Skip to content
← Back to search
Award NoticeAwarded

TF34 Engine Main Fuel Control Overhaul

DEPT OF DEFENSE · FLEET READINESS CENTER

This notice records an award. Find active opportunities

Award Information

This solicitation resulted in an award to WOODWARD, INC. Loves Park IL 61111 USA for approximately $7,355,448 on December 17, 2024. Similar contracts are typically issued by DEPT OF DEFENSE under 336412 (Aircraft Engine and Engine Parts Manufacturing).

Award Number
N6852025C0004
Award Amount
$7,355,448
Award Date
December 17, 2024
Awardee
WOODWARD, INC. Loves Park IL 61111 USA

Contract Details

Notice ID
N68520
Opportunity Type
Award Notice
Sub-Agency
DEPT OF THE NAVY
Office
FLEET READINESS CENTER
Posted Date
Wednesday, April 23, 2025
Response Deadline
Not specified
PSC Code
J016
Set-Aside
Full & Open Competition
Place of Performance
Loves Park, IL, 61111, USA
Status
Awarded

Description

The Fleet Readiness Center Southeast (FRCSE), located in Jacksonville, FL, is an industrial facility that reworks, repairs, and overhauls various aircraft, engines, and components. The FRCSE does not have the capacity or capability to meet fleet demand requests of Main Fuel Control (MFC) overhauls. The FRCSE therefore requires assistance with the overhaul of these TF34-100A engine components.This is a non-personal services contract. The Government will not exercise any supervision or control over the Contractor and its personnel. The Contractor shall furnish principal tools, equipment, and facilities. All repair, maintenance, and overhauls shall be conducted at the Contractors facility.The Contractor shall perform maintenance, repair, overhauls to include cleanings, inspections, and testing on items/components listed in section 3.2 In Accordance with (IAW) the latest applicable documents. All material utilized to perform overhauls shall be traceable to the source of origin. The Contractor shall comply with all specifications provided in the PWS. No exception or variations will be permitted without prior approval of the Technical Point of Contact (TPOC) and written authorization from the Contracting Officer (KO). The Contractor shall modify all fuel controls with part number 6040T09P01/P01A/P02/P02A received for overhaul to part number 6040T09P02 B performance specifications. If the fuel control data tag is not identified with part number 6040T09P02 B, upon conclusion of overhaul and compliance with requirements of this PWS, the Contractor shall re-identify the data tag with part number 6040T09P02 B. The contractor shall verify fuel controls have a 3082-644-1 part number data tag installed. If a 3082-644 part number data tag is installed, replace with a 3082-644-1 data t

Read full description (1,803 characters)

ag.

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
Brandon Fabricante
Email
gregory.b.fabricante2.civ@us.navy.mil
Loadingchange history…
Loadingrelated notices…