Ten Mile Road and Deer Flat Road

Description

In accordance with the plans and specifications, this work shall consist of constructing a roundabout at the intersection of Ten Mile Road and Deer Flat Road. Work includes concrete and asphalt paving; curb and gutter; multi-use pathways; Rectangular Rapid Flashing Beacons (RRFB); school zone flashers; street lighting; stormwater; irrigation; and water line installations. Special Provisions Special Provisions Please refer to the " Attachments " section for Special Provisions and other pertinent supporting documents. Legal Notice Ada County Highway District Invitation to Bid Ten Mile Road and Deer Flat Road Contract Number: CT227-10 Project Number: 321038 GIS Number: IN205-44 Project Location: Kuna, Idaho Only electronically sealed bids will be received by Ada County Highway District (ACHD) until 3:00 pm , Wednesday, November 18, 2026 , at which time they will be publicly opened via Zoom. Be advised that ACHD may have more than one (1) bid opening scheduled for Wednesday, November 18, 2026 , at 3:00 pm . ACHD will conduct the bid openings scheduled for that date and time individually and in an order established solely by ACHD that best suits its business needs. All proposals must be electronically sealed and submitted via ACHD's eProcurement portal https://procurement.opengov.com/portal/achdidaho . Manual/Paper bids will be deemed non-responsive. All electronic bidders must first register on the ACHD eProcurement portal at https://procurement.opengov.com/portal/achdidaho . No fee will be incurred to bid electronically. Bidders will have the option to Subscribe to all ACHD solicitations and receive email notifications. Following the Bid Opening, the Bid Results will be available from the eProcurement Portal . In accordance with the plans and specifications, this work shall consist of constructing a roundabout at the intersection of Ten Mile Road and Deer Flat Road. Work also includes concrete and asphalt paving; curbs and gutters; multi-use pathways; Rectangular Rapid Flashing Beacons (RRFB); school zone flashers; street lighting; stormwater and irrigation; and water line installations. All work involving irrigation and/or bridge work shall be completed no later than March 15, 2027, unless otherwise approved by the irrigation district. All other work shall be completed in its entirety on or before September 3, 2027 . The completion dates are predicated on the intent of ACHD to issue a Notice to Proceed to the Contractor on or about February 1, 2027 . ACHD shall be entitled to liquidated damages of Two Thousand Dollars ($2,000.00) for each calendar day of delay in the completion of the work. A delay on one portion of the project does not justify delays on other portions of the project. The contractor shall be liable for any and all damage charges filed as a result of disruption of irrigation water delivery. Liquidated damage assessments shall be cumulative and concurrent. All questions or requests for clarification regarding this Invitation to Bid, including the content and requirements of the Bid and Contract Documents, must be submitted in writing through the "Question and Answer" section of the ACHD eProcurement Portal and must be submitted no later than 12:00 pm on Friday, November 13, 2026 . Questions submitted by any other method, including manual delivery or email, will not be accepted , nor will questions be accepted after the designated Question and Answer deadline. Bidders are strongly advised to observe the stated deadline for submitting inquiries. To ensure timely receipt of updates, bidders are encouraged to select "Follow" on this Bid within the eProcurement Portal to receive automated email notifications when responses are posted. Notwithstanding such notifications, it remains the sole responsibility of each bidder to monitor the eProcurement Portal for updates and responses regularly. Any interpretation, clarification, or modification of the ITB that may affect its substance will be issued only in writing in the form of an Addendum and will be made available through the eProcurement Portal. It is the bidder's responsibility to review and acknowledge all Addenda before submitting a Bid. A Plan Holders List will be posted on the eProcurement Portal . ACHD has prepared the Invitation to Bid (ITB) including the Plan Sets for the proposed project. These ITB and Plans are available for download at the eProcurement Portal . Except as modified herein, all construction shall conform to the currently adopted Edition of the IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC), and approved supplements, for use in the ACHD rights-of-way. Except as modified herein, any bridge construction shall conform to the currently adopted Edition of State of Idaho STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION, including the current edition of the Supplements and Standard Drawings. Proposals must be accompanied by an original, photocopy, or electronic version, e.g., PDF, FAX, etc., of a certified check, cashier's check, or a bid bond (collectively referred to hereafter as “Bid Security”) issued by a surety authorized to issue such bonds in the State of Idaho, in an amount of ten percent (10%) of the total amount of the proposal submitted. If a photocopy or electronic version of a certified check or cashier's check is provided with the proposal, an original certified check or cashier's check shall be submitted to ACHD within 48 hours of the bid opening. In addition, any Contractor submitting a Certified Check or Cashier's Check for Bid Security will be required to submit within 48 hours of the bid opening a letter from their bonding company stating that it will guarantee bonding for the Bidder, in the event said Bidder is notified via a “Notice of Intent to Award Letter” that it is the apparent low-cost Bidder and may be awarded the contract. Said letter is to be included with the Proposal Form, and shall name the Bidder, project number, and the amount of bonding value being guaranteed. The apparent low-cost responsive Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the contract and supply the necessary insurance documents as prescribed in the ITB. The right is reserved to reject all proposals or reject any proposal not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD. Award of a contract pursuant to this invitation may be delayed, without penalty, for up to sixty (60) calendar days after the date of bid. PROVISION Introduction Summary Background Contact Information Timeline Instructions to Bidders The following Instructions to Bidders are General Requirements that apply to Electronic Procurements. FORMAT The Contract Documents are divided into parts, divisions, and sections in keeping with Industry practice in order to separate categories of subject matter for convenient reference thereto. Generally, there has been no attempt to divide the specification sections into work performed by the various building trades, work by separate subcontractors, or work required for separate facilities in the project. GENERAL DESCRIPTION OF THE PROJECT A general description of the work to be done is contained in the Invitation to Bid (ITB). The scope is indicated on the accompanying drawings and specified in the applicable parts of these Contract Documents. DOCUMENT INTERPRETATION The Contract Documents governing the work proposed herein consist of the drawings and all material bound herewith. Said documents are intended to be compatible and to provide all details reasonably required for the execution of the proposed work. Anyone submitting a proposal shall have thoroughly examined all the Contract Documents. Should there be any doubt as to any meaning or intent of any Contract Document statement or provision, all questions or clarifications must be posted in the Q&A section of the solicitation located at the eProcurement Portal located at https://procurement.opengov.com/portal/achdidaho . All questions or clarifications must be submitted by noon on the Monday prior to the Bid Opening. Any interpretation that may alter or change the Contract Documents will be digitally published, in the form of Addenda, which will be furnished to officially listed Plan Holders via the eProcurement Portal . Bidders shall acknowledge receipt of Addenda as instructed. BIDDER'S UNDERSTANDING Each Bidder must inform their self of the conditions relating to the execution of the work, and it is assumed that the Bidder will adequately inspect the site and become thoroughly familiar with all site conditions and the Contract Documents. Failure to do so will not relieve the successful Bidder of their obligation to enter into a contract and complete the contemplated work in strict accordance with the Contract Documents. It shall be the Bidder's obligation to verify complete satisfaction to all information concerning all site conditions. Ada County Highway District (ACHD) will make available for inspection by prospective Bidders, upon request and prior to the final inquiry deadline, during regular business hours, any information that it may have as to the subsurface conditions and surface topography at the work site. Investigations, if any, conducted by ACHD of subsurface conditions were made for the purpose of study and design and the ACHD does not assume any responsibility whatever with respect to the sufficiency of borings or of the logs of test borings or of other investigations that have been made or of the interpretations made therefrom; and there is no warranty or guarantee, either expressed or implied, that the conditions indicated by such investigations are representative of those existing through-out such area, or any part thereof. Logs of test borings or topographic maps showing a record of the data obtained by ACHD investigations of surface and subsurface conditions that are made available or bound herewith shall not be considered a part of the contract documents; said logs represent only the opinion of the Engineer as to the character of the materials encountered by the Engineer in their investigations and is provided only for the convenience of the Bidders. Information derived from inspection of logs of test borings, or topographic maps, or from drawings showing location of utilities and structures will not in any way relieve the Bidder from any risk or the responsibility to properly examine the site and make such additional investigations as necessary or from properly fulfilling all the terms of the Contract Documents. Each Bidder shall inform their self of, and the Bidder awarded a contract shall comply with, all Federal, State, and local laws, statutes and ordinances relative to the execution of the work. This requirement includes, but is not limited to, applicable regulations concerning minimum wage rates; non-discrimination in the employment of labor; protection of public and employee safety and health; environmental protection; the protection of natural resources; fire protection; burning and non-burning requirements; permits, fees and similar requirements. The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has been given adequate opportunity to get acquainted with the scope of the Work, the conditions imposed upon execution of the Work and to the Bidder’s satisfaction, has resolved any questions regarding any perceived conflicts, ambiguities, errors, and discrepancies contained within the Contract Documents. ACHD has prepared and upon request will provide prospective Bidders with electronic versions of the Contract Documents and Proposal Documents for Submittal including the Design Plan Sets and Specifications for the proposed project in PDF format. The original digital copy of the electronic design data is retained on file at the ACHD. The electronic data is provided for Bidder convenience and information and will not become part of the Contract. No guarantee or warranty is made by ACHD that the electronic design data provided to the Bidder is compatible with any of the systems that are used by the Bidder, is complete, is representative of the actual conditions at the sight of work, or accurately reflects the quantities and character of the actual work required. The furnishing of electronic design data does not relieve the Bidder from risks or of duty to make examination and investigations of the site of work or of other responsibilities as outlined in the Contract Documents including, but not limited to, the General Conditions. DRAWINGS The number of drawings consists of Sixty-Seven (67) Plan Sheets. TYPE OF PROPOSAL Unit Price: When the proposal for the work is to be submitted on a unit price basis, unit price bids will be required for all items of work set forth in the proposal, except those designated to be paid for as a lump sum. IN CASE OF DISCREPANCY BETWEEN UNIT PRICES AND TOTALS, UNIT PRICES WILL PREVAIL. The estimate of quantities of work to be done is tabulated in the Contract Documents and, although stated with as much accuracy as reasonably possible, is approximate only and is established solely for the basis of calculation upon which the award of contract shall be made. Payment to the Contractor will be made on the measurement of work actually performed by the Contractor as specified in the Contract Documents. ACHD reserves the right to increase or decrease the amount of any class of work as may be deemed necessary, unless otherwise specified in the Contract Documents. Lump Sum: When the proposal for the work is to be submitted on a lump sum basis, a single lump sum price shall be submitted in the appropriate place in the Proposal Documents For Submittal. The total amount to be paid the Contractor shall be the amount of the lump sum. PREPARATION OF PROPOSALS All bidders must submit their proposals as electronically sealed bids utilizing the eProcurement Portal located https://procurement.opengov.com/portal/achdidaho . All Contract Documents and Plans are available through the eProcurement Portal . All blanks on the Vendor Questionnaire and Bid Schedule(s) shall be completed, and the Authorized Signature Form electronically signed as provided. If the Bidder is a corporation, the legal name of the corporation shall be set forth, together with the signature of the officer or officers authorized to sign contracts, attested to by the Secretary of the Corporation, and affix corporate seal, on behalf of the corporation. If the Bidder is a partnership, the true name of the firm shall be set forth, together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership. If the signature is by an agent other than an officer of a corporation or a member of a partnership, a notarized power-of-attorney must be on file with the ACHD prior to opening of proposals or submitted with the proposal. Bidders may modify their electronic Proposals at any time prior to the scheduled closing date and time for the receipt of bids. If any document uploaded and submitted to the eProcurement Portal contains omissions, erasures, or alterations, they shall be initialed by an authorized representative of the Bidder. In addition, the Proposal submitted shall not contain additions of any kind, prices uncalled for, or fail to conform to the conditions of the published Invitation to Bid. Late Bids are not allowed through the eProcurement Portal website. ACHD will not accept a late Bid or Proposal, in any format, regardless of cause or circumstance. Bidders are solely responsible to ensure timely submission of their Proposals to ACHD via the eProcurement Portal . All electronic Bids shall be accompanied by the Bid Security and other required documents. If a Cashier’s Check or Certified Check is utilized as the Bid Security, then the Check shall be hand-delivered to or sent to and received by ACHD within 48 hours of the Bid Opening date and time stated in the ITB. The shipping envelope for the Check Bid Security shall be plainly marked with the Project Name, Contract Number, Bid Opening date and time, and state “Bid Security Enclosed”. ACHD assumes no responsibility for failure of any computer or other equipment to deliver all or a portion of the bid or proposal at the time or to the location required by the solicitation. Following the Bid Opening, the Bid Results will be available at the eProcurement Portal . Neither OpenGov nor ACHD warrant that access to and use of the eProcurement Portal will be free from interruptions or free from errors, nor shall OpenGov or ACHD be responsible for any inadvertent disclosure of bid repository information or any unauthorized access to bid repository information by third persons. In the case of known loss of services by OpenGov within two (2) hours prior to the deadline for submission of bids, ACHD will delay the deadline for bid submissions to ensure the ability of potential Bidders to submit bids. If this occurs, instructions will be communicated to known Plan Holders. “OR-EQUAL” ITEMS The Contract, if awarded, will be on the basis of material and equipment specified or described in the Proposal Documents for Submittal without consideration of possible “or- equal” items. Whenever it is specified or described in the Proposal Documents For Submittal that an “or-equal” item of material or equipment may be furnished or used by the Contractor if acceptable to the Resident Engineer, Application for Acceptance will not be considered by the Resident Engineer until after the execution of Contract. STATE AND LOCAL SALES AND USE TAXES State and local sales and use taxes, as required by the laws and statutes of the State and its political subdivisions, shall be paid by the Bidder. Prices quoted in the proposal shall include sales and/or use tax, unless provisions are made in the Contract Documents form to separately itemize such taxes. The Bidder is advised that in accordance with Idaho Code Chapter 15, Title 63, Collection of Taxes from Public Works Contractors, Section 63-1502; that as a condition precedent for the construction of any public works in this state, the Bidder will be required to show proof that they are authorized to do business in the State of Idaho and furnish evidence that they have paid or secured, to the satisfaction of the respective taxing unit, all taxes for which the Bidder and the Bidder property is liable then due or delinquent. Verification that all taxing requirements have been met may be obtained from the State of Idaho, Department of Revenue and Taxation, State Tax Commission, at 700 West State Street, Boise, Idaho 83722. NAMING OF STATUTORILY-REQUIRED SUBCONTRACTORS Pursuant to Idaho Code, Section 67-2310, the Bidder shall be required to include in their proposal the name and address or names and addresses of the subcontractor(s) who shall perform the plumbing, heating, ventilation, and/or air conditioning (HVAC); and/or electrical work under the construction contract in the event the Bidder secures said contract. If the Bidder intends to self-perform the plumbing, HVAC, and/or electrical work, then the Bidder must be licensed by the State of Idaho to perform such work. The Bidder shall demonstrate compliance with this requirement by listing on the Bid Proposal the Bidder’s valid license number for the plumbing, HVAC, and/or electrical work to be performed by the Bidder. Failure to name subcontractors as required shall render any bid submitted by a Bidder unresponsive and void. MODIFICATION OF PROPOSAL In all instances, after having submitted an electronically sealed proposal to ACHD via the eProcurement Portal , a Bidder may only modify their Proposal at any time prior to the scheduled closing date and time for the receipt of bids via the eProcurement Portal . In all instances, Proposal modifications that are not

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Addendum One Please use the See What Changed link to view all the changes made by this addendum. Refer to the attached Addendum One for all revisions.

Public questions and answers
  • The Special Provision reference a geotechnical investigation that has been performed. Can a geotechnical report for the project be provided?

    See Addendum #1.

  • If Seepage beds fail perc test due to rock will blasting be considered a change order or incidental to 202.4.4.A.1 Controlled Blasting?

    Blasting associated with failed perc test due to rock is incidental to 302.4.1.B.1 - Rock Excavation. See Addendum #1

  • BS1 includes (202.4.4.A.1) 450 LF Controlled Blasting. BS2 includes (0202.4.2.D.1) 1 LS Rock Excavation. Please confirm whether or not these 2 items are related. If they are not, are the excavation, import trench backfill, and rock disposal for BS1 Controlled Blasting incidental to the item? Is the blasting for the BS2 Rock Excavation incidental to the item?

    See Addendum #1

  • Please provide additional detail on what this item is for.

    See Addendum #1

  • Class B-2 Pipe Bedding for 12" Diameter Pipe is by the LF. How will the contractor be compensated if the trench ends up being larger than anticipated due to rock or unsuitable material in the excavation? Type "A" Trench Bacfill is measured the same. Can these items be changed to CY or Ton?

    Backfill due to over excavation is incidental to 302.4.1.B.1 - Rock Excavation, Class B-2 Pipe and Type A Trench Backfill was all measured by LF intentionally.

  • Could potential rock excavation needs be clarified or a geotech provided to get a clearer understanding of rock excavation needs? The bid schedule shows 450 LF of controlled blasting for utilities and a lump sum rock excavation item for the water pipe scope but just the seepage beds seem to easily exceed the rock excavation expectations captured in bid items. These are pretty large and deep seepage beds and without knowing how much rock is to be expected or at what depth rock begins, it is impossible to bid these accurately and there will probably be a large variance in bids depending on assumptions made regarding rock excavation.

    Refer to the provided geotechnical report.

  • Is rock sawing an approved method for this item.

    Item 202.4.4.A.1 will be replaced with item 302.4.1.B.1 - Rock Excavation, which allows for both blasting and mechanical (i.e. rock sawing) methods

  • Could existing and proposed elevations for the project shoofly be added to the plans and cad files? The shoofly is installed beyond project limits in the plans/cad files so it is difficult to determine how much excavation/grading will be needed to bring it to grade if existing and proposed grades are unknown.

    The shoofly vertical profiles areas that do not show existing ground was not surveyed. The areas of the shoofly that show existing ground was surveyed.

  • The Special Provision contains a SS25030 Demolish & Remove Building yet the Plans depict this work is held under a sperate contract. The is no bid item for this work. Please confirm this work is not under this project.

    Building Demo will be done on a separate contract.

  • The cross sections in the plans aren't showing dowels between the island curb, the RAB curb, and the curb and gutter next to concrete paving. ACHD Traffic Standards 2026 Sheet TS-1130.06 shows there is tie bar connecting all the curb profiles in the RAB to the concrete paving. Please advise if tie bar is needed or not.

    Tie bars are needed as indicated in ACHD's Standard Drawings.

  • Could the bid date on this project be extended? With multiple days now of Microsoft services being down, it has made coordination with subcontractors very difficult in order to get coverage on job scopes. Some additional time to ensure proper communication and coverage would be appreciated by all bidders.

    Due to ACHD Commission deadlines, project bid date cannot be extended.

  • What is the marking preference for ACHD on speed tables?

    Per manufacturers recommendation or ACHD's Standard Drawings.

  • Please confirm whether the removal of existing asphalt pavement and sidewalk will be paid under Bid Item 201.4.1.C.1

    Sidewalk removal is indicated as item 201.4.1.C.1, Removal of asphalt is included with 202.4.1.A.1

  • Please provide as-built information or separate demolition sheets showing items to be removed. The limits of existing asphalt pavement, sidewalks, and pipe for removal is unclear in the provided plan sheets.

    Demolition sheets are unavailable at this time.

  • All removal items are currently included under a single lump sum Removal of Obstructions item. The extents of removal are not well defined in the plan sheets provided. Please consider providing individual removal items, paid by unit quantity as commonly seen on other ACHD projects to reduce the uncertainty with the current bid schedule and potential for future change orders during construction.

    ACHD will consider this on future projects.

  • Will an alternate traffic control plan with a full closure of Ten Mile Rd, with a signed detour, be allowed for this project?

    ACHD recommends bidding per plan.

  • Item 202.4.5.A.1 – Unsuitable Material Excavation is noted to be paid as plan quantity in the bid schedule. There is no information included for this work in the plans or special provisions. No geotechnical report has been provided. Contractors are not able to accurately price this work without this information, please consider making this a contingency amount item to reduce risk for both ACHD and the Contractor.

    Plan Quantity removed in Addendum #1.

  • Please provide the horizontal and vertical limits anticipated for Item 202.4.4.A.1 Controlled Blasting and 0202.4.2.D.1 Rock Excavation.

    See Addendum #1.