Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Traffic Signal Preemption Equipment (ADOT/federal-funded)

Description

The City of Sierra Vista is requesting bids from qualified Contractors for Traffic Signal Preemption Equipment (ADOT/federal-funded) , 2027-IFB-004-GR285 to be received no later than Tuesday, December 1, 2026 at 10:00 am . All bids received after bid response deadline will not be accepted. Implementation of an Emergency Vehicle Preemption (EVP) system that provides priority for emergency vehicles at 19 signalized intersections within the City of Sierra Vista to improve response times and public safety. The EVP system equipment will be acquired through the City’s procurement process and in alignment with state and federal regulations, and the installation of the EVP system will be carried out by the City’s Public Works Department. No installation services are being requested as part of this Invitations for Bids process. Bid Schedule Quantities listed are estimated and subject to change at time of award based on available funds. The Total of the Bid Schedule must include all applicable delivery, handling, shipping fees and sales tax and reflect the total final price to reflect the requirements of the scope of work and specification reflected in the Invitation for Bids. Detectors: Each detector includes an integrated LED confirmation light. Optical Preemption Detectors are mounted on traffic mast arms to observe the approaches of an intersection. They sense the infrared optical pulses emitted by properly equipped emergency vehicles and inform the traffic control system of the presence of designated vehicles. Emitters: Optical emitters provide emergency vehicle preemption at upcoming traffic signal intersections by emitting infrared optical pulses that are sensed by preemption detectors. Optical Signal Processors (OSP): Installed inside a traffic cabinet that receives infrared light signals from approaching emergency vehicles. It decodes these signals to identify valid vehicles, prioritizes their requests, and sends a preemption or priority request to the traffic controller, which then adjusts the signals to allow valid vehicles to pass safely and quickly. Detector Mounting Brackets Detector Cable: Three (3) conductors shielded and one bare. Assumptions are based upon 1,000 feet per intersection. Equipment Warranty: 10 Years Minimum. A zero-dollar ($0) bid will be accepted as an "Included" cost, not a "No Bid." Shipping/Handling/Delivery Any other applicable fees (upload backup documentation). Sales Tax Scope of Work Emergency Vehicle Preemption (EVP) System Description An Optical Signal Processor (OSP) receives electrical signals sent by an optical preemption emitter to an optical preemption detector. While being received, the signals are processed to determine if the vehicle is a valid emergency vehicle. The OSP is connected directly to the preemption inputs of the traffic controller at the intersection in which it is installed. When a vehicle’s signal is accepted as valid, the OSP sends a preemption request to the proper input of the traffic controller. The traffic controller then safely manipulates the traffic signals according to a pre-programmed algorithm. Depending on where the traffic controller was in its normal cycle, the vehicle will receive a “green light” after a minimum of 3 or more seconds. Traffic signals which are already green will stay green until the vehicle passes. If multiple vehicles are being received, they are prioritized to determine which vehicle should be given the right of way. If vehicles are of equal priority, right of way is given on a first-come, first-served basis. Equipment Specifications The CITY may adjust quantities and purchase additional eligible equipment, materials, or components consistent with the Scope of Work depending on the results of the Invitation for Bids process and available funding. All listed quantities are estimates. Specification Estimated Quantities Detectors: Each detector includes an integrated LED confirmation light. Optical Preemption Detectors are mounted on traffic mast arms to observe the approaches of an intersection. They sense the infrared optical pulses emitted by properly equipped emergency vehicles and inform the traffic control system of the presence of designated vehicles. 76 Detectors Emitters: Optical emitters provide emergency vehicle preemption at upcoming traffic signal intersections by emitting infrared optical pulses that are sensed by preemption detectors. 120 Emitters Optical Signal Processors (OSP): Installed inside a traffic cabinet that receives infrared light signals from approaching emergency vehicles. It decodes these signals to identify valid vehicles, prioritizes their requests, and sends a preemption or priority request to the traffic controller, which then adjusts the signals to allow valid vehicles to pass safely and quickly. 19 Processors Detector Mounting Brackets 76 Brackets Detector Cable Three (3) conductors shielded and one bare 1,000 Feet per Intersection Equipment Warranty 10 Years Budget The budget for this project is not publicized, allowing for maximum competition. It is the responsibility of the Contractor to propose the most competitive pricing possible, and then after award, to work within the constraints of the awarded budget. Deliverables / Disclaimer To meet the requirements of 23 CFR 420.117(e), the Contractor and its Sub‐Contractors shall include the following disclaimer in each deliverable: This report was funded in part through grants from the Federal Highway or Federal Transit Administration, U.S. Department of Transportation. The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the data, and for the use or adaptation of previously published material, presented herein. The contents do not necessarily reflect the official views or policies of the Arizona Department of Transportation or the Federal Highway or Federal Transit Administration, U.S. Department of Transportation. This report does not constitute a standard, specification, or regulation. Trade or manufacturers’ names that may appear herein are cited only because they are considered essential to the objectives of the report. The U.S. government and the State of Arizona do not endorse products or manufacturers. Contractor Responsibilities Pursuant to 2 CFR §200.330, any contract awarded to accomplish this project establishes a Contractor relationship with the Department, and shall not establish a Subrecipient relationship and the disbursement of Federal program funds casts the party receiving the funds in the role of a Contractor. This project is funded under CFDA 20.205 Highway Planning and Construction, FHWA 80%. All terms and conditions required for Contractors / SubContractors of federal recipients under this funding source and according to 2 CFR §200 et seq. shall apply. In the event that this project is located within tribal land or includes tribal involvement as a stakeholder, ADOTMPD and the Contractor must exercise tribal consultation and coordination protocol when providing related services. The purpose for this provision is to ensure compliance with "ADOT's Tribal Consultation Policy" and Arizona Revised Statute Section 41‐2051, Subsection C ‐ Responsibilities of state agencies located at: https://www.azleg.gov/viewdocument/?docName=https://www.azleg.gov/ars/41/02051.htm. An ADOT Tribal Transportation Consultation Online Training Course and Handbook are available to the Contractor and shall be reviewed upon selection. For an understanding of what that protocol entails, refer to Module 4 of the Course which is located on the Arizona Tribal Transportation website at: http://www.aztribaltransportation.org . Federally‐funded Projects: Pursuant to 23 CFR 420.121, the Arizona Department of Transportation may copyright any books, publications, or other copyrightable materials developed in the course of the Project. The funding Federal agency reserves a royalty‐free, nonexclusive and irrevocable right to reproduce, publish, or otherwise use, and to authorize others to use, the work for Government purposes. This contract does not establish a sub‐recipient relationship. Any awarded contract establishes a Contractor relationship. A Contractor shall not be entitled to any copyright for anything created for, through, or as a result of this project. The Contractor shall not release any material, report, or other document related to this project without the written approval of the ADOT Research Center. The Contractor shall not present information related to this project without the written approval of the Department's Research Center. Pursuant to 23 CFR 420.121 (i), patents and inventions developed in the course of the Project are subject to federal standard patent rights at 37 CFR 401.14, incorporated herein by reference. The Contractor will retain all rights provided for the State in this clause, and the State will not, as part of the consideration for awarding the contract, obtain rights in the Contractor's subject inventions. However, the State shall be granted an immediate, irrevocable right to use, without royalty or fee, the subject invention for its purposes related to this project. Disadvantaged Business Enterprise (DBE) Contractor Responsibilities All Contractors and Sub-Contractors must be registered in the ADOT DBE (Disadvantaged Business Enterprise) System. For DBE Sub-Contractor/Contractor removals from an active Project, a Termination / Substitution / Reduction Request Form (Form 108C) is required, followed by approval from the ADOT Business Engagement and Compliance Office (BECO). If a replacement DBE sub-contractor shall be added to the project and/or the same goal committed to on the approved DBE forms will be met, no additional forms are needed. If this is not the case, then the Good Faith Effort (GFE) is also required. All forms are available at https://azdot.gov/business/procurement/federal-forms-and-provisions . If removal of a DBE Sub‐Contractor/Contractor is requested, submit the required form for DBE removal to the ADOT Business Engagement and Compliance Office (BECO). The Contractor must copy on the form submission and make sure the response from BECO is forwarded to: the Procurement Officer, the project manager, and MPDContracts@azdot.gov . Modifying sub‐contractors will require submission of revised DBE forms and approval from BECO and Department's Procurement Office if the modifications alter the DBE commitment on the project. In the event this project is federally funded, or if there is voluntary DBE participation in a State‐funded project, the project will be entered as a contract or task order in the AZ DBE System (DOORS). Payment audits are required. For training on completing payment audits, please see the video: https://www.youtube.com/watch?v=QFZJIlYmN1I. Prompt Payment Pursuant to 49 CFR 26.29 prime Contractors must pay Subcontractors for satisfactory performance (i.e., all the tasks called for in the subcontract for the invoicing period have been accomplished and documented as required by the Agency and any deliverables are approved by the Agency) of their contracts no later than 7 days from receipt of each payment the Agency makes to the prime Contractor. The prompt payment provision applies to Subcontractors at all tiers. This applies to all Subcontractors, not just DBEs. In the event the Prime fails to invoice according to its scheduled invoicing activities, and in any case where a Prime’s invoice has been rejected through no fault of the sub‐contractor’s performance, the Prime shall pay each Subcontractor for satisfactory work completed in no more than 30 calendar days from receipt of invoice for that work. Discovery or Admission into Evidence The Contractor is herein notified of 23 USC §409. The Contractor shall include the notice in each Subcontractor agreement wherein the scope includes relative completion or submission of reports, surveys, schedules, lists, or data compilation or collection. Pursuant to 23 USC §409: Notwithstanding any other provision of law, reports, surveys, schedules, lists, or data compiled or collected for the purpose of identifying, evaluating, or planning the safety enhancement of potential accident sites, hazardous roadway conditions, or rail‐way‐highway crossings, pursuant to sections 130, 144, and 148 [152] of this title or for the purpose of developing any highway safety construction improvement project which may be implemented utilizing Federal‐aid highway funds shall not be subject to discovery or admitted into evidence in a Federal or State court proceeding or considered for other purposes in any action for damages arising from any occurrence at a location mentioned or addressed in such reports, surveys, schedules, lists, or data. Non-Collusion No direct contact with agency staff is permitted during the solicitation period except when contact is initiated as part of the evaluation or negotiation processes. Direct contact with other agency staff shall be made only after award. All inquiries must be directed to the Procurement Contact listed in the solicitation. Reaching Project Objectives Tasks in the scope are designed to accomplish project objectives. If, after the award, critical tasks or products must be changed or be added to the approved work plan in order to reach the stated objectives, a revised work plan and a budget that clearly demonstrates the original scope, the changes needed, and a justification for the changes shall be submitted. Such a modification must be requested by the agency's project manager, and appropriate budget approvals must be obtained, and a revised contract / amendment and/or purchase order must be issued prior to engaging in the work. The agency reserves the right to remove or reduce any tasks during the life of the project that are deemed unnecessary or no longer necessary to reach the project objectives. In the event the Contractor has already begun working on removed or reduced tasks that were scheduled or approved by the PM to already begin, the agency will reimburse that portion of the costs sufficient to make the Contractor whole, as required in federal regulations. Retainage Primes are herein notified they are prohibited from holding retainage from Sub‐Contractors on this Project pursuant to 49 CFR 26.29.b(1). Legal Notice Legal Notice of Solicitation Traffic Signal Preemption Equipment (ADOT/federal-funded) IFB# 2027-IFB-004-GR285 The City of Sierra Vista will accept competitive bids from qualified suppliers for Traffic Signal Preemption Equipment (ADOT/federal-funded) . Bids must be submitted in via the City's e-Procurement System, OpenGov https://procurement.opengov.com/portal/sierravistaaz . Bids shall be received until Tuesday, December 1, 2026 before 10:00 am Arizona Time, at which time the bids shall be opened and the name and pricing of each responding firm shall be publicly read via virtual meeting, as posted in the eprocurement portal. The solicitation documents may be obtained by downloading them at the following URL: https://procurement.opengov.com/portal/sierravistaaz . Should you have any issues accessing the documents, please email or call: Helen Lee Chief Procurement Officer helen.lee@sierravistaaz.gov (520) 439-2207 Post: Wednesday, November 4, 2026 Open: Tuesday, December 1, 2026 at 10:00 am , Arizona Time Introduction Summary Background Contact Information Timeline Information for Bidders Bid Submission The City of Sierra will accept competitive bids from qualified contractors to Purchase of Traffic Signal Preemption Equipment and related materials. . Bids must be submitted in electronic form via the City’s e-Procurement Portal, OpenGov ( https://secure.procurenow.com/portal/sierravistaaz ). Bids shall be received until Tuesday, December 1, 2026 before 10:00 am Arizona Time, at which time the bids shall be opened and read aloud as a matter of public record. Late bids shall not be accepted. Pre-Solicitation Meeting No pre-solicitation meeting has been scheduled. Inquiries All questions related to this IFB shall be submitted in writing through the OpenGov Question/Answer Tab via the City's e-Procurement portal, on or before, Friday, November 13, 2026 by 5:00 pm . Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on the City's e-Procurement Portal. Addenda Any changes to the bid documents will be distributed to all bidders in the form of an Addendum. Verbal discussions or comments will not change the official bid docs unless provided in a written Addendum. Addenda shall be posted on the City's e-Procurement Portal. Addenda notifications will be emailed to all persons on record as following this IFB. Failure of any bidder to receive any such addenda or interpretation shall not relieve such bidder from any obligation under their bid as submitted. All addenda so issued shall become part of the contract documents. Bid Withdrawal Bids may be withdrawn through the City's e-Procurement Portal, the responding firm may “unsubmit” their proposal in OpenGov. After withdrawing a previously submitted proposal, the responding firm may submit another proposal at any time up to the deadline for submitting proposals prior to the bid opening. No bidder may withdraw his bid for a period of sixty (60) days following the bid openings. Contract Award The contract(s) shall be awarded to the lowest responsive/responsible bidder. The City reserves the right to waive any informality in bids received, and to accept, increase, or reduce the quantities of any or all items of any bid proposal, unless the bidder qualifies such bid by specific limitation. The Chief Procurement Officer may condition award of any successful bid upon payment of any and all required taxes, license fees, or other monies due to the city or another governmental agency. Contractor Requirements Each bidder shall denote his Arizona State Contractor's License Number and Classification as evidence that he is qualified to contract and perform the work as indicated in the specifications and plans. Bid Security Each bid shall be submitted in OpenGov under the Section titled " Pricing Proposal " , to the specifications and shall be accompanied by a bid bond acceptable to the City of Sierra Vista for a penal sum of not less than ten percent (10%) of the amount of the bid made payable to the order of the City of Sierra Vista. Protests Any protest shall be in writing and shall be filed with the Chief Procurement Officer. A protest of an Invitation for Bids shall be received at the Office of the Chief Procurement Officer before the Bid opening date. A protest of an award or of a proposed award shall be filed within fourteen (14) days after the protester knows or should have known the basis of the protest. A protest shall include: The name, address and telephone number of the protestor. The signature of the protestor or its representative. Identification of the Invitation for Bids or contract number. A detailed statement of the legal and factual grounds of protest including copies of relevant documents. The form of relief requested. Cooperative Use of Contract In addition to the City of Sierra Vista, and with approval of the Contracted Vendor, this Contract may be extended for use by other municipalities, school districts, and governmental agencies of the state. Any such usage by other entities must be in accordance with the city code, charter, and/or procurement rules and regulations of the respective governmental entity. Complete information regarding the bid requirements and the contract execution may be found within Sections 102 and 103, Uniform Standard Specifications for Public Works Construction, sponsored and distributed by the Maricopa

Plain text

OpenGov categories

  • 55085 · Traffic Signal Poles, Standards, and Brackets
  • 55088 · Traffic Signals and Equipment, Electric Systems
  • 55089 · Traffic Signals and Equipment, Electric Parts