Transportation Project Delivery Plan Consultant Services

Description

H-GAC is seeking Statements of Qualifications from firms interested in developing a detailed, actionable plan to guide the development and long‑term success of a Transportation Project Delivery team responsible for delivering federally funded transportation projects. To achieve this purpose, the Consultant will evaluate the MPO’s existing project delivery framework by assessing current capabilities, organizational structure, team roles, and operational gaps; define the appropriate scope of delivery involvement through stakeholder engagement and peer analysis; and develop recommendations for structuring, resourcing, and integrating the team into MPO operations. This effort will also establish standardized budgets for project delivery services; define processes for project selection, initiation, and procurement for the delivery program; and develop consistent procedures to execute and close out (pre-construction) projects in compliance with all applicable Federal and State requirements. Scope of Work Overview The Houston-Galveston Area Council (H-GAC) in coordination with the Transportation Policy Council serves as the Metropolitan Planning Organization (MPO) for an eight-county area in the Gulf Coast region. H-GAC staff work collaboratively with Texas Department of Transportation (TxDOT) and local governments to develop long-range plans, including the Regional Transportation Plan (RTP) and the Unified Transportation Program (UTP). In addition, these entities jointly prepare the Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP), which outline projects ready for construction and implementation scheduled over a 4-year, fiscally constrained planning horizon. H-GAC is responsible for coordinating transportation planning and programming across multiple jurisdictions and stakeholders. Traditionally focused on long-range planning and funding allocation, the MPO is exploring an expanded role in transportation project development and delivery -- particularly in light of funding demands, growing regional mobility needs, and the need for coordinated project implementation. This increased support would not only help local governments advance projects to the next scheduled phase but also ensure that federal funding is applied and utilized within the federally allotted time. To support this expanded role, H-GAC is in the process of establishing a robust Transportation Project Delivery Team that will assist local sponsors in delivering regional transportation projects. This assistance could span a variety of activities related to project development and delivery including capacity development/training, preparing agreements, conducting preliminary engineering and environmental tasks, securing right of way or utility agreements, final design tasks and more. Requirements All materials developed for H-GAC related to this project will belong to H-GAC and must feature H-GAC branding. All documents must be submitted to H-GAC in an editable format (i.e., Word, Excel, Power Point, GIS, etc.) and will be reviewed and approved by H-GAC prior to distribution. The final decision on project deliverables and content will remain with H-GAC. Task 1 - Project Administration and Coordination Conduct activities as discussed in scoping and kickoff meetings for project administration tasks, which include: bi-weekly progress/coordination meeting minutes, and invoices, which must be submitted to H-GAC’s Project Manager monthly. Monthly progress reports are required regardless of whether the Contractor submits an invoice for that month. Monthly progress reports will include a summary of: Activities, ongoing or completed, during the reporting period. Activities planned for the following month. Problems encountered, and remedial actions taken; and Project status report, detailing milestones completed and a tabulation of percent completed by task. Coordinate and hold bi-weekly progress/coordination meetings (virtual is o.k.) with H-GAC to discuss progress, outstanding issues, and prepare for upcoming tasks and activities. Provide continuous quality assurance and quality control throughout the duration of the project. Monthly invoicing procedures will be discussed at the Contractor kick-off meeting with H-GAC’s Transportation Finance staff. Task 1: Deliverables Bi-weekly progress meeting minutes Monthly invoices and monthly progress reports due by the 10 th of each month Task 2 - Organizational Assessment and Team Roles Conduct interviews with internal MPO staff and external stakeholders, including Departments of Transportation (DOTs), transit agencies, and local governments, to determine regional project delivery needs. Benchmark MPOs or regional agencies with similar project delivery functions and organizational models to understand how peer MPOs approach project delivery, through coordination with state DOTs and local government sponsors, in order to support and inform early‑stage discussions with TxDOT. Clarify the appropriate role of the project delivery team within the MPO’s regional mission and legal authority. Define the types of projects and project phases in which the team may engage to assist with delivery (such as feasibility analysis, environmental tasks/coordination, design (preliminary and detailed) assistance and coordination, and grant administration). Recommend an appropriate service model for the team, including project management and coordination support, technical support, and/or direct delivery oversight. Task 2: Deliverables Summary report of all data and information collected regarding the overall organizational assessment and service model recommendations necessary for sponsor support as it relates to project delivery. Task 3 - Develop Organizational & Staffing Plan Review the MPO’s existing organizational structure, staffing levels, processes, and legal authority related to project development and delivery. Identify capacity, legal, and procedural gaps associated with performing project delivery–related responsibilities. Propose an organizational structure for the team within the MPO. Define staffing needs, job descriptions, and minimum required qualifications. Identify internal capacity-building and/or consultant support strategies. Recommend interagency collaboration models (MOUs, shared staffing, joint project agreements, etc.). Task 3: Deliverables List and graphic representation (e.g., charts or infographics) of organizational necessities required to provide project delivery services. Write-up of an organizational plan for the newly formed Project Delivery team to perform the project delivery services considering existing organizational, staffing structure, and any perceived gaps. Task 4 - Develop Program Processes and Procedures Task 4.1 Project Selection and Initiation Develop comprehensive procedures to guide the effective identification, evaluation, and selection of transportation projects for delivery assistance, including sub-tasks associated with these projects. Establish clear project eligibility guidelines that define the types of projects H‑GAC can deliver based on: Available and anticipated funding sources Strategic priorities and regional goals Coordinate with TxDOT, H‑GAC, and local government sponsors to collect and review data on projects submitted for federal funding. Define standardized processes for: Regional project selection and prioritization Project scoping Funding coordination across agencies Develop detailed procedures outlining how local government sponsors can submit projects and enter the regional project delivery pipeline(e.g. Call for Projects). Task 4.1: Deliverables Graphic or visual representation of the project selection and initiation process. Write-up and list of guidelines and best practices for the selection and initiation of projects including procedures mentioned in the task description above. Task 4.2: Procurement Process for Project Delivery Services Review and analyze applicable State and Federal procurement policies relevant to the procurement of consulting/professional services for transportation engineering, environmental projects, and sub-tasks. Identify and evaluate the most appropriate procurement methods for H‑GAC to use when procuring consultant/professional services. Ensure all recommended procurement approaches align with applicable Federal regulations, statutes, and codes to maintain full compliance for federally funded projects. Coordinate closely with H‑GAC’s procurement team to: Understand internal procurement processes and decision points Clarify the agency’s role and level of involvement during consultant procurement Develop and clearly document recommended procurement procedures incorporating: Industry best practices Federal and State funding requirements H‑GAC‑specific operational considerations Provide guidance to support consistent, compliant, and efficient implementation of consultant procurement processes. Task 4.2: Deliverables Description and summary of applicable Federal and State procurement policies List of recommended procurement methods and guidelines for consultant services, including a visual representation (e.g., flowchart or infographic) of the federal and state procurement process as mentioned in the task description above. Task 4.3: Implementing Organizational Procedures and Systems for Executing Projects in Compliance with Federal and State Requirements Develop a comprehensive project delivery task roadmap for technical assistance, covering the full lifecycle of project development and delivery assistance including preparing agreements, conducting preliminary engineering and environmental tasks, securing right of way or utility agreements (also mentioned in task 4.4), and final design tasks. Clearly define each stage of project development, including: Required activities and task sequencing Required decision milestones Coordinate with TxDOT to ensure any and all project phases comply with applicable Federal and State requirements, particularly as H‑GAC assumes a project management role. Ensure the roadmap functions as a practical, implementable guide to support consistent, compliant, and efficient project delivery across all programs. Evaluate and recommend tools, systems, and data platforms to support: Project tracking and workflow management Project performance and readiness monitoring Interagency data sharing and coordination Define standardized documentation and reporting requirements to ensure consistency and uniform application across projects. Develop templates, guidance documents, manuals, and reference materials to support consistent application of processes across similar scoped projects for various local government sponsors. Incorporate change management strategies to support the adoption of new processes, tools, and roles within H‑GAC, particularly as they relate to project delivery assistance activities for the newly formed project delivery team. Identify training needs and develop recommendations for staff and partner agency training. Outline internal communication approaches to support awareness, alignment, and effective implementation. Propose quick‑start actions to support early-stage implementation and improvements. Recommend a long‑term governance structure to oversee project delivery processes, tools, and continuous improvement. Utilize TxDOT Local Government Scheduling tool and any other resources to provide insight into scheduling constraints for projects as well as establishing baselines. Develop Risk Management procedures to follow through full cycle of all tasks related to project delivery. Task 4.3: Deliverables List of Federal and State requirements applicable to each stage of project delivery. Comprehensive writeup of all procedures written in this task description above, necessary for full project execution. Visual representation (e.g., chart or diagram) outlining the full project execution process from initiation to final deliverables (pre-construction). Determine best practices and procedures for schedule management (including baseline schedule creation and tracking) and risk management. Task 4.4: Identify critical aspects of pre-construction project closeout (i.e. Utility Agreements, ROW acquisitions, Railroad agreements, close out documents/forms) in accordance with Federal and State guidelines Develop a detailed project closeout outline and checklist to ensure full compliance with applicable Federal and State guidelines. Coordinate with TxDOT to confirm all pre-construction closeout activities meet regulatory requirements and follow industry best practices. Provide H‑GAC with a clear and practical framework to efficiently complete project closeouts while maintaining compliance. Identify and Task 5 - Establishing Short-Term and Long-Term Workplan and Standard Budgets for H-GAC Project Delivery Services Collect all necessary data to evaluate existing and projected budget information related to H-GAC’s project delivery efforts. Develop long term and short term workplan and associated budget required for services Gather relevant data sources, which may include: Internal financial data Historical budget trends Anticipated funding allocations for each project delivery service Task 5: Deliverables Summary report of all data and information collected List and graphic representation (e.g., charts or infographics) of existing and projected budgets for H-GAC’s project delivery framework. Long term and short term workplan with associated required budgeting needs Final Deliverables Provide the following minimum deliverables. Additional deliverables may be included as needed and should be clearly noted in the proposal. All electronic files must be submitted on a flash drive containing the original files in editable formats, including any graphics used for illustrations. Documents must be submitted to H-GAC in editable formats (e.g., Word, Excel, Power BI, Microsoft Project, PowerPoint, GIS) and will be subject to review and approval by H-GAC prior to distribution. H-GAC reserves the final decision on all project deliverables and content. Draft document containing the deliverables specified for each task Final document incorporating the deliverables specified for each task Electronic copies of all deliverables Inquiries and Clarifications Respondents must submit questions by the Questions deadline indicated in this Solicitation. Telephone/email inquiries are not accepted. H-GAC will respond as completely as possible to each question. Questions and answers will be posted as soon as available. The names of respondents who submit questions will not be disclosed. All clarifications will be available in the Question and Answer and/or Addenda Sections in OpenGov, only the information in these sections should be used in preparing a response; verbal communications and other written documents intended to clarify and interpret will not legally bind H-GAC. H-GAC does not assume responsibility for the receipt of any clarifying information. Respondent must carefully examine all Solicitation documents and become thoroughly familiar with all requirements before submission to ensure the response meets the intent of this Solicitation. Respondent is responsible for making all investigations and examinations that are necessary to ascertain conditions affecting the requirements of this Solicitation. Failure to make such investigations and examinations will not relieve the Respondent from the obligation to comply, in every detail, with all provisions and requirements of the Solicitation. Submission Requirements Submissions must be in PDF or Excel format ONLY where indicated and uploaded to the designated section. Documents uploaded into incorrect sections or other formats may be deemed non-responsive and the submission rejected. Additionally, zip files are not allowed. All responses and required documents must be submitted via the OpenGov system before the deadline. The system will close automatically at the specified time, and late or incomplete submissions will not be accepted. The OpenGov system will not transmit partial or incomplete submissions attempted after the deadline date and time specified in this solicitation. Recording of proposal submission time and date occur via OpenGov. To satisfy any required public opening, the respondent list is made available in the OpenGov Public Portal after the deadline. Respondents are strongly encouraged to submit proposals well in advance of any deadline to ensure all uploads and submissions are completed successfully before the cutoff time. Respondents are also encouraged to double-check all uploads to ensure the file is correct and the document is uploaded to the proper section of the response. Respondents may modify submissions that have already been submitted, before the deadline. The H-GAC Procurement and Contracts Department will not respond to emails from potential respondents related to the acceptance or consideration of incomplete, incorrect, or late submissions. Service Region Map The MPO services the eight counties below in blue, consisting of: Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller. Additional Resources / Website Links Houston-Galveston Area Council (H-GAC) Website: https://www.h-gac.com/Home Transportation Improvement Program: https://www.h-gac.com/transportation-improvement-program Additional Reference Documents An H-GAC Sample Contract with standard General Provisions is provided for review. The awarded contract will be the same or similar to the sample. H-GAC reserves the right to update the actual contract with any additional required terms and conditions as required for compliance to agency and funding source requirements. Exceptions to these standard terms and conditions are not allowed, and will not be reviewed. Any special provisions required of any H-GAC funding source will also become part of any subsequent contract. Contract Usage/Term Contract Term H-GAC estimates that the resulting contract will have an initial term of approximately twelve (12) months. This estimate is provided for planning purposes only, and the actual contract term will be established in the executed contract. The contract may be renewed by mutual agreement of the parties, subject to programmatic needs, funding availability, applicable laws and regulations, and any required Board approvals. H-GAC retains sole discretion regarding the exercise of any contract renewal option. Information contained in this Solicitation regarding contract term, renewal options, or other contractual matters is provided for informational purposes only and does not create any contractual obligation. In the event of any conflict or inconsistency between this Solicitation and the executed contract, the terms and conditions of the executed contract will control. Contract Terms Applicable to Software and Technology H-GAC anticipates that any resulting agreement for software, software-as-a-service (SaaS), licensing, subscription, hosting, maintenance, or technology support services may include an initial term of one (1) year with up to four (4) optional one-year renewal periods. This anticipated term structure is provided for planning purposes only, and the actual contract term and renewal options will be established in the executed agreement. H-GAC’s preference is to utilize its standard terms and conditions as the primary governing contract document. Contractor-developed agreements, subscription terms, licensing agreements, or similar documents may be incorporated as supplemental documents when necessary to address technology-specific requirements. H-GAC reserves the right to negotiate contractual provisions as needed to ensure compliance with applicable procurement requirements, funding requirements, and H-GAC contracting standards. In the event of any conflict or inconsistency betwe

Published attachments
Addenda and notices
  • Official Notice #1: Pre-Proposal Conference · 1

  • Addendum #1 · 1

    DBE goal corrected to 26%.

  • Addendum #2 · 2

    Updated timeline: Closing Date/Submission Deadline: December 3, 2026, 12:00pm Notice of Shortlist: December 22, 2026 Interview Date: January 12, 2027

Public questions and answers
  • • Is a cover letter or executive summary acceptable?

    Yes, if you would like to include a cover letter or executive summary, please upload to section 10.1.3 Firm Experience/Capabilities.

  • • Are section dividers acceptable

    Please upload information to its corresponding section within Section 10. Submission Uploads/Required Documents.

  • • Please confirm if the DBE goal is required for this contract?

    Please refer to Section 9.2. DBE Supplemental Guidance.

  • • Are there page limitations for each section?

    No.

  • We’re interested in learning more about your transportation project and wanted to ask whether prior experience specifically in Texas is a requirement. While Respondent does not have direct Texas experience, we have relevant project experience throughout the East Coast.

    No.

  • 1. Budget: Can H-GAC share an estimated budget or maximum amount for this contract? 2. Contract type: Will this be a lump-sum, hourly-rate, or cost-plus-fixed-fee contract? 3. Overhead rate: For the pre-award audit in §7.1, will H-GAC accept a standard (de minimis) indirect rate from a small firm that doesn’t yet have an audited overhead rate? References: For the five projects in §9.1.3, can the same owner contact be listed for more than one project? 4. Subcontractor projects: Can projects done by a proposed subcontractor count toward the five, if they’re clearly labeled as the subcontractor’s work? 5. Current tools: What tools or systems does the Project Delivery Group use today to monitor and track projects?

    1: The budget is not being disclosed. 2: Firm-Fixed-Price. 3: Pre-award audit items will be discussed with the selected Awardee during the contract phase. Yes, the same owner contact can be listed for more than one project. 4: Yes, the references can be reflective of any firm included in the proposed team, with at least one reference for the Prime's past work. 5: The current tools used to monitor and track projects include an in-house Risk Register developed by the team, meeting minutes located in local project files, and the TxDOT LG Scheduling Tool for baseline schedule development. The group has also recently procured PMIS software that will assist with baseline schedule tracking and serve as a centralized repository for meeting minutes and project documentation.

  • Can we feature more than five projects in the Firm Experience/Capabilities section?

    No.

  • Has H-GAC already established a preliminary organizational structure, staffing plan, or service model for its Transportation Project Delivery Team? If so, will those materials be available to the selected consultant, and should the consultant focus on refining an existing framework or developing a new operating model?

    H-GAC has established a preliminary organizational structure for the Transportation Department, as well as an initial staffing plan. This can be provided once the project is initiated. However, the intent of this project is for the consultant to evaluate the existing project delivery team structure and provide recommendations regarding the organizational model, staffing needs, roles, responsibilities, and service delivery approach necessary to effectively support project delivery and technical assistance activities for project sponsors. The consultant's work may build upon the existing framework but is not limited to it.

  • For Task 4, does H-GAC expect the consultant to develop implementation-ready procedures, templates, checklists, and workflow tools for immediate staff use, or primarily recommend frameworks and processes for subsequent development?

    H-GAC expects the consultant to develop implementation-ready procedures, templates, checklists, and workflow tools that can be used by staff immediately. While recommendations for additional frameworks and process improvements are pieces to a few "sub-tasks", the primary expectation is the development of practical, actionable tools and procedures that support project delivery activities. It is recognized that a large number of project delivery and technical assistance tasks will require the procurement of consultants to perform those professional services that H-GAC cannot perform in-house. The overall intent of this project is to establish processes, tools, and resources that enable H-GAC to effectively assist local project sponsors and TxDOT with project delivery activities, helping projects stay on schedule, within budget, and consistent with the programmed scope.

  • Has H-GAC established preliminary agreements or received guidance from TxDOT regarding the project development and delivery responsibilities it may assume? Should the consultant evaluate alternative arrangements and recommend decision rights and responsibilities among H-GAC, TxDOT, and local sponsors?

    No preliminary agreements regarding project development and delivery responsibilities have been executed with TxDOT at this time. Establishing and defining those responsibilities is one of the primary objectives of this project. TxDOT has agreed to participate in project coordination and review efforts and are aware of this MPO initiative. As part of this work, the consultant should evaluate potential project development and delivery arrangements and provide recommendations regarding decision-making authority, roles, and responsibilities among H-GAC, TxDOT, and local project sponsors.

  • Section 3.5 mentions review of legal authority. Does HGAC expect respondents to engage legal advisors to complete this review?

    No. The legal authority is mainly to follow federal and state transportation laws based off codes, guidance, and regulations posted publicly.

  • Section 3.7 mentions data sources related to internal financial data. Can HGAC provide a list of the existing systems in place currently?

    The intent of this task is for the consultant to research and coordinate with H-GAC Finance and Transportation Finance staff to better understand how the project delivery program can be successfully implemented and sustained in both the short and long term. This effort should identify eligible funding opportunities and determine which program activities can be supported based on budget constraints, grant requirements, funding timelines, and other financial considerations.

  • Section 8.1, “DBE Goal”, states that "H-GAC has established a goal of 25% (30% goal for Workforce/Aging projects)..." Please confirm whether the 30% Workforce/Aging goal applies this project, or whether the applicable DBE goal is 25%.

    The applicable DBE goal is 26%; an amendment to correct this has been issued. The 30% Workforce/Aging goal does not apply to this project.

  • Does H-GAC anticipate implementing a new project delivery tracking or workflow management system under this contract, or is the consultant expected to evaluate existing systems and recommend future technology investments? If implementation is anticipated, what level of configuration, dashboard development, or systems integration is expected?

    The program recently procured a project scheduling software platform to support project tracking and management. As part of this RFP, the selected consultant will be expected to evaluate existing systems and processes and provide recommendations for future technology investments. Dashboard development will be beneficial as the consultant evaluates what the program currently uses. The level of development could be full dashboard integration or just recommendations and guidance on how we can complete it in-house.

  • For Section 9.1.3(D), what form of information should respondents provide for the “Owner’s stated satisfaction level”? For example, is a client quote, rating, or narrative statement expected?

    A quote from the client can be provided regarding their satisfaction with the services rendered.

  • Is there a page limit for the proposal overall or for any individual response section? Are there any required font, margin, or formatting standards?

    There are no page limits for the proposal overall, nor any of the response sections. There are no requirements for font, margin, nor formatting.

  • Please confirm the available project budget. Does the approximately $350,000 identified in the UPWP apply entirely to consultant services, or does it also include H-GAC/MPO staff costs?

    It applies to consultant services for this contract.

  • The RFP states that H-GAC's expanded project delivery support could include capacity development/training, preparation of agreements, preliminary engineering and environmental tasks, right-of-way or utility agreements, final design tasks, and other project development and delivery activities. Please clarify whether H-GAC envisions the future Project Delivery Team directly performing or managing these technical services for local sponsors, or primarily providing technical assistance, coordination, guidance, readiness monitoring, and other project delivery support.

    When we consider the future of this program, and depending on available staff resources, some tasks could ultimately be performed in-house. In the short term, however, our approach will focus on managing technical services through consultants, vendors, and other professional service providers. Functions such as technical assistance, coordination, guidance, readiness monitoring, and other project delivery support can currently be provided in-house. However, certain specialized technical assistance services will still require procurement of external professional services.

  • The RFP requires a timeline for completion. Please confirm whether H-GAC expects the proposal timeline to show durations and milestones by individual task/subtask, or whether an overall project-level timeline with key milestones is sufficient.

    Overall project level timeline with key milestones (each task at the minimum) will be sufficient.