State and local · OpenGov
Storrs Hill Lodge Renovation - Carpentry
Description
The City of Lebanon, New Hampshire (the CITY) Recreation, Arts, and Parks Department (the DEPARTMENT), invites qualified contractors (the Contractor) to participate in the renovation of the Storrs Hill Ski Lodge building located at 60 Spring Street, Lebanon, NH. This exciting project will provide: additional conditioned interior gathering and instructional space; new toilet rooms; upgrades to the kitchen, ski-patrol, and office spaces; replacement of exterior decks and entries, and; upgrades to the building mechanical and electrical and communications systems. The CITY is pleased to accept proposals that include donations in kind from Contractors who wish to contribute to the continuing success of Storrs Hill's community sponsored ski programs, including: free public ski program that has resulted in record attendance in recent years; ski and ride lessons that have afforded the opportunity for thousands of kids from all over the Upper Valley to learn to ski inexpensively and properly, guided by hundreds of volunteers; ski race and ski jumping programs that serve youth and high school teams. Epilog Building Services is currently offering project management services at a discount rate, and two other vendors have indicated an interest in making a donation of in-kind services. This specific Request for Proposals (RFP) solicits qualified CONTRACTORs to offer proposals for completing the required carpentry for the project. If a CONTRACTOR does not have in house resources to complete all of the required work, the CONTRACTOR may subcontract with another contractor who can provided the required work, but the prime CONTRACTOR must be responsible in every way for the work of the subcontractor. The Contract will be with the prime CONCTRACTOR. Carpentry Pricing Demolition Rough Framing Insulation Instalation Finishes Doors / Windows Exterior Bidder Information Please Provide: • Name of Bidder: • Authorized Representative's Name: • Authorized Representative's Title: • When Incorporated • Where Incorporated • Corporate Main Office Address: Scope of Work Summary The carpentry contractor (Contractor) shall be responsible for: Demolition of walls, doors, windows, siding, and other elements of the existing structure as called for in the plans and as required to enable new features to be constructed. Demo of interior concrete slab and patching of same to enable the installation of new sub-slab plumbing by the CITY’s MEP (mechanical, electrical, and plumbing) contractor. Construction of new walls. Coordination with the CITY’s insulation contractor. Installation and finishing of new drywall. Installation of new doors and windows. Installation of new trims and millwork. Coordination with the CITY’s painting contractor. Repairs of exterior siding and trims. Repairs and upgrade of exterior wood deck. The scope of work is more fully detailed in the plans, specifications, and scope of work documents. General Supply all materials needed to accomplish the scope of work described below. Demolition Selected interior walls, doors, stairs, and windows. Damaged exterior siding and trim. Exterior doors and windows. Other elements of the existing structure as called for in the plans and as required to effect repairs and to enable new features to be constructed. Concrete slab areas where new sub-slab plumbing is to be installed. Coordinate with the CITY’s mechanical contractor for exact locations and dimensions of trench. Mechanically cut slab and dispose of concrete cuttings. Hand excavate trench. Backfill and compact trench materials. Pour and finish concrete slab patch. Rough Framing Rough frame new walls, stairs, etc. Coordinate with the CITY’s MEP and other contractors for the installation of blocking and the installation of building MEP systems. Install all required blocking. Insulation Installation Coordinate with the CITY’s insulation contractor for the installation of new insulation. Install firestopping materials where required by code and not otherwise installed by others. Finishes and Doors and Windows Install and finish new GWB and required GWB patches throughout the interior. Install new doors and windows. Coordinate with the CITY’s garage door and storefront window contractors for the installation of these elements. Install new trims and cabinetry millwork. Exterior Work Repair or replace damaged exterior trim. Infill windows that are to be deleted. Reinforce/replace exterior wood deck framing as needed. Install new composite decking and trims. Schedule The Contractor will work closely with the CITY’s Project Manager (PM) to develop a construction schedule that leads to the efficient prosecution of the overall project, to include providing for other contractors to complete their work in a sequenced, timely and efficient manner. Once the schedule has been agreed to by the Contractor, the Contractor shall do everything within the Contractor’s ability to keep to the schedule. Any expected delays or schedule changes must be communicated to and coordinate with the PM as soon as such delays or changes become apparent. Trades Coordination The Contractor will communicate and coordinate with all other trades who may need to be performing work either at the same time as the Contractor, or whose work is dependent upon the Contractor finishing or partially finishing the Contractor’s own work. Manufacturer's Technical Information The Contractor shall provide to the CITY one (1) hard copy and one (1) .pdf formatted digital copy of all installation and operating and maintenance manuals for equipment and fixtures installed in the project. Introduction The City of Lebanon reserves the right to reject any and all Bids and to waive any irregularity in Bidding. The successful Bidder will be required to furnish the necessary Bonds and Insurance Certificates. The City will award this project based on the City’s discretion and may or may not include any or all bid alternatives. All work included in this bid is dependent upon the bid amounts and available funding. Actual quantities are subject to change and will be based upon actual field measurements taken during construction. Summary Background Contact Information Timeline Instructions Guidelines All Bids must be submitted through the City of Lebanon eProcurement Portal located at LebanonNH.gov/Bids . The “Bid Proposal” should give a unit price in figures for each item which will yield a total price for each item and must be entered by a company representative authorized to commit the company. It is the policy of the CITY that Contracts be awarded only to responsible CONTRACTORS. In order to qualify as responsible, a prospective CONTRACTOR must meet the following standards as they relate to this request: Have adequate financial resources for performance, or have the ability to obtain such resources, as required during performance; Have the necessary experience, organization, technical and professional qualifications, skills, equipment, and facilities; Be able to comply with the proposed or required time of completion or performance schedule; Have a satisfactory record of performance and documented successful completion of similar projects. Contract Documents and Definitions The Contract Documents that will form the Contract are as defined in the General Conditions. Bidders must examine each of the Contract Documents, visit the location of the work, and inform themselves of the difficulties attending the execution of the work prior to the submission of their Proposals. The successful Contractor shall give attention to the definitions included in the Contract Documents. Terms and Conditions Limitations, Omissions, Discrepancies, Addenda and Revisions This Request for Bids does not commit the CITY to award a contract, to pay any costs incurred in the preparation of a response to this request, or to procure or contract for services or supplies. The CITY reserves the right to accept or reject any or all Bids received as a result of this request, or to cancel in part or in its entirety this Request for Bids, if in the best interest of the CITY to do so. The quantities that will be awarded would depend on final bid pricing and budget limitations. Should a Bidder find discrepancies in or omissions from the Contract Documents or is in doubt as to their meaning, the Bidder should at once notify the Owner. In general, no answer will be given to the prospective Bidders in reply to an oral question if the question involves the equality or use of products or methods other than those specifically designated or described on the Drawings or in the Specifications. All information given to Bidders by means other than set forth in the Contract Documents is given informally and shall not be used as the basis of a claim against the Owner. Omissions, discrepancies, and questions must be submitted via the eProcurement Questions portal by the designated date and time on the timeline. If a question involves the equality or use of products or methods not specifically designated or described on the Drawings or in the Specifications, it must be accompanied by Drawings, Specification, or other data in sufficient detail to enable the Owner to determine the equality or suitability of the product or method. In general, the Owner will neither approve nor disapprove particular products prior to the opening of the bids; such products will generally be considered only when offered by the Contractor for incorporation into the work after the award and signing of the Contract. The Owner will prepare Addenda to address all pertinent questions received and answers shall be provided by the designated date and time on the timeline. Addenda will be sent to each Bidder/Follower who has downloaded the Contract Documents. Bid Date Postponement The Owner reserves the right to postpone the date for presentation and opening of Proposals and will give email notice of such postponement to each prospective Bidder/Follower. Pricing Discrepancies In the event of discrepancies between the price totals quoted in the Bids and the unit price figures, the unit price figures shall control. The price is to include the furnishing of all material, plant, equipment, tools, labor, and other facilities required for the completion of the work except as may be otherwise expressly provided in the Contract Documents. The Contractor shall prepare his prices for the Bids based on the equipment named in the Specifications. After the award of the Contract, if the Contractor desires to use equipment or methods other than those specified or shown in these documents, the Contractor shall submit data to prove equality, submit reason for change, submit the amount of credit (if any) to the Contract Price, provide Owner documentation for any changes required to arrive at a decision as to the suitability of the substitution. Insurance The Contractor shall, at its sole expense, obtain and maintain the following types of insurance, with an insurance company licensed to do business in the State of New Hampshire with a financial rating of A- or better in “Best’s Insurance Guide”, and for the following minimum amounts: Type of Insurance Limits A. Workers’ Compensation Per New Hampshire Statute B. Employer’s Liability Insurance $1,000,000 C. Comprehensive General Liability* $1,000,000 per occurrence / $2,000,000 in the aggregate / $1,000,000 Project Aggregate Comprehensive General Liability Insurance shall include coverage for all claims of personal injury, bodily injury, sickness, disease, or death (including coverage for acts of Consultant’s officials and employees), and broad form property damage (including loss of use resulting therefrom) and for completed operations. D. Comprehensive Automobile Liability* Bodily Injury $1,000,000 per occurrence/ Property Damage $2,000,000 in the aggregate E. *Comprehensive Liability $5,000,000 in the aggregate Umbrella Coverage in the amount of $2,000,000 Prior to the start of Work, the Consultant shall provide Certificates of Insurance to the City showing policy coverage of all of the above types of insurance with the coverage and limits as indicated above and, thereafter, on an annual basis for the duration of this Agreement and also at the termination of the Agreement, as evidence that policies providing the required coverage, conditions and limits are in full force and effect for the required period of time. Such Certificates shall identify this Agreement and contain provisions that coverage will not be cancelled or materially altered until at least thirty (30) days prior written notice has been given to the City. The City, to include its officers, agents, and employees, shall be named as an additional insured on all insurance required under this Agreement except for Professional Liability and Workers' Compensation. Installation Floater Contractor shall provide an installation floater In the amount of the estimated cost of materials necessary to complete the contract. Should include temporary location, job site, and in transit coverage. Payment Schedule Invoices are due and payable monthly by the third Friday of the following month. Invoices are to be for the actual dollar value of the services provided. Unless otherwise stated, payment will be net thirty (30) days after the receipt of a correct invoice for reasonable work allocable to the contract or after date of acceptance of work that meets contract requirements. Arbitration Any controversy arising out of or relating to this Contract or the breach hereof shall be settled by arbitration. The parties shall select an arbitrator. The arbitrator shall adopt appropriate arbitration rules similar to the American Arbitration Association or any other arbitration procedure. The place of arbitration shall be in Lebanon, New Hampshire. The arbitration hearing shall be held within thirty (30) days after the notice of arbitration is delivered by one party to the other party. In the event the parties are unable to agree on an arbitrator, application can be made to the Grafton County Superior Court under RSA Chapter 542. The arbitrator shall have the power to determine the interpretation of any provision of the Contract contained herein. Termination of contract by the City for Cause In the event the CONTRACTOR shall fail to perform as required under this Contract, the CITY shall then give notice to the CONTRACTOR in writing describing the default, the action to cure the default and the time within which the default is to be cured. If the CONTRACTOR does not cure the default within the time prescribed by the CITY, then the CITY shall have the right to terminate this Contract by giving written notice to the CONTRACTOR of the termination and specifying the effective date. In the event of the termination, all finished or unfinished documents, data, programs and reports prepared by the CONTRACTOR shall, at the option of the CITY, become its property. If the contract is terminated by the CITY, the CONTRACTOR will be paid an amount which bears the same ratio to the total compensation as the services covered by the Contract, less payments previously made and less payments made by the CITY to another contractor to complete the Contract Termination of contract by the City for Convenience The CITY may terminate the Contract at any time by giving written notice to the CONTRACTOR of such termination and specifying the effective date thereof, at least fifteen (15) days before the effective date of such termination. In that event, all finished or unfinished documents and materials, at the option of the CITY become its property. If the Contract is terminated by the CITY as provided herein, the CONTRACTOR will be paid an amount which bears the same ratio to the total compensation as the services covered by the Contract, less payments previously made by the CITY. Indemnification To the fullest extent permitted by law, the CONTRACTOR shall indemnify and hold harmless the CITY and its agents or employees, from any kind or character, either direct or indirect, at law or in equity, including but not limited to attorney’s fees, arising out of or resulting from the performance of this Contract, regardless of negligence. None of the foregoing provisions shall deprive the CITY of any action, right or remedy otherwise available to it under law. In the event that the CONTRACTOR is requested but refuses to honor the indemnity obligations hereunder, then the CONTRACTOR shall, in addition to all other obligations, pay to the CITY the cost of bringing any action at law or in equity, including but not limited to attorney’s fees, to enforce this indemnity Contract The Contract between the City of Lebanon and the CONTRACTOR shall consist of (1) the Request for Bids (RFB) and any amendments thereto, and (2) the CONTRACTOR’s bid submitted in response to the RFB. In the event of a conflict in language between the two documents referenced above, the provisions and requirements set forth and referenced in the request for bids shall govern. However, the City of Lebanon reserves the right to clarify any contractual relationship in writing with the concurrence of the CONTRACTOR, and such written clarification shall govern in case of conflict with the applicable requirements stated in the RFB or the CONTRACTOR’S bid. In all other matters not affected by the written clarification, if any, the request for bid shall govern. The CONTRACTOR is cautioned that his bid shall be subject to acceptance without further clarification. Bid Acceptance The Owner reserves the right to reject any or all Bids for any reason, or to accept any Bid which it deems to be in its best interest. Any Bid which is incomplete, obscure, or irregular may be rejected; any Bid having erasures or corrections in the price sheet may be rejected; any Bid which omits a bid on any one or more required items may be rejected; and any Bid accompanied by an insufficient or irregular certified check or Bid Bond may be rejected. The use of unbalanced bids is prohibited. The project description is for illustrative purposes only and does not commit the City of Lebanon to perform the work described or to limit work performed under the terms, conditions, and specifications contained in this document to only those projects described below. The City reserves the right to change project scopes prior to the issuance of Purchase Orders against this Contract. It is the proposer’s responsibility to review and confirm estimated quantities. If the Bidder submits a Proposal before the deadline time for submission, the Bidder may withdraw its submission and modify the original Proposal for submission and re-submit prior to the deadline time. No verbal, telephone, or elelectronic communication methods will be considered. Protest Solicitations and Awards Right to Protest. Any actual or prospective bidder who is allegedly aggrieved in connection with the solicitation or pending award of a contract may protest to the City Manager. Notice. A notice of protest must be submitted no later than 5:00 p.m., on the fifth full business day after posting of the award recommendation. The protest must be in writing and must identify the protesting party and the project number and title and shall include a factual summary of the basis of the protest. The formal written protest shall; identify the protesting party and the solicitation involved; include a clear statement of the grounds on which the protest is based; refer to the statutes, laws, ordinances or other legal authorities which the protesting party deems applicable to such grounds; and specifically request the relief to which the protesting party deems itself entitled by application of such authorities to such grounds. A formal written protest is considered filed with the City when it is received by the Ci