Well 115 Maintenance & Rehabilitation
Description
The City of Aurora is seeking qualified well equipment and maintenance contractors to provide all labor, materials, transportation, tools, supplies, equipment, and appurtenances necessary to complete the satisfactory rehabilitation of existing Well 115 for the Water Production Division. SCOPE OF WORK Goals for project The Work consists of the maintenance and rehabilitation of shallow Well 115, including inspection and evaluation of existing well and pumping equipment; maintenance, repair, and replacement of equipment and components as necessary; redevelopment of the aquifer formation; and testing and related activities necessary to restore and maintain sustainable well yield and a safe pumping level. Detailed Scope of Work - Well 115 Special Provisions for this project are included separately as an attachment. GENERAL INFORMATION CITY OF AURORA, IL (Government) The City of Aurora (“City”) is a municipal corporation and unit of local government existing under the laws of the State of Illinois pursuant to the Illinois Municipal Code, 65 ILCS 5/1-1-1 et seq. (the “Code”). The City was established to provide municipal services and to promote the health, safety, and welfare of its residents and businesses within its jurisdiction. The City owns, operates, and maintains various public facilities and infrastructure, including municipal buildings, parks, and community centers located throughout Aurora, Illinois. INSTRUCTIONS TO BIDDERS SUMMARY The City of Aurora is seeking qualified well equipment and maintenance contractors to provide all labor, materials, transportation, tools, supplies, equipment, and appurtenances necessary to complete the satisfactory rehabilitation of existing Well 115 for the Water Production Division. TIMELINE Release Project Date: October 29, 2026 Pre-Proposal Meeting (Non-Mandatory): November 10, 2026, 11:00am 1435 Southlawn Place Aurora, IL 60506 | Please call 630-256-3254 Robert Lieble if you are attending Question Submission Deadline: November 13, 2026, 11:00am Question Response Deadline: November 16, 2026, 11:00am Response Submission Deadline: November 18, 2026, 11:00am Purchasing Division Definitions Award: The formal decision to select a vendor for a contract. Bid: A submitted response by a vendor in response to a bid document. Bidder: An individual, firm, or corporation formally submitting a proposal for the work contemplated, or any portion thereof, acting directly through an authorized representative. Change Order: A change to a contract or purchase order made after it has been approved by the city that alters the term of the contract, the contract price, or the obligations of the parties. Contract: A formal agreement between the City and a successful bidder outlining obligations, deliverables, timelines, and pricing. Cooperative Purchasing: When goods or services are purchased through shared contracts (mostly government entity contracts), to leverage buying power. Direct Purchase Method: The method in which, after bids are rejected or if no bids are received, the City Council by resolution may approve the work to be done by city personnel or authorize the purchase of goods or services involved to be purchased more economically on the open market without complying with the requirements of the Purchasing Division. Emergency Procurement: An expedited purchase that bypasses standard bidding due to immediate threats to public health, safety, or welfare. Encumbrance: Funds that are formally committed and set aside in the budget to pay for a specific future purchase. Evaluation Criteria: The standards and scoring factors used to assess bids or proposals. Formal Bid: For goods/services over $25,000, with well-defined requirements and structured bidder/proposal submissions. Informal Bid: For goods/services valued between $5,000 and $24,999, with well-defined requirements. Businesses are notified via web alerts. Invitation for Bid (IFB): A formal solicitation inviting vendors to submit competitive bids based strictly on price and predefined specifications. Invoice: A bill sent by a vendor/contractor/supplier for goods/services provided. Shows what was purchased, how much it costs, and payment due date. Local Bidder Preference: Policy that allows the City to give priority or scoring advantages to local businesses. Lowest Responsible Bidder: The lowest bidder whose offer best responds in quality, fitness and capacity to the requirements of the proposed work or usage. Payment Bond: The bond executed by the Vendor/Contractor and his surety guaranteeing the payment of all sums of money due for any labor, materials, apparatus, fixtures, or machinery furnished to such principal for the purpose of performing the contract work. Performance Bond: The bond executed by the Vendor/Contractor and his surety, guaranteeing complete execution of the contract. Piggybacking: An authorized purchase made by utilizing another government agency's existing, competitively awarded contract. Plans: All drawings, sketches, and detailed Plans or reproductions thereof pertaining to the construction involved. Procurement: The process by which a municipality acquires goods, services, or construction, including planning, soliciting offers, evaluating responses, awarding contracts, and managing vendor performance. Professional Services: Services that require specialized professional knowledge or expertise, such as accounting, architecture, engineering, law, medicine, surveying, or other fields defined by state law. Proposal: A bidder’s response to a solicitation that often includes technical details, methodology, pricing, and qualifications. Public Notice: Official announcement of a solicitation, typically published through OpenGov. Purchase/Procurement Card (P-card): A City issued charge card for the purchase of city-related goods/services. Purchase Order (PO): The formal authorizing document issued after an award. No work begins, or payment made, without a city-generated PO. Sent to Vendor/Contractor/Supplier. Quote: Request from vendors for pricing on goods or services or a combination thereof that may be verbal or in writing. Request for Proposals (RFP): A solicitation used when seeking a solution, goods, or service and evaluating vendors based on multiple criteria, not only price. Request for Qualifications (RFQ): A solicitation for qualifications, used especially for professional or consultative services. It does not result in a contract. Requisition: A request to create a PO for the purchase of goods/services. Stays internal. Responsible Bidder: Section 2-331(5) of the Aurora City Code requires that bidders for city contracts in excess of $25,000 must participate in active apprenticeship and training programs approved and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training to be considered a responsible bidder. Scope of Work (SOW): A detailed document outlining the specific tasks, deliverables, timelines, and quality standards required from the vendor. Sole Source: A non-competitive procurement used when only one vendor can provide the required goods or services. Specification: Any description of the physical or functional characteristics, or of the nature of a supply, service or construction item. A specification may include a description of any requirement for inspecting, testing, or preparing a supply, service, or construction item for delivery. Vendor/Contractor/Supplier: A company or individual that enters into a contract with the City to provide goods or services. ACCEPTANCE OF BID PROPOSALS a. Bidders intending to respond to this solicitation must create a free account with OpenGov Procurement . Registration is required to establish a communication link with the City. The Bidder, and not the City, is solely responsible for obtaining all addenda issued for this solicitation. Addenda and other relevant information will be posted through the City’s E-Procurement System. Notifications of issued addenda will be emailed to all persons registered as following this bid. Failure of any Bidder to receive any addendum or interpretation shall not relieve the Bidder of any obligation under its submitted Bid Proposal. All addenda issued shall become part of the Contract Documents. Paper submissions will not be accepted . b. Bids will be accepted only through the City’s E-Procurement System, OpenGov, up to the date and time specified in the solicitation. The official system clock within the City’s E-Procurement System shall govern all submission deadlines. Late submissions will not be accepted under any circumstances, including technical difficulties such as internet connectivity issues. The City strongly encourages Bidders to complete submissions well in advance of the deadline. All bids must include all requested information and all required forms, certificates, affidavits, and addendum acknowledgments to be considered responsive. c. A subcontractor may not submit a Proposal or otherwise serve as the PRIME VENDOR on behalf of another entity. Responses submitted solely on behalf of a subcontractor, third-party vendor, broker, or other entity that will not be the prime vendor under the resulting Contract will not be accepted. d. Bids shall be submitted on the forms provided and must include all required information and certifications. Bids submitted in any other manner, or failing to include all required information or certifications, may be rejected as non-responsive. Bids may be modified or withdrawn prior to the bid opening deadline through the City’s E-Procurement System. Each Bid shall include the legal name of the Bidder, complete mailing address, and electronic signature of a person legally authorized to bind the Bidder. The printed or typed name of the authorized signer shall also be provided. e. The City of Aurora reserves the right to accept or reject any or all bids, in whole or in part, to accept alternate bids, and to waive any immaterial defect, technicality, informality, or irregularity in any bid received. Unless otherwise specified, the City reserves the right to hold bids for ninety (90) days following the bid opening date. By submitting a bid, the Bidder agrees to accept a Notice of Award if issued within this ninety (90) day period. The City further reserves the right to cancel this solicitation at any time without liability for any costs incurred by any Bidder in preparing or submitting a Bid Proposal. Each Bidder assumes sole responsibility for all costs associated with preparation and submission of its Bid Proposal. f. While price is an important consideration, the City will also evaluate qualifications, experience, demonstrated capacity, responsiveness to the solicitation requirements, and overall ability to successfully perform the Work. No Bid Proposal will be considered unless the Bidder provides evidence satisfactory to the City demonstrating the necessary facilities, experience, equipment, personnel, and financial resources required to perform the Work. The Bid will be awarded to the lowest responsive and responsible Bidder. In determining responsibility, the City may consider factors including, but not limited to: Prior performance history Experience on similar projects Ability to work cooperatively with the City Adequacy of equipment and staffing Ability to complete the Work within required timeframes Reliability, reputation, competency, and available resources The City and its representatives may conduct any investigation deemed necessary to evaluate a Bidder’s qualifications. The Bidder shall furnish all information requested by the City for this purpose. RECEIPT OF BID PROPOSALS Bids must be submitted electronically , up to, but no later than the designated date and time as specified via the City’s E Procurement System, OpenGov. It is the sole responsibility of the Bidder to see that their Bid Proposal is received in the proper time. Bids must be submitted electronically via the City’s E Procurement System. There will be no exceptions! WITHDRAWAL OF BID PROPOSALS Bids may be withdrawn at any time prior to the submission deadline through the City’s E-Procurement System by “un-submitting” the proposal in OpenGov. After withdrawal, the Bidder may revise and resubmit its proposal at any time prior to the submission deadline. Bidders are strongly encouraged to carefully review their submissions before final submission. Negligence on the part of the Bidder in preparing a bid shall not confer any right to withdraw or modify the bid after the submission deadline. No bid may be withdrawn after bid opening without the written approval of the Director of Purchasing. Requests for withdrawal after bid opening must be submitted in writing by an authorized representative of the Bidder. Bid Proposals received after the date and time specified for submission will not be opened or accepted. BID DEPOSIT Each Bidder shall deposit with Bid a Bid guarantee consisting of a bank draft, Bid bond, cashier’s check, or certified check drawn on a good and solvent National or State Bank and payable to the order of the City, in an amount not less than ten percent (10%) of the total amount of the Bid submitted, as a guaranty that in case the Bidder’s Bid is accepted, the Bidder shall within one day after the date of such acceptance and notification thereof, deliver to the City a contract signed and executed by the Bidder, proper insurance certificates and a Performance and Payment Bond in one hundred percent (100%) of the contract sum furnished by a responsible bonding company acceptable to and written upon forms prepared or approved by the City as security for payment of labor and materials and for the faithful performance of the contract and compliance with the provisions of law relating to the payment of prevailing rate of wages. Bid Deposit MUST be uploaded electronically with submission through the City’s E Procurement System, OpenGov. Upon notification from the City, Bidder’s must deliver ORIGINAL Bid Deposit within three (3) business days. All Bid deposits will be retained by the City until a Bid award is made, at which time the Bid deposit will be promptly returned to the unsuccessful Bidders. The Bid deposit of the successful Bidder will be retained until the equipment, goods or services have been received or completed and found to be in compliance with the specifications. Performance by the Bidder shall not be considered complete, until final inspection and acceptance by the City of the Bidder’s Work. Final inspection shall occur within 30 days after the actual completion of the Work. Execution of the contract is contingent upon receipt of an acceptable Performance and Payment Bond and any required certificates of insurance. Upon failure to meet the requirements of this paragraph, the Bidder shall forfeit the amount deposited as liquidated damages and no mistakes or errors on the part of the Bidder shall excuse the Bidder or entitle him to a return of the aforementioned amount. AWARD It is the intent of the City to award the contract to the lowest responsive and responsible Bidder meeting all specifications and requirements of this Invitation to Bid. In determining responsiveness and responsibility, the City may consider factors including, but not limited to: (a) Compliance with all terms, conditions, and specifications of the Invitation to Bid; (b) Bid price; (c) Qualifications of the Bidder, including demonstrated experience with municipal well maintenance and rehabilitation projects, past performance, financial stability, technical capability, personnel qualifications, and available equipment and resources; (d) Ability to complete the work within the required project schedule; (e) Quality of proposed materials, equipment, and methods of performance; and (f) Warranty provisions and long-term serviceability. Any bid that modifies, limits, restricts, or conditions the requirements of this Invitation to Bid may be deemed non-responsive and rejected by the City. The City reserves the right to reject any or all bids and to delete, modify, or omit any portion of the work when determined to be in the best interest of the City. PRICES The price quoted for each bid item shall include all costs necessary to complete the Work in accordance with the Contract Documents, including labor, materials, equipment, mobilization, transportation, delivery, handling, bond premiums, insurance, overhead, profit, and all other costs incidental to the satisfactory completion of the Work, unless otherwise specified in the Contract Documents. Unless otherwise specified, all bid prices shall remain firm for the duration of the Contract. The City of Aurora is exempt from applicable federal excise taxes and Illinois Retailers' Occupation Tax. Bid prices shall exclude taxes from which the City is exempt. In the event of a discrepancy between a unit price and the corresponding extended price, the unit price shall govern. DISCOUNTS Bid prices shall be submitted as net prices and shall include all labor, materials, equipment, transportation, permits, supervision, overhead, profit, and all other costs necessary to complete the work as specified. Any prompt payment discounts offered by the Bidder shall apply only after receipt by the City of a complete and accurate invoice and final acceptance of the work, unless otherwise specified in the Contract Documents. TAXES The City of Aurora is exempt, by law, from paying State and City Retailer’s Occupation Tax, State Service Occupation Tax, State Use Tax and Federal Excise Tax (per Illinois Revised Statutes, Chapter 120, Paragraph 44) upon City works and purchases. The City of Aurora’s Sales Tax Exemption Number is E9996-0842-07. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS Bidders shall promptly notify the City of any ambiguity, inconsistency of error which they may discover upon examination of the bidding documents. Interpretations, corrections and changes will be made by addendum. Each bidder shall ascertain prior to submitting a bid that all addenda have been received and acknowledged in the bid. SIGNATURES Bid Proposals must be signed by the Bidder with his/her usual signature. Bid Proposals by partnerships must be signed with the partnership name by all members of the partnership, or an authorized representative, followed by the signature and title of the person signing. Bid Proposals by corporations must be signed with the name of the corporation, followed by the signature and title of the person authorized to bind it in the matter. When a corporation submits a Bid Proposal, its agent must present legal evidence that he has lawful authority to sign said Bid Proposal and that the corporation has a legal existence. In the event that any corporation organized and doing business under the laws of any foreign state is the successful Bidder, such corporation must present evidence before any Bid is executed that it is authorized to do business in the State of Illinois. Bidders by corporations must be executed in the corporate name by the President or a Vice President (or other corporate officer accompanied by evidence of authority to sign), and the signature must be attested by the Secretary or an Assistant Secretary, along with the corporate seal. The corporate address and state of incorporation must be shown below the signature. Bid Proposals by partnerships must be executed in the partnership name and signed by a partner whose title must appear under the signature, and the official address of the partnership must be shown below the signature. Any corrections to entries made on the Bid Proposal forms shall be initialed by the person signing the Bid Proposal. When requested by the City, satisfactory evidence of the authority of any signature on behalf of the Bidder shall be furnished. DEMONSTRATIONS The City reserves the right
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Does the bowl need to have each of the 2 points be 80% efficiency or more? this may be difficult to achieve as they are able to optimize the bowl for one of the data points (875gpm or 700gpm) but comes at the expense of lower efficiency at the other
The best efficiency point for the pump shall be greater than 80% and is preferred to be between the two data points (700 gpm and 875 gpm). The efficiency shall be greater than 77% for both the 700 gpm and 875 design operating points.
Can you clarify if the design is 875gpm @ 210ft (as orignally installed) or 875gpm @ 150ft as mentioned somewhere else in the spec?
The design point is as originally installed: 875 gpm @ 210ft. This will be updated in the special provisions as part of an addendum.
Is the new motor size to be 75hp or 60hp? the majority of the spec mentions 75hp as is currently installed, however one of the areas in the spec mentions 60hp for new motor.
75 hp
Is stainless steel impellers an acceptable alternate to thebronze impellers?
Bronze impellers.
can the terminal clamp material also be made of stainless steel? Sunstar produces them with SS not bronze.
Yes, 304 or 316 stainless steel is an acceptable material for the terminal clamp. This will be updated in the special provisions as part of an addendum.
Is wire to water efficiency necessary for the factory testing? This requirement is often removed as it requires a different setup. manufacturer's will use a calibrated motor.
All factory testing requirements, including wire-to-water efficiency, are required.
are there any anticipated water quality issues necessitating hauling water offsite from this well or nearby wells in the past?
No, this is not necessary.
Could you clarify who will be responsible for collecting bacteriological samples after the well rehab? is it the city or the contractor? also contractors cannot estimate or predict the number of bacT samples necessary as it is beyond our control; if the contractor is to collect, can you state the number of samples were responsible for, and if necessary for additional redisinfection this will be paid for separately, correct?
The city will collect any samples. Disinfection is only required one time as this is a collector line well that pumps to the treatment plant and is disinfected with all other wells and river.
are any additional well chemistry treatments acceptable; like GO2?
No substitutes are allowed.
Is 1.25" PVC acceptable for the carrier pipe? also how much wiring is needed to reach the control center? is the existing panel nearby
Yes, 1.25” PVC carrier is acceptable. The city will order and supply the appropriate transducer.
are the PVC centering guides necessary? We dont believe they're currently installed, and they aren't available in PVC material for the sizes needed. Can this be removed from the misc. install items?
PVC centering guides are not specified or required.
OpenGov categories
- 72090 · Well Pumps, All Kinds
- 91063 · Public Utilities: Water, Sewer and Gas Maintenance and Repair
- 91164 · C.I.P., Utilities
- 91392 · Maintenance and Repair, Water System, Main and Service Line
- 91741 · Contracted Services, Utilities
- 92849 · Hydraulics (Pump, Hydraulic Motor, Valves, Gauges, etc.) Maintenance and Repair
- 92943 · Hydraulics (Pump, Hydraulic Motor, Valves, Gauges, etc.) Maintenance and Repair
- 93662 · Pumps and Pump Accessories Maintenance and Repair
- 93663 · Pumps, Vertical, Maintenance and Repair
- 96296 · Well Services (Including Oil, Gas, and Water): Drilling, Plugging, Consulting, Maintenance, Repair, etc.