State and local · OpenGov
Traffic Control Products
Description
The County of San Mateo is accepting bids from qualified vendors to provide Traffic Control Products. The vendor must meet the minimum requirements and should include the following: Account representation/point of contact Detailed reporting Response time to inquiries (calls, emails, etc.) of three (3) days preferred For custom products, please provide estimated lead time in the minimum qualifications section 4.2.8 (if applicable). The award shall be made in the form of a contract with a term of three (3) years with option to extend for a total of five (5) years. Items will be ordered on an as needed basis throughout the contract term. The contract will be written in the form of a County of San Mateo Vendor Agreement. This agreement will allow the requesting department to order the items included in the bid directly from the supplier. The County may purchase items directly from the Part Number List or order other items within covered categories using the percentage discounts in the Category List price table. The bidder shall appoint an account representative for the County as a single point of contact in order to ensure a high level of responsiveness to the County’s needs. A backup contact shall also be designated for the purposes of providing coverage during the primary contact’s absence. The successful proposer must be able to supply the County with monthly/quarterly/yearly usage reports as requested to include but not limited to the following: Frequency by department Cost totals per department, per reporting period Grand total of orders The County intends to award a contract to the responsive and responsible bidder offering the best value, evaluated across both the Category List and Part Number List tables. Email Address for Protests: Protest@smcgov.org Category List Please include % off categories below. Traffic Paints, Epoxies, Stencils, & Pavement Markings Signs, Custom Sign Making, & Message Boards Sign Posts, Hardware, Brackets, & Mounts Plastic Traffic Control Devices & Delineators Safety Gear & Apparel Traffic Calming, Barricades & Parking Safety Devices Guardrails & Heavy Infrastructure Equipment Rentals, Maintenance, & Repairs Part Number List This list contains most frequently purchased items. Round Sign Post - 10’, Thick .95”, Galvanized Steel Round Sign Post - 10’, Thin .06”, Galvanized Steel Round Sign Post - 11’, Galvanized Steel Round Sign Post -12’, Galvanized Steel Looper Temporary Traffic Delineator Posts - N/A, Orange, MUTCD Standard Traffic Cone - 18”, Orange/Black, MUTCD Standard Standard Traffic Cone - 28”, Orange/Black, MUTCD Standard Standard Traffic Cone with 1 Reflective Stripe - 36”, Orange/Black, MUTCD Standard Anchor Square Post - 2”x2”, Orange Stake Post - 66”, Fiberglass-reinforced Square Sign Post - 2’x10’, 14 GA, Galvanized Steel Square Sign Post - 2’x12’, 14 GA, Galvanized Steel Surface Mount for Square Post - 2”x2” Clamp-On U Bracket - 12 mm, Steel/Iron, Theft-Proof Bolt with Washer - 5/16”, Stainless Steel Bike Rider Stencil - 48”, Aluminum, MUTCD (1-R) Pavement Button Marker - 4”, Plastic, AY Yellow 4 Reflective Pavement Marker - 4”, Type D, Two-way yellow (amber) Stencil Letter Set - Height 12”, Plastic Stencil Letter Set - Height 18”, Plastic Stencil Letter Set - Height 24”, Plastic Round Center Mount Reflector - 3.25”, Amber Object Type K-1 Marker with No Base - 18”, White with Reflective Yellow Tape, Type K-1 Object Type K-2 Marker with No Base - 21”, White with Reflective Yellow Tape, Type K-2 Object Type K-1 Marker with Base - 18”, White with Reflective Yellow Tape, Type K-1 Object Type K-2 Marker with No Base - 21”, White with Reflective Yellow Tape, Type K-2 Round Flexible Delineator Post with Base – 36”, White Round Flexible Delineator Post with Base – 48”, Orange Traffic Barricade – Wood, Type 1 A-Frame Traffic Barricade – Plastic, Type 1 A-Frame Temporary Traffic Roll Up Signage for Road Work Ahead – 36” x 36”, Vinyl Temporary Traffic Signage for Road Closed Ahead - 36”x36”, Vinyl, Orange Temporary Traffic Signage for Shoulder Work Ahead - 36”x36”, Vinyl, Orange Temporary Traffic Signage for Loose Gravel – 24”x24”, Paper, Orange Temporary Traffic Signage for Detour – 24”x24”, Paper, Orange Traffic Paddle Stop/Slow – 18”x18”, Plastic Impact Recovery Post – 24”, White Inverted Paint Dispensing Temporary Marking Paint – 20 oz, White Inverted Paint Dispensing Temporary Marking Paint – 20 oz, Fluorescent Orange Inverted Paint Dispensing Temporary Marking Paint – 20 oz, Fluorescent Blue Scope of Work Summary of Scope of Work The County of San Mateo is accepting bids from qualified vendors to provide Traffic Control Products. The vendor must meet the minimum requirements and should include the following: Account representation/point of contact Detailed reporting Response time to inquiries (calls, emails, etc.) of three (3) days preferred For custom products, please provide estimated lead time in the minimum qualifications section 4.2.8 (if applicable). The award shall be made in the form of a contract with a term of three (3) years with option to e xtend for a total of five (5) years. Items will be ordered on an as needed basis throughout the contract term. The contract will be written in the form of a County of San Mateo Vendor Agreement. This agreement will allow the requesting department to order the items included in the bid directly from the supplier. The County may purchase items directly from the Part Number List or order other items within covered categories using the percentage discounts in the Category List price table. The bidder shall appoint an account representative for the County as a single point of contact in order to ensure a high level of responsiveness to the County’s needs. A backup contact shall also be designated for the purposes of providing coverage during the primary contact’s absence. The successful proposer must be able to supply the County with monthly/quarterly/yearly usage reports as requested to include but not limited to the following: Frequency by department Cost totals per department, per reporting period Grand total of orders The County intends to award a contract to the responsive and responsible bidder offering the best value, evaluated across both the Category List and Part Number List tables. Email Address for Protests: Protest@smcgov.org Include Shipping and Delivery (if applicable) For sales tax purpose s, the delivery location is in San Mateo County. The exact locations will be shared with the lowest responsible bidder. Bidder shall deliver all products and other related supplies for the County of San Mateo within 14 days after receiving purchase order. I f Bidder cannot deliver all products and other related supplies by required delivery date, submit proposed delivery date for consideration. If this condition and proposed delivery is not met, the equipment will be returned to the vendor at no cost to the County. Introduction Summary Background Contact Information Timeline Price Bid Sheet Bid Submission, Minimum Qualifications, and Local Preference Ordinance County of San Mateo Bid for: Traffic Control Products ( Submit only this Part 3- Bid Documents, including the bid sheet, fully executed, as the bid .) Notice to Bidder Submission Deadline Proposals must be electronically received by 5:00 pm , on Thursday, December 3, 2026 via OpenGov (details below) . Allow sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate and proposals will be rejected. The OpenGov submission time will be the official submission time. The County will not be responsible for and shall not accept proposals that are late due to slow internet connections or for any other failure of the OpenGov system. NOTE: The County does not maintain the OpenGov system and is not liable for site failures or technical problems. To resolve technical issues, contact OpenGov using the chat within the portal or email Vendor Support at procurement-support@opengov.com . Late submission will not be considered. Pre-Submission Registration Organizations or individuals interested in responding to this solicitation must register online with the County of San Mateo at: https://procurement.opengov.com/portal/smcgov It is recommended that organizations complete this registration as soon as possible and subscribe to the County of San Mateo for bid opportunities. The County will not be responsible for and shall not accept proposals that are late due to a failure to register in the OpenGov system. Submission via OpenGov Required Documents: BID SUBMISSION Electronic Submissions Include the proposer name and the IFB title and number in each filename. Submit proposals via the OpenGov website, allowing sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate and bid will be rejected. The OpenGov submission time will be the official submission time. Contact OpenGov with technical questions regarding the site. The County will not be responsible for and may not accept bid that are late due to slow internet connections or for any other failure of the OpenGov system. Late submissions will not be considered. Conflicts between Certain Requirements Prior to the submission deadlines and solely relating to a determination of the timeliness of questions, comments, and proposal submissions, information displayed on the OpenGov site will take precedence in the event of a discrepancy between that information and the information within the solicitation documents. For all other discrepancies, the information in the solicitation documents will take precedence. Errors in Bids The County will not be liable for any errors in bids. Bids may be rejected as unresponsive if they are late, incomplete, missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any remaining IFB requirements. Communications As of the issuance date of this IFB and continuing until it is canceled or an award is made, no proposer or person acting on behalf of a prospective proposer may discuss any matter relating to the IFB with any officer, agent, or employee of the County, other than through OpenGov, to the Authorized Contact Person, or as outlined in the evaluation or protest procedures. Proposers may not agree to pay any consideration to any company or person to influence the award of an Agreement or Purchase Order by the County, nor engage in behavior that may be reasonably construed by the public as having the effect or intent of influencing the award of an Agreement or Purchase Order. Procurement Preference for Local Businesses and Local Non-Profits The County of San Mateo has adopted a Procurement Preference for Local Businesses Ordinance (County Ord. Code Ch. 2.89.) The purpose of this Ordinance is to promote a strong local economy by giving preference to local businesses, local non-profits, local small and micro businesses, and local small and micro non-profits in County procurements, to the extent consistent with the law and interests of the public. The County’s process for applying local preferences to competitive procurements is set forth in County Ordinance Code Section 2.89.030. The Ordinance and exemptions (e.g. the ordinance will be exempt when all bids or proposals received are from Non-Profit Organizations) can be reviewed here: Chapter 2.89 - PROCUREMENT PREFERENCE FOR LOCAL BUSINESSES | Code of Ordinances | San Mateo County, CA | Municode Library The requirements for bidders to establish eligibility for a local preference for this solicitation are detailed below in Section III (Submission Requirements) The Ordinance does not apply if a procurement is determined to be exempt (County Ord. Code sec. 2.89.050), and the County reserves the right to waive application of the Ordinance to this procurement if determined to be in the best interests of the County (County Ord. Code sec. 2.89.060). Evaluation Criteria Bid Evaluation Criteria A Scoring Tabulation will be generated to compile the prices and ranking to determine the awarded bidder. Bids will be evaluated based on the Total Bid Price. All responsive and responsible bidders will be ranked from the lowest to the highest price based on the Total Bid Prices. Award Procedure Notice of Intent to Award Once a decision has been made to award a purchase order or agreement to a bidder, the County will post a Notice of Intent to Award, notifying the remaining bidder of their non-selection. The posting may be inclusion of the recommendation to award as an agenda item on the Board of Supervisors schedule. Protest Procedures Protest of Non-Responsiveness Determination Within five (5) working days of the County's issuance of a notice of non-responsiveness, any firm that has submitted a proposal and believes that the County has incorrectly determined that its proposal is non-responsive may submit a written notice of protest. Such notice of protest must be received by the County on or before the fifth working day following the County's issuance of the notice of non-responsiveness. The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest. Protest of Purchase Order/Agreement Award Within five (5) working days of the County's issuance of a notice of intent to award the PO/agreement, any firm that has submitted a responsive proposal and believes that the County has incorrectly selected another proposer for award may submit a written notice of protest. Such notice of protest must be received by the County on or before the fifth working day after the County's issuance of the notice of intent to award. The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest. Delivery of Protests All protests must be received by the due date. If a protest is mailed, the protestor bears the risk of non-delivery within the deadlines specified herein. Protests should be transmitted by a means that will objectively establish the date the County received the protest. Protests or notice of protests made orally (e.g., by telephone) will not be considered. Protests must be delivered to: Protests@smcgov.org Subject: Traffic Control Products and 2027-IFB-00046 Standard Terms and Conditions COMMENCEMENT OF PERFORMANCE Written Notice Until the County provides written authorization to commence deliveries of the goods and services specified, there is no contractual agreement between the County and the selected bidder. No verbal instructions or promises are binding on the County. Purchase Orders and Task Orders If the contract anticipates multiple Purchase Orders or Task Orders, the relevant scope of work, payment terms, delivery instructions, period of performance, and any unique contractual terms and conditions may be set forth in the Purchase Orders or Task Orders. Estimated Quantities If this solicitation is for an indefinite quantity contract, any estimates of expected use or quantities provided are for bid purposes only. The County does not guarantee any specific number of orders. Levine Act Disclosure The Levine Act (California Government Code Section 84308) imposes certain requirements on parties contracting with the County of San Mateo related to campaign contributions to County “officers,” including elected County officers and candidates seeking elective office, who may participate in making a decision on certain County contracts. Elected County officers in San Mateo County include: the San Mateo County Board of Supervisors, Assessor-County Clerk-Recorder, County Controller, Coroner, District Attorney, Sheriff, and Tax Collector-Treasurer. Generally, under current County policy, approval by the Board of Supervisors is required for any agreement for services above $200,000, and agreements for services below that threshold may be approved by Department heads. If your proposal is selected, you will be required to certify compliance with the Levine Act. As part of this process, you will need to certify and warrant that you have fully complied, and will remain in full compliance, with all applicable requirements of the Levine Act in connection with the Agreement, including making any required disclosures of campaign contributions to County Officers, which includes but may not be limited to elected County Officers. Elected County Officers include members of the San Mateo County Board of Supervisors, as well as the Assessor-County Clerk-Recorder, Controller, Coroner, District Attorney, Sheriff, and Tax Collector-Treasurer. Any campaign contribution required to be disclosed under the Levine Act in connection with this Agreement shall be disclosed on the County of San Mateo Levine Act Disclosure Form, a copy of which is available from the County upon request. Parties are solely responsible for accurate certification and disclosure. The Levine Act is complex, and this brief description is not legal advice. For example, certain contributions must be aggregated when determining whether contributions have exceeded the $500 threshold. If your proposal is selected, you are urged to review the Levine Act and consider consulting an attorney. PAYMENT Compensation The County will pay the quoted prices as full consideration for Contractor’s full, complete and faithful performance of the Contractor’s obligations under the contract. The County does not accept COD shipments. Payment will be by one of the following methods, as indicated in the Contract Documents: Full payment will be made after the County’s acceptance of goods or services and receipt of a complete invoice, as applicable; or Partial payments will be made in accordance with the schedule set forth in the Scope of Work; or Payments will be invoiced monthly by Contractor in arrears, based upon goods or services provided and at the amounts set forth in the payment schedule up to the maximum amount of the contract; or The County may issue Purchase or Task Orders, which will be paid according to the payment schedule attached to the contract or Purchase or Task Order, or on the County’s receipt and acceptance of the goods and services and receipt and acceptance of a complete invoice; or As otherwise agreed to by the parties. Late Payment Charges The County will not be responsible for late payment charges unless they are stated on the Purchase Order or contract. A payment is late only if payment of an invoice exceeds the time allowed by the payment terms of the Purchase Order or contract. Credits Prior to releasing final payment, the County must be reimbursed for any overpayments, advance payments, or other credits due from the Contractor, and the County may deduct these amounts from payments otherwise due Contractor. Conditions Prerequisite to Payment The County may withhold payment under any of the following circumstance: Contractor, with or without knowledge, made a misrepresentation of substantial and material nature with respect to any information furnished to County; Contractor took any action pertaining to this agreement that required County approval, without having first received County approval; Contractor was or is in default under any of the te
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum. Part Number List added IFB Q&A and bid submission date extended
Public questions and answers
Since pricing is a percentage discount off MSRP, how will the County compute the "Total Bid Price" used to rank bids? Is there an estimated annual spend or a market basket by category?
Award(s) will be given to the prospective bidder who can provide the greatest overall percent discount off categories and meet minimum qualifications.
May a bidder price only some of the eight categories (for example, plastic traffic control devices, signs and hardware, and safety gear and apparel) and leave out guardrails, heavy infrastructure, and equipment rental, maintenance and repair? Is each category awarded separately?
Bidders may mark 'No Bid' for categories not offered.
Is the required delivery time frame 3 days ARO or 14 days (2.7)? Is this for standard items and extensions are allowed for specialized items?
Bidder shall deliver all products and other related supplies for the County of San Mateo within 14 days after receiving purchase order. For custom products, please provide estimated lead time in the minimum qualifications section 4.2.8 (if applicable).
If a supplier is currently contracted, and supplies items within these categories is there a need to respond?
This IFB is being issued to establish new contract(s) for Traffic Control related commodity categories specifically. Please submit a response if the supplier wishes to continue supply these items after the current agreement expires.
Hi, Could you please provide a list of commonly purchased items with estimated annual quantities? Also, is there a historical purchasing report or sample order list available? Thank you,
Please see the table "Part Number List" on the Price Bid Sheet tab for a list of common items purchased. Estimated annual quantities not available at this time.
Can you provide examples of products included in each category list? Does the County have specifications on the products they are looking to purchase?
Please see the table "Part Number List" on the Price Bid Sheet tab for a list of common items purchased.
OpenGov categories
- 21000 · Concrete And Metal Products, Culverts, Pilings, Septic Tanks, Accessories And Supplies
- 33500 · Fertilizers And Soil Conditioners
- 51500 · Lawn Maintenance Equipment And Accessories (See Class 020 For Agricultural Types)
- 59500 · Nursery (Plants) Stock, Equipment, And Supplies
- 65000 · Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
- 67500 · Pesticides And Chemicals: Agricultural And Industrial
- 69000 · Power Generation Equipment, Accessories, And Supplies
- 69100 · Power Transmission Equipment (Electrical, Mechanical, Air And Hydraulic)
- 74500 · Road And Highway Building Materials (Asphaltic)
- 75000 · Road And Highway Building Materials (Not Asphaltic)
- 75500 · Road And Highway Asphalt And Concrete Handling And Processing Equipment
- 76000 · Road And Highway Equipment: Earth Handling, Grading, Moving, Packing, Etc.
- 76500 · Road And Highway Equipment (Except Equipment In Classes 755 And 760)
- 77500 · Salt (Sodium Chloride) (See Class 393 For Table Salt)
- 79000 · Seed, Sod, Soil, And Inoculants
- 80100 · Signs, Sign Materials, Sign Making Equipment, And Related Supplies
- 83000 · Tanks (Metal, Plastic, Wood, And Synthetic Materials): Mobile, Portable, Stationary, And Underground Types
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 91000 · Building Maintenance, Installation And Repair Services
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
- 91400 · Construction Services, Trade (New Construction)
- 95900 · Marine Construction And Related Services; Marine Equipment Maintenance And Repair
- 96800 · Public Works And Related Services
- 98800 · Roadside, Grounds, Recreational And Park Area Services