Skip to content
← Back to search
JustificationActive

USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

Description

RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.

Attachments

4 links

Contacts

Observed opportunity history

This is the history collected by Gov Contract Finder. Times show when information was captured or a version was assembled, not when SAM.gov originally changed it. Earlier revisions may be missing.

Publications are grouped by matching evidence; revision relationships are inferred.

The original SAM.gov root publication has not been verified.

History
  1. Opportunity version

    Initial information

    USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

    Solicitation: N5523626R0009

    Publication: e28e42098d3b432287458e7ac3b57102

    Current publication

    Changed fields: Description

    First established information: Description

  2. Opportunity version

    New opportunity observed

    USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

    Solicitation: N5523626R0009

    Publication: e28e42098d3b432287458e7ac3b57102

    Current publication

    Changed fields: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, AwardDate, AwardNumber, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PopStreetAddress, PopZip, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, descriptionUrl, fullParentPathCode, fullParentPathName, groupingConfidence, logicalOpportunityId, naicsCodes, pointOfContact, resourceLinks, samNoticeId, samRootId, solicitationNumber, source, sourceResourceCount, sourceResourceIds

  3. Opportunity capture

    Initial information

    USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

    Solicitation: N5523626R0009

    Publication: e28e42098d3b432287458e7ac3b57102

    Current publication

Official sources

Notice on SAM.govsam.gov · Official U.S. government record (opens in a new tab)Plain text

DEPT OF DEFENSE

Posted
Nov 27, 2026
Due
Dec 7, 2026, 4:30 PM EST
NAICS
333618
Set-aside
Small Business Set Aside - Total

DEPT OF DEFENSE

Posted
Nov 26, 2026
Due
Dec 7, 2026
NAICS
333618
Set-aside
Small Business Set Aside - Total

DEPT OF DEFENSE

Posted
Nov 26, 2026
Due
Dec 11, 2026
NAICS
333618
Set-aside
Small Business Set Aside - Total