal would not unduly delay the acquisition; and there is acceptable evidence to establish that an error occurred while attempting submission prior to designated time for receipt of bids; or it was the only bid received. However, a late modification of an otherwise successful bid that makes its terms more favorable to SORTA, will be considered at any time it is received and may be accepted. Any bid that is received outside of the e-Procurement portal https://procurement.opengov.com/portal/go-metro. for the receipt of such bids after the exact time specified is will not be considered, unless: Acceptable evidence to establish an error occured prior to the time of receipt and shows electronically the bid being uploaded in the e-Procurement Portal was unsuccessful due to system error If an emergency or unanticipated event interrupts normal SORTA processes, so that bids cannot be received in the SORTA e-Procurement portal designated for receipt of proposals by the exact time specified in the solicitation and urgent SORTA requirements preclude amendment of the solicitation closing date, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the date to be determined by SORTA. Bidders may withdraw a bid or modification thereof electronically via the e-Procurement Portal at any time prior to the time specified for receipt of proposals or modifications. A bid or modification may be resubmitted prior to the time specified for receipt. MetroMAX Small Business Mission Statement The Southwest Ohio Regional Transit Authority (SORTA) has established a Small and Disadvantaged Business Enterprise program that encourages diversity and inclusion on all contracts. It is the policy of SORTA to promote equal opportunity and fairness in all its procurement matters, in accordance with state and federal laws, so that small and disadvantaged businesses have an equal opportunity to receive and participate in all contracts. It is also our policy to: Ensure nondiscrimination in the award and administration of contracts; Create a level playing field on which small and disadvantaged businesses can compete fairly for SORTA contracts; Help remove barriers to the participation of small and disadvantaged businesses in SORTA contracts; and Assist the development of firms that can compete successfully in the marketplace outside of SORTA’s small and disadvantaged business program. SORTA is committed to fostering small and disadvantaged business participation in contracting opportunities. As such, bidders/proposers are expected to make reasonable efforts to support inclusivity in staffing and subcontracting, to support SORTA’s mission. Verification of Proposer Responsibility SORTA may undertake such investigations as it deems necessary to determine the ability of each Proposer to perform the work, and the Proposer shall furnish to SORTA all such information and data as SORTA may request for this purpose. SORTA reserves the right to reject any proposal if the evidence submitted by, or investigation of, such proposer fails to satisfy SORTA that such proposer is properly qualified to carry out the obligations of the contract and to complete the work required, hereunder. SORTA may require the proposer to submit any of the following information as part of the evaluation process: (1) proposer’s performance record; (2) proposer's certified, audited financial statements for up to three (3) prior years; and (3) such additional information as will satisfy SORTA that the Proposer is adequately prepared to fulfill the contract. SORTA also reserves the right to verify a proposer’s indirect cost rates, such as provisional overhead (burden) and General & Administrative (G&A) rates, before or after award of a contract. In this connection, SORTA may request the proposer to provide copies of undisputed audits of the proposed by (1) other FTA grantees; (2) the federal government; or (3) state government. Award The Contract will be awarded to the responsible Bidder(s) submitting the lowest offer. SORTA reserves the right to accept or reject any or all bids in their entirety or in part, to waive informalities and minor irregularities and to contract as the best interest of SORTA may require. Bids will be evaluated on vendor’s responsiveness and responsibility. A responsive bid conforms, in all material respects, to the requirements of the solicitation. Bids will be evaluated to determine the responsible bidder submitting the lowest responsive bid. In determining responsibility, the following elements shall be given consideration in addition to price: The character, integrity, reputation, judgment, and efficiency of the bidder; The bidder is neither debarred nor suspended from Federal, State or local programs; The bidder is in compliance with the Common Grant Rules’ affirmative action and FTA’s Disadvantaged Business Enterprise requirements or another State or local programs as they apply; The bidder is in compliance with the public policies of the Federal Government, as required by 49 U.S.C. Section 5325(j)(2)(B) or other State or local policies as they apply; The bidder has the necessary organization, experience, accounting, and operational controls, and technical skills, or the ability to obtain them, in compliance with 49 U.S.C. Section 5325(j)(2)(D) or as required in the Work Scope to perform the service or work; The bidder is in compliance with applicable licensing and tax laws and regulations; The bidder has, or can obtain, sufficient financial resources to perform the contract, as required by 49 U.S.C. Section 5325(j)(2)(D); The bidder has, or can obtain, the necessary production, construction, and technical equipment and facilities, The bidder is able to comply with the required delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments, and; The bidder is able to provide a: Satisfactory current performance record, and Satisfactory past performance record in view of its records of long-time performance or performance with a predecessor entity, including: Sufficient Resources. Key personnel with adequate experience, a parent firm with adequate resources and experience, and key subcontractors with adequate experience and past performance, Adequate Past Experience. Past experience in carrying out similar work with particular attention to management approach, staffing, timeliness, technical success, budgetary controls, and other specialized considerations as described in the recipient’s solicitation, and Any Past Deficiencies Not the Fault of the Bidder. A prospective bidder that is or recently has been seriously deficient in contract performance is presumed to be non-responsible, unless SORTA determines that the circumstances were properly beyond the bidder’s control, or unless the bidder has taken appropriate corrective action. Past failure to apply sufficient tenacity, perseverance, and effort to perform acceptably is strong evidence of non-responsibility. Failure to meet the quality requirements of a contract is a significant factor to consider in determining satisfactory performance. The Bidder’s compliance with contract terms; Such other information as may be secured having a bearing on whether the bidder is responsible and has submitted a responsive bid. Protests SORTA’s policy and procedure for the administrative resolution of protests is set forth in §3.10 of SORTA’s Procurement Procedures Manual (PPM). The PPM contains rules for the filing and administration of protests. SORTA shall furnish a copy of §3.10 upon request. The policy and procedure is available on SORTA’s website at Microsoft Word - Metro Protest Procedure (9.23) An interested party wishing to protest a matter involving a proposed procurement or contract award, shall file a written submission with the Director of Procurement by certified mail or other delivery method by which receipt can be verified. Electronic submission of protests is not acceptable unless an original signed copy of the protest is received by the Director within 24 hours (not including weekends and holidays) after receipt of the electronic copy. The Director may, however, permit the electronic provision of supplemental information after the initial protest submittal. The protest shall include, at a minimum: The name and address of the protesting party and its relationship to the procurement sufficient to establish that the protest is being filed by an interested party; Identity of the contact person for the protestor, including name, title, address, telephone, fax and e-mail addresses. If the contact point is a third party representing the protester, the same information must be provided, plus a statement defining t

Published attachments
Addenda and notices
Public questions and answers
  • Will this bid go to multiple bidders or just one award?

    This will likely be awarded by line item; however, this will be determined at the time of award. SORTA may choose to award by line item or one contract for all items.

Plain text

OpenGov categories

  • 336390 · Other Motor Vehicle Parts Manufacturing
  • 423120 · Motor Vehicle Supplies and New Parts Merchant Wholesalers
  • 423610 · Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers
  • 441310 · Automotive Parts and Accessories Stores