Skip to content
← Back to search
SolicitationSmall business set-asideActive

Tunnel 9 Pitch Upgrade

Description

The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: • Primary control valve (step response time of 55 ms or less) • Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s) • Hydraulic Power Unit (HPU) • Dedicated filtration and cooling "kidney" loop.

Attachments

4 files

Contacts

Amendment history

2 amendments · latest Nov 6
  1. Latest amendment

    Response deadline
    Before: Nov 6After: Dec 10
    Attachments
    Before: 3After: 4+1
    View on SAM.gov (opens in a new tab)
  2. Amendment

    Attachments
    Before: 2After: 3+1
    View on SAM.gov (opens in a new tab)
  3. Earliest version on file

    2 attachments · Responses due Nov 6

    View on SAM.gov (opens in a new tab)

Official sources

Notice on SAM.govsam.gov · Official U.S. government record (opens in a new tab)Plain text

DEPT OF DEFENSE

Posted
Nov 12, 2026
Due
Nov 27, 2026
NAICS
332912
Set-aside
Small Business Set Aside - Total