State and local · OpenGov
US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)
Description
The City of Richmond is accepting bids for the US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702) project. The work will include construction of sidewalks, curbs, and ADA-compliant curb ramps; installation of pavement markings, signage, lighting, and traffic signal conduit; landscaping, utility adjustments, and all other work items needed to complete the project. Statement of Work Project Identification Project Title: US 60 Downtown Expressway Gateway Pedestrian Improvements Drawing #: O-29131 City Project #: 106673 State Project #: 0060-127-002, C501 Federal Project No: NHPP-5A27(693) UPC: 111702 Acronyms & Definitions The Definitions, Abbreviations, Acronyms, and Terms as presented in Section 101 of the 2020 Virginia Department of Transportation Road and Bridge Specifications are incorporated by reference. The following is a summary of Acronyms and Definitions as noted within this document. A&E of Record: Architect or Engineer of Record for the project. ADA: Americans with Disabilities Act. Agency: The City of Richmond and other representative departments responsible for the oversight of the proposed project. CAD: Computer Aided Design City’s Representative: Means a party that has been delegated authority to conduct inspections, monitor, and/or perform testing and report to the City all and any issues of significance. CO: Contracting Officer. Complete in Place: Means all work shall be fully completed, and not left in an unfinished condition, prior to engaging in any additional tasks. COR: Change Order Request. PM: City Project Manager or designated authority. Project Closeout: Means certain collective project requirements, signifying completion of the work that is to be fulfilled to achieve contract completion in preparation for final payments to the respective parties. RFI: Request for information; means a formal written submittal to the A&E of Record or the contracting officer, to obtain further clarification on matters relating to the solicitation process, contract documents, construction documents, or other subject matter relating to construction phase activities. SC: Subcontractor; Means a designated firm for which a contractual agreement is binding between itself and the Construction Manager/General Contractor. SSC: Sub-subcontractor, a designated firm in which a contractual agreement is binding between the Subcontractor. Third Party: Means a company, firm, or special inspections service provider that is under a contractual agreement with the City of Richmond to perform professional and/or non-professional services for the project. Scope of Construction Construction includes, but is not limited to, the following: Maintenance of Traffic Construction of new concrete sidewalks Installation of new street trees and landscaping Construction of new concrete ADA curb ramps Installation of pavement markings and traffic signs Construction of curb extensions and traffic islands Installation of ornamental pedestrian lights to existing poles Refurbishment of existing light poles Installation of conduit for traffic signal communications Adjustment of water and sanitary services as necessary Erosion and sediment control including inlet protection and tree protection fencing Plans and Specifications All work shall be performed in accordance with the official plans and specifications as noted below: City of Richmond and the Virginia Department of Transportation standards and specifications, most recent edition. Latest versions of Virginia Department of Transportation (VDOT) 2020 Road and Bridge specifications, 2016 Road and Bridge Standards. VDOT Work-Area Protection Manual (VWAPM) version 11.0, January 2026 - final The Virginia Manual on Uniform Traffic Control Devices, Version 11.0 (VMUTCD) Attachment T - UPC_111702_Plans_O-29131_21Sept2026 Attachment U - VDOT_Special_Provisions_UPC_11702 Attachment V - Richmond_Special_Provisions_UPC_111702 Attachment W - VDOT Picklist Attachment X - Richmond Mod VDOT MP-3 Signal Pole 3.17.2022 Attachment Y - CQAP Sample-UPC111702 Attachment Z - Wage_Determination_VA20260098 The Contractor shall refer and conform to these documents and shall construct the proposed work per the approved specifications and approved construction drawings. The Contractor shall provide their subcontractors and suppliers all necessary documents to complete their work. Place and Time of Performance The project will be performed along S. 9th, S. 7th, E. Byrd, and E. Canal Streets adjacent to Kanawha Plaza. Work is permitted on this project from 7:00 AM to 6:00 PM Monday through Friday. No work shall be performed on Saturday, Sunday, or the following holidays or special events without written consent of the City: New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Holidays (Wednesday thru Friday), and Christmas Holidays (Christmas Eve & Christmas Day). There shall be NO lane closures or reductions to the number of existing thru lanes from 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM any day of the week. The period of performance for the project shall be 550 consecutive calendar days from the Notice to Proceed which includes thirty (30) calendar days for inclement weather and holidays. Points of Contact During the solicitation phase, contact with City officials or representatives of the City shall be limited to City staff from the Department of Procurement Services (DPS). The DPS main point of contact for this solicitation is Sue Demery, Sue.Demery@rva.gov . All questions regarding this solicitation shall be asked via the question and answer feature in OpenGov. During the delivery of the project, the main point of contact for this project is the PM. Unless otherwise authorized, the Contractor shall not contact the A&E of Record or other Agency representatives for any matter. The Contractor shall be allowed to contact DPS solely to address administrative matters pertaining to the construction Contract. DPS will not answer any questions, direct any work, or handle disputes related to construction, design of the proposed systems, or any other associated efforts. The table below provides a list of contacts for the project: Project Manager Yongping Wang, PE Department of Public Works 804-646- 2467 Yongping.Wang@rva.gov Engineer of Record Chris Daily, PE Vanasse Hangen Brustlin, Inc. 1021 E. Cary St. Ste 200, Richmond, VA 23219 571-389-8121 Capital Projects Administrator Lamont Benjamin, PE Department of Public Works 804-646-6339 Lamont.Benjamin@rva.gov General Notes Permits. The Contractor shall be responsible for coordinating all traffic control and work-in-streets permits within the city. No Right of Way is needed for this project. Mobilization and Demobilization. No additional payment will be made for demobilization and remobilization due to shutdowns, suspensions of work, work moratoriums, or other mobilization activities. The construction site shall be restored in compliance with City Standards. Demobilization shall include, but is not limited to, pavement restoration, removing any steel plates, and vacating the construction site and surrounding area (men and equipment). The restored site shall not interfere with the flow of traffic or pedestrian movements in any way. Street and Sidewalk Access. Access for both emergency services and residents shall be maintained at all times during construction regardless of whether a street closure is or is not in effect. The Contractor shall limit the length of work areas along E. Canal Street, E. Byrd Street, S. 7th Street and S. 9th Street, such that sidewalk excavation and restoration can be complete in no more than one month for each block. Access to all businesses shall be maintained at all times during working hours. The Contractor shall maintain accessible pedestrian routes around the work area at all times or properly sign pedestrian detours in compliance with the latest revision of the Virginia Work Area Protection Manual. Detectable edge devices shall be used along all pedestrian paths adjacent to the work area. For work at intersections in the vicinity of intersections with existing crosswalks the contractor shall maintain at least one crosswalk at all times. Enclosed Spaces. At locations where work is called for in manholes, the Contractor shall follow all applicable City, State, and Federal requirements regarding work in enclosed spaces. Work within the City’s Department of Public Utilities (DPU)/Department of Public Works (DPW) joint-use manholes requires the Contractor to have personnel certified for cable installation in a medium-voltage (2400 through 15000 volts) work environment and for work in enclosed spaces. Required Work Zone Certifications. As work may be required at congested traffic intersections, the Contractor shall have at least one employee or subcontractor who is IMSA Traffic Signal Construction Level II and VDOT Intermediate Work Zone Safety Training certified on-site at all times. Retainage. Retainage will not be held unless the Engineer determines the Contractor’s progress is unsatisfactory according to the approved schedule or other applicable Contract documents. The Engineer will send a notice of unsatisfactory progress to the Contractor advising him of such determination. This notification will also advise the Contractor that five percent retainage of the monthly progress estimate is being withheld and will continue to be withheld for each month the Contractor’s actual progress is determined to be unsatisfactory. When the Engineer determines that the Contractor’s progress is satisfactory in accordance with these requirements, the 5 percent retainage previously withheld because of unsatisfactory progress will be released in the next monthly progress estimate, and the remaining monthly progress estimates will be paid in full provided the Contractor’s progress continues to be satisfactory. Maintenance of Traffic. Maintenance of Traffic is to be paid for as a lump sum for all work required in accordance with the Virginia Work Area Protection Manual, latest revision, to maintain traffic and a work zone at all individual work locations. Joint Work. All joint work shall be neat, clean, and straight. Material Salvage and Disposal. Contractors are responsible for the proper disposal of excess excavation, materials and demolition. All inert materials not designated for salvage (concrete, brick, uncontaminated soils, cobblestone, etc.) from the project shall be disposed of at an approved landfill and the cost of loading and hauling to the landfill shall be incidental to the unit price of the other items. Subcontractors. All subcontractors shall be documented on a subletting request, VDOT Form C-31. Federal Funding Requirements This Project is funded by Smart Scale Funding and is subject to federal contract provisions and the Davis Bacon General Wage Decision. Should there be any discrepancies among mandatory requirements of federal, state and/or local laws or regulations, the federal aid or the most restrictive shall apply. This is federally funded project; no negotiation shall be allowed with the selected bidder. Safety Prior to assuming any construction activities, the Contractor shall submit a site safety plan and company safety plan to the PM, Consultant Construction Manager, and A&E of Record. The Contractor shall submit a list of emergency contact numbers to both the PM and A&E of Record; such list shall also be posted on-site in an area that can be readily visible to first responders and others in the event of an emergency. The Contractor shall immediately report any accidents or incidents to the PM or PM designee. Post-accident reports shall be submitted to both the PM/PM designee and A&E of Record for further review. Quality Control The Contractor shall be responsible for Quality Control (QC) on the project. The Contractor shall review all construction work and associated activities on the project to verify conformance with the approved construction documents. If the Contractor subcontracts quality control, the Contractor is prohibited from using the same third-party testing firm(s) that the City will use on the project. Acceptance testing will be performed, at a minimum, by the City in accordance with VDOT standards, Virginia Test Methods, and/or locality standards, as applicable. The City and/or designee(s) will review all work and other associated activities on the project to verify conformance with the contract. Cost for quality control testing is incidental to the associated line item. Unit price shall include all overhead, profit, labor, materials, equipment, and incidental work and shall be the sum total compensation payable or creditable for such items of work in place. The unit price shall be good for the duration of the contract. All erosion and sediment control measures shall be the responsibility of the Contractor and in accordance with VDOT Erosion and Sediment Control Standards. All erosion control measures will be in place and reviewed by the Contractor at least once every five (5) business days and within 24 hours of a rainfall event or every four (4) business days to ensure compliance for the control of any erosion and siltation. Any corrections or repairs will be made immediately by the Contractor at the Contractor's expense. Existing Utilities Improvements were developed using survey in the project corridor. Utilities are shown based on record and survey data. The exact condition of existing utilities are unknown. The City strongly recommends that the Contractor assess and document the condition of any utility in the work area prior beginning work as part of the requirement to verify location and condition of existing utilities. The Contractor is responsible for coordination and protective measures required to safely perform work within utility transmission corridors. The Contractor must contact the City Surveys Department (804-646-5404) 48 hours prior to start of any work that may impact existing right-of-way monuments and/or markings so that reference points may be established for all permanent monuments or baselines that may be disturbed. Personnel The Contractor shall submit a list of key personnel that will be assigned to the project/project areas. The list shall comprise of the following: Name of Individual Company Title/Position Contact Numbers – Office and Mobile E-mail Address If personnel are removed from the project, the Contractor shall immediately notify the PM of the personnel change. The Contractor shall seek approval from the PM prior to assigning new personnel to key positions overseeing the project. The Contractor shall provide at minimum five (5) business days' notice of the change in personnel. Following approval, the Contractor shall issue a revised key personnel chart to the PM. Change Orders Should unforeseen events occur that expand the initial scope, the Contractor shall submit a change order request (COR) to the A&E of record and PM. The Contractor shall provide a PDF on the City’s Proposed Change Order form of the COR outlining the basis of the request in which a change order is justified with supporting documentation to substantiate additional costs, increases, or requests for additional time. The request will be thoroughly reviewed by the A&E of record, PM, and Department of Procurement Services (DPS) prior to accepting or rejecting the request. This review will take a minimum of ten (10) business days. Project Closeout Project closeout shall entail a number of conditions and terms which must be satisfactorily met before the final payment per the last schedule of values. Prior to close out of the project, the A&E of Record shall certify that there are no outstanding items pending on the project punch list and shall verify receipt of the Affidavit of Claims. Close out of the project shall be at the discretion of the A&E of Record and PM or PM designee. Deliverables The Deliverables for the project shall include, but be not limited to, the following items which shall be relinquished to the City. Progress Schedule. The Contractor shall submit to the City and Architect/Engineer for review and approval a proposed CPM-type Project Schedule within seven (7) calendar days prior to beginning work. The schedule must show the anticipated time of commencement and completion of each of the various operations to be performed under this Contract, together with all necessary and appropriate information regarding sequence and correlation of work, and an estimated time required for delivery of all materials and equipment required for the project including a schedule of submission for submittals, shop drawings, and samples. The proposed Project Schedule shall include each major milestone to be achieved for the duration of the project that directly coincides with the critical path. The milestones should include, but are not limited to, the following activities such as: Award of subcontracts, Material buyouts, Submittal approvals, Mobilization, All construction activities, and Associated inspections/testing. The proposed Project Schedule shall be revised as directed by the City or Architect or Engineer until approved and shall be considered the approved Project Schedule and strictly adhered to by the Contractor. The Project Schedule may only be revised per submittal by the Contractor of a proposed Project Schedule revision in sufficient detail as determined by the City for review and approval by the City. Project Schedule progress updates shall be provided at each monthly Project Meeting and the Project Schedule progress updates submitted at these meetings are not to be considered as Project Schedule revisions or as a submittal for a Project Schedule revision. Two weeks look ahead (TWLA) will be submitted every other Wednesday by close of business. VDOT Forms for Source of Materials. The Contractor shall submit source of material/C-25 forms for all materials to be used on the project. Materials shall come from sources approved by VDOT or approved by the City, where applicable. No materials shall be delivered for use on the project without prior approval of the C-25 form. Shop Drawings. The Contractor shall submit Shop Drawings for all work requiring fabrication in accordance with City and VDOT specifications. Payment Reporting/Certifications. This project is subject to the Davis Bacon General Decision VA20260126. The Contractor shall submit documentation in the timeframes indicated to ensure compliance. The City Minority Business “Monthly Compliance Report” (MBE-3) shall be submitted with pay requests/invoices. As-Built Drawings. The Contractor shall ensure that As-Built drawings are kept up to date throughout the project. Drawings will be reviewed periodically as part of the draft monthly pay application review and approval process. Monthly pay application processing may be delayed if as-built drawings are not up to date. All as-built drawings (one–hard copy and three electronic copies) are required by Final Completion of the project per review and approval requirements. Inspection and Acceptance. Inspections of the new installations shall be coordinated by the Contractor who shall be responsible for scheduling of the inspections with the City, City’s representative, and/or A&E of Record. A minimum of ten (10) business days advanced notice will be required and will be subject to change based on the availability of all parties. In-progress work will be tested and/or accepted in accordance with the project Construction Quality Assurance Plan (CQAP). Items requiring special inspection and acceptance will be inspected by the A&E of Record. Other items will be inspected by the City’s representative. Final acceptance testing will be coordinated by the Contractor and shall be scheduled at a time in advance to ensure presence of appropriate personnel. Acceptance shall be done in accordance with the proje
Published attachments
- SIGNATURE SHEET
- STATEMENT OF NO OFFER
- STATE CORPORATION COMMISSION FORM
- CONSENT TO ACCEPT ELECTRONIC SIGNATURES
- City of Richmond Bid Bond
- City of Richmond Performance Bond
- City of Richmond Labor and Material Payment Bond
- Field Change Order Directive (FCOD)
- Proposed Change Order Form (PCO Form)
- Construction Change Order Summary
- ACH-Direct Deposit Form
- EDI Payment Agreement for Contractors
- Construction Contractor Performance Evaluation
- Affidavit of Payment and Claims
- Minority Business Development Cover Letter
- MBE-ESB - 1 PARTICIPATION COMMITMENT PREQUALIFICATION FORM
- MBE-ESB - 2 PARTICIPATION FORM
- Construction Contract - Example
- myCOI Sample Certificate
- UPC_111702_Plans_O-29131_21Sept2026
- VDOT_Special_Provisions_UPC_111702
- 111702_Richmond_Special_Provisons
- VDOT Picklist PDF
- Richmond Mod VDOT MP-3 Signal Pole 3.17.2022
- CQAP Sample -UPC111702
- Wage_Determination_VA20260098
- US_60_Downtown_Expressway_Gateway_Pedestrian_Improvements_(UPC#111702).pdf
OpenGov categories
- 91117 · C.I.P., Construction, Roads
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
- 91232 · Construction, Street Lighting
- 91275 · Quality Control Testing Services for Construction
- 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
- 91315 · Construction, Canal or Aquaduct
- 91319 · Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal)
- 91327 · Construction, Highway and Road
- 91345 · Construction, Sewer and Storm Drain
- 91347 · Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps)
- 91350 · Construction, Street (Major and Residential)(Includes Reconstruction)
- 91356 · Construction, Utility/Underground Projects
- 91357 · Construction, Vaulted Sidewalk