Skip to content
← Back to search

State and local · OpenGov

OpportunityawardPending

Steel Sign Post and Hardware

Description

General Work Washington County Land Use and Transportation Operations Maintenance Division is requesting price quotes for Steel Sign Posts and Hardware. This will be a 3-year, $200,000.00 contract with a renewable option up to 5-years. Escalation/De-Escalation language will be included in the contract in case the supplier cannot hold their price for the length of the contract. Quantities will vary depending on work program and scheduled activities. All freight is to be prepaid (Washington County will not pay freight). FOB will be destination, 1400 SW Walnut St. Hillsboro, OR. Materials must be received no later than 10 business days after an order is placed. Washington County reserves the right to cancel an order at no cost to the County if an order is not on site after 10 business days. This will be an award all contract, meaning that only one contract will be awarded to the low supplier who provides quotes on all listed items. Two (2) inch x Two (2) inch x Ten (10) foot Perforated Steel Sign Posts. Two (2) inch x Two (2) inch x Twelve (12) foot Perforated Steel Sign Posts. 2-1/4" x 2-1/4" x thirty-six (36) inch Perforated Steel Anchor Posts. Steel Anchors shall be on the ODOT QPL. 2-1/2" x 2-1/2" x eighteen (18) inch Perforated Steel Sleeve Posts. 3/8" x 7/16" Steel Drive Rivets with plastic washers. Preferred rivet manufacturer is Xcessories Squared, part # XDR 3878-05-Z-B. Other brand manufacturer specifications MUST match Xcessries Squared rivet specificatations. 45 Degree Angle Sign Bracket. Bracket must fit perforated steel post. Surface Mounted Base for 10' and 12' sign posts. Base is 12"x12" with 4 corner holes and has a 6" upright with holes for steel sign posts. Steel sign posts shall be able to slide over the upright and the steel rivet holes will be on all four sides of the upright. Two (2) inch Square Tube Cap 5-1/4" for flat blade with set screws. Must fit over 2" square steel sign post. Ninety (90) Degree Crosspiece 5-1/4" for flat blade with set screws. Ninety (90) Degree Cap 12" Receiver for flat blade with set screws. Cap MUST bolt to inside of steel post. Ninety (90) Degree Crosspiece 12" for flat blade with set screws. 3/4" x 100' x .30 Stainless Steel Banding, Part #C206. Manufacturer: Bandit Stainless Steel Flared Leg Bracket with Bolt, Part #D021. Manufacturer: Bandit Stainless Steel Straight Leg Bracket with Bolt, Part #D001. Manufacturer: Bandit 3/4" Buckle, Part #C256. Manufacturer: Bandit Project Details General Specifications The steel posts, anchors, and sleeves furnished on this bid shall conform to the following: A. The cross section shall be square tube formed of twelve (12) gauge (0.105" U.S.S Gauge) steel, rolled and welded in the corner. B. The furnished members shall be straight and shall have smooth uniform finish. C. It shall be possible to telescope consecutive size tubes freely with minimum amount of play. D. All holes and cut-off ends shall be free from burrs. E. The length of the posts, sleeves, and anchors shall be specified on the bid list with a length tolerance of +1/4". F. All posts, sleeves, and anchors shall have 7/16" holes on all sides on one-inch (1") spaces. G. All posts, sleeves, and anchors shall be hot dipped galvanized, 1.25 ounces coating conforming to ASTM specifications A-653. Steel posts shall have a minimum yield stress of 50 KSI. H. The corner welds shall be zinc coated after scarfing. I. Cutting oil shall be removed from all steel signposts, sleeves, and anchors. J. The posts, sleeves, and anchors shall be banded in bundles of twenty-five (25) for shipment. K. All steel perforated sign posts must have Federal Highway Administration (FHWA) approval. L. Steel must be made in the U.S.A and shipment must be accompanied by manufacturers certification that steel perforated signposts have been manufactured and treated to required specifications. M. Bidder must specify manufacturer of steel perforated signposts. Itemized Quantities For each item there is an estimated annual quantity for bidding purposes only. The County is not restricted to or limited by the estimated quantities listed. Approximate quantity does not constitute an order, but only implies the probable quantity the County may order. The actual needs of the County in terms of variety and quantity may vary from that indicated in the sample listings. Items and quantities are given for the purpose of comparing bids on a uniform basis and giving the bidder an approximate idea of usage by the County. Some items listed for quotes are by the manufacturer and must be provided by that manufacturer. Washington County will not accept alternates for those specific items. Freight A. No freight will be charged on any order. B. Prices bid shall be F.O.B destination and delivered to Washington County Land Use and Transportation Operations Division, Walnut Street Operations yard, 1400 SW Walnut St, Hillsboro, OR 97123. C. Delivery of steel posts must be on a flatbed trailer or flatbed truck. D. Delivery shall be within ten (10) business days after confirmation of County order. Price Adjustments & Escalation / De-Escalation Revised Published Price Lists will be used as a means of price increases. However, all bids are to be firm for a period of 180 calendar days after the bid closing date and Revised Price Lists will not be accepted by the County until after that date. Revised Published Price Lists will be accepted only in the event of an industry-wide price change, as evidenced by the issuance of revised price lists by the manufacturer. Price adjustments will not be made for changes in freight. Price increases will not become effective until revised list(s) are submitted to the County Contract Administrator under Contractor's cover letter identifying the applicable requirements contract number. Contractor cover letter and pricing list(s) must be dated, signed and submitted at least thirty (30) days prior to the date the increase becomes effective. The County reserves the right to accept or reject any proposed changes in prices or discounts. If the price changes are accepted, they shall become effective upon completion of the contract amendment process. If price increases are necessary, the County must receive the same or better percentage discount from list as was reflected in the original bid prices. All price decreases and store specials shall be passed through in total to the County on the effective date of the price decrease. The County reserves the right to determine the acceptability of price verification documentation. Increases shall apply to orders issued on or after the effective date of the increase request once approved by the County. In the event of price increases(s), the County reserves the right to audit Contractor's books and records relating to cost or pricing data. Introduction Summary Background Contact Information Timeline Washington County reserves the right to modify this timeline at the County’s discretion without notice. Legal Advertisement WASHINGTON COUNTY, OREGON INVITATION TO BID No. 2026.098-ITQ Steel Sign Post and Hardware The Quote documents will be available at www.WashCoPurch.com/biz Respondents are responsible for checking the site for any addenda to the quote documents before submitting their quotes to the site. Quotes are due no later than 2:00 pm on Thursday, November 12, 2026 ; the system does not allow for late submissions. Quotes must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120(1)(b). The County may reject any quote not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all quotes upon a finding of the County it is in the public interest to do so. Washington County reserves the right to reject any and all bids and to waive any and all informalities in the best interest of the County. Respondents are solely responsible for ensuring receipt of their quote by the Procurement Division. Respondents must conform to the requirements of these quote documents and all related, applicable laws. The County does not intend to pre-qualify any respondents for this project. All quotes submitted for this project will be considered provided that they meet the criteria set forth in the quote documents with respect to submission in a timely manner, bonding, and all other applicable requirements. Dated this Thursday, October 22, 2026 Danielle Howard Procurement Analyst II (503) 846-8757 Posted to: Thursday, October 22, 2026 Oregon Buys Pricing Table All items must have a price or percentage in order to be seen as responsive. The County considers a line marked as $0 to be the price quoted for that line item. Instruction to Bidders for Quotes Deadline Disclaimer It is the responsibility of the responder to upload and submit their electronic response before the deadline date and time approaches as posted on the County's Procurement Portal. Allow for a sufficient amount of time for the bid entry/document upload process in order to ensure timely submission. Make sure that all documents are uploaded as soon as possible well in advance of the deadline. The County's Procurement Portal will close promptly at the deadline date and time. All responses must be submitted, not in process, by that time…no exceptions are allowed. Please note the system will accept Google Docs or Google Pages, but they are not readable by the County. DO NOT upload your response using a Google product. Public Bid Opening A Public Bid Opening is not required for purchases under $250,000. Rights of the County The County expressly reserves the following rights: To waive any irregularities in the quotes submitted. To base awards with due regard to price, delivery, compliance with specifications, and other such factors as may be necessary and in the public interest in the circumstances. To make awards to any respondent whose quote, in the opinion of management and the Board, is the lowest responsible quote. To cancel the procurement or reject any or all quotes, or selected portions thereof, in accordance with ORS 279B.100. Under no circumstances shall the County be responsible for, nor shall it reimburse, any costs associated providing a bid for this solicitation. To negotiate final contract terms and conditions to the fullest extent allowed by the law and as in the best interests of the County. Acceptance of an offer is subject to budget approval and budgetary constraints as determined by the County. Expectations of Responder If this solicitation requires response on all items, failure to do so will disqualify the quote. If quoting on all items is not required, responders should check the No Bid box for any item on which no price is submitted. To examine all specifications, instructions, terms and conditions thoroughly. To provide for appropriate insurance as required. To comply with all Federal, State and County laws, ordinances, and rules. Responder will comply fully with specifications as attached for the agreed quote and/or resulting contract, especially where materials and work are involved. To clean up all debris and remove from the site as specified. Upon completion of the resulting contract and/or delivery and installation, to pass a good, free and clear title for goods and services rendered to the County. Such goods and services shall be free of all claims, mechanic’s liens, subcontractor judgments and other encumbrances which might cloud the County’s title to said goods and services. That they have met any and all registration or license requirements where required for contractors as set forth in the Oregon Revised Statutes. To accept any claims, liens and demands to indemnify the County and preserve harmless the County or the property the entire time of equipment installation and/or resulting contract duration. To meet the highest standards prevalent in the industry or business most closely related to the goods or services of this bid. To understand that the successful bidder will be held to all County policies and procedures. Bidder Responsibility Form Questions The Apparent Low Bidder may be sent a link to respond to the Bidder Responsibility Form. Bidder must respond by the due date which shall be no more than 2 business days after the bid due date. Failure to do so will result in the low bidder being found non-responsive. Bidder will complete and submit the Bidder Responsibility Form Questions, signifying electronic signature by the Bidder, that states the qualifications of the firm for accomplishing the specified work with their bid. The Bidder Responsibility Form addresses the following standards of responsibility: Evidence of projects of similar scope undertaken and completed by the bidder for local government agencies within the last five (5) years. Previous project information should include: examples of scope of work similar to this project, the name of the project, the bidder's role on the project (general contractor or subcontractor), the date completed, the project engineer or architect, and the name of the public agency (include the public agency's address, phone number and contact person). To be considered for acceptance a bidder must demonstrate a minimum of three (3) consecutive years' experience in successfully executing work of the types specified. Evidence of a satisfactory record of performance during the last five (5) years; Evidence of sufficient financial, material, equipment, facility and expertise, necessary to meet all contractual responsibilities; Evidence that the key subcontractors, installers and personnel supervisory proposed for this contract are qualified for the type of work specified; and Evidence of a satisfactory record of integrity. A bidder may be determined to lack integrity if the County determines the bidder demonstrates a lack of business ethics such as violation of state environmental laws or false certifications made to an agency. The County may find a bidder non- responsive based on the lack of integrity of any entity having influence or control over the bidder (such as a key employee of the bidder that has the authority to significantly influence the bidder's performance of the Contract or a parent company, predecessor or successor entity). The standards for conduct disqualification under Washington County Procurement Rule 30-145(1)(a) may be used to determine a bidder's integrity. Copies of any letters of recommendation or appreciation from other public agencies of previous improvement projects successfully completed by the bidder would be accepted but are not required. Changes The County, by written order, may make changes in the following areas: Drawings, design, and/or specifications where the product or service is a special order or separate project for the County. The method of shipment or packaging. The place of delivery and installation (if required). If said change(s) increases or decreases the net cost of the product/service, the County and the responder agree to negotiate an equitable adjustment. The contractor shall not make any changes in the specifications or other requirements without the express prior written consent of the County. Any proposed changes shall be presented in writing to County management not less than fourteen (14) calendar days prior to the proposed effective date of said change. The additions of similar or related work or materials or unidentified needs. Record Drawing This record drawing (also referred to as As Builts) has been prepared, in part, based upon information furnished by others. While this information is believed to be reliable, Washington County and its Architects/Engineers assume no responsibility for the accuracy of this record drawing or for any errors or omissions that may have been incorporated into it as a result of incorrect information provided or subsequent changes to the building that were not captured. Those relying on this record document are advised to obtain independent verification of its accuracy. Unit Prices If the bid document includes a schedule of unit prices for labor and materials or other items to establish a cost basis for unforeseen contract changes, Washington County reserves the right to reject, without impairing the balance of the bid, any or all such predetermined unit prices, and negotiate such unit prices during the term of the award. Qualifications of Responders Qualifications may be evaluated when determining award. Responders may be required to produce acceptable personal, business, and credit references and completed examples of previous work of a similar nature. The County reserves the right to investigate references and to consider the past performance of any responder with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, its completion or delivery of services on schedule, and its lawful payment of employees and workers whether or not specifically listed by the responder. Low Tie Quotes Low tie quotes are subject to the Oregon preference contained in ORS 279A.120: “For purposes of awarding a public contract, a contracting agency shall give preference to goods or services that have been manufactured or produced in this state if price, fitness, availability and quality are otherwise equal.” Low tie quotes that remain after application of the statutory Oregon preference shall be awarded according to the following sequence: Preference shall be given to the responder whose principal offices or headquarters are located in Oregon. If a tie still remains after applying (A) above, award shall be made by drawing lots among any tied Oregon responders. Such responders shall be given notice and an opportunity to be present when lots are drawn. If none of the tied responders is located in Oregon, award of the contract shall be made by drawing lots among the tied responders. Contractor's Responsibility It is understood that the specifications and other contract documents do not purport to control the method of performing the work, but only the requirements as to the nature of the completed work. The contractor assumes the entire responsibility for the method of performing the work. Suggestions as to the method included in the contract documents shall be deemed advisory only and the feasibility of such methods or the lack thereof, shall not affect the contractor's liability, or status as an independent contractor under the resulting contract. Employment Standards The contractor agrees that upon request by the County, it shall remove from County premises any of contractor’s employees, subcontractors or agents who, in the reasonable opinion of the County, has been involved in inappropriate conduct; bringing any unauthorized personnel (including their own children) into a County facility; are involved with the unauthorized use of County equipment, or are not qualified to perform the work assigned. Contractor agrees to take immediate and reasonable steps to maintain its provisions of service under the resulting contract in the event of any labor action involving its employees on County premises or elsewhere. Guarantee and Damage Clause Contractor agrees to repair any failures due to inferior workmanship and/or materials without additional expense to the County. Contractor shall be responsible for redecorating, restoring, or otherwise repairing any portion of the County's premises, facilities, or any County owned properties or right-of-ways which are damaged by the contractor and its agents in the case of any work related to its obligation under this contract. Contractor agrees to repair any avoidable damage to existing materials, surfaces and equipment caused during the execution of the work, without additional expense to the County. Public Contracting Statutes This solicitation and the resulting contract are governed by Oregon Law and Washington County Procurement Rules. The provisions

Published attachments
Addenda and notices
Public questions and answers
  • Dear Ms. Howard, We are interested in submitting a quotation for Washington County Solicitation 2026.098-ITQ, Steel Sign Post and Hardware. We reviewed Section 5.5, Bidder Responsibility Form Questions, particularly the requirement for at least three consecutive years of experience successfully performing similar work. We are an established general trading and supply company with commercial business experience and is expanding its participation in government procurement. We intend to serve as the prime contractor, working with an established U.S. manufacturer or authorized distributor experienced in manufacturing and supplying steel signposts and traffic-sign hardware. To ensure that our quotation meets the County's responsibility requirements, we respectfully request clarification on the following: Must the prime contractor independently demonstrate three consecutive years of experience supplying steel sign posts and related hardware? May the County consider a proposed manufacturer's or distributor's relevant manufacturing, supply, and government contract experience when evaluating the prime contractor's responsibility? Would documented commercial supply transactions, supplier agreements, purchase orders, and customer references be acceptable evidence of relevant experience? Is the three-year experience requirement a mandatory minimum qualification, or may the County consider other evidence demonstrating the bidder's capability to perform successfully? If the apparent low bi

    If you are a distributor then past experience as a distributor would be sufficient so long as all other specifications are able to be met. It does not need to be (3) years distributing the same product, but detailed proof of past performance and meeting expectations as a distributor would be required. We do require you supply the name of the manufacturer that you intend to use at the time of quote submission in the vendor questionnaire. The manufacturer's past experience will be taken into account and will require the (3) year minimum.

Plain text