The work under this project involves the repair of the Virginia Zoo Africa Boardwalk. SCHEDULE OF UNIT PRICES For Virginia Zoo - Africa Boardwalk Repairs The unit prices have been computed in accordance with Paragraph 7.3.3.2 of the General Conditions of the Contract for Construction (as amended). Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents. The prices quoted shall include, without exception, all materials, labor, equipment, appliances, clean-up, applicable sales, use and other taxes, building permits or fees, and the Contractor's labor, overhead, profit, mobilization, and other mark-ups, and in full accordance with the Specifications. Include allowance for waste where appropriate. The unit prices shall be maintained throughout the contract period. Unit prices shall be used in determining additions or deductions from the TOTAL CONTRACT AWARD amount in the event of changes in the work. Offeror will provide a complete solution in accordance with the project specifications at Lump Sum pricing below. LUMP SUM BID Project Details Important Bid Details Work to be Substantially Completed in: 445 calendar days Liquidated Damages: one thousand dollars ($1,000.00) per day Performance Bond: one hundred percent (100%) Payment Bond: one hundred percent (100%) Bid Bond: five percent (5%) Closing Date/Time: Friday, December 4, 2026 4:00 pm Physical Correspondence All physical correspondence will be sent to the address shown below and include the Project ID and Project Title. Ken Peacock , Design & Construction Contracting Specialist Project - 24051 : Virginia Zoo - Africa Boardwalk Repairs City of Norfolk, Public Works 810 Union St, 7th Floor Norfolk VA, 23510 Plan Holders List / Project Followers Upon request, contact Ken Peacock at kenneth.peacock@norfolk.gov . Please also check the Followers Tab on this e-Procurement Portal. Other Methods to Receive Bidding Documents Bidding Documents are available from the Department of Public Works at no cost by download at https://procurement.opengov.com/portal/norfolk/projects/299109 or from the City of Norfolk’s website, http://www.norfolk.gov/bids.aspx . A Bid Bond, certified check, or cashier’s check made payable to the Treasurer, City of Norfolk, for five percent (5%) of total bid must accompany each bid. Offerors shall upload a copy of the bid guarantee with the Offeror’s acknowledgement to mail the original sealed document to the Owner, within two (2) business days. State Contractor registration class and number is required by electronic bidding via the Vendor Questionnaire. The City reserves the right to cancel the bid opening or to reject any or all bids in whole or part, when it is in the best interest of the City. The right to waive informalities and to determine responsiveness of any bid and responsibility of all bidders is reserved to the City. Withdrawal of bids will be in accordance with Section 33.1-42.1 of the Norfolk City Code and Section 11-54 of The Code of Virginia, 1950 (as amended). Introduction Summary Background Contact Information Timeline Vendor Questionnaire Lump Sum Bid Bid Award shall be based on the lowest responsive and responsible Total Bid regardless of whether the City elects to award any or all of the Add Alternates. Attachments
Published attachments
Addenda and notices
Official Notice #1: Virginia Zoo - Africa Boardwalk Repairs - Pre-Bid Meeting Sign In Sheet · 1
Listing of attendees to the Pre-Bid meeting has been attached.
Addendum #1 · 1
ADDENDUM NO. 1 Dated: October 1, 2026 24051 - Virginia Zoo - Africa Boardwalk Repairs Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (1) page plus attachments. ITEM NO. DESCRIPTION DATE EXTENSION - Request for Information / Q&A due date extended to 10/19/2026 at 4:00 PM. Response due date extended to 11/12/2026 at 4:00 PM.' TECHNICAL SPECIFICATIONS - Add VirginiaZoo_AfricaWalk_PME Set_260603 plan set. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared By: Armaghan Shalbaftabar, Ph.D Issued By: Ken Peacock, Design & Construction Contracting Specialist
Addendum #2 · 2
ADDENDUM NO. 2 Dated: November 10, 2026 24051 - Virginia Zoo - Africa Boardwalk Repairs Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (1) page plus attachments. ITEM NO. DESCRIPTION Date Extension Response due date extended to 12/4/2026 at 4:00 PM. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Armaghan Shalbaftabar , Ph.D. Issued by: Ken Peacock, Design & Construction Contracting Specialist Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
ADDENDUM NO. 3 Dated: November 19, 2026 24051 - Virginia Zoo - Africa Boardwalk Repairs Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (1) page. ITEM NO. DESCRIPTION Complete Bid Package Delete: 24051 - Complete Bid Package R11102026 Replace with: 24051 - Complete Bid Package R11192026 Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Armaghan Shalbaftabar , Ph.D. Issued by: Katelyn Kroboth, Design & Construction Contracting Specialist Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Do you have an anticipated NTP date?
We would like to start this project asap and NTP will be set when the contract is awarded.
Looks As If The MEP Drawings Are Not Part Of The Drawing Set. End of Drawings Is S502
MEP plans are provided as addendum. Please check open gov document section.
The drawing list on the cover sheet indicates there are plumbing, mechanical, and electrical drawings. They are not with the initial posting. Will they be included?
MEP plans are provided as addendum. Please check open gov document section.
Decking questions: Pattern: Is the pattern for the board widths going to be 4,6,8,4,6,8 or a different pattern? Will there be a 6" border at the perimeter and on spans larger than 20'? Fasteners: Will this project be using a hidden fastening system with plugs? or color matched TopLoc? Skirts: Do the skirts follow the decking pattern? Conflict in the drawings: some parts refer to the decking as composite, and some parts say PVC. If the decking is PVC, there are only two Azek series that have the different width boards. Vintage and Harvest. Rails: What spans are we using between posts? 6'? 8'?
The decking board specified in the drawing are Azek Vintage. The width will all be 5.5 inches per drawings, the hidden fastening systems is not required and the skirts will be 5.5 inches as well.
Please Identify an anticipated allowance for locations/quantities of existing timber girders requiring repair/replacement, and clarify treatment of concealed deterioration
Girders will be replaced as needed after inspection by the engineer.
Please clarify girders, posts, foundations, connections, and supporting members to remain versus replace, including required treatment.
Refer to structural demo plans and sections.
Please provide specifications or clarify treatment of deteriorated structural components discovered after demolition but not identified for replacement.
The structural components will be inspected by the engineer after demolition and identify any deteriorated structure to replace. Cost will be negotiated with the contractor.
Please provide access requirements, closure limits, and Zoo operational restrictions.
Access will be available from 7:30 AM – 3:45 PM. The project site is located in active facility. See Sheet G-001
Will we be able to use the exterior access road to move and store materials?
Yes, there will be specific locations that are available for contractor to store the materials.
Please Identify approved access, delivery, parking, staging, dumpsters, temporary facilities, equipment areas, and applicable restrictions.
Yes, there will be specific locations that are available for contractor to access and store the materials.
Please identify pedestrian circulation, barricade, signage, and active exhibit access requirements.
Areas under construction are expected to be closed to pedestrian traffic. Construction area should be signed appropriately.
Please confirm railing/fencing system and gate type
Refer to plan notes on the structural drawings.
Are there any special permitting requirements for this project?
The contractor is responsible to follow up for all required permits. You can visit the following website for more information: https://www.norfolk.gov/2799/Permits-and-Inspections
Can we get approval to have dumpsters right by the work area (on either side of ramp / deck.
The city and zoo will work with the contractor to provide the laydown area for dumpster.
Will we be applying any kind of finish / protectant to PRESSURE TREATED 1x12 RANDOM LENGTH BOARD SIDING.
Cut ends of pressure treated lumber shall be treated with a preservative.
On page S311, it states "Final Grade material to be determined by the owner". What is the final grade material? Is dirt the material to be expected?
Final grade material will be dirt. Any additional material will be provided and installed by the zoo.
Spec Section 02 41 00 lists removal of existing 3x12± timber joists complete in LF while drawings measure the same item in SF (see Mammal House west/east ramp demolition sheets). Please confirm correct unit of measure and provide consistent quantities.
Correct unit of measurement for 3x12 timber joist should be linear feet.
Spec Section 02 41 00 requires removal of existing wood fence, posts, rails with wire mesh. Drawings show aluminum handrail, wood railing and wire mesh for the same locations (pedestrian bridge and walkway areas). Please clarify exact materials to be removed.
Remove the existing rail as indicated on structural drawings.
Page E001, please confirm all conduit will be rigid galvanized steel excluding below grade.
Exposed conduits in building interior may be EMT. All exterior conduit, except below grade, will be rigid galvanized steel. Refer to electrical general notes 3, 4, and 5, sheet E001.
Please identify an allowance for any foundations that may be reused versus replaced and acceptance criteria for reuse.
Bid the drawings to replace as indicated in the drawings.
Please confirm manufacturer, product line, profile, color, fastening system, attic stock, and approved-equal requirements.
The decking board specified in the drawing are Azek Vintage. The width will all be 5.5 inches per drawings, the hidden fastening systems is not required and the skirts will be 5.5 inches as well.
Please confirm mesh material, opening size, finish, attachment, below-grade, corrosion resistance, and product requirements.
Please see bird screen specification on plan sheet G-002.
Please identify any OFOI, OFCI, and CFCI specialty equipment and Contractor utility rough-ins/connections.
NO special equipment is anticipated on the project.
Please confirm whether weekend or extended-hour work may be approved for phasing, operations, or schedule needs.
The request needs to be reviewed and approved by the city.
Please identify restrictions for noise, vibration, dust, odors, hot work, chemicals, equipment, hours, and exhibit proximity.
Work will be done in very close proximity to sensitive animals so any reduction in noise or vibrations would be ideal but also well aware that this work will require a lot of both of those. Animals will be relocated for the main boardwalk phase so starting timelines will be critical for this portion.
Please identify any special events, blackout periods, seasonal restrictions, and dates affecting construction, deliveries, or closures.
Zoo staff will work with the contractor for the events at the zoo.
Please confirm whether mandatory interim or phase milestones apply in addition to overall Contract completion.
The engineer will need to inspect the walkway after demolition is complete. Refer to the plan sheet G-004 for phasing.
Please confirm whether an allowance will be established for unforeseen timber deterioration or will it be handled as a change order if needed.
The structural components will be inspected by the engineer after demolition and identify any deteriorated structure to replace. Cost will be negotiated with the contractor.
Please identify any anticipated permits, approvals, inspections, Contractor fees that will be the contractor's responsibility.
The contractor is responsible for checking and obtain all required permits.
Please provide any required testing/special inspections, and identify whether they will be required by the Owner, Contractor, or other authority.
Special inspections are required as indicated on the drawings. Special inspection services will be provided by the owner.
Please confirm the known presence of any hazardous-material surveys/testing and clarify treatment of unforeseen hazardous materials during demolition.
Hazardous material is not anticipated in this project.
Please identify construction water/power sources and whether Zoo utilities may be used, including metering/reimbursement.
Power can be supplied depending on where the work is being done. Water sources will be in proximity of the mammal house or other buildings during the phases. Zoo will have to be reimbursed for those.
Please provide any long-lead specialty materials where substitutions are prohibited.
The contractor is required to meet the substantial completion set in the contract. Plan schedules accordingly based on materials availability.
Please confirm that utility conflicts encountered during construction will be handled by change order.
Any confirmed changes to the project scope will be negotiated with the contractor.
Please clarify required closeout deliverables, including CAD files, BIM files, commissioning reports, TAB reports, and record drawings.
Closeout deliverables will include as-built drawings, manufacturer warranty documents and final warranty letter.
Please confirm acceptable manufacturers, fixture package basis of design, and whether substitutions will be accepted.
The lights are called out on plan sheet E-002, and the substitutions is acceptable upon approval of city.
Please clarify whether lighting controls are standalone, relay-based, or integrated into an energy management system.
The contractor can assume that the lighting controls are standalone.
The drawings indicate underground feeder installations. Please confirm anticipated boring lengths and identify whether rock excavation should be included.
The underground feeder routing are general and schematically shown on the drawings. Final determination of conduit and boring lengths are part of Means and Methods. The Contractor shall visit the job site prior to bidding to identify all items required to be demolished and new work. Refer to electrical general demolition notes, sheet DE101.
Please clarify the extent of demolition and whether abandoned conductors must be removed entirely or may remain in place.
The extent of demolition work are as shown on the demolition plans, sheets DE101-DE106. Abandoned conduits may remain in place. All conductors in abandoned conduits must me removed to point of origination. Refer to electrical general demolition notes and electrical demolition work note 7.
Please identify final electrical requirements for all mechanical and plumbing equipment, including voltage, MCA, and MOCP.
Electrical requirements for all mechanical and plumbing equipment are listed in the plumbing schedule (sheet P101), mechanical schedules (sheet M001), and panel schedules (sheet E107). The wire and circuit breaker sizes in the panel schedules account for MCA, MOCP, and voltage drop. Circuits serving this equipment are shown on the electrical floor plans (sheet E107).
Please provide detailed HVAC control sequences for all equipment.
The HVAC sequence of operation is as shown on sheet M001.
Will HVAC controls operate as stand-alone systems or integrate with an existing building automation system?
The HVAC will operate as stand-alone as noted on the sequence of operation on sheet M001.
Please provide TAB requirements, including certified reports and witness testing requirements.
Contractor shall field balance air distribution system. Certified air balance not required.
Please clarify acceptable condensate discharge locations for heat pump equipment.
Condensate can discharge on grade adjacent to building.
Please clarify whether third-party commissioning is required and identify commissioning agent responsibilities.
No third-party commissioning is required. Contractor shall test system and demonstrate operation to the City of Norfolk.
Please provide the exact point of connection, utility pressure, and available flow data for domestic water service.
Connection point are shown on drawings. Utility and available flow data are not available.
Please confirm pump manufacturer, redundancy requirements, alarm requirements, and control panel specifications.
Unit as specified on drawings. Contractor shall provide as specified or equal.
Please confirm invert elevations and routing information for sewage ejector discharge piping.
Invert elevation shall be minimum 24” below grade as detailed. Invert elevation shall match ejector pump discharge and specified extension.
Please clarify whether controls, filtration equipment, water treatment, freeze protection, and startup services are included.
Startup service shall be included. System will be drained at wintertime by the City of Norfolk. Provide minimal controls for operational system. See drawings. System is specified on drawings.
Please provide requirements for paving, concrete, landscaping, and site restoration following utility installation.
The contractor shall restore the disturbed areas to the original condition.