Skip to content
← Back to search

State and local · OpenGov

Opportunitypending

Surface Grinding (Cold Planing) Asphalt Services

Description

The City of Napa (“ City ”) requests proposals (“ Proposals ”) from qualified individuals or firms (individually, a “ Respondent ” and collectively, “ Respondents ”) for Surface Grinding (Cold Planing) Asphalt Services (“ Project ”) by or before Monday, November 16, 2026 , at 4:00 pm , via electronic submission through the procurement portal at https://procurement.opengov.com/portal/cityofnapa , in the manner set forth in the Request for Proposal Procedures. The City of Napa anticipates requiring asphalt grinding services sporadically from March through November, as needed to support its paving operations. The City plans to award up to one (1) multi-year agreement, with a total not-to-exceed (NTE) amount of up to $600,000. Services shall be performed on a task order basis, with no minimum amount of work guaranteed, in support of paving, and other City operations that require asphalt surface grinding services. Mobilization One mobilization/demobilization charge per authorized Task Order. Mobilization/Demobilization includes all labor, equipment transportation, loading, unloading, travel, setup, removal, fuel, and incidental costs required to place the equipment into and out of service for a Task Order. Estimated quantity for evaluation purposes only. Actual quantities may vary. Mobilization/Demobilization Surface Grinder 48" with Operator Daily Rate – Includes one (1) operator and up to eight (8) hours of work. Overtime Rate – Applies to authorized hours worked in excess of eight (8) hours in a workday or to authorized Monday–Friday work performed between 5:00 p.m. and 6:59 a.m., in accordance with Section 2.9. Saturday Differential – Additional per-day charge for authorized Saturday work; applied in addition to the Daily Rate. Sunday Differential – Additional per-day charge for authorized Sunday or City-recognized holiday work; applied in addition to the Daily Rate. Surface Grinder 49" to 60" with Operator Daily Rate – Includes one (1) operator and up to eight (8) hours of work. Overtime Rate – Applies to authorized hours worked in excess of eight (8) hours in a workday or to authorized Monday–Friday work performed between 5:00 p.m. and 6:59 a.m., in accordance with Section 2.9. Saturday Differential – Additional per-day charge for authorized Saturday work; applied in addition to the Daily Rate. Sunday Differential – Additional per-day charge for authorized Sunday or City-recognized holiday work; applied in addition to the Daily Rate. Surface Grinder 61" to 72" with Operator Daily Rate – Includes one (1) operator and up to eight (8) hours of work. Overtime Rate – Applies to authorized hours worked in excess of eight (8) hours in a workday or to authorized Monday–Friday work performed between 5:00 p.m. and 6:59 a.m., in accordance with Section 2.9. Saturday Differential – Additional per-day charge for authorized Saturday work; applied in addition to the Daily Rate. Sunday Differential – Additional per-day charge for authorized Sunday or City-recognized holiday work; applied in addition to the Daily Rate. Surface Grinder 73" to 90" with Operator Daily Rate – Includes one (1) operator and up to eight (8) hours of work. Overtime Rate – Applies to authorized hours worked in excess of eight (8) hours in a workday or to authorized Monday–Friday work performed between 5:00 p.m. and 6:59 a.m., in accordance with Section 2.9. Saturday Differential – Additional per-day charge for authorized Saturday work; applied in addition to the Daily Rate. Sunday Differential – Additional per-day charge for authorized Sunday or City-recognized holiday work; applied in addition to the Daily Rate. DRAFT SCOPE OF WORK General This Scope of Work outlines the requirements for surface grinding (cold planing) contractor(s) to support ongoing in-house paving and roadway maintenance operations performed by City of Napa's Public Works crews. The Contractor shall provide all labor, equipment, and qualified operators necessary to perform asphalt surface grinding in close coordination with City crews and equipment, ensuring safe, efficient, and continuous operations in preparation for paving and related improvements. Other City functions in the Public Works and Utilities Departments may also require surface grinding services. The Utilities Department may utilize these services for pavement removal associated with water and wastewater infrastructure work. These services supplement, and do not replace, work performed by City forces, and are required due to equipment capacity, operational scheduling needs, and the City’s limited grinding capabilities. Description of Work Work includes, but is not limited to: Cold planing (surface grinding/milling) of asphalt concrete pavement to depths specified by the City Full-width, partial-width, and localized grinding for roadway maintenance and rehabilitation Grinding and matching to existing grades, including gutters, cross slopes, and transitions Grinding around utility structures such as manholes, valve boxes, pull boxes, and survey monuments Feathering and tapering at grind limits to provide smooth transitions to adjacent pavement Coordination with City staff and other contractors to maintain continuous and efficient operations Mobilization and demobilization of equipment and operator(s) for each task order Performing work during daytime, nighttime, weekend, or City-recognized holiday hours as required by the City. All work shall be performed in accordance with applicable federal, state, and local regulations, and to the satisfaction of the City. Term Initial Contract Term: The initial contract term is tentatively scheduled to commence upon execution of the contract. The City anticipates that the contract(s) will remain in effect for a period of three (3) years, unless otherwise terminated in accordance with the Agreement. Initial Rates: The rates proposed in the Price Proposal shall apply for first twelve (12) months of the Agreement. Rate Increases: Annual rate adjustments shall be subject to the provisions set forth in Section 2.14. Master Agreement - Task Order Contractor will perform the work specified in this Scope of Services, and shall furnish all labor, materials, equipment, supplies, transportation, and any and all other items or services necessary or incidental to the work set forth in a duly executed Task Order as defined below (collectively, the “Work”), in accordance with the terms and conditions in this Contract (Attachment A - Public Works Construction Template - Task Order), including all attachments to the Contract, and in compliance with all applicable federal, state, and local laws, regulations, codes, ordinances, rules, licenses, and permits (collectively, “Laws”). To the extent that any attachment contains provisions that conflict or are inconsistent with the terms set forth in the body of this Contract, the Contract terms will control. This Contract is a master agreement. City does not guarantee any minimum amount of Work. All Work shall be authorized through a written task order (“Task Order”) issued by City staff. Each Task Order may specify department, location, hours, equipment type, and duration. No Work shall be performed unless authorized by a duly executed Task Order. Task Orders shall be issued only by the City Manager or a properly authorized City designee in accordance with the City Charter, the Napa Municipal Code and applicable City administrative regulations. Required Contractor Capabilities - Surface Grinding Operations The contractor must demonstrate the ability to: Provide and operate cold planing equipment suitable for municipal roadway applications. Perform grinding operations in coordination with City paving crews and separately contracted trucking services. The City will provide trucks and trailers for hauling of grindings. Maintain consistent production rates to support continuous paving operations Operate efficiently and safely in residential streets, collector and arterial roadways, and constrained urban environments Adjust operations for variable site conditions, including utility conflicts and irregular pavement sections Accommodate early morning, evening, or weekend schedules as required Operator Requirements All operators must: Be properly trained and experienced in operating cold planing equipment Have a minimum of two (2) years of experience performing asphalt grinding operations. Be proficient in safely and accurately discharging grindings into City-provided or City-designated hauling vehicles (e.g., Super Tag trucks). Follow directions from City staff (hand signals, radio, or verbal communication) Comply with all site safety protocols and PPE requirements Equipment Requirements All equipment used to perform the Work must: Be in safe, legal operating condition and meet all applicable regulatory requirements Be capable of achieving specified grind depths and surface tolerances Include functioning dust control systems (e.g., water spray) Be equipped with appropriate safety lighting and backup alarms Be maintained to prevent fluid leaks and contamination of the work site The Contractor shall provide cold planers of appropriate size and capability, depending on the task order requirements. Scheduling and Dispatch Work will be requested on a task-order basis. Except for emergency or high-priority work, the City will generally provide a minimum of two (2) business days' notice. Emergency or high-priority work may require shorter notice. Scheduling will be coordinated through the Public Works and Utilities departments (depending on project needs/locations). Working Hours City and Contractor shall coordinate work schedules based on project needs. Hours shall be defined as follows: Hours Work Period When Applicable Compensation Basis Daily Rate Monday through Friday - First 8 Hours Daily Rate Overtime Rate Monday through Friday - Hours worked between 5:00 p.m. and 6:59 a.m. Overtime Hourly Rate for each hour worked Overtime Rate Hours worked in excess of eight (8) hours in a workday Overtime Hourly Rate for each additional hour Saturday Services Saturday 12:00 am – 11:59 pm Daily Rate + Saturday Rate Sunday Services Sunday 12:00 am – 11:59 pm Daily Rate + Sunday Rate C ity-Recognized Holidays City-recognized holidays Daily Rate + Sunday Rate Only one Daily Rate shall apply per equipment unit per workday. Overtime Hours shall be compensated at the applicable Overtime Hourly Rate as specified above. Saturday and Sunday shift differentials shall be added to the applicable Daily Rate and shall not result in an additional Daily Rate. Safety and Compliance Contractor must comply with: All City of Napa safety and operational policies OSHA, DOT, and any applicable state safety regulations City traffic control and work zone safety standards Use of proper PPE at all times Failure to follow safety protocols or directions from City crews may result in immediate removal from the project site and/or possible contract termination. Prevailing Wages All surface grinding services performed under this Agreement are subject to prevailing wage requirements where applicable. Contractors are solely responsible for compliance with all applicable requirements set forth by the California Department of Industrial Relations (DIR). Upon award of a contract under this RFP, Contractor will receive a DIR Project ID number for reporting purposes. Labor Code Compliance . Unless the Contract is for construction work of $25,000 or less or alteration, demolition, or repair work of $15,000 or less, the Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, beginning at § 1720, and the related regulations, including, but not limited to, requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified below. Contractor must also post all job site notices required by Laws pursuant to Labor Code § 1771.4. Prevailing Wages . Each worker performing Work under this Contract that is covered under Labor Code § 1720, 1720.3, or 1720.9, must be paid at a rate not less than the prevailing wage as defined in §§ 1771 and 1774 of the Labor Code. The prevailing wage rates are on file with the City Engineer’s office and are available online at http://www.dir.ca.gov/DLSR. Pursuant to Labor Code § 1775, Contractor and any subcontractor will forfeit to City as a penalty up to $200 for each calendar day, or portion thereof, for each worker paid less than the applicable prevailing wage rate, in addition to paying each worker the difference between the applicable wage rate and the amount actually paid. Working Day . Pursuant to Labor Code § 1810, eight hours of labor consists of a legal day’s work. Pursuant to Labor Code § 1813, Contractor will forfeit to City as a penalty the sum of $25 for each day during which a worker employed by Contractor or any subcontractor is required or permitted to work more than eight hours during any one calendar day, or more than 40 hours per calendar week, unless such workers are paid overtime wages under Labor Code § 1815. All Work must be carried out during regular City working days and hours unless otherwise specified in Exhibit A or authorized in writing by City. Payroll Records . Contractor and its subcontractors must maintain certified payroll records in compliance with Labor Code §§ 1771.4, 1776, and 1812, and all implementing regulations promulgated by the DIR. For each payroll record, Contractor and its subcontractors must certify under penalty of perjury that the information in the record is true and correct, and that it has complied with the requirements of Labor Code §§ 1771, 1811, and 1815. Unless the Contract Price is $25,000 or less, Contractor must electronically submit certified payroll records to the Labor Commissioner as required under Laws. Apprentices . If the Contract Price is $30,000 or more, Contractor must comply with the apprenticeship requirements in Labor Code § 1777.5. DIR Monitoring, Enforcement, and Registration . This Project is subject to compliance monitoring and enforcement by the DIR pursuant to Labor Code § 1725.5, and, subject to the exception set forth below, Contractor and any subcontractors must be registered with the DIR to perform public works projects. The registration requirements of Labor Code § 1725.5 do not apply if the Contract Price is for $25,000 or less. Performance Expectations The contractor is expected to: Provide reliable, on-time grinding services Maintain production rates consistent with project requirements Maintain professional conduct and communication on project sites Assign experienced operators and maintain properly functioning equipment Coordinate effectively with City crews and other contractors Maintain and provide available backup equipment and/or personnel to address breakdowns or delay. Contractors must be able to deploy replacement equipment and/or a qualified operator within two (2) hours of any equipment failure or service interruption. Failure to follow performance expectations may result in immediate removal from the project site and/or possible contract termination. Unsatisfactory Work Unsatisfactory work includes but is not limited to: improper grind depth, uneven surfaces, failure to meet tolerances, equipment breakdowns causing delays, poor coordination with City crews, or failure to maintain safe work conditions. The City, or any representative therein, reserves the right to immediately dismiss any operators not meeting these expectations. If the Contractor's Work is deemed unsatisfactory by City, the City’s Project Manager or an authorized representative will notify the contractor verbally immediately at the project location. Upon being notified of unsatisfactory performance, the contractor shall have two (2) hours to initiate corrective actions. In the event the corrective action plan is not completed as agreed upon, the City has the right to immediately complete the work to its satisfaction, through the use of City employees and equipment, and/or engage the use of alternative vendors to complete the services. The City shall follow up in writing within two (2) business days of the noted discrepancy, which resulted in unsatisfactory work. Contractor shall be responsible for damages caused by the Contractor or its employees and shall remain subject to all remedies available under the Agreement, including any applicable liquidated damages provisions contained in Attachment A. The City may reject payment for nonconforming Work and pursue any remedies available under the Agreement. Rates, Compensation and Invoicing Compensation will be at agreed upon daily rates as the default basis of payment, unless otherwise specified (see Price Proposal). Daily rates shall include labor, equipment, fuel, insurance, bonds, and all other associated costs in providing the Work, except where compensation is expressly provided as a separate line item in the Price Proposal. Invoices must include: Date and location of work Task Order number Project Location Code (PL Code) Description of work performed (including area and depth if applicable) Equipment used (size) Invoices shall be submitted by project area, as identified in the applicable Task Order, or monthly, whichever period is shorter. Year-end Close-out: Services performed June 1st through June 30th must be billed by July 15th. Mobilization/Demobilization . Contractor shall be entitled to one (1) mobilization/demobilization payment for each authorized Task Order. Mobilization/Demobilization shall include all labor, equipment transportation, loading, unloading, travel, setup, removal, fuel, and all incidental costs necessary to transport equipment to and from the project site and place it into and out of service for the Work. Multiple work locations authorized under the same Task Order shall not be entitled to additional mobilization payments unless expressly authorized in writing by the City. If the Contractor leaves the project and later remobilizes for reasons within its control, no additional mobilization payment shall be made unless expressly authorized in writing by the City. A Task Order may include one or more work locations under a single written authorization. The City reserves the right to combine multiple work locations into a single Task Order, and no additional mobilization payment shall be due solely because the Task Order includes multiple work locations. Annual Rate Increase . Contractor may request an increase in the rates set forth above, on an annual basis, beginning on the first anniversary of the “Effective Date” of the Agreement and each anniversary thereafter during the term of the Agreement. Rates may be increased by the percentage equal to the rate of increase in the Consumer Price Index for the San Francisco – Oakland area as published by the Bureau of Labor Statistics for the year immediately preceding, with City’s prior written approval. Contractor would be required to provide City with at least 60 days' advance written notice of a proposed increase. Only one (1) request may be granted per calendar year, not to exceed three (3) percent. The requested increase would only be effective 30 days after being approved in writing by the City. Bonds (A) Payment and Performance Bonds . Upon award, Contractor shall provide City with a payment bond and a performance bond, each for at least 100% of the awarded Contract amount, using the bond forms (Attachments E-F), and submit the bonds with the executed Contract. Each bond must be issued by a surety admitted in California. If an issuing surety cancels a bond or becomes insolvent, Contractor must provide a substitute bond from a surety acceptable to City, within seven days following writt

Plain text

OpenGov categories

  • 91327 · Construction, Highway and Road
  • 91350 · Construction, Street (Major and Residential)(Includes Reconstruction)
  • 91371 · Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
  • 91384 · Maintenance and Repair, Street (Major and Residential)
  • 91396 · Paving/Resurfacing, Street (Major and Residential)