Skip to content
← Back to search
Combined Synopsis/SolicitationArchived

UPDATED: 9/8/2026 - 37250PR260000050 - USCG AIR STATION SAN DIEGO CREW BERTHING ROOMS RENOVATIONS - CONSTRUCTION

HOMELAND SECURITY, DEPARTMENT OF · BASE LOS ANGELES/LONG BEACH(00037)

This notice is no longer open for responses. Find active opportunities

Contract Details

Solicitation number
37250PR260000050
Notice ID
37250PR260000050
Opportunity Type
Combined Synopsis/Solicitation
Sub-Agency
US COAST GUARD
Office
BASE LOS ANGELES/LONG BEACH(00037)
Posted Date
Tuesday, September 8, 2026
Response Deadline
Sep 18, 2026, 11:59 PM EDT
PSC Code
Z2JZ
Set-Aside
Small Business Set Aside - Total
Place of Performance
San Diego, CA, 92101, USA
Status
Archived

Description

UPDATE: PHOTOS HAVE BEEN ADDED TO SOLICITION EVALUATION TERMS ADDED: FAR 52.212 - RELEVANT PAST PERFORMANCE AND PRICE ARE MORE IMPORTANT Solicitation: Aircrew Duty Berthing Renovations Set-Aside: Total Small Business Set-Aside (FAR Subpart 19.5) Location: USCG Sector San Diego, Building D (Aircrew Duty Berthing Room), 2170 N. Harbor Drive, San Diego, CA 92101 Important Dates Questions Due: September 15, 2026 Proposals Due: September 18, 2026, by 11:59 PM Eastern Time 1. Project Background and Objective The U.S. Coast Guard requires complete renovations of the Aircrew Duty Berthing Room in Building D at Sector San Diego. The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to modernize the space for active-duty personnel. 2. Scope of Work (Summary) - Please review the attached Statement of Work (SOW) for full technical requirements, safety standards, and applicable codes. The Contractor is responsible for the demolition of existing materials and the installation of new commercial-grade fixtures. Key tasks include: Lighting Renovation: Replace existing light fixtures with new fully dimmable LED fixtures featuring a selectable red-light mode across 6 sleeping rooms, 1 central hallway, and 1 bathroom. Bathroom Renovation: Demolish existing fixtures, tile, and shower pan. Install a new commercial-grade toilet, sink/vanity with enclosed storage, shower pan, low-maintenance sheet vinyl flooring, and a new mirror. Flooring Installation: Remove approximately 590 sq ft of existing carpet and install new Luxury Vinyl Plank (LVP) flooring, including new baseboards and trim. Interior Painting: Prepare and paint all interior walls and trim in the 6 sleeping rooms and the common passageway. 3. Site Conditions &

Read full description (4,144 characters)

Hazardous Materials An Asbestos and Lead Survey was conducted for this facility (AESS Job No. 26-092). Asbestos: No asbestos was detected in the Berthing Room in Building D. Lead: Lead was detected at very low concentrations (<0.00146% to 0.0039% by weight). While below the EPA/HUD threshold for Lead-Based Paint, any detectable level of lead triggers Cal/OSHA Lead in Construction Standard (8 CCR § 1532.1) compliance. Handling & Disposal: Debris and waste generated from the removal of lead-containing materials must be evaluated for appropriate disposal classification (TCLP or TTLC) prior to off-site disposal. Government dumpsters shall not be used. 4. Period of Performance and Hours All work shall be completed within 60 calendar days from the issuance of the written Notice to Proceed (NTP). Work hours are Monday through Friday, 0800 to 1700 hours, excluding federal holidays. Any disruption to utilities must be coordinated at least 72 hours in advance. 5. Wage Determinations This project is subject to the Davis-Bacon Act (FAR 52.222-6). Prevailing wages for San Diego County, CA, apply. See the attached General Decision Wage Determination. 6. Proposal Submission Requirements To be considered for award, interested offerors must submit the following documents with their proposal: Product Data Sheets & Warranties: For LED lighting fixtures, bathroom vanity, toilet, shower pan, LVP flooring, and any other major items to be replaced. Samples: Paint color and flooring finish samples or spec sheets. Safety Plans: An Activity Hazard Analysis (AHA) & Accident Prevention Plan (APP) detailing Cal/OSHA compliance for lead-containing materials and general construction safety. Technical Plan: Detailed technical plan outlining the project schedule from the post-award walk-through to construction completion. Past Performance & Licensing: Relevant past performance examples and proof of valid professional and trade licenses (plumbing, electrical, tile-setting). Pricing: Transparent pricing sheet breaking down labor, materials, waste disposal, and the total proposed cost. Attachments Statement of Work (SOW) - Aircrew Duty Berthing Renovations Davis-Bacon Wage Determination - San Diego, CA Asbestos and Lead Survey Report - AESS Job No. 26-092 All questions should be directed to the Contracting Officer prior to the Q&A deadline.

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
Ryan H. King
Email
ryan.h.king2@uscg.mil
Phone
6199435942

Observed opportunity history

This is the history collected by Gov Contract Finder. Times show when information was captured or a version was assembled, not when SAM.gov originally changed it. Earlier revisions may be missing.

Publications are grouped by matching evidence; revision relationships are inferred.

The original SAM.gov root publication has not been verified.

History
  1. Opportunity version

    Initial information

    UPDATED: 9/8/2026 - 37250PR260000050 - USCG AIR STATION SAN DIEGO CREW BERTHING ROOMS RENOVATIONS - CONSTRUCTION

    Solicitation: 37250PR260000050

    Publication: 7cf54211582a453ea2519692ad0c7191

    Current publication

    Changed fields: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, Award$, AwardDate, AwardNumber, Awardee, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, Description, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PopCity, PopCountry, PopState, PopStreetAddress, PopZip, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, groupingConfidence, logicalOpportunityId, samNoticeId, samRootId, solicitationNumber, source

    First established information: AAC Code, Active, ArchiveDate, ArchiveType, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, Description, FPDS Code, Industry, Link, NaicsCode, Office, OrganizationType, PopCity, PopCountry, PopState, PopZip, ResponseDeadLine, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, samNoticeId, solicitationNumber, source

  2. Opportunity capture

    Initial information

    UPDATED: 9/8/2026 - 37250PR260000050 - USCG AIR STATION SAN DIEGO CREW BERTHING ROOMS RENOVATIONS - CONSTRUCTION

    Solicitation: 37250PR260000050

    Publication: 7cf54211582a453ea2519692ad0c7191

    Current publication

STATE, DEPARTMENT OF

Posted
Oct 20, 2026
Due
Not specified
Place of performance
Mexico City, MX-CMX
NAICS
236118
Set-aside
No Set Aside