Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)

Description

The proposed project, hereinafter referred to as the “Project” consists of the construction of a fishing pier at Tri Village Park in Choctaw Beach on Choctawhatchee Bay, including an ADA-accessible ramp, access pier, terminal platform, kayak launch, stairs, and handrails, on driven timber piles with composite decking, in accordance with the Bidding Documents, including the Contractor’s signed and sealed plans. Location : Tri Village Park (Choctaw Beach), 13837 W Hwy 20, Choctaw Beach, Walton County, Florida, on Choctawhatchee Bay, at the site of the former fire station. Contract Time: The contract duration is ONE HUNDRED TWENTY (120) days to substantial completion with an additional THIRTY (30) days for punch list completion. Base Bid Signed and sealed structural plans for the pier, prepared by a Florida-licensed professional engineer to follow the County's conceptual plans, including submittals and review comments. Construct the Tri Village Park fishing pier complete and in place per the approved signed and sealed plans, including mobilization, building permit and fees, removal and reset of riprap as required to place piles along the bluff, driven timber piles, framing, composite decking, ADA ramp, stairs, handrails, kayak launch, signs, permit compliance, closeout, and demobilization. Scope of Work Special Requirements 1. License. The Bidder must hold, at bid opening and throughout the contract, all licenses required by Chapter 489, Florida Statutes, and by Walton County for the Work, including any marine contractor license. Submit license numbers with the bid. A bid submitted without them may be rejected as non-responsive. 2. Insurance. The Contractor shall carry the insurance required by the Contract, including marine coverages. SCOPE OF WORK: TRI VILLAGE PARK PIER CONSTRUCTION (ITB 27-01) 1. Project Description. The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals, including the structural design and signed and sealed plans described in Item 9, to construct a fishing pier at Tri Village Park (Choctaw Beach) on Choctawhatchee Bay. The conceptual plans prepared by Walton County Engineering dated April 29, 2026 (the "Plans") are provided for reference and establish the footprint, dimensions, and location of the pier. The Contractor's County-approved sealed plans control construction, except that the footprint, dimensions, and location shown in the Plans shall be held. 2. Work Included. Work includes the following, as shown conceptually on the Plans and as detailed in the Contractor's approved sealed plans: - ADA-accessible ramp, access pier, terminal platform, and kayak launch, with stairs and handrails, per the Plans. - Driven pressure-treated timber piles, with embedment and driving per the sealed plans. - Pressure-treated timber framing, flow-through composite decking, hardware, guardrails and ADA handrails, aluminum steps and railing at the kayak launch, and "No Boat Mooring Allowed" signs, per the Plans. - Marine access by barge for pile placement, as allowed by the permit conditions. Equipment and materials shall be staged on site at a location coordinated with the County, outside the FDOT right-of-way. Removal and reset of existing riprap as required to place piles along the bluff, per the Plans. 3. Work Not Included. All other park work (driveway, parking, sidewalks, grading, stormwater, and demolition of existing buildings) will be performed separately by County forces, and permits for the park work are the County's responsibility. The County will complete the upland work required for the Contractor to mobilize before issuing the Construction Notice to Proceed, and will coordinate access and staging with the Contractor. 4. Contractor Qualifications. See Special Requirements, item 1 (License). 5. Permits and Conditions. The County has obtained FDEP verification of exemption, proprietary authorization, and Federal authorization under the State Programmatic General Permit for the pier (FDEP File No. 0470011-001-EE-66). The Federal authorization is subject to its terms and conditions, which will be attached to the bid documents. FDEP advised the County in writing on October 30, 2026 that the SPGP verification remains valid. The Contractor shall comply with all permit conditions attached to the bid documents. The authorizations are based on the pier design as submitted to FDEP. The Contractor shall not change the footprint, dimensions, or location of the pier without the County's prior written approval and any re-verification the issuing agency requires. The Contractor shall complete and submit any commencement, as-built, or completion documentation required by the permits. The County will not issue a Construction Notice to Proceed or a Limited Notice to Proceed until it has confirmed that all required authorizations remain in effect. The Contractor shall obtain and pay for the Walton County building permit required for this Work and any other permits required for its work, shall pass all required inspections, and shall deliver the final inspection approval to the County at closeout. 6. Site Conditions and Hours. Work is allowed in daylight hours, Monday through Friday, because the surrounding parcels are residential. No maintenance of traffic is anticipated on Highway 20. No submerged debris or existing piles are known in the pier footprint. Water service is from the City of Freeport. 7. Warranty and Closeout. Contractor shall provide a one-year warranty on all materials and workmanship, beginning on the date of Substantial Completion. Closeout requires: (a) as-built drawings; (b) completion certifications and any closeout documentation required by each permit or authorization for the Work; and (c) manufacturer information and warranties for all materials used in the Work, delivered to the County. Final payment is conditioned on receipt of all closeout documents. 8. Administration. Walton County Engineering administers the Contract on behalf of the County, reviews and approves the Contractor's sealed plans, and inspects the Work. The Contractor's engineer is the engineer of record for the sealed plans. Change orders require written approval of the County in accordance with the County's purchasing policy and the Contract. 9. Structural Design. The Contractor shall furnish structural plans signed and sealed by a Florida-licensed Professional Engineer, at its expense and included in the bid price. The sealed plans shall conform to the pier footprint, dimensions, and location shown in the Plans and verified by FDEP, and to the Florida Building Code and ADA requirements. The County must review and approve the sealed plans before the building permit application is submitted and before construction begins. County review does not relieve the Contractor of responsibility for the design. The geotechnical report is provided for information only. The Contractor is responsible for verifying site conditions and for its own design. The Contractor shall submit its sealed plans to the County within the time stated in the Contract Documents. Invitation to Bid BOARD OF COUNTY COMMISSIONERS, WALTON COUNTY, FLORIDA Tri Village Park Pier Construction (Choctaw Beach Fishing Pier) 27-01 Sealed bids for the Tri Village Park Pier Construction (Choctaw Beach Fishing Pier) Project will be received by the Walton County Board of County Commissioners, hereinafter referred to as "County" until 2:00 pm LOCAL TIME on Thursday, December 10, 2026 , for furnishing labor and materials and performing all work set forth in the Bidding Documents prepared by Walton County. IMMEDIATELY FOLLOWING the scheduled closing time for the reception of bids, all bids which have been submitted in accordance with the conditions of the Bidding Documents issued in relation to this Project will be publicly opened and read aloud. Bidder is responsible for the submission of its bid. Bids received after the specified day and time will not be opened. The proposed project, hereinafter referred to as the “Project” consists of the construction of a fishing pier at Tri Village Park in Choctaw Beach on Choctawhatchee Bay, including an ADA-accessible ramp, access pier, terminal platform, kayak launch, stairs, and handrails, on driven timber piles with composite decking, in accordance with the Bidding Documents, including the Contractor’s signed and sealed plans. Location : Tri Village Park (Choctaw Beach), 13837 W Hwy 20, Choctaw Beach, Walton County, Florida, on Choctawhatchee Bay, at the site of the former fire station. Contract Time: The contract duration is ONE HUNDRED TWENTY (120) days to substantial completion with an additional THIRTY (30) days for punch list completion. AWARD OF THE CONTRACT FOR THIS PROJECT SHALL BE SUBJECT TO LOCAL VENDOR PREFERENCE IN ACCORDANCE WITH WALTON COUNTY PURCHASING POLICIES AND PROCEDURES (PP017). Application for Local Preference is available in the Vendor Submissions section of this Invitation to Bid. Advertisement Date: November 10, 2026 Pre-Bid Meeting (Non-Mandatory): November 17, 2026, 10:30am In-Person: Walton County Central Purchasing, 176 Montgomery Circle, DeFuniak Springs, FL 32435 OR Remote: Bidders may also attend the pre-bid meeting via Microsoft Teams. No download or Microsoft account is required — a web browser is sufficient. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2957406963056437?p=JHILB150ax9u2thQjp Meeting ID: 295 740 696 305 643 7 Passcode: QL6eH9ht Question Submission Deadline: December 3, 2026, 12:00pm Bid Closing Deadline: December 10, 2026, 2:00pm In-Person: Walton County Central Purchasing, 176 Montgomery Circle, DeFuniak Springs, FL 32435 OR Remote: Bidders may also attend the Bid closing meeting via Microsoft Teams. No download or Microsoft account is required — a web browser is sufficient. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2748621335773868?p=49NMBS0obvgzmV0BGG Meeting ID: 274 862 133 577 386 8 Passcode: Qo7qF948 All responses must be submitted electronically via the County e-Procurement Portal: https://procurement.opengov.com/portal/waltoncountyfl/projects/321219. Through the e-Procurement Portal, responses will be securely locked and digitally encrypted until the submission deadline passes. Should you encounter any technical difficulties or require assistance with the e-Procurement Portal, please reach out to our technical support team via the blue chat bubble on the bottom right or via email at procurement-support@opengov.com All subcontractors and suppliers shall be declared on the prescribed Subcontractors and Suppliers Declaration form. Each Bidder’s submittal shall include all the items listed in the Vendor Submissions section. The Successful Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract, as prescribed in the Contract Documents. All bid bonds, payment and performance bond(s), insurance contracts, and certificates of insurance shall be executed by a licensed agent of the surety or insurance company possessing a current A.M. Best’s Financial Strength Rating of A- Class VII or better, that is authorized to do business in the State of Florida and meets the requirements set forth in the Bid Security section. The bid may be withdrawn without penalty prior to the date and time of bid opening. Bids shall remain open and subject to acceptance for a period of forty-five (45) calendar days after the date of bid opening, but the County at its sole discretion may release any bid and bid security. No Bidder may withdraw its bid for a period of forty-five (45) calendar days after the date of bid opening. In order to perform work on public contracts, the successful Bidder shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances. The County will award the bid to the lowest, most Responsible and Responsive Bidder that is most qualified to perform the job according to the specifications and qualifications listed in the Invitation to Bid. Bidders shall provide documentation that they can perform the required services and provide documentation of past and present projects of this same nature, along with references. Failure to provide said documentation will result in a bid being found non-responsive. Before a contract will be awarded for the Project contemplated herein, the County will conduct such investigations as is necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of project specified under the Contract. The County reserves the right to reject bids from Bidders whose past work performance with the County and other governmental agencies, including timeliness of completion of projects and history of payment to subcontractors or materialmen are deemed by the County to be unsatisfactory. The Bidder shall submit with its bid detailed written evidence of experience and current commitments necessary to allow the County to evaluate the bidder's qualifications. Failure to do so will Instruction to Bidders DEFINED TERMS The term "Bidder" shall mean one who submits a bid directly to the County, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Responsible and Responsive Bidder" means a person or entity who has submitted a bid which conforms in all material respects to the requirements set forth in the Bidding Documents and has the capability, in all respects, to perform fully the contract requirements, and the tenacity, perseverance, experience, integrity, reliability, capacity, facilities, equipment, and credit which will assure good faith performance. The term “ Successful Bidder ” means the most Responsible and Responsive Bidder with the lowest bid who has been selected for award of the Contract. The term “ Contract ” shall mean the agreement between the Successful Bidder and the County resulting from this ITB. The term “ Contract Documents ” includes the Construction Contract, Construction Plans prepared by Walton County Engineering dated April 29, 2026 (the ‘Plans’), the Contractor’s County-approved signed and sealed plans, and the information provided in the Scope of Work and Attachments sections , dated April 29, 2026 , that can be accessed by the provided links: Scope of Work and Attachments . The term "Bidding Documents" includes the Invitation to Bid, Instruction to Bidders, Contract Documents and the Bid Form (including all addenda issued prior to receipt of bids). The term “ Notice of Award” shall mean the form issued by the Purchasing Department awarding the Contract to the Successful Bidder. The term " Notice to Proceed " shall mean the letter issued by the Purchasing Department notifying the Successful Bidder to commence work on the Project, including design, submittal, and permitting work. COPIES OF BIDDING DOCUMENTS Complete sets of Bidding Documents must be used in preparing bids; neither the County nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. The County and Engineer in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining bids on the Project and do not confer a license or grant for any other use. QUALIFICATIONS OF BIDDERS To demonstrate qualifications to perform the Project, each Bidder shall submit with their bid detailed written evidence of experience completing projects of the nature and scope similar to the project described in this Invitation to Bid, documentation of current commitments, a copy of all applicable occupational and state contractor licenses, and such information as is required in the Vendor Submissions section. Each Bidder must also be prepared to submit within FIVE (5) business days of the County's request, written evidence, such as licenses, financial data, previous experience, present commitments, and other such data as may be requested by the County. Each bid must contain evidence of Bidder's qualification to do business in the State of Florida. Specifically, the Bidder shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances. EXAMINATION OF CONTRACT DOCUMENTS AND SITE It is the responsibility of each Bidder before submitting a bid, to (a) examine the Contract Documents thoroughly, (b) visit the Project site to become familiar with local conditions that may affect cost, progress, performance, or completion of the Project, including the time and cost in obtaining any necessary fee or permit, (c) consider federal, state, and local laws and regulations that may affect cost, progress, performance, or completion of the Project, (d) study and carefully correlate Bidder's observations with the Contract Documents, (e) notify the County of any conflicts, errors, or discrepancies in the Contract Documents, and (f) attend any mandatory pre-bid meeting. The County does not assume responsibility for the accuracy or completeness of the Contract Documents or for any additional reports, drawings, and specifications that may be made available for viewing by the County to any Bidder on request. Before submitting a bid, each Bidder will, at the Bidder's own expense, make or obtain any additional information and data which pertain to the physical conditions (surface, subsurface, underground facilities) at or contiguous to the site which may affect cost, progress, performance, or completion of the Project and which Bidder deems necessary to determine its bid for performing and completing the Project in accordance with the time, price, and other terms and conditions of the Contract Documents. Upon request, in advance, the County will provide each Bidder access to the Project site to conduct such explorations and tests as each Bidder deems necessary for submission of a bid. Bidder shall fill all holes, clean up, and restore the site to its former condition upon completion of such explorations. Temporary construction facilities and storage of materials and equipment will be provided by Bidder. The submission of a bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of these Instructions to Bidders including visiting the Project site to become familiar with local conditions that may affect the cost, progress, performance, or completion of the Project; that without exception the bid is premised upon performing and furnishing of the labor, services, equipment, and materials required by the Contract Documents in accordance with such means, methods, techniques, sequences, or procedures of construction as may be indicated in or required by the Contract Documents; and that other than the structural design the Contractor is required to furnish, the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and completion of the Project. NON-MANDATORY PRE-BID CONFERENCE A non-mandatory pre-bid conference will be held at 10:30 am on Tuesday, November 17, 2026 at In-Person: Walton County Central Purchasing, 176 Montgomery Circle, DeFuniak Springs, FL 32435 OR Remote: Bidders may also attend the pre-bid meeting via Microsoft Teams. No download or Microsoft account is required — a web browser is sufficient. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2957406963056437?p=JHILB150ax9u2thQjp Meeting ID: 295 740 696 305 643 7 Passcode: QL6eH9ht . INTERPRETATIONS AND ADDENDA All questions about the meaning or intent of the Contract Documents are to be posted on the County's e-Procurement portal accessible via the following link; https://procurement.opengov.com/portal/waltoncountyfl . Addenda may be issued to modify the Bidding Documents as deemed appropriate by the County. DIRECTING QUESTIONS TO ANY

Published attachments
Public questions and answers
  • What is the budget and/or estimated cost of construction?

    Estimated Project Cost: $234,025.00

  • If the total price is below $200K will you still require a bond? Referencing Section 255.05

    Yes. The ITB requires the Successful Bidder to furnish a payment and performance bond (see Section 5.3), regardless of the final bid amount. The County’s estimate exceeds $200,000, and the County has not exempted any bidder from the bond requirement. The 5% bid security in Section 2.8 is also required with every bid.

Plain text

OpenGov categories

  • 12035 · Docks and Piers, Fixed and Floating (Including Dock Systems, Gangways, Marinas, Wharfs, etc.)