State and local · OpenGov
Water Treatment Plant Improvements Phase 1: Buildout of the Existing Nanofiltration Facility (State Revolving Fund)
Description
The City of Pompano Beach (the "CITY") is interested in receiving proposals in response to the attached ITB for Water Treatment Plant Improvements Phase 1: Buildout of the Existing Nanofiltration Facility (State Revolving Fund). Proposers must be registered with OpenGov Procurement to view the solicitation documents and respond to this solicitation. The complete solicitation document can be downloaded for free from the eBid System at https://procurement.opengov.com/portal/copbfl/projects/292455. Proposals must bear the electronic signature of an authorized officer of the Proposer who is legally authorized to enter into a contractual relationship in the Proposer's name. The CITY will consider the submittal of a proposal as constituting an offer by the Proposer to perform the required services at the prices stated herein. The CITY is not responsible for the accuracy or completeness of any documentation the Proposer receives from any source other than OpenGov. The proposer is solely responsible for downloading all required documents. Responses will be electronically unsealed in a public forum and read aloud. Proposals must be submitted electronically at https://procurement.opengov.com/portal/copbfl/projects/292455 , referred to hereinafter as OpenGov Procurement or OpenGov, on or before the date and time stated in Schedule of Events. Proposals received after 2:00 pm ET on the due date will not be considered, and late bids will not be accepted . The Cone of Silence shall take effect once this solicitation is released to the General Public and shall remain in effect until the City Commission has taken final action to approve or reject an award. The “Cone of Silence” shall terminate upon the City’s award or approval of a contract, rejection of all proposals or responses, or any other formal action that concludes the solicitation or other procurement process. For confirmation of the official termination date of the Cone of Silence, contact the Purchasing Agent of record. During the Cone of Silence period, Respondents to this solicitation, or persons acting on their behalf, including lobbyists, shall not communicate, directly or indirectly, regarding any aspect of this solicitation with any member of the City Commission, the City Clerk, the City Manager’s Office, any Evaluation Committee member, or any other City of Pompano Beach employee, except in writing to the Procurement and Contracts Department staff as expressly permitted in this solicitation. Violation of the Cone of Silence may be grounds for rejection of a Proposal or other appropriate action as permitted by City ordinance. Any proposer or lobbyist for a proposer is prohibited from having any communications concerning any solicitation for a competitive procurement with any member of the City Commission, City Clerk, City Manager’s Office, any Evaluation Committee Member, or any other City of Pompano Beach employee after Procurement and Contracts releases a solicitation to the General Public. All communications must go through the Procurement and Contracts Department staff. No other member of the City Commission, City Clerk, City Manager’s Office, any Evaluation Committee Member, or any other City of Pompano Beach employee should be contacted concerning this ITB. Any information that amends any portion of this ITB received by any method other than an Addendum issued to the ITB is not binding on the City of Pompano Beach. Carefully read all portions of the ITB document to ensure the Proposer's bid fully complies with all requirements. Phase 1: Buildout of the Existing Nanofiltration Facility Site mobilization and demobilization Bonding and insurance Indemnification Permit Allowance Lump sum price for all work in the Contract Documents except work covered in other Bid Items Additive Alternate A (Phase 3): Amount to be added to the Total Base Bid to complete following work items designated “Additive Alternate A” in the bidding documents Demolition and removal of existing NF Units 1 through 5 New NF Units 1 through 5 New Degasifier No. 6 Work in the Contract Documents associated with Volume 3 of the Construction Drawings and Technical Specifications Florida Power & Light Company fee allowance for the Work included in the Contract Documents Bidder Acknowledgement By submitting a bid, the bidder acknowledges that: (i) read, is aware, understand and agrees with the conditions and requirements as described on the Bidder Acknowledgement section of the solicitation; (ii) all requested forms and documents were properly filled, signed and uploaded to the e-Bid system, as required by the solicitation, and (iii) failure to comply with the requirements of this solicitation may result in the submittal being deemed non-responsive and the Bidder or Proposer being deemed non-responsible and/or disqualified. Schedule of Events Solicitation Release Date: October 1, 2026 Date Published in Sun-Sentinel: October 5, 2026 Pre-Bidder's Conference (Non-Mandatory): October 14, 2026, 10:00am https://www.pompanobeachfl.gov/meetings Written Questions and Inquiries are due on or before:: December 16, 2026, 5:00pm Responses Due Date: January 13, 2027, 2:00pm Evaluation Committee Meeting: N/A Recommendation for Award: TBD Direct All Inquiries To:: https://procurement.opengov.com/portal/copbfl/projects/292455 E-Proposal Submittals Only:: https://procurement.opengov.com/portal/copbfl/projects/292455 Proposal Virtual Opening:: https://www.pompanobeachfl.gov/meetings Line Item Pricing Attributes and Response Attachments Vendor Questionnaire Attachments and Exhibits All documents shall be uploaded, including the ones that shall be downloaded by the vendor, filled, signed and uploaded as part of the answer to the solicitation.
Published attachments
- Exhibit B - Insurance Requirements
- Technical Specifications Vol 1 - Bid Set
- Technical Specifications Vol 2 - Bid Set
- Construction Drawings Vol 1 - Bid Set
- Construction Drawings Vol 2 - Bid Set
- Technical Data - Bid Set
- Technical_Specifications_Vol_3_-_Bid_Set_7
- Construction_Drawings_Vol_3_-_Bid_Set_7
- ITB27-001_WTP Improvements Phase 1 Buildout of the Existing NF Facility
Addenda and notices
Addendum #1 · 1
Addendum 1 - Bidders are reminded to acknowledge receipt of this Addendum by completing the Addendum Attribute in the Attributes tab within the eBid System.
Addendum #2 · 2
Addendum 2 - Bidders are reminded to acknowledge receipt of this Addendum.
Public questions and answers
Please provide the manufacturer of the existing fire alarm control panel.
Existing Fire Alarm Control Panel is Notifier AFP-200 in the Membrane Administration Building.
Please confirm if this is a Federal Cap Grant project.
Refer to requirements of Florida Department of Environmental Protection (FDEP) State Revolving Fund (SRF) Program Supplementary Conditions for Formally Advertised Construction Procurement and FDEP SRF Supplementary Conditions for Formally Advertised Equipment/Materials Procurement included with this solicitation.
Is there an estimated contract budget available for this project?
The City is seeking proposals.
What is the project budget?
The City is seeking proposals.
What is the budget for this project? Is there specific insurance i.e. builder risk? Is there specific wages i.e. Davis Bacon? Does this project’s funding incorporate monies provided by the State of Florida? Such as • Florida grant-funded water/wastewater projects • Projects funded through Florida Department of Environmental Protection (FDEP) programs • State legislative appropriations • State-administered infrastructure grants. If so, please confirm that Florida Statute § 255.0993 Florida's "Buy American" provision is applicable to this project.
The City is seeking proposals. Refer to Addendum #1 for insurance requirements. Refer to requirements of Florida Department of Environmental Protection (FDEP) State Revolving Fund (SRF) Program Supplementary Conditions for Formally Advertised Construction Procurement, FDEP SRF Supplementary Conditions for Formally Advertised Equipment/Materials Procurement, and the wage determination that immediately follows these pages included with this solicitation.
Please provide duct bank concrete PSI as 03 31 00 only mentions structural concrete.
Refer to 03 31 00, 2.05, E, 2: Structural Concrete Table, Regular Mix.
Please clarify whether third-party AWS-CWI welding inspection, nondestructive testing (NDT), and welding qualification services are to be procured directly by the City through its testing/special-inspection agency or furnished by the awarded general contractor and/or specialty subcontractors. If contractor-furnished, please identify the applicable specifications and required inspection/testing scope.
Third-party welding inspection or nondestructive testing is not required for the limited allowed field welding. Note that field welding of stainless steel pipe, fittings, or other stainless steel fabrications shall not be allowed on the project. The welding qualifications, inspection, and testing requirements for shop welding of stainless steel components are contained within the respective specifications for those components.
ITG Technologies, LLC respectfully requests consideration as an Owner-Approved Equal Instrumentation & Control System Integrator for this project. The specifications identify prequalified I&C suppliers and also allow for an Owner-Approved Equal. Please advise the required process, qualification criteria, supporting documentation, and applicable deadlines for formal evaluation and approval as an equivalent I&C System Integrator. ITG is prepared to submit company qualifications, municipal project references, software engineering experience, personnel resumes, and any additional information required to support the review.
I&C system integrator must have a maintenance office within a 175 mile radius of the project. Maintenance office must have technicians available to response for this project. For I&C system integrator to be consider as approved equal, submit all references as required by specification 40 90 00, 1.02.
Can NOV Fiber Glass Systems be added as an approved manufacturer of the Fiberglass Reinforced Plastic Tanks in section 43 41 45? NOV Fiber Glass Systems is the group that makes Belco, Ershings, and LF Manufacturing Tanks
Refer to Section 01 25 00 - Substitution and Product Options of the Technical Specifications.
Who is the current vendor for this type of services
Refer to Article D of ITB27-001_WTP Improvements Phase 1 Buildout of the Existing NF Facility for Bidder's Responsiveness and Responsibility requirements.
what is the projected budget for this project
The City is seeking proposals.
We will like the city to consider adding IonClear Recovery Solutions to the named list of MSS’s in the project specifications, subject to review and acceptance of our qualifications package? Our qualifications package includes our company profile, capability statement, relevant project experience, and reference letters supporting our team’s membrane treatment system capabilities. Please advise how we should submit this package for review, as the portal’s Question & Answer form does not appear to provide an attachment option. If our qualifications are accepted, we respectfully request that IonClear Recovery Solutions be added to the named MSS list through a formal addendum to the bidding documents.
Refer to Section 01 25 00 of the Technical Specifications.
respectfully request consideration as an Approved VFD Equal: ABB ACQ580 series VARIABLE FREQUENCY DRIVES.
The specifications sections 26 29 24 and 26 29 25 for Variable Frequency Drives already list 4 acceptable manufacturers. No additional manufacturers will be listed.
We'd like to respectfully submit a request for extension.
Refer to Addendum #1.
Please provide conduit number from 1IT5-30 KVA to 1IP5 panel on E-47.
An additional feeder "P934A" and required conduit and wiring will be issue on addendum.
Please clarify which will of the following is being provided and installed by others. E-60 instrument rack and signal j-box or I-42 remote I/O panel, instrument rack and signal j-box.
Neither item is provided and installed by others. The Contractor shall furnish and install all controls, instrumentation, wiring, supports, ancillary materials, commissioning, and testing required for a complete and operational membrane system. The Contractor remains responsible for any work delegated to subcontractors or suppliers.
Modifications are required for the existing Degasifier I/O system and Concentrate Pump Station. These mods/additions will be made within the Degasifier I/O Panel (RIO-3.1) and RIO-2.1 remote I/O panels. Please advise if any new PLC controllers or hardware modifications will be required for the PLC-2 or PLC-3, or if the owner just wishes to modify the current PLC systems within these panels.
Refer to drawings I-44 and specifications for the existing panel modifications. Contracotr is responsible to provide all necessary PLC hardware modifications as part of this project.
The specification section for the NF membrane equipment supplier states that the Membrane System Supplier (MSS) shall be responsible for supplying the controls and instrumentation associated with NF skids #1-10. However, the network diagrams in the I-drawings label each of these panels and skids with a diamond (which means furnished by the I&C supplier). Please advise whether all control panels and instrumentation for each NF skid are provided by the MSS or the I&C supplier.
Refer to Section 46 63 23, 1.01, F of the Technical Specifications.
Instrumentation detail #12 on dwg #I-42 shows the Remote I/O panels and instrument layouts for the NF membranes with an instrument rack mounted adjacent to the new Remote I/O panels. The P&IDs do not match up with the instrument detail and do not show any skid instrument panels. Please confirm that integrator/system supplier is not responsible for furnishing any of these skid instrument panels for the NF #1-10.
Instrumentation details are not intended to show every instrument. Provide instruments as per P&ID drawings. All instruments shown on P&ID sheets and specifications are required to be provided. The Contractor remains responsible for any work delegated to subcontractors or suppliers.
Modifications to the existing Data Flow System will be required as noted in the drawings. Please advise who will be responsible for carrying the scope for Data Flow Systems to provide their services.
Data Flow System modification is part of this project. The Contractor remains responsible for any work delegated to subcontractors or suppliers.
Due to the limited time between the scheduled pre-bid meeting and the current bid submission deadline, we respectfully request an extension of the bid submission date. The current timeframe does not allow sufficient time to identify and coordinate with qualified vendors, obtain necessary pricing, and prepare a complete and competitive bid.
Refer to Addendum #1.
Please confirm the Pressure Filter Supplier is responsible for providing the pressure instruments associated with the orifice plates on I-20 through I-25.
Refer to Section 46 61 21, 1.01, C of the Technical Specifications.
To allow sufficient time to develop a complete and competitive proposal, we respectfully request an extension of the current November 2 due date to the week of November 16, preferably Tuesday through Thursday. The additional time would assist with our current estimating workload and allow for more effective coordination with subcontractors and vendors, particularly avoiding a Monday deadline immediately following the weekend.
Refer to Addendum #1.
Would the City consider extending the bid submission deadline for ITB27-001? Several subcontractors and suppliers have requested additional time to review the project documents and prepare their quotations. An extension would allow bidders to obtain more comprehensive and competitive pricing.
Refer to Addendum #1.
Are there any specific subcontractor qualifications?
Refer to Article D of ITB27-001_WTP Improvements Phase 1 Buildout of the Existing NF Facility for Bidder's Responsiveness and Responsibility requirements.
Would the following experience be considered acceptable? Evidence that the Bidder was the prime contractor on three water or wastewater projects that are of similar or greater complexity and scope with a project value over $20,000,000, completed in the last 15 years.
Refer to Article D of ITB27-001_WTP Improvements Phase 1 Buildout of the Existing NF Facility for Bidder's Responsiveness and Responsibility requirements.
Does the 920 calendar days include Additive Alternate A?
The Contract Time includes all work associated with the project.
Regarding Specification Sections 01 43 26 (Testing Laboratory Services) and 03 31 00 (Cast-in-Place Concrete), the project documents identify certain testing and code-required special inspections as owner-paid services. Please clarify whether the City has already selected or contracted with the independent testing laboratory/special-inspection agency for this project. If not, will these services be procured separately by the City, and what is the process for a qualified specialty inspection firm to submit qualifications and pricing for consideration?
The City has not yet determined how these services will be procured or provided. Topics of future questions submitted for this solicitation should focus on the work to be performed by the Contractor, as detailed in the Contract Documents.
CEC Controls respectfully requests consideration as an Owner-Approved Equal I&C Supplier for this project. The specifications identify pre-qualified I&C suppliers and also allow for an Owner-Approved Equal. Please advise the required process and applicable deadlines for evaluation and approval as an equivalent I&C System Integrator. CEC Controls is prepared to submit company qualifications and any additional information required to support the review.
I&C system integrator must have a maintenance office within a 175 mile radius of the project. Maintenance office must have technicians available to response for this project. For I&C system integrator to be consider as approved equal, submit all references as required by specification 40 90 00, 1.02.
Please provide AIT/PIT equipment rack detail.
Refer to Drawing Sheet I-42, Detail 11.
Will any lighting controls be required? Please provide lighting conduit number from Main Electric Building. Which ductbank section will it be included with?
Lighting control for the Raw Water Booster Pump Station and clarification of drawing E-47 will be issued by Addendum.
Please provide ductbank section from PMH-20 to Raw Water Booster PS.
The conduits from Manholes PMH-20, PMH-14 and SMH-14 branch-out to the Booster Pump Station as shown on drawing E-21, and they are a continuation of ductbanks shown on drawing E-5, in addition to requirements included on respective Conduit and Wiring Schedules.
Please provide ductbank section from Main Electric Building to SMH-14.
The conduits from Electrical Building and Pull Boxes SPB-EB4 (and SPB-EB5) to Manhole SMH-14 are shown on drawings E-5 and E-23, and they shall be encased in concrete. The ductbanks continue to the Raw Water Pump Station as shown on drawing E-5, in addition to requirements and descriptions included on respective Conduit and Wiring Schedules.
Please provide equipment rack detail.
Bidders are advised to review all solicitation documents prior to submitting questions. Notwithstanding, See rack detail on drawing E-26 and E-27.
We request a three (3) week due date extension.
Refer to Addendum #1.
Please consider revising Article 5 of the Agreement so that the stated liquidated damages represent the full compensation for Contractor-caused delay, without additional engineering and inspection costs.
The solicitation shall be bid as advertised.
Please consider revising Article 5 of the Agreement so that the stated liquidated damages represent the full compensation for Contractor-caused delay, without additional engineering and inspection costs.
The solicitation shall be bid as advertised.
Please consider revising GC §20.03 and GC §§34.08.02-.03 to allow the Contractor seven (7) calendar days from discovery to provide written notice of differing site conditions, unanticipated underground facilities, or pre-existing hazardous materials. Please also confirm that the Contractor will be entitled to an equitable adjustment to the Contract Price and/or Contract Time for resulting impacts from such conditions when not reasonably foreseeable or identified in the Contract Documents.
The solicitation shall be bid as advertised.
Please consider revising GC Articles 27 and 33 to provide a consistent twelve (12) month warranty and correction period, commencing upon the Owner’s beneficial use or Substantial Completion, whichever occurs first, for the applicable Work or equipment. Manufacturer warranties with longer durations would remain as specifically required by the Contract Documents.
The solicitation shall be bid as advertised.
Please consider revising GC §31.01 to remove the reference to the “No Damage for Delay” provision in Article 6 of the Agreement, as no such provision appears in Article 6. Please also confirm that the Contractor will be entitled to an equitable adjustment to the Contract Price and/or Contract Time for delays caused by the Owner or other circumstances for which the Contractor is not responsible, in accordance with the applicable provisions of the Contract Documents.
The solicitation shall be bid as advertised.
Please consider revising GC §§31.01.01 and 31.01.04 to allow the Contractor thirty (30) calendar days from the event or circumstances giving rise to the claim to submit the claim with all supporting documentation, and to allow recovery of reasonable and documented costs associated with compensable claims, including direct costs, subcontractor and supplier costs, jobsite overhead, and applicable overhead and profit in accordance with GC §32. The exclusion of consequential damages may remain.
The solicitation shall be bid as advertised.
Please consider revising GC §4.01.04 so that any conflicts or inconsistencies among the Contract Documents are resolved in accordance with the order of precedence established in Article 9 of the Agreement, rather than applying the most stringent requirement to the Contractor.
The solicitation shall be bid as advertised.
Please consider revising GC §44.02 to provide that, when changes in laws, ordinances, or regulations occurring after execution of the Contract affect the Contractor's cost or time of performance, the Contractor shall be entitled to an equitable adjustment to the Contract Price and/or Contract Time for the resulting impacts, subject to the applicable notice requirements.
The solicitation shall be bid as advertised.