Water Treatment Plant Maintenance Package ‘A’; Project No. 25- 4261
Description
The Work to be performed under this Contract consists of constructing the Work shown in the Contract Documents and described below. This Work consists of all the improvements, and all related appurtenances, incidentals, and General Conditions. The Work is generally described as follows: The City wishes to undertake repair of certain existing facilities and equipment that are of a scope and complexity beyond regular operational maintenance. The City has accordingly hired Arcadis to prepare design and contract documents for bidding this work for completion by a suitable Contractor. Two maintenance packages were developed by the City and this RFP covers only the scope for Maintenance Package “A”. The design of Maintenance Package “B” will be completed by others. Maintenance Package “A” at the Hollywood WTP will consist of the following six distinct work elements: Lime Silo Repairs Replace Silo Dust Collectors Replace Sludge Drum Thickener and Repair Building Storage Tank Nos. 3 and 4 Valves Replacement Replace Clearwell Sample Lines The Work is located at the following address: City of Hollywood, Water Treatment Plant 3441 Hollywood Boulevard Hollywood, Florida 33021 Contracting Method: Work shall be constructed under one prime contract. SCOPE OF WORK/SERVICES Project Description Refer to Attachment D - WTP Maint Package A - Specifications Technical Specifications Refer to Attachment D - WTP Maint Package A - Specifications Contractor Qualifications The contract will be awarded only to a responsive contractor qualified by experience to do the Work specified. The bidder shall submit, prior to award of contract, satisfactory evidence of his experience in like Work and that he is fully prepared with the necessary organization, capital, equipment and machinery to complete the Work to the satisfaction of the City within the time limit stated. In addition to the above, the Contractor shall satisfy the following criteria: Contractor with a project manager with experience of five (5) years in similar projects (3 projects minimum). Form 15 – Information Required from Bidders shall be completed fully and accurately by the Contractor and submitted with the bid. Information included on the questionnaire will be used in evaluating the qualifications of the Contractor. The City reserves the right to request additional information not identified on the questionnaire. Any one of the following causes, among others, may be considered as sufficient justification to disqualify a bidder and reject his or her bid: A. Submission of more than one bid for the same work by an individual, firm, partnership or corporation under the same or different names. B. Evidence of collusion. C. Previous participation in collusive bidding on work for the City of Hollywood, Florida. D. Submission of an unbalanced bid in which the prices bid for some items are out of proportion to the prices bid for other items. E. Lack of competency. The Bidder shall provide proof that their past experience can demonstrate similar complexity and size compared to this contract. The Engineer may declare any bidder ineligible, at any time during the process or receiving bids or awarding the contract, if developments arise which, in his opinion, adversely affects the bidder's responsibility. The Bidder will be given an opportunity, by the engineer, to present additional evidence before final action is taken. F. Lack of responsibility as shown by past work judged by the Engineer from the standpoint of workmanship and progress. G. Non-compliance with the City’s Local Preference (when applicable). H. Uncompleted work for which the Bidder is committed by Contract, which is in the judgment of the Engineer, might hinder or prevent the prompt completion of work under this Contract. I. Being in arrears on any existing Contracts with the City, or any taxes, licenses or other monies due the City; in litigation with the City or having defaulted on a previous contract with the City. Deliverable and Objectives Refer to the following Attachments: Attachment B - General Conditions Attachment C - Supplementary General Conditions Attachment D - WTP Maint Package A - Specifications Attachment E - WTP Maint Package A - Drawings Project Schedule / Timeline Refer to Attachment C - Supplementary General Conditions , Section 1, Project Schedule. Questions Refer to IFB Section 5 - BID SUBMISSIONS. Form 15, Information Required from Bidders. SUMMARY Summary Background Contact Information Timeline INTRODUCTION Purpose The City of Hollywood, Florida (City) is seeking bids from qualified and experienced contractors, hereinafter referred to as the Contractor or Bidder, to repair of certain existing facilities and equipment that are of a scope and complexity beyond regular operational maintenance for the City, in accordance with the terms, conditions, and specifications contained in this solicitation. Responses to this solicitation are due by Monday, December 14, 2026 , by 3:00 pm , and will be opened in a virtual public setting on December 14, 2026, at 3:00 PM EST . Submittals shall be received electronically through OpenGov, the City's eProcurement Portal ("Portal"). Submittals shall be considered a bid on the part of the bidder, which bid shall be deemed accepted upon approval of the City, and in case of default, the City reserves the right to accept or reject any or all bids, to waive irregularities and technicalities, and request new bids The City also reserves the right to award any resulting agreement as it deems will best serve the interests of the city. Submission of a bid shall serve as prima facie evidence that the Bidder has examined this solicitation and is fully aware of all conditions affecting the provision of services and the evaluation criteria and scoring methodology as set forth in this solicitation document. Pre-bid Conference and/or Site Visit (Non-Mandatory) There will be a non- mandatory pre-bid co nference and/or site visit scheduled for this solicitation. It is strongly suggested that all Contractors attend the non-mandatory pre-bid conference and/or site visit to receive information that may be critical to their understanding of this solicitation. Please keep in mind that site visits at other times might not be available. It is the sole responsibility of the Contractor to become familiar with the scope of the City’s requirements prior to submitting a bid. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, equipment, materials, and labor required. OpenGov ("Portal") The City of Hollywood uses OpenGov, the e-Procurement Portal (“Portal”) ( https://procurement.opengov.com/portal/hollywoodfl ) to administer the competitive solicitation process, including but not limited to soliciting bids/proposals, issuing addenda, posting results and issuing notification of an intended decision. The City shall not be responsible for a Bidder's/Proposer’s inability to submit a bid/proposal by the bid/proposal end date and time for any reason, including issues arising from the use of the Portal. Point of Contact For information concerning procedures for responding to this solicitation, contact the Point of Contact within the Office of Procurement Services, Julissa Marcano , Senior Purchasing Agent at jmarcano@hollywoodfl.org or by phone at (954) 710-9956 , or Jean Joinville, Procurement Manager, at jjoinville@hollywoodfl.org or by phone at 954-921-3290. Such contact is to be for clarification purposes only. All questions must be submitted in writing via the Portal by Thursday, November 5, 2026 , by 5:00 pm , in order to receive a timely response. Project Manager: Juan Figueroa , Senior Project Manager , Public Utilities , email: jfigueroa@hollywoodfl.org , or by phone: (954) 921-3930 . For information concerning technical specifications, please utilize the question / answer feature provided by OpenGov at https://procurement.opengov.com/portal/hollywoodfl . Questions of a material nature must be received prior to the cut-off date specified in the solicitation schedule. Material changes, if any, to the scope of services or bidding procedures will only be transmitted by written addendum. (See addendum section of the OpenGov site). Bidders please note: No part of your bid can be submitted via FAX. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, and the equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. The questions and answers submitted in OpenGov shall become part of any contract that is created from this solicitation. It is the sole responsibility of the Bidder to ensure that their bid is submitted electronically through the Portal at https://procurement.opengov.com/portal/hollywoodfl Cone of Silence The City of Hollywood City Commission adopted Ordinance No. O-2007-05, which created Section 30.15(F) imposing a Cone of Silence for certain City purchases of goods and Services. The Cone of Silence refers to limits on communications held between vendors and vendor’s representatives and City elected officials, management and staff during the period in which a Formal Solicitation is open. The Ordinance does allow potential vendors or vendor’s representatives to communicate with designated employees for the limited purpose of seeking clarification or additional information. The names and contact information of those employees that may be contacted for clarification or additional information are included in the solicitation. The Cone of Silence does not prohibit a vendor or vendor’s representative from communicating verbally, or in writing with the City Manager, the City Manager’s designee, the City Attorney or the City Attorney’s designee on those procurement items to be considered by the City Commission. The Cone of Silence does not prohibit a vendor or vendor’s representative from making public presentations at a duly noticed pre-bid conference or duly noticed evaluation committee meeting or from communicating with the City Commission during a duly noticed public meeting. The Cone of Silence shall be imposed when a formal competitive solicitation has been issued and shall remain in effect until an award is made, a contract is approved, or the City Commission takes any other action which ends the solicitation. To view the Cone of Silence, go to the City of Hollywood Code of Ordinance online, and view Section 30.15F All communications regarding this bid should be sent in writing to the Procurement and Performance Management Division as identified in this bid. SPECIAL TERM AND CONDITIONS Addenda, Changes, and Interpretations It is the sole responsibility of each contractor to notify the Point of Contact utilizing the question / answer feature provided by OpenGov and request modification or clarification of any ambiguity, conflict, discrepancy, omission or other error discovered in this competitive solicitation. Requests for clarification, modification, interpretation, or changes must be received prior to the Question and Answer (Q & A) Deadline. Requests received after this date may not be addressed. Questions and requests for information that would not materially affect the scope of services to be performed, or the solicitation process will be answered within the question / answer feature provided by OpenGov and shall be for clarification purposes only. Material changes, if any, to the scope of services or the solicitation process will only be transmitted by official written addendum issued by the City and uploaded to OpenGov as a separate addendum to the solicitation. Under no circumstances shall an oral explanation given by any City official, officer, staff, or agent be binding upon the City and should be disregarded. All addenda are a part of the competitive solicitation documents and each firm will be bound by such addenda. It is the responsibility of each to read and comprehend all addenda issued. Dimensions, Quantities and Subsurface Information Dimensions, quantities, and subsurface information supplied by the City are in no way warranted to indicate true amounts or conditions. Bidders/Contractors shall neither plead misunderstanding or deception nor make claims against the City if the actual amounts, conditions, or dimensions do not conform to those stated. Any "Outside" reports made available by the Engineer are neither guaranteed as to accuracy or completeness, nor a part of the Contract Documents. Trench Safety Form The Trench Safety Form included in the Bid Documents must be completed and signed. Noncompliance with this requirement may invalidate the bid. Changes and Alterations Bidder may change or withdraw a Bid at any time prior to Bid submission deadline; however, no oral modifications will be allowed. Modifications shall not be allowed following the Bid deadline. Bidder’s Costs The City shall not be liable for any costs incurred by Bidders in responding to this solicitation. Pricing/Delivery All pricing must include delivery and installation and be quoted FOB: Destination, unless specified otherwise in the #SCOPE OF WORK/SERVICES section. Price Validity Prices provided in this solicitation shall be valid for at least One-Hundred and Twenty (120) days from time of solicitation opening unless otherwise extended and agreed upon by the City and Bidder. No Exclusive Contract Bidder agrees and understands that the contract shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services from another vendor at the City’s sole option. Responsive In order to be considered responsive to the solicitation, the contractor’s bid shall fully conform in all material respects to the solicitation and all of its requirements, including all form and substance. Responsible In order to be considered as a responsible bidder, bidder shall be fully capable to meet all of the requirements of the solicitation and subsequent contract, must possess the full capability, including financial and technical, to perform as contractually required, and must be able to fully document the ability to provide good faith performance. Minimum Qualifications To be eligible for award of a contract in response to this solicitation, the Bidder must demonstrate that they have successfully completed services, as specified in the #SCOPE OF WORK/SERVICES section of this solicitation, are normally and routinely engaged in performing such services, and are properly and legally licensed (if required) to perform such work. Bidder must possess and be able to provide the City with any and all required Federal, State, County and/or municipal licenses, and occupational licenses. Bidder must be able to provide proof of valid licensing for all subcontractors and/or material suppliers hired by the contractor, if requested. In addition, the Bidder must have no conflict of interest with regard to any other work performed by the Bidder for the City. Award of Contract Award may be in the aggregate, or by line Item, or by group, whichever is determined to be in the best interest of the City. Award will be made to the responsive and responsible bidder, quoting the lowest price, for that product/service that will best serve the needs of the City. The Contract will be awarded only to a Bidder, who in the opinion of the Engineer, is fully qualified to undertake the work, quoting the lowest price, for that product/service that will best serve the needs of the City. The City reserves the right before awarding the Contract to require a Bidder to submit such evidence of his qualifications as it may deem necessary and may consider any available evidence of his financial status, technical qualifications, and other qualifications and abilities. The City also reserves the right to accept or reject any or all bids, part of bids, and to waive minor irregularities or variations to specifications contained in bids, and minor irregularities in the bidding process. The City also reserves the right to award the contract on a split order basis, lump sum basis, individual item basis, or such combination as shall best serve the interest of the City. As applicable, the City shall comply with Section 287.05701, Florida Statutes, in not considering or giving preference for an award based on a vendor’s social, political, or ideological interest. The City, in all solicitations or advertisements for purchasing of goods, supplies, materials, equipment and services, will receive consideration from qualified businesses without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. Execution Of Contract The Bidder awarded the Contract shall, within ten days from the date of award, execute all required documents and submit them electronically, complete with valid signatures and seals. A. The Contract B. Performance and Payment Bond C. Evidence of required Insurance D. Proof of authority to execute the Contract E. Proof of authority to execute the Bond on behalf of the Awardee F. List of Subcontractors, estimated Contract Value for each and proof that such subcontractors possess all required Federal, State, County and/or municipality licenses, including but not limited to certified of competency and occupational license The above documents must be furnished, executed and delivered before the Contract will be executed by the City. The Contract shall not be binding upon the City until it has been executed by the City and a copy of such fully executed Contract is delivered to the Contractor. Failure To Execute Contract, Bid Guaranty Forfeited Should the Bidder to whom the Contract has been awarded refuse or fail to complete the requirements of Section 2.13 above within ten (10) days after Notice of Award, the additional time in days (including weekends) required to CORRECTLY complete the documents will be deducted, in equal amount, from the Contract Time, or the City may elect to revoke the Award. The Bid Guaranty of any Bidder failing to execute the awarded Contract shall be retained by the City and the Contract awarded as the Commission desires. Manufacturer/Brand/Model Specific Request In the event of a manufacturer/brand/model specification. No substitutions will be allowed unless specified in Section: SCOPE OF WORK/SERVICES . Permits and Fees The Contractor and Subcontractors must obtain Building Permits required for all work covered under this contract as well as any other permit required by any other regulatory agency. The Master Building Permit required by the City shall be obtained by the Contractor but paid for by the City. Any and all other permits required by the City, County, State of Florida, or other regulatory agency shall be obtained and paid for by the Contractor. The Contractor or Subcontractors shall also be responsible to call for all inspections as required in Section 110 (Inspections) of the latest edition of the Florida Building Code. Refer to the Technical Specifications ( Section 01 22 13 Measurement and Payment ) Contract Security When the awarded bidder delivers the executed contract to the City, it must be accompanied by the required bonds. Contract Period The initial contract term shall commence upon date of award by the City for a duration of 645 calendar days. The City reserves the right to extend the contract providing all terms, conditions and specifications remain the same, both parties agree to the extension, and such extension is approved by the City. Refer to the technical specificat
Published attachments
- Attachment A - Sample Contract and P&P Bonds
- Attachment B - General Conditions
- Attachment C - Supplementary General Conditions_Addendum 1
- Attachment D - WTP Maint Package A - Specifications
- Attachment E - WTP Maint Package A - Drawings
- Water_Treatment_Plant_Maintenance_Package_‘A’;_Project_No._25-4261_(Addendum_#3_Revision).pdf
Addenda and notices
Official Notice #1: Notice of a Public Meeting · 1
Addendum #1 · 1
Addendum No. 1 includes the following: IFB Section 3.18 has been updated to reflect a contract duration of 645 calendar days . Attachment C – Supplementary General Conditions has been updated to reflect 615 calendar days for substantial completion and a contract duration of 645 calendar days . Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #2: Pre-bid meeting minutes and sign-in sheets · 2
Addendum #2 · 2
Addendum No. 2 includes the following: The Bid Submission Deadline has been extended to 12/3/2026 by 3:00 PM. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Addendum No. 3 includes the following: The Bid Submission Deadline has been extended to 12/14/2026 by 3:00 PM. Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
What is the budget for this project? Is there specific insurance i.e. builder risk? Is there specific wages i.e. Davis Bacon? Does this project’s funding incorporate monies provided by the State of Florida? Such as • Florida grant-funded water/wastewater projects • Projects funded through Florida Department of Environmental Protection (FDEP) programs • State legislative appropriations • State-administered infrastructure grants. If so, please confirm that Florida Statute § 255.0993 Florida's "Buy American" provision is applicable to this project.
• The budget for this project is $4,500,000.00 including bid base and alternate bid items. • The insurance requirements are provided in IFB section 3.28. • There are no specific wage requirements on this project. • The project is not funded in any part by the State of Florida or the Federal Government. • The project requires that only domestic steel be used on it.
will an underground utilities license surfice as the license
The scope of work requires the contractor to possess a General Contractor License.
The bid due date is currently scheduled for November 25, 2026. Given that many suppliers, vendors, and key personnel will be unavailable due to the Thanksgiving holiday weekend, we respectfully request an extension of the bid submission deadline to December 3, 2026. This additional time will allow all parties sufficient opportunity to prepare and submit complete and competitive proposals.
The bid submission deadline will be extended to December 3, 2026.
SINCE THE WEATHER WAS REALLY BAD AND WE WERE NOT ABLE TO MAKE IT TO THE PREBID BECAUSE OF WEATHER. IS IT POSSIBLE TO DO ANOTHER SITE VISIT?
Thank you for your inquiry. We understand that the weather affected your ability to attend. Unfortunately, we are unable to schedule an additional site visit at this time. The pre-bid meeting and site visit were not mandatory. Please refer to the pre-bid meeting summary and sign-in sheet available under the Notices tab, as well as the Questions and Answers tab for questions submitted by subcontractors who attended the meeting.
OpenGov categories
- 89015 · Complete Water Treatment Systems, Chemical
- 89016 · Complete Water Treatment Systems, Nonchemical: Ultraviolet Water Supply Sterilization, etc.
- 89052 · Removal Equipment, Water Treatment: Ammonia, Bacterial, Iron, Etc.
- 89087 · Water Treatment Equipment (Not Otherwise Classified)
- 91359 · Construction and Upgrades, Wastewater Treatment Plant
- 91391 · Maintenance and Repair, Wastewater Treatment Plant
- 92596 · Waste Water Treatment Engineering
- 96895 · Wastewater Treatment Plant, Operations, and Testing
- 96896 · Water and Wastewater Treatment Services