State and local · OpenGov
Trash Collection Services for COTA's Transit Location
Description
COTA is seeking a qualified contractor to provide trash collection and disposal services for bus-stop shelter waste containers throughout its service area. The contract includes regularly scheduled trash collection from 634 bus-stop shelter containers, additional weekly collections at designated high-traffic locations, Saturday service for downtown High Street containers, and supplemental Sunday collections. The estimated workload is approximately 1,327 service stops per week. The selected contractor will be responsible for providing all necessary labor, equipment, vehicles, and supervision to ensure timely collection, transportation, and proper disposal of waste. Additional responsibilities include cleaning up spills and scattered debris, replacing COTA-provided liners and lids as needed, reporting damaged or missing containers, and maintaining a 24/7 emergency contact. The contractor will also be required to maintain detailed collection schedules, provide weekly service reports, and implement a real-time tracking system to document completed collections and support accurate invoicing. These services are intended to maintain clean, safe, and presentable bus-stop shelter areas, reduce litter and overflowing containers, and enhance the overall customer experience for COTA passengers. Solicitation Information Introduction COTA Background The Central Ohio Transit Authority (COTA) is the region’s public transportation system for the Columbus region , providing more than 12 million passenger trips to communities in six Central Ohio counties . COTA provides fixed-route, paratransit, and microtransit service and employs more than 1,200 people , including 900+ frontline workers . The organization recently won approval from voters to implement LinkUS , an $8 billion transit modernization plan . Through LinkUS , COTA will expand service by 45% over the next 25 years , including new and improved fixed-route lines , eight new COTA//Plus microtransit zones , five new rapid transit lines , and 500 miles of new sidewalks, bikeways, and trails to better connect more than 40 communities to public transit. Project Summary COTA is seeking a qualified contractor to provide trash collection and disposal services for bus-stop shelter waste containers throughout its service area. The contract includes regularly scheduled trash collection from 634 bus-stop shelter containers, additional weekly collections at designated high-traffic locations, Saturday service for downtown High Street containers, and supplemental Sunday collections. The estimated workload is approximately 1,327 service stops per week. The selected contractor will be responsible for providing all necessary labor, equipment, vehicles, and supervision to ensure timely collection, transportation, and proper disposal of waste. Additional responsibilities include cleaning up spills and scattered debris, replacing COTA-provided liners and lids as needed, reporting damaged or missing containers, and maintaining a 24/7 emergency contact. The contractor will also be required to maintain detailed collection schedules, provide weekly service reports, and implement a real-time tracking system to document completed collections and support accurate invoicing. These services are intended to maintain clean, safe, and presentable bus-stop shelter areas, reduce litter and overflowing containers, and enhance the overall customer experience for COTA passengers. Timeline Posting Date: October 28, 2026 Question Submission Deadline: November 11, 2026, 5:00pm Question Response Deadline: November 18, 2026, 5:00pm Proposal Response Submission Deadline: November 30, 2026, 2:00pm Recommended Vendor Selection (Tentative): December 7, 2026 Presentations or Interviews (At COTA’s Discretion, If Deemed Necessary): The Week of 11/30/2027 Project Contact Beth Cremeens Director, Facilities 1600 McKinely Ave Columbus , OH 43222 Email: cremeenseh@cota.com Procurement Contact Ciara Walker Procurement Administrator, IT & Operations 33 N High St Columbus , OH 43215 Email: walkercm@cota.com Instructions to Proposers General Instructions Each proposer is solely responsible for submitting any necessary forms and certifications that may be required by the RFP. A list of all holders (“followers”) of the RFP is available for view and/or print on the online procurement portal. The list is obtainable from the RFP advertisement date through the RFP close date. Addenda to RFP In the event that it becomes necessary to revise any part of this RFP, or if additional information is necessary to enable potential proposers to make an adequate interpretation of the provisions of this RFP, an addendum to the RFP will be provided through Central Ohio Transit Authority (COTA) online procurement portal. Notice shall be deemed received once given. Failure to receive such notice shall not affect any solicitation response or contract award. Inquiries Questions about Central Ohio Transit Authority (COTA) and this RFP shall be directed to Ciara Walker , Procurement Administrator, IT & Operations , through Central Ohio Transit Authority (COTA) ’s online procurement portal. From the issuance date of this RFP until Central Ohio Transit Authority (COTA) selects a proposal for award, Ciara Walker is the sole point of contact for Central Ohio Transit Authority (COTA) and Central Ohio Transit Authority (COTA) ’s project team members concerning this RFP. (In this RFP and the Contract Documents, this point of contact may be referred to as the Contract Administrator, Contracting Officer, Purchasing Agent, Buyer, or the like.) Any violation of this condition may be cause for Central Ohio Transit Authority (COTA) to reject the offending proposer’s proposal. If Central Ohio Transit Authority (COTA) later discovers that the proposer has engaged in any violations of this condition, Central Ohio Transit Authority (COTA) may reject the offending proposer’s proposal or rescind its Contract award. Proposers must agree not to distribute any part of their proposals beyond Central Ohio Transit Authority (COTA) . A proposer that shares information contained in its proposal with other Central Ohio Transit Authority (COTA) personnel, Central Ohio Transit Authority (COTA) project team members, Central Ohio Transit Authority (COTA) board members, and/or competing proposer personnel may be disqualified. Proposers’ questions must be submitted through Central Ohio Transit Authority (COTA) ’s online procurement portal. All questions or requests for clarification regarding this Solicitation, including the form of the Contract, must be submitted during the Inquiry Period. Central Ohio Transit Authority (COTA) has no obligation to respond to questions or requests for clarification that are not submitted through COTA’s online procurement portal or that are submitted outside of the Inquiry Period. To the extent that Proposers request changes to the form of the Contract, including additional or alternative terms, conditions, or agreements (such as license agreements, master services agreements, or user agreements), such requested changes must be submitted with the Proposal. Any requested changes not identified in the Proposal may be deemed waived. If a Proposal does not identify any requested exceptions, revisions, or redlines to the Contract terms and conditions, the Proposal shall be deemed to have accepted the Contract as presented in the Solicitation. If a Respondent needs assistance using the online procurement portal, Respondents may access the Help Center for vendor training guides provided by OpenGov ("Software Administrator"). Respondents may also contact the Software Administrator using the real-time chat function on the online procurement portal (located in lower right-hand corner of the screen), or via email at procurement-support@opengov.com for support. Cost Type Payments are anticipated to be made on a Unit Price basis. Award of Contract Proposals will be evaluated by an ad hoc committee. Award will be granted to the responsive and responsible vendor who provides the Best Value- Award is made to the proposer whose offer is most advantageous to the agency, considering price and other evaluation factors. Period of Performance Subject to the Termination provision of the Contract, performance shall commence as of the Effective Date (or in the event that Central Ohio Transit Authority (COTA) provides a Notice to Proceed to the Contractor, the Period of Performance shall commence on the date of the Notice to Proceed and shall continue for Five (5) Years and Zero (0) Months (subject to the exercise of any option periods). Options for this Contract COTA reserves the right, at its sole discretion, to renew the contract for up to Zero (0) additional one-year option periods. The exercise of any option year shall be contingent upon satisfactory performance, continued operational need, and the availability of funding. Small Business Requirement Central Ohio Transit Authority (COTA) has specified a SBE participation goal of 0 for the Work to be performed under the Contract. Proposers must make adequate good faith efforts to meet this goal in order to be deemed as a responsive and responsible proposer. Award of the Contract will be conditioned on meeting the requirements of this section. 49 CFR Part 26.53 and Appendix A of 49 CFR Part 26 shall serve as the criteria for evaluating compliance with the good faith efforts requirements. Additionally, proposers are required to solicit the support and assistance of Central Ohio Transit Authority (COTA) ’s Small Business Opportunity Office if they are unable to meet the SBE participation goal assigned to this Contract. The proposers can meet this requirement in one of two ways: First, the proposer can meet this goal by demonstrating and documenting its commitments for participation by SBEs for at least the total percentage identified above or a percentage that exceeds the goal for the project. The SBE Contract Requirements as well as 49 CFR Part 26.53 explain the procedures that recipients/agencies such as Central Ohio Transit Authority (COTA) should follow in this situation. For purposes of this section, Central Ohio Transit Authority (COTA) will accept SBEs that are currently certified with the Central Ohio Transit Authority (COTA) Small Business Opportunity Office as well as SBEs that are currently certified with the Ohio Department of Transportation under the NAICS code that coincides with the Scope of Work that they will execute in this project. All SBEs must be certified prior to the proposal submission, except in a “design-build” or “turnkey” contracting situation, multi-year projects, or some on-call or work order projects where Central Ohio Transit Authority (COTA) will explain its procedure in the SBE Contract Requirements. Second, if the proposer does not meet the SBE goal identified in this Contract or is able to only meet part of this goal, it must document adequate good faith efforts. Appendix A to 49 CFR part 26 clearly states, “This means that the proposer must show that it took all necessary and reasonable steps to achieve a SBE goal or other requirement of this part which, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to obtain sufficient SBE participation, even if they were not fully successful.” Additionally, SBE Contract Requirements as well as 49 CFR Part 26.53 explain the good faith efforts procedures that recipients/agencies such as Central Ohio Transit Authority (COTA) should follow when a proposer does not meet the goal. The SBE participation goal applies to the total value of the Contract including all pre-award negotiation results and post-award change orders/modifications. Submittals of the proposer’s SBE Plan/Program will be evaluated based on the proposer’s SBE approach, creativity, demonstrated commitment to Central Ohio Transit Authority (COTA) ’s SBE and diversity programs, ability to successfully respond to project SBE participation goals and compliance with overall SBE program requirements as codified in 49 CFR Part 26 and Central Ohio Transit Authority (COTA) ’s SBE Program. Subcontracting Subcontractors may be used to perform work under this contract. If a proposer intends to use subcontractors, the proposer must identify, in their proposal, the names of the subcontractors and the portions of the work the subcontractors will perform. If a proposal with subcontractors is selected, the proposer must provide the following information concerning each prospective subcontractor Complete name of the subcontractor Complete address of the subcontractor Type of work the subcontractor will be performing Percentage of work the subcontractor will be providing A written statement, signed by each proposed subcontractor that clearly verify that the subcontractor is committed to render the services required by the contract Central Ohio Preference To the greatest practical extent possible, all contractors and subcontractors involved with the project will use Central Ohio products, materials, services, and labor. Submission & Withdrawal Respondents shall register on Central Ohio Transit Authority (COTA) ’s online procurement portal. Once registered, Respondents may view and click "Follow" to be a Prospective Respondent for this RFP and will appear on the Follower’s list. Respondents that fail to Follow this project will not receive automated Addenda notifications, nor will they be able to submit a Response in the online procurement portal, and therefore will be unable to participate, nor be considered for this RFP. Respondents must click “Draft Response” to properly begin and submit a Response via the online procurement portal. Responses received after the scheduled due date and time for submission will not be accepted. Responses submitted in any other format other than via the online procurement portal, including but not limited to, hard copy (mailed or hand delivered), facsimile, or emailed submittals, will not be accepted. Central Ohio Transit Authority (COTA) and the Software Administrator are not responsible for untimely submissions due to personal or company internet or hardware limitations, settings or restrictions, internet speed, power outage, network connection, or use of a malfunctioning electronic device, or the like. Respondents are solely responsible for the capability of their computer system while responding to this RFP and for the stability of their internet service. Failure of the Respondent to successfully submit an electronic Response before the deadline indicated herein shall be at the Respondent’s sole risk. It is at COTA’s sole discretion whether the Central Ohio Transit Authority (COTA) will accept or not accept late and/or improperly submitted Responses. Once file(s) have been uploaded and the Submission Status shows as “Submitted,” a submission is complete. At that point, the Respondent should also receive an email confirmation from the online procurement portal. Respondents may withdraw their submittal electronically via the online procurement portal at any time prior to the scheduled due date and time for submission. Proposals that are late will not be accepted. Proposal Validity All pricing submitted in response to this Request for Quotes shall remain firm, fixed, and valid for a minimum period of one hundred twenty (120) calendar days from the Due Date. Pricing shall not be subject to escalation, adjustment, or withdrawal during this period. Following contract award, all pricing shall remain firm for the duration of the contract term , unless otherwise authorized in writing by COTA. Unacceptable Proposals No proposal will be accepted from or contract awarded to, any person, firm or corporation that is in arrears or is in default to COTA upon any debt or contract, or that is a defaulter as surety or otherwise, upon any obligation to COTA, or has failed to perform faithfully any previous contract with COTA. Proposal Requirements All proposals shall be submitted in a digital .pdf format and shall be no more than 30 pages in length (excluding the required notarized forms and separate price proposal). Submissions exceeding the page limit will be deemed unresponsive and will not be evaluated. The submitting offeror is responsible for all costs associated with the preparation and submittal of its proposal. Section 1. Title Page: The title page should reflect the Request for Proposal number and subject title, the name of the offeror’s firm, and the primary contact person with their e-mail address and telephone number. Section 2. Transmittal Letter: A transmittal letter must be submitted with an offeror's proposal. The letter must include the following: A statement of the offeror's understanding of the services required by the Request for Proposal and the scope of services. The name(s) of the person(s) authorized to make representation(s) on behalf of the offeror (including their title, address, telephone number, and e-mail address.) A statement that the individual who signs the transmittal letter is authorized to bind the offeror to a contract with COTA. Section 3. Personnel, Qualifications and Experience: Provide an overview of the offering firm’s mission, purpose, historical background, proof of financial stability, and experience regarding the services requested in the solicitation. Supply the name, title, and resume of the individual(s) who will serve as the primary point(s) of contact and/or project manager(s). The identified individual(s) must be empowered to speak for the company on policy and contractual matters and be familiar with the services required by COTA. Provide a list of at least three (3) references, other than COTA, who may be contacted to assist in evaluating the offering firm’s past performance. Please limit these references to organizations (preferably government, industrial, or commercial accounts) for whom services have been provided over the past three (3) years. Information should include the organization's name, contact person, complete address, telephone number, e-mail address, and the service provided.. Section 4. Technical Approach: Present a detailed discussion of the offering firm’s understanding of COTA's needs and the planned approach to fulfilling those needs, including: Design, Development, & Implementation of Services Overall Strategic approach and methodology of services Understanding of COTA’s business plan and vision, and how the proposed services support and align with that vision and organizational objectives Section 5. Project Management and Data Security: Describe the approach to identifying and managing risks related to this engagement. Include key risks anticipated for the project, how they will be assessed and prioritized, proposed mitigation strategies, and how risks will be monitored and communicated throughout the engagement. Emphasis should be placed on proactive planning and effective communication. Exhibit how the offering organization will ensure that COTA’s assets (physical and digital) will be protected from physical and cybersecurity threats, and the offeror will protect data/information shared between COTA and the vendor. Cost Proposal: Provide complete, current, and accurate cost or pricing data in accordance with Federal and State of Ohio Acquisition Regulations. In order to ensure that all information provided in the Cost Proposal is complete and accurate and includes the necessary detailed documentation to allow COTA to perform the required review and evaluations in a timely and efficient manner, the following information should be provided for the individual cost categories or cost elements. Failure to submit the required information may delay the review, negotiation, and awar
Published attachments
Public questions and answers
Section 3.1.1 lists invoice requirements but does not state payment timing. What are COTA's payment terms for this contract (for example, net 30 days from an accepted invoice)?
NET30
Have there been any changes to the scope of work from the current contract to the New RFP?
The scope of work outlined in the current RFP reflects COTA's requirements for the new contract. Prospective bidders should carefully review the RFP, including all service requirements, locations, frequencies, and associated responsibilities, and base their proposals on the requirements identified in the solicitation documents.
Section 1.3.3 requires three references for services provided by the offering firm over the past three years. For a newly formed prime contractor whose proposed work will be performed by an experienced identified subcontractor, may the subcontractor's references and past performance be offered to satisfy this requirement, and how would COTA evaluate past performance in that case?
Section 1.3.3 requires references for services performed by the offering firm (prime contractor). References from an identified subcontractor may be submitted as supplemental information to demonstrate the subcontractor's relevant experience and capabilities; however, they do not replace the requirement for references from the offering firm. COTA will evaluate the qualifications and past performance of the prime contractor in accordance with the solicitation requirements. The experience of proposed subcontractors may also be considered where relevant. The prime contractor remains responsible for all contractual obligations and satisfactory performance of the services.
Can COTA provide the current contractor's original contract award amount, current annual contract value, and any amendments or extensions? Or Can COTA provide the previous contract award tabulation and the current contract's scope of work for comparison?
please submit a public records request to publicrecords@cota.com to obtain this information.
OpenGov categories
- 562111 · Solid Waste Collection