State and local · OpenGov
Steel Structures
Description
GRU is soliciting vendors for the manufacturing and delivery of new steel structures per the Scope of Work/Technical Specifications. GRU would like to enter into a 3 year contract with the awarded vendor. Scope of Work/Technical Specifications Scope This specification covers the requirements to manufacture and deliver new steel structures. The workmanship, design, and material shall be of the highest quality and free of defects. The vendor shall be solely responsible for design, detailing, fabrication and labor necessary to furnish and deliver to GRU of the structures in accordance with this specification. The major items to be furnished as part of this specification are listed below with a reference to the detail drawing for each. The below referenced specifications will also be applicable to this project. QTY DESCRIPTON DRAWING 2 230kV Low Switch Support PKSTLDTL1 5 230kV High Bus Support PKSTLDTL2 1 230kV CCVT Support PKSTLDTL3 3 138kV High Bus Support PKSTLDTL4 2 138kV 45° Low Bus Support PKSTLDTL5 1 138kV Low Bus Support PKSTLDTL6 1 230kV Low Bus Support (3 Phase) PKSTLDTL7 11 230kV Low Bus Support (1 Phase) PKSTLDTL8 1 15kV Tertiary Structure PKSTLDTL9 5 Lightning Mast PKSTLDTL10 2 Ground Mats PKSTLDTL11 Referenced Specifications 33 72 00 TND – Substation Steel Structures 33 71 16.23 TND – Tubular Steel Structures Drawings It is the responsibility of the manufacturer to expeditiously furnish drawings initially, and by resubmitting as needed, to decide and agree on all details. The drawings shall contain information indicating meeting of all requirements of the specifications, but not limited to the following: A drawing to an exact scale showing the location and code marking (piece mark) of each piece in the structure, the location, size, grade, and number of bolts for all connections and the weight of the entire structure and major subassemblies. Drawings showing each individual piece in sufficient detail for shop fabrication including shipping weight. Anchor bolt or stub angle setting plans showing the number, location, projection, and size of all anchor bolts. Manufacturer shall grant GRU the right to use or furnish to other contractors, who may be hired by GRU to participate in installation of the equipment for subsequent work, the drawings made by manufacturer, including design drawings, shop detail drawings, erection drawings and bills of material. All manufacturers’ drawings shall be in AutoCAD version 2024 or earlier. Shipment Parts shall be well packaged with each package and each item clearly identified with the GRU's purchase order number, switch serial number, and the function of the part. All parts shall be shipped at the same time as the switch in order to minimize storage and prevent losses. Packaging shall allow off-loading of structures using a material handler. The manufacturer shall furnish and ship with the structure receipt, handling and storage instructions that must be followed to protect warranties and/or guarantees. All risk of loss including damage during shipment shall remain with the supplier until equipment is received, inspected, and signed for by GRU personnel. The Supplier shall be responsible for delivery of equipment F.O.B. Parker Substation 12301 SW Archer Rd Gainesville, FL 32618 Instructions It is the bidders responsibility to read and understand all instructions in this section. Definitions for Instructions Addendum/Addenda : Written or graphic document(s) issued prior to the Response due date, which make additions, deletions, or revisions to the solicitation or contract documents. Agreement : A written Contract between two or more Parties. “Contract” and “Agreement” are synonymous. Best and Final Offer (BAFO) : The final proposal submitted after competitive negotiations are completed that contains the Responders most favorable terms. Bid : The written response to a Solicitation. Due Date : The date the response is due. Non–Responsive : A response that does not meet the material requirements of the solicitation. Redacted : The censoring of part of a Response. Respondent : An individual or business entity that submits a response to a Solicitation. Response : A written document submitted by a Respondent in reply to Solicitation.. Solicitation : A written document issued by an agency to obtain information or pricing for goods and/or services. May also be referred to as an Invitation to Bid, Request for Proposal, Request for Quotation, or Request for Statement of Qualifications. Work : Activity involving mental or physical effort done in order to achieve a purpose or result requested in the scope. Responsible/Responsive Bidder A responsible bidder has the capability to perform the contract requirements in all respects, including the experience, integrity, reliability, capacity, facilities, equipment, and good credit, which will help assure good faith performance. A bidder’s qualifications may be considered in making an award recommendation. GRU has the right to verify the qualifications of a bidder as GRU deems appropriate either before or after the bid opening. A responsive bidder has submitted a bid which fully conforms in all material aspects to the solicitation’s requirements, as determined solely by GRU. “Material” aspect refers to factors of importance which help to ensure that the bidder will adequately comply with the prerequisites of the solicitation by performing the work in the manner specified, or providing equipment or goods meeting specifications. If GRU determines either that a bidder is not responsible, or the bid submitted is nonresponsive, written notice will be sent by the Purchasing representative to the bidder, setting forth the basis of the finding. The failure of a bidder to promptly supply such information to support their company’s capabilities as may be requested by the Purchasing representative may be grounds for GRU to determine that the bidder is not responsible. Similarly, the failure of a bidder to promptly supply information in connection with an inquiry may be grounds for a determination of non-responsiveness. GRU may, in the exercise of its sole discretion, require a prequalification process in connection with any bid. In such case, a prequalification form is sent to bidders to complete which helps GRU assess the bidder’s qualifications and experience. Bidders are notified whether or not they qualify to participate in the solicitation. The form may also be modified for submittal with the bid response based on the type of goods or services needed. If a prequalification process is not used, GRU may also elect to award the solicitation based on an evaluated process. Notice SOLICITATION FOR: Steel Structures SOLICITATION NO.: ITB 2027-027 CLOSING DATE AND TIME: Monday, November 30, 2026 at 2:00 pm GRU NEEDS: Gainesville Regional Utilities (GRU) is seeking to procure Steel Structures WHERE TO SUBMIT BIDS: Bids shall be submitted online on the OpenGov website prior to the closing date and time. OpenGov can be accessed by the following: https://produrement.opengov.com/signup BID BOND REQUIRED: No Timeline Release Project Date: November 9, 2026 Question Submission Deadline: November 23, 2026, 4:00pm Response Submission Deadline: November 30, 2026, 2:00pm Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2220533384618357?p=qSv7De0sFBHuiXmJee Meeting ID: 222 053 338 461 835 7 Passcode: EG2T2Lk3 ________________________________________ Need help? | System reference Dial in by phone +1 352-554-8008,,659062004# United States, Gainesville Find a local number Phone conference ID: 659 062 004# For organizers: Meeting options | Reset dial-in PIN Intent to Award: December 4, 2026 Questions & Answers Process Questions are to be submitted to the https://procurement.opengov.com/portal/gru/projects/323893 portal no later than Monday, November 23, 2026 at 4:00 pm . Respondents shall submit all inquiries regarding this bid via GRU e-Procurement Portal, located at https://procurement.opengov.com/portal/GRU. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on GRU e-Procurement Portal. Respondents shall click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the respondent to check the website for answers to inquiries. Addenda Notification and Acknowledgement Addenda Notification: Respondents are required to register for an account via GRU e-Procurement Portal hosted by OpenGov. Once the respondent has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda at https://procurement.opengov.com/portal/GRU . Contact Information The contact for this project is Robbin Odowski . Procurement Specialist III can be reached at (352) 393-1209 or odowskirr@gru.com . Solicitation Response Bids may be received up to but no later than 2:00 pm on Monday, November 30, 2026 via GRU e-Procurement Portal located at https://procurement.opengov.com/portal/GRU . GRU e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. Gainesville Regional Utilities strongly recommends completing your response well ahead of the deadline. By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. Responses will be electronically unsealed and publicly opened at the time and place indicated in the Solicitation and will be available for inspection upon notice of award or intended Award, or within thirty (30) calendar days after the opening of Responses, whichever occurs first. Prices may be publicly disclosed on GRU’s eProcurement Portal at the sole discretion of GRU Procurement. The Respondent’s Certification Form must be submitted with the Response. If required, a Bid Bond and other documents must be provided with the Response. If a Bid Bond is required by the Solicitation and not included the response will be deemed non-responsive. A “No-Bid” Response can be submitted for those who choose not to participate in the Solicitation. This designation can be submitted in GRU’s eProcurement Portal: https://procurement.opengov.com/portal/gru/projects/323893 Examination of Solicitation Documents and Work Site Prior to responding to the Solicitation, Respondents are responsible for the following: (a) examining the Solicitation thoroughly, (b) if applicable, visiting the work site to become familiar with local conditions that may affect the cost, progress, performance of furnishing the Work, (c) considering federal, state and local laws and regulations that may impact or affect cost, progress, performance or furnishing of the Work, (d) studying and carefully correlating Respondent’s observations with the Solicitation, and (e) notifying the Procurement Representative of all conflicts, errors or discrepancies in the Solicitation. Respondents are expected to become fully informed as to the requirements of the Specifications and failure to do so will be at their own risk. Respondents cannot expect to secure relief on the plea of error. A Respondent who is aggrieved in connection with the specifications of this Solicitation may protest in writing to GRU Procurement at least seven (7) business days prior to the Response due date. Interpretations and Addenda All questions about the meaning or intent of the Solicitation are to be directed to the Procurement Representative, unless stated otherwise in the Solicitation. Interpretations or clarifications considered necessary in response to such questions will be issued by Addenda sent to all parties recorded as having received the Solicitation. Questions received less than seven (7) business days prior to the Response due date/time may not be answered by the Procurement Representative. Only questions answered by formal written Addenda will be binding. Addenda may also be issued to modify the Solicitation as deemed advisable by the Procurement Representative. Addenda issued by GRU prior to the Solicitation due date/time are considered binding as if written into the original Solicitation. Respondents are responsible for ensuring that all addenda have been received prior to submitting their Response. Response Preparation The Pricing Response Form is included in the Solicitation and should be used to submit pricing information, providing a price for all items listed on the form, unless noted otherwise. The Respondent’s Certification Form must be legibly completed in ink (computer printed, typed or handwritten). A Response submitted by a corporation must be executed in the corporate name by the president, a vice-president, or other corporate representative and accompanied by a document showing authorization of such person’s authority. Include the physical address and state of incorporation. A Response submitted by a partnership must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the physical address of the partnership must be shown below the signature. The names of individuals included on the Respondent’s Certification Form must be legibly printed below signatures (computer printed, typed or handwritten). Respondent must acknowledge receipt of all addenda using the space provided on the Respondent’s Certification Form. Costs for developing a response to the Solicitation are the sole obligation of the Respondent. Price The price stated on the Pricing Response Form is firm. Any additional charges that were not included in the Response will not be paid by GRU unless approved in writing by an authorized GRU representative. Subsequent to contract formation, pricing inconsistencies on invoices may be grounds to cancel the contract. If the Respondent offers discounted pricing, such as prompt payment discounts or volume discounts, it must be clearly stated and explained on the Pricing Response Form. Such discounts, if applicable, will not be used in determining award of the Solicitation. Deviations from Specifications Any deviation from this Solicitation must be provided and explained in detail with the Response. Deviations must be explained on a separate page labeled “Exceptions and Clarifications” and included with the Response. Each exception and clarification must correspond to the specific referenced section in the Solicitation. Otherwise, the Response will be considered in strict compliance with the Solicitation and the selected Respondent will be held accountable for compliance with the Specifications. GRU reserves the right to waive exceptions and clarifications to the Solicitation if determined by GRU to be in GRU’s best interest. Exceptions and Clarifications While a responsive bid meets all material requirements of the solicitation, GRU may waive non-material requirements. Some requirements cannot be waived without adversely impacting the competitive bid process. If, during bid evaluation, there is any doubt as to the materiality of any exception or clarification, Utilities Procurement and/or the Utilities Attorney shall be consulted before acceptance of a bid. Similarly, a bid will not be rejected without such consultation. Distribution of Information GRU requires electronic submission of bids and proposals. Submit electronic responses via GRU e-Procurement Portal: https://procurement.opengov.com/portal/GRU . By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. The OpenGov portal allows the following: Access procurement documents and related information. Receive automatic and instant notifications of government opportunities. Download solicitation documents and specifications online. Submit your bids and proposals online. See all the forms and documents you need to complete in one place. Receive and respond to government requests for quotes immediately. Automatic notification of awards. For more information about OpenGov, visit https://procurement.opengov.com . Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda at https://procurement.opengov.com/portal/GRU . Vendor failure to retrieve available, required procurement information and include the appropriate documentation and information in solicitation responses may result in disqualification. Cancellation of Solicitation Procurement may determine, at its sole discretion, that it is in GRU's best interest to cancel a solicitation before the bid due date, either for the purpose of reissuing the solicitation or because there is no longer the need for the equipment, materials or services. Any responses to the solicitation received by Procurement will not be opened but will be maintained pursuant to the State of Florida’s Records Retention Schedules, as may be modified from time to time. Modification or Withdrawal of a Response Changes to a vendor’s bid submittals in GRU's eProcurement Portal can be made up to the deadline date for the bid submittal. After responses have been opened, corrections to the response are permitted only to the extent that: Respondent can show by clear and convincing evidence that there was a material and substantial mistake in the preparation of its Response; the nature of the mistake is evident; and the intended pricing is evident. Cancellation of Award Cancellation occurs when an issued purchase order or executed contract is voided, rescinded or terminated, or the delivered goods or work are rejected. If defective goods are received, an order is incorrect, or work is not performed in accordance with specifications, the user department shall contact Procurement before taking any action. In addition, departments must contact Procurement for assistance with canceling any purchase order or contract. Even after a bid has been awarded, Procurement may cancel the award or executed contract based on a bid error and may take action to reject performance when appropriate. If the contract is canceled at the request of the vendor, the vendor may be required to reimburse GRU for the difference between its bid and the next low bid. Terms of Award Award will be made to the lowest, responsive, responsible Respondent with the best lead time. GRU reserves the right to reject any and all Responses, or any part thereof, to waive any and all informalities or irregularities, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Responses. A responsible Respondent and any selected subcontractors, suppliers, other persons, and/or organizations proposed to perform or furnish the Work have the capacity in all respects to fully perform the Contract requirements and the experience, integrity, reliability, capacity, facilities, equipment, and credit to ensure good faith performance, such capacity and responsibility to be determined solely by GRU. GRU may conduct such investigation as GRU deems necessary to establish the responsibility, qualifications and financial ability of Respondent(s), proposed subcontractors, material suppliers, individuals, or entities to perform the Work in accordance with the Contract. Such information may include, but shall not be limited to, current financial statements, bank records, verifications of availability of equipment and personnel and past performance records. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the c
Published attachments
Addenda and notices
Addendum #1 · 1
Per questions 2 and 3, exhibits N and O have been attached. It is the vendor's responsibility to review the questions and answers in order to fully understand the scope of this solicitation.
Public questions and answers
The PKSTLDTL10 structure is out of the scope for the low-profile plant. Would GRU accept a bid for all other items?
Yes, GRU will accept a bid for all other items.
Please provide the PK230PLAN drawing to determine how many wires are going to each static mast.
See attached drawing PKSITEPLAN (Exhibit N). Two of the static masts were not shown the 230kV plan view.
Also are anchor bolts part of the scope of this RFQ? if so can you please provide reference drawings: • PK230FPLAN (Foundation Plan) • PKFDNDTL1 (Foundation Details)
Vendors must include anchor bolts as part of their scope. Drawing PKFDNDTL1 has been attached (Attachment O). The anchor bolt technical details for the lightning mast will be the responsibility of the steel supplier.
Would you have drawings for these items? We cannot tell what is needed by these descriptions
The anchor bolt information is shown on drawing PKFDNDTL1. See question 3 above.
OpenGov categories
- 11171500 · Basic steels
- 11171501 · E24-2 or A37-2 steel
- 11171600 · Stainless steel alloys
- 11171601 · Stainless steel alloy 304
- 11171602 · Stainless steel alloy 304l
- 11171603 · Stainless steel alloy 316
- 11171700 · High speed steels
- 11171701 · Z90WDCV6542 or M2 high speed steel
- 11171702 · Z90WDKCV65542 or M35 high speed steel
- 30241513 · Steel A-frame
- 30263900 · Specialty steel bars
- 31152200 · Non electric iron and steel wire
- 40181800 · Welded steel tubes
- 72152900 · Structural steel erection services
- 95121601 · Steel bridge