Description

The City of Hollywood Department of Public Utilities is seeking qualified contractors for the Stormwater Pump Station No. 2 (SW-2) Bypass Pumping & Rehabilitation project (Project No. 25-11070) located along South 8th Avenue and North Southlake Drive . The primary objective of this project is to execute comprehensive structural rehabilitation, pump well modifications, and site infrastructure upgrades to modernize and restore full operational performance to the SW-2 stormwater pumping facility . To maintain essential uninterrupted stormwater service during construction, Phase 1 requires the contractor to establish and operate a fully automated, 20,000 GPM bypass pumping system utilizing MWI hydraulic pumps, temporary discharge piping over the seawall, concrete equipment pads, and security fencing . Once the bypass system is proven operational for one week, Phase 2 structural rehabilitation will commence . Scope for this phase includes demolition of existing pump well top slabs and apparatus, pouring a new reinforced concrete top slab, executing localized CMU wall and concrete spall/crack structural repairs, and installing new pumping equipment and control drive units . The final phase involves full site restoration, including removing all temporary bypass piping and equipment, restoring affected asphalt pavement, concrete sidewalks, and sodded areas, and ensuring all drainage structures and outfalls meet municipal standards . Qualified vendors with strong expertise in municipal utility infrastructure, temporary flow bypass management, and heavy structural concrete restoration are invited to submit bids . SCOPE OF WORK/SERVICES Project Description The City of Hollywood Department of Public Utilities is soliciting bids for the Pump Station SW-2 Bypass Pumping & Rehabilitation project (City Project No. 25-11070), located at South 8th Avenue and North Southlake Drive . The initiative involves executing a three-phase rehabilitation to modernize and restore the structural integrity of the stormwater pumping facility . Phase 1 (Bypass Operations): Install and operate a 20,000 GPM temporary bypass pumping system with automated monitoring to maintain uninterrupted stormwater drainage . Phase 2 (Structural Rehabilitation): Demolish existing pump well top slabs and apparatus, cast a new reinforced concrete slab, repair concrete spalls and CMU walls, and install new pumping equipment and drive units . Phase 3 (Site Restoration): Remove temporary bypass piping, demobilize equipment, and restore affected pavement, sidewalks, and sodded areas to municipal standards . Technical Specifications Refer to Attachment D - Technical_Specs Contractor Qualifications To be considered for the Pump Station SW-2 Bypass Pumping & Rehabilitation project, bidding contractors must satisfy the following minimum qualifications and licensing requirements: Licensing: Must hold an active Florida General Contractor License and Florida Underground Utility or Excavation Contractor License in good standing . Demonstrated Experience: Minimum of 5 years of experience in heavy civil construction, municipal stormwater management, and structural concrete rehabilitation . Similar Project History: Successfully completed at least 3 projects of similar scope within the past 5 years involving heavy structural concrete restoration, pump station infrastructure, and coastal stormwater facilities . Bypass Pumping Expertise: Proven technical capacity and track record in executing high-capacity temporary flow bypass systems with automated monitoring and 24/7 emergency response protocols . Municipal Right-of-Way Work: Demonstrated experience managing traffic control (MOT), public utility coordination, and pavement/site restoration within municipal right-of-ways . Deliverable and Objectives Core Objectives Modernize Infrastructure: Upgrade and rehabilitate Pump Station SW-2 to ensure long-term operational reliability and structural integrity for critical coastal flood mitigation . Maintain Uninterrupted Drainage: Ensure continuous, 24/7 stormwater service and flood protection throughout all construction phases . Ensure Regulatory & Municipal Compliance: Execute all work strictly in accordance with City of Hollywood, FDOT, and Florida Building Code standards . Key Project Deliverables Phase 1: Temporary Flow Bypass System Installation and operation of a 20,000 GPM noise-compliant bypass pumping system with MWI hydraulic pumps, dual discharge piping over the seawall, concrete equipment pads, and temporary security fencing . 24/7 automated monitoring system and continuous operation for a minimum 7-day demonstration period prior to starting demolition . Phase 2: Pump Station Structural Rehabilitation Demolition of existing pump well top slabs, masonry walls, and obsolete mechanical apparatus . Form, pour, and cure a new reinforced concrete top slab designed to specified structural load requirements . Structural masonry repair, CMU cell regrouting, and concrete spall/crack restoration using polymer-modified repair mortars . Installation of new pump equipment, drive units, and associated mechanical connections . Phase 3: Site & Right-of-Way Restoration Complete removal and demobilization of temporary bypass pumps, piping, and concrete pads . Asphalt roadway mill and resurface (354 S.Y.) and sidewalk restoration . Installation of new drainage structures (5' and 6' diameter manholes), 30" and 48" storm sewer piping, and pipe plugs . Complete sod restoration (475 S.Y. Argentine Bahia) and final project closeout submittals . Project Schedule / Timeline The overall contract duration for the Pump Station SW-2 Bypass Pumping & Rehabilitation project is 240 calendar days from the official Notice to Proceed (NTP) . Key milestone timelines are structured as follows: Substantial Completion (210 Days): All Phase 1 bypass operations, Phase 2 structural rehabilitation, pump well modifications, concrete top slab casting, and mechanical equipment installations must be fully completed, operational, and accepted within 210 calendar days from NTP . Final Completion (240 Days): Complete demobilization, removal of temporary bypass piping, final site, sidewalk, and pavement restoration, testing certifications, and closeout submittals must be finalized within 240 calendar days from NTP . Questions Refer to Form 15, Information Required from Bidders. SUMMARY Summary Background Contact Information Timeline INTRODUCTION Purpose The City of Hollywood, Florida (City) is seeking bids from qualified and experienced contractors, hereinafter referred to as the Contractor or Bidder, to Stormwater Pump Station No. 2 (SW-2) Bypass Pumping & Rehabilitation project (Project No. 25-11070A) located along South 8th Avenue and North Southlake Drive. The primary objective of this project is to execute comprehensive structural rehabilitation, pump well modifications, and site infrastructure upgrades to modernize and restore full operational performance to the SW-2 stormwater pumping facility for the City, in accordance with the terms, conditions, and specifications contained in this solicitation. Responses to this solicitation are due by Thursday, December 3, 2026 , by 3:00 pm , and will be opened in a virtual public setting on December 3, 2026, at 3:00 PM EST . Submittals shall be received electronically through OpenGov, the City's eProcurement Portal ("Portal"). Submittals shall be considered a bid on the part of the bidder, which bid shall be deemed accepted upon approval of the City, and in case of default, the City reserves the right to accept or reject any or all bids, to waive irregularities and technicalities, and request new bids The City also reserves the right to award any resulting agreement as it deems will best serve the interests of the city. Submission of a bid shall serve as prima facie evidence that the Bidder has examined this solicitation and is fully aware of all conditions affecting the provision of services and the evaluation criteria and scoring methodology as set forth in this solicitation document. Pre-bid Conference and/or Site Visit (Non-Mandatory) There will be a non- mandatory pre-bid co nference and/or site visit scheduled for this solicitation. It is strongly suggested that all Contractors attend the non-mandatory pre-bid conference and/or site visit to receive information that may be critical to their understanding of this solicitation. Please keep in mind that site visits at other times might not be available. It is the sole responsibility of the Contractor to become familiar with the scope of the City’s requirements prior to submitting a bid. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, equipment, materials, and labor required. OpenGov ("Portal") The City of Hollywood uses OpenGov, the e-Procurement Portal (“Portal”) ( https://procurement.opengov.com/portal/hollywoodfl ) to administer the competitive solicitation process, including but not limited to soliciting bids/proposals, issuing addenda, posting results and issuing notification of an intended decision. The City shall not be responsible for a Bidder's/Proposer’s inability to submit a bid/proposal by the bid/proposal end date and time for any reason, including issues arising from the use of the Portal. Point of Contact For information concerning procedures for responding to this solicitation, contact the Point of Contact within the Office of Procurement Services, Julissa Marcano , Senior Purchasing Agent at jmarcano@hollywoodfl.org or by phone at (954) 710-9956 , or Jean Joinville, Procurement Manager, at jjoinville@hollywoodfl.org or by phone at 954-921-3290. Such contact is to be for clarification purposes only. All questions must be submitted in writing via the Portal by Thursday, November 5, 2026 , by 5:00 pm , in order to receive a timely response. Project Manager: Hugo Davalos , Senior Project Manager , Public Utilities , email: hdavalos@hollywoodfl.org , or by phone: (954) 329-8955 . For information concerning technical specifications, please utilize the question / answer feature provided by OpenGov at https://procurement.opengov.com/portal/hollywoodfl . Questions of a material nature must be received prior to the cut-off date specified in the solicitation schedule. Material changes, if any, to the scope of services or bidding procedures will only be transmitted by written addendum. (See addendum section of the OpenGov site). Bidders please note: No part of your bid can be submitted via FAX. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, and the equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. The questions and answers submitted in OpenGov shall become part of any contract that is created from this solicitation. It is the sole responsibility of the Bidder to ensure that their bid is submitted electronically through the Portal at https://procurement.opengov.com/portal/hollywoodfl Cone of Silence The City of Hollywood City Commission adopted Ordinance No. O-2007-05, which created Section 30.15(F) imposing a Cone of Silence for certain City purchases of goods and Services. The Cone of Silence refers to limits on communications held between vendors and vendor’s representatives and City elected officials, management and staff during the period in which a Formal Solicitation is open. The Ordinance does allow potential vendors or vendor’s representatives to communicate with designated employees for the limited purpose of seeking clarification or additional information. The names and contact information of those employees that may be contacted for clarification or additional information are included in the solicitation. The Cone of Silence does not prohibit a vendor or vendor’s representative from communicating verbally, or in writing with the City Manager, the City Manager’s designee, the City Attorney or the City Attorney’s designee on those procurement items to be considered by the City Commission. The Cone of Silence does not prohibit a vendor or vendor’s representative from making public presentations at a duly noticed pre-bid conference or duly noticed evaluation committee meeting or from communicating with the City Commission during a duly noticed public meeting. The Cone of Silence shall be imposed when a formal competitive solicitation has been issued and shall remain in effect until an award is made, a contract is approved, or the City Commission takes any other action which ends the solicitation. To view the Cone of Silence, go to the City of Hollywood Code of Ordinance online, and view Section 30.15F All communications regarding this bid should be sent in writing to the Procurement and Performance Management Division as identified in this bid. SPECIAL TERM AND CONDITIONS Addenda, Changes, and Interpretations It is the sole responsibility of each contractor to notify the Point of Contact utilizing the question / answer feature provided by OpenGov and request modification or clarification of any ambiguity, conflict, discrepancy, omission or other error discovered in this competitive solicitation. Requests for clarification, modification, interpretation, or changes must be received prior to the Question and Answer (Q & A) Deadline. Requests received after this date may not be addressed. Questions and requests for information that would not materially affect the scope of services to be performed, or the solicitation process will be answered within the question / answer feature provided by OpenGov and shall be for clarification purposes only. Material changes, if any, to the scope of services or the solicitation process will only be transmitted by official written addendum issued by the City and uploaded to OpenGov as a separate addendum to the solicitation. Under no circumstances shall an oral explanation given by any City official, officer, staff, or agent be binding upon the City and should be disregarded. All addenda are a part of the competitive solicitation documents and each firm will be bound by such addenda. It is the responsibility of each to read and comprehend all addenda issued. Dimensions, Quantities and Subsurface Information Dimensions, quantities, and subsurface information supplied by the City are in no way warranted to indicate true amounts or conditions. Bidders/Contractors shall neither plead misunderstanding or deception nor make claims against the City if the actual amounts, conditions, or dimensions do not conform to those stated. Any "Outside" reports made available by the Engineer are neither guaranteed as to accuracy or completeness, nor a part of the Contract Documents. Trench Safety Form The Trench Safety Form included in the Bid Documents must be completed and signed. Noncompliance with this requirement may invalidate the bid. Changes and Alterations Bidder may change or withdraw a Bid at any time prior to Bid submission deadline; however, no oral modifications will be allowed. Modifications shall not be allowed following the Bid deadline. Bidder’s Costs The City shall not be liable for any costs incurred by Bidders in responding to this solicitation. Pricing/Delivery All pricing must include delivery and installation and be quoted FOB: Destination, unless specified otherwise in the #SCOPE OF WORK/SERVICES section. Price Validity Prices provided in this solicitation shall be valid for at least One-Hundred and Twenty (120) days from time of solicitation opening unless otherwise extended and agreed upon by the City and Bidder. No Exclusive Contract Bidder agrees and understands that the contract shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services from another vendor at the City’s sole option. Responsive In order to be considered responsive to the solicitation, the contractor’s bid shall fully conform in all material respects to the solicitation and all of its requirements, including all form and substance. Responsible In order to be considered as a responsible bidder, bidder shall be fully capable to meet all of the requirements of the solicitation and subsequent contract, must possess the full capability, including financial and technical, to perform as contractually required, and must be able to fully document the ability to provide good faith performance. Minimum Qualifications To be eligible for award of a contract in response to this solicitation, the Bidder must demonstrate that they have successfully completed services, as specified in the #SCOPE OF WORK/SERVICES section of this solicitation, are normally and routinely engaged in performing such services, and are properly and legally licensed (if required) to perform such work. Bidder must possess and be able to provide the City with any and all required Federal, State, County and/or municipal licenses, and occupational licenses. Bidder must be able to provide proof of valid licensing for all subcontractors and/or material suppliers hired by the contractor, if requested. In addition, the Bidder must have no conflict of interest with regard to any other work performed by the Bidder for the City. Award of Contract Award may be in the aggregate, or by line Item, or by group, whichever is determined to be in the best interest of the City. Award will be made to the responsive and responsible bidder, quoting the lowest price, for that product/service that will best serve the needs of the City. The Contract will be awarded only to a Bidder, who in the opinion of the Engineer, is fully qualified to undertake the work, quoting the lowest price, for that product/service that will best serve the needs of the City. The City reserves the right before awarding the Contract to require a Bidder to submit such evidence of his qualifications as it may deem necessary and may consider any available evidence of his financial status, technical qualifications, and other qualifications and abilities. The City also reserves the right to accept or reject any or all bids, part of bids, and to waive minor irregularities or variations to specifications contained in bids, and minor irregularities in the bidding process. The City also reserves the right to award the contract on a split order basis, lump sum basis, individual item basis, or such combination as shall best serve the interest of the City. As applicable, the City shall comply with Section 287.05701, Florida Statutes, in not considering or giving preference for an award based on a vendor’s social, political, or ideological interest. The City, in all solicitations or advertisements for purchasing of goods, supplies, materials, equipment and services, will receive consideration from qualified businesses without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. Execution Of Contract The Bidder awarded the Contract shall, within ten days from the date of award, execute all required documents and submit them electronically, complete with valid signatures and seals. A. The Contract B. Performance and Payment Bond C. Evidence of required Insurance D. Proof of authority to execute the Contract E. Proof of authority to execute the Bond on behalf of the Awardee F. List of Subcontractors, estimated Contract Value for each and proof that such subcontractors possess all required Federal, State, County and/or municipality licenses, including but not limited to certified of competency and occupational license The above documents must be furnished, executed and delivered before

Published attachments
Addenda and notices
Public questions and answers
  • what is the budget/engineers estimate?

    Construction Estimate $ 3 Million

  • What is the budget for this project? Is there specific insurance i.e. builder risk? Is there specific wages i.e. Davis Bacon? Does this project’s funding incorporate monies provided by the State of Florida? Such as • Florida grant-funded water/wastewater projects • Projects funded through Florida Department of Environmental Protection (FDEP) programs • State legislative appropriations • State-administered infrastructure grants. If so, please confirm that Florida Statute § 255.0993 Florida's "Buy American" provision is applicable to this project.

    The total budget is $3,000,000. • Insurance Requirements: Refer directly to Section 3.28 Insurance Requirements of your contract or solicitation document for the explicit coverage types (such as Builder's Risk, General Liability, or Workers' Compensation) and limits required for this specific project. • Wages: The project follows State minimum wages. Because federal funding is not involved, the federal Davis-Bacon Act prevailing wage rates do not apply. • Funding & Florida Statute § 255.0993: Because this project does not incorporate any state or federal grants, Florida's "Buy American" provision (Fla. Stat. § 255.0993) is not applicable.

  • Are there any SBEs / DBEs requirements?

    SBE/DBE goals are not required for this solicitation.

  • What are the Liquidated Damages?

    $500 a day per Supplementary Conditions

  • Does the original bid bond need to be mailed prior to the bid opening?

    It can be sent electronically with the BID.

  • Are there any additional city registration or license requirements?

    Licensing: Must hold an active Florida General Contractor License and Florida Underground Utility or Excavation Contractor License in good standing.

  • How many vendor reference forms is required?

    A minimum of three reference forms need to be submitted.

  • Section 4.4- Deliverables and Objectives, Phase 2, calls for installation of new pump equipment, drive units, and associated mechanical equipment. Construction plans sheet S-1.4 calls for a new apparatus to be installed with an arrow to a pumping unit. Is there a written technical specification for the new pumping equipment? Specifically a pumping design point, manufacturer MWI model of pump, or materials of construction?

    No new permanent pumping equipment or drive units are proposed as part of this project. Temporary bypass pumping equipment will be utilized during construction as required to maintain system operation. The reference in Section 4.4 – Deliverables and Objectives, Phase 2, and the callout on Sheet S-1.4 should not be interpreted as requiring the installation of new permanent pumping equipment. The existing pumps will be re-installed after Pump Station Structural Rehab finishes. Sheet S-1.4 has been updated to call out “EXISTING ELECTRICAL MOTORS TO BE REINSTALLED AFTER CONSTRUCTION”.

  • Will the owner consider extending the bid due date due to the Thanksgiving holiday?

    After reviewing the project schedule, we are unable to extend the bid due date at this time.

Plain text

OpenGov categories

  • 33500 · Fertilizers And Soil Conditioners
  • 51500 · Lawn Maintenance Equipment And Accessories (See Class 020 For Agricultural Types)
  • 59500 · Nursery (Plants) Stock, Equipment, And Supplies
  • 65000 · Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
  • 67500 · Pesticides And Chemicals: Agricultural And Industrial
  • 69000 · Power Generation Equipment, Accessories, And Supplies
  • 69100 · Power Transmission Equipment (Electrical, Mechanical, Air And Hydraulic)
  • 79000 · Seed, Sod, Soil, And Inoculants
  • 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
  • 91000 · Building Maintenance, Installation And Repair Services
  • 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
  • 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
  • 91400 · Construction Services, Trade (New Construction)
  • 95900 · Marine Construction And Related Services; Marine Equipment Maintenance And Repair
  • 96800 · Public Works And Related Services
  • 98800 · Roadside, Grounds, Recreational And Park Area Services