Skip to content
← Back to search

State and local · OpenGov

Opportunitypending

Wellness Center, Pct.3

Description

RELEASE DATE: Saturday, October 17, 2026 RESPONSE SUBMISSION DATE/TIME: Wednesday, November 18, 2026 at 3:00 pm RE: HIDALGO COUNTY - REQUEST FOR COMPETITIVE SEALED PROPOSALS RFCSP NO.: 26-0632-11-18-12 – Wellness Center, Pct.3 Dear Prospect Offeror: Hidalgo County Purchasing Department welcomes and appreciates your interest and participation. For your review and consideration, enclosed find the procurement packet for the aforementioned project. Modifications and new requirements have been added and implemented. Please ensure to carefully read and review all instructions, requirements and specifications. All times referenced in this procurement packet are Central Standard Time – CST. If assistance is required, please do not hesitate to call the Purchasing Department at (956) 318-2626. Sincerely, Ignacio Amezcua, MBA, CTCM, CTCD Hidalgo County Purchasing Director INVITATION LETTER Summary Background Contact Information Timeline SUBMISSION DETAILS SUBMISSION OPTIONS & REQUIREMENTS Respondents have two (2) options for submitting a response. Respondents shall submit their response using one (1) of the following methods ( DO NOT duplicate submittals by submitting both an electronic and hard copy response. Respondents shall select one only (1) method to respond).: Submit responses electronically via the PORTAL: https://procurement.opengov.com/portal/co-hidalgo-tx on or before Wednesday, November 18, 2026 , at 3:00 pm OR; Submit one (1) hard copy and one (1) USB in original PDF format via personal hand-delivery or delivery service on or Wednesday, November 18, 2026 , at 3:00 pm . Any Proposal received after this deadline will not be accepted and will be returned unopened to the sender. HAND DELIVERED SUBMISSION When hand delivering the packet, Proposer should make sure that the package is stamped with the date and time received by the Hidalgo County Purchasing staff. DELIVER TO: US Postal Mail Address : Ignacio Amezcua, MBA, CTCM, CTCD, Purchasing Director ATTN: Coral Reyes , Contract Specialist III Hidalgo County Purchasing Department Administration Building 2812 S. Business Hwy 281 Edinburg, Texas 78539 Physical Address : Ignacio Amezcua, MBA, CTCM, CTCD, Purchasing Director ATTN: Coral Reyes , Contract Specialist III Hidalgo County Purchasing Department Administration Building 2802 S. Business Hwy. 281 Edinburg, Texas 78539 FIRM INSTRUCTIONS Responses to this procurement packet shall be formatted and organized in the following order for consistency and easy screening: All submissions must be typed, single-spaced, and printed one-sided on 8 ½” by 11” paper. One (1) hard copy, marked “ORIGINAL” and one (1) USB in PDF format. The original document must be submitted with a Cover Page containing the information listed in the Submission Outline/Checklist, under the Submission Cover Page. The complete response must be sealed in an appropriately sized envelope or box for delivery to the Hidalgo County Purchasing Department, per instructions in the Procurement Packet Submission paragraph of the Legal Notice section contained within this procurement packet. All documents must be labeled with the firm’s name and the project number. Responses that are not identified with the project number on the outside, will be at risk of rejection. SUBMISSION OUTLINE/CHECKLIST To assist in ensuring all submissions received are complete, it is recommended for the Offeror to use this Submission Outline as a Checklist prior to submitting a response. All Responses must be submitted in the following order with the guidelines provided within this solicitation. For the hand delivery option, the solicitation packet can be found under the #ATTACHMENTS section: Table of Contents Required Confirmations/Documents Legal Notice Declaration - (Confirmation) Requirements/Specifications - (Confirmation) Appendix "C" - Insurance and Bid Bond Requirements Proof of Insurance - (Document) Insurance Requirement Acknowledgment - (Confirmation) Bid Bond Acknowledgment - (Document) Project Requirements Acknowledgment - (Confirmation) Conflict of Interest Questionnaire - Copy of County Clerk File with fee receipt (when applicable) (Document) Vendor Acknowledgment, and HUB Declaration Vendor Acknowledgment - (Confirmation) HUB Declaration - (Document) Certification Regarding Debarment Signed Certification - (Document) SAM.gov Registration Acknowledgment - (Document) Form 1295 - (Document) Title VI Appendices [A -E] - (Confirmation) Required Contract Clauses For Contracts Under Federal Award Byrd Anti-Lobbying Contract Clause - (Document) 2 CFR 200 Certification - (Document) FHWA 1273 - (Confirmation) David Bacon Act Wages Determination - (Confirmation) Prevailing Wage Rates Certification Statement (Document) Proposer's Affidavit - (Document) Draft Agreement - (Confirmation) Standard General Conditions of the Construction Contract - (Confirmation) References - (Document) Construction Identification Sign (Confirmation) Addenda (when applicable; see Addenda under Legal Notice) - (Confirmation) Statement of Credentials - (Document) Company/Firm Response - (Document) Cover Sheet Company Name, Company Address, Company Phone Number Project Name: Wellness Center, Pct.3 Procurement Number: 26-0632-11-18-12 Opening Date: Wednesday, November 18, 2026 Opening Time: 3:00 pm Complete Response (All Required Information/Documents) (Confirmation) = A confirmation is required for this section. (Document) = A document submission is required for this section. ELECTRONIC SUBMISSION Hidalgo County Purchasing Department will only accept electronic responses that are submitted via the PORTAL: https://procurement.opengov.com/portal/co-hidalgo-tx . The COUNTY will NOT accept telegraphic, emailed, nor responses submitted via facsimile. *When submitting a response electronically, the firm will be required to complete all the sections found in this solicitation in order for the submission to be valid. PROCUREMENT OVERVIEW THE RESPONDENT IS RESPONSIBLE FOR READING AND UNDERSTANDING ALL DOCUMENTS, FORMS, SPECIFICATIONS, AND INSTRUCTIONS WITHIN THIS ENTIRE DOCUMENT. Follow all instructions; you are responsible for obtaining any information needed in order to respond to this solicitation. Further, the Respondent is responsible for providing any and all relevant information necessary to submit a response. Failure to do so will be at the Respondent’s risk and may result in rejection of the response as non-conforming. General Requirements apply to all advertised solicitations; however, these may be superseded, whole or in part, by OTHER DATA CONTAINED HEREIN. Review the Table of Contents. Be sure your proposal package is complete. INTRODUCTION Hidalgo County (hereinafter referred to as “COUNTY”) is seeking qualified respondents interested in providing services for the " Wellness Center, Pct.3 ". Proposals will be received in accordance with the requirements attached hereto as "Requirements/Specifications" . The response should address all requirements. Pre-Proposal Meeting If there will be a Pre-Proposal meeting the information will be included in Section 1 – Invitation Letter/Timeline. AWARD No award can be made until approved by Hidalgo County Commissioners Court. This RFCSP does not obligate Hidalgo County to the eventual purchase of any product and/or service described, implied or which may be proposed. Progress toward this end is solely at the discretion of Hidalgo County and may be terminated at any time prior to execution of an agreement. a. Before awarding any contract, Hidalgo County Purchasing Department will verify, using the Federal System for Award Management (SAM) and the Texas Comptroller’s Debarred Vendor List, that the offeror recommended for contract award has no unsatisfactory performance history that would prohibit awarding them a contract. b. The contract will be awarded to that responsible offeror(s) whose offer, conforming to the solicitation, will be most advantageous to the county, price ,and other factors considered. A responsible offeror is one who affirmatively demonstrates to the County that the offeror has adequate financial resources and the requisite capacity, capability, and facilities to perform the contract within the delivery period or period of performance, has a satisfactory record of performance on other comparable projects, has a satisfactory record of integrity and business ethics, and is otherwise qualified and eligible to receive an award under the solicitation and laws or regulations applicable to this procurement. c. The County reserves the right to accept other than the lowest offer, reject any or all offers in part or in total for any reason, to accept any offer if considered best for its interest, and to waive informalities and minor irregularities in offers received. d. The County may accept any item or group of items of any offer unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in Pricing Schedule, offers may not be submitted for any quantities less than those specified, and the County reserves the right to make an award on any item for a unit quantity less than the quantity offered at the unit prices offered unless the offeror specifies otherwise in the offer. e. The County’s execution of the Contract shall be deemed to result in a binding contract without further action by the offeror. f. The County may, within the time specified therein, accept any offer or part thereof, as provided in (c) above, whether or not there are negotiations subsequent to its receipt unless the offer is withdrawn by written notice received by the County prior to award. g. The County may award a contract, based on initial offers received, without discussion of such offers. Accordingly, each initial offer should be submitted on the most favorable terms from a price and technical standpoint, which the offeror can submit to the County. g. The County may award a contract, based on initial offers received, without discussion of such offers. Accordingly, each initial offer should be submitted on the most favorable terms from a price and technical standpoint, which the offeror can submit to the County. TERM It is intended that the contract term will commence on or after a date to be specified in written "Notice to Proceed" and Contractor shall fully complete the project within 300 Calendar Days thereafter. SUBMISSION OPTIONS & REQUIREMENTS Respondents have two (2) options for submitting a response and shall select only one (1) method to respond. Please see Section 2 – Submission Details above for submission options, procedures, and requirements. Any Proposal received after the provided deadline will not be accepted and will be returned unopened to the sender. PROPOSAL OPENING STREAMING Please find the proposal opening information included in Section 1 – Invitation Letter HAND DELIVERED SUBMISSION If Respondent chooses to hand deliver its submission, whether personally or via delivery service, it must follow the procedures and requirements set for in Section 2 – Submission Details above. ELECTRONIC SUBMISSION If Respondent chooses to submit its response electronically, it must follow the procedures and requirements set for in Section 2 – Submission Details above. SIGNING OF SUBMISSION In order to be considered, all submittals must be signed by an authorized representative of the firm. For hardcopy submissions, please sign the original in blue ink and ensure the copy is clearly labeled. For electronic submissions, please ensure all appropriate certifications are marked. QUESTIONS AND ANSWERS Questions must be submitted via the PORTAL'S Question and Answer Tab (Q&A) no later than Tuesday, October 27, 2026 , at 5:00 pm . Responses to properly submitted questions will be published in the PORTAL and emailed to all planholders who are listed as a Follower in the PORTAL. Telephone inquiries will not be accepted. RESTRICTIVE OR AMBIGUOUS REQUIREMENTS It is the responsibility of the Proposer to review the procurement packet and to notify the Hidalgo County Purchasing Department if the requirements are formulated in a manner that would unnecessarily restrict competition or request clarification of any requirements that are ambiguous. Any such protest or question regarding the requirements or proposal procedures must be received in writing via the PORTAL'S Q&A Tab by the deadline stated for Questions and Answers. COST OF SUBMISSION Hidalgo County will not be liable for any costs incurred by the vendor in preparing a response to this procurement packet. Each Proposer acknowledges it is submitting a response at their own risk and expense. Further, no reimbursement for such charges or expenses shall be passed onto Hidalgo County. Hidalgo County makes no guarantee that any products or services will be purchased as a result of this solicitation and reserves the right to reject any and all submissions received. All responses and accompanying documentation will become the property of Hidalgo County. WAIVING OF INFORMALITIES Hidalgo County reserves the right to waive minor informalities or technicalities when it is in the best interest of Hidalgo County. NOTICE OF COMMUNICATION All communications by a vendor to the county, its officials, and department heads regarding this procurement shall be done through the Hidalgo County Purchasing Department. No vendor, its’ representative, agent, or employee shall engage in private communication with a member of the Hidalgo County Commissioners Court or county department heads regarding any procurement of goods or services by the County from the date that this procurement packet is released. No private communication regarding the purchase shall be permitted until the procurement process is complete and a purchase order is granted or a contract is entered into. “Private Communication” means communication with any vendor outside of a posted meeting of the governing body, a regular meeting of a standing or appointed committee, or negotiation with a vendor which has been specifically authorized by the governing body. LEGAL NOTICE These General Provisions are considered standard language for an Offeror (hereinafter referred to as “Offeror”, “Vendor”, “Respondent”, or “Contractor”) submitting a response for a Request for Bids, Proposals, Qualifications or other solicitation (hereinafter referred to as “Procurement Packet”) made by the County of Hidalgo (hereinafter referred to as “Hidalgo County” and “County” or any other governing body/agency for which the Hidalgo County Purchasing Department has been authorized to perform procurement services. The Hidalgo County Purchasing Department webpage may be found at https://www.hidalgocounty.us/143/Purchasing-Department . It is the Offeror’s sole responsibility to be in compliance of all federal, state, and local laws, requirements, rules, codes, ordinances, and regulations applicable to their proposed goods and/or services. In the event of any conflict between the terms and provisions of these requirements and the specifications, the specifications shall govern. In the event of any conflict of interpretation of any part of this overall procurement packet, Hidalgo County's interpretation shall govern. Referenced appendices may be subject to change. The following is a link to all adopted Hidalgo County policies ( https://www.hidalgocounty.us/805/CountyAdministrative-Policies ), which for all purposes, when applicable and whether specified explicitly or not, are incorporated by reference as part of this procurement packet and any resulting agreement. ACCEPTANCE OF SUBMISSION Receipt of the submission shall under no circumstance obligate Hidalgo County to accept the response, or make an award. The Offeror is responsible for obtaining any information needed in order to respond and for all costs of submitting its response. An Offeror’s submitted response is to remain firm for a minimum of ninety (90) days after opening. Hidalgo County is not responsible for any missing, lost, or late submissions. ACCESS TO RECORDS In special circumstances, Vendor may be required to allow duly authorized representatives of Hidalgo County, or the state and federal government access to contracts, books, documents, and records necessary to verify the nature and extent of the cost of services provided by Vendor. Vendor must keep records within Hidalgo County or note in their submission that records will be available within the boundaries of Hidalgo County to those representatives within one (1) business day of request by the County. ACCOUNT CREATION FOR PAYMENT Upon award and prior to execution of a contract, Offeror shall cooperate with and submit any required information to the Hidalgo County Auditor’s Office in order to establish an account with the County for payment, including information requested on Hidalgo County "Vendor Enrollment Solution" on this procurement packet. This information must be on file with the Hidalgo County Purchasing Department and the Hidalgo County Auditor’s Office. Failure to provide this information may result in a delay in payment and/or back-up withholding as required by the Internal Revenue Service. ADDENDA When specifications interpretations, amendments, corrections or changes are revised, the Hidalgo County Purchasing Department will issue an Addendum addressing the nature of the change. All released Addenda will be e-mailed to all point of contact(s) who are known to have received or requested a copy of the procurement packet directly from the Hidalgo County Purchasing Department. Offeror must sign in blue ink and include it in the returned submission package. ASSIGNMENT The successful Offeror shall not assign, sell, transfer, convey, or otherwise transfer its rights under any awarded contract, in whole or in part, without the prior written consent of County of Hidalgo County Commissioners Court (hereinafter referred to as “Commissioners Court”), or other applicable governing body. AWARD Hidalgo County reserves the right to award this contract on the basis determined on the Procurement Overview, and when applicable, listed on "Company/Firm Response” , in accordance with the laws of the State of Texas, to waive any formality or irregularity, to make awards to more than one Offeror, and to reject any or all submissions received. After Hidalgo County Commissioners’ Court approves an award, and the awarded Contractor defaults in meeting the general requirements and/or specifications in complying with the contract agreement, Hidalgo County reserves the right to seek the services of the next lowest bidder(s) and/or qualified Offeror(s). In such event, Hidalgo County shall charge the Awarded Vendor the difference for any additional cost of such item. Hidalgo County reserves the right to add or delete items during the term of the contract under the same rates and conditions. COMPLIANCE WITH FEDERAL, STATE, AND LOCAL LAWS The County will search a database maintained by the Texas State Comptroller which contains relevant vendor information. A contract may not be entered into with an entity that is identified therein. Search results shall be incorporated for all purposes as part of any resulting agreement entered into by the parties. The Offeror shall follow all federal, state, and local laws, requirements, rules, codes, ordinances, regulations and Hidalgo County Policy & Procedures applicable to their proposed goods and/or services, including, but not limited to those addressed within this procurement packet, the resulting agreement and the following: 4.7.1 Attestation Terrorist Organizations - TEX. GOVT. CODE CH. 2252 . Pursuant to the Texas Government Code, including but not limited to Chapter’s 2252, 806 and 807, the Offeror

Published attachments
Addenda and notices
  • Official Notice #1: Release of Addendum No.1 · 1

    Please be advised that Addendum No.1 has been released for your review.

  • Addendum #1 · 1

    Addendum No.1 has been created to address the following changes: Question Response Submission Deadline has been extended to November 2, 2026, at 05:00 pm Proposal Submission Deadline has been extended to November 11, 2026, at 03:00 pm Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #2: Release of Addendum No.2 · 2

    Please be advised that Addendum No.2 has been released for your review.

  • Addendum #2 · 2

    Addendum No.2 has been created to address the following changes: Question Response Submission Deadline has been extended to November 4, 2026, at 05:00 pm Proposal Submission Deadline has been extended to November 13, 2026, at 03:00 pm Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Addendum No.3 has been created to address the following changes: Provides responses to questions and addresses corrections to plans Includes Geo-Tech report, and updated plans. Response to Questions 7,15,45,46,48,52,53,55,66,67,69,76 to be addressed in Addendum forthcoming

  • Official Notice #3: Release of Addendum No. 3 · 3

    Please be advised that Addendum No.3 has been released for your review

  • Official Notice #4: Release of Addendum No. 4 · 4

    Please be advised that Addendum No.4 has been released for your review

  • Addendum #4 · 4

    Addendum No.4 has been created to address the following changes: Provides responses to questions and addresses corrections to specifications Proposal Submission Deadline has been extended to November 18, 2026, at 03:00 pm Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Is there a cost estimate available?

    Refer to response provided in Addendum # 3

  • What is the budget for project?

    Refer to response provided in Addendum # 3

  • Sheet AF101A lists CS-1 as “Painted Concrete.” Please clarify the required product, color, surface preparation, and number of coats, including whether a clear coat or non-slip finish is required.

    Refer to response provided in Addendum # 3

  • what is the project budget for this project

    Refer to response provided in Addendum # 3

  • I can see in the Specifications that the contractor shall participate in the commissioning process. I do not see a section in the Specifications for Commissioning. At this time are you requesting a proposal for Building Commissioning and/or Building Enclosure Commissioning? If you are not requesting this at this time, can you share with me the information so I can share a proposal for this or any other project with Hidalgo County. Thank you.

    Refer to response provided in Addendum # 3

  • Due to the changes in HUB Program, will the HUB Declaration Form still be required to be submitted? Please advise.

    Refer to response provided in Addendum # 3

  • SYNTHETIC TURF – SUBSTITUTION REQUEST PDF Upload Issue We attempted to upload the Synthetic Turf Substitution Request Form submitted by Hellas Construction, Inc., along with the manufacturer’s supporting product data. However, the OpenGov bidding portal would not allow us to upload the PDF. Therefore, we are providing the complete substitution request information and technical specifications below for review and approval. 1. Substitution Request Information * Project: Hidalgo County Wellness Center * Owner: Hidalgo County * Request Type: Substitution Request During Bidding Phase * Original Request Date: October 22, 2026 * Specification Title: Synthetic Turf * Specification Section: 09 62 53 * Specification Page: 5 * Article/Paragraph: 2.01(A) and (B) * Description: Manufacturers * Proposed Substitution: EPXP * Trade Name: EPXP (Extended Play – 5MM Foam) * Manufacturer Listed on Request: Hellas Construction * Submitting Firm: Hellas Construction, Inc. * Submitted By: Christopher Crenshaw * Address: 12000 West Parmer Lane, Cedar Park, TX 78613 * Telephone: 512-250-2910 2. Manufacturer Product Data Product: Extended Play – 5MM Foam (EPXP) Product Data Branding: EnvyLawn / Challenger Turf Turf Details * Face Weight: 48 oz/sy * Pile Height: 5/8” * Tuft Gauge: 3/8” * Total Weight: 133.1 oz/sy Fiber Details * Primary Yarn Type: Polyethylene * Primary Yarn Denier: 5040 * Primary Yarn Shape: Rectangle * Primary Yarn Color: Field Green * Thatch Yarn Type: Polyethylene * Thatch Yarn Sha

    Refer to response provided in Addendum # 4

  • what material do you want for the lockers, benches and toilet compartments? Both specs and plans contain references to phenolic and HDPE/plastic. These are two different materials.

    Refer to response provided in Addendum # 3

  • Under the Additional Requirements/Key Information it states that the following project schedule is required with submission, relevant work history is required, and provide a list of their superintendent, subcontractors, all disciplines, and mechanical equipment, but there is no box to upload this information under the section.

    Refer to response provided in Addendum # 3

  • Under the Section Proof of Insurance it states provide or upload your certificate of insurance but there is not box to do so. Please advise.

    Refer to response provided in Addendum # 3

  • There are to areas requiring a List of Subcontractors, one in the Statement of Credentials and the other in the Specifications book. Which do we submit? Please advise.

    Refer to response provided in Addendum # 3

  • Regarding Section 5 – Evaluation Criteria, the County's evaluation includes consideration of the proposer's project understanding; qualifications and approach; and personnel and staffing. However, the RFCSP does not appear to identify a specific section, form or attachment where respondents are required to provide this information. Can you please clarify if inclusion of this information within the Statement of Credentials section would satisfy the County's requirements? If no, please identify where/how respondents should provide this information within the portal.

    Refer to response provided in Addendum # 3

  • Regarding Section 6.3, Requirements/Specifications (confirmation), a project schedule is required with submission. Can you please clarify if inclusion of the project schedule within the Company/Firm Response Bid_Page.pdf would satisfy the County’s requirements. If no, please identify the specific location where respondents should provide provide schedule?

    Refer to response provided in Addendum # 3

  • Please clarify the limits of work included in the mezzanine alternate and identify the exact stopping point on the drawings. Confirm which materials, structural supports, connections, and other provisions must be furnished or installed under this alternate to accommodate future construction. Please distinguish work required in our bid from work to be completed under a future phase.

    Refer to response provided in Addendum # 3

  • The project specifications identify REGUPOL AktivPro Roll, 1-inch (25 mm) thickness, as the basis of design. For bidding purposes, please advise whether either of the following Ecore athletic flooring products would be acceptable as an approved substitution: Option 1 – Ecore Performance Beast Plus Rolls (Preferred) 14.5 mm total thickness ASTM F970 @ 250 psi: 0.008-inch indentation ASTM D2047: Coefficient of friction greater than 0.90 ASTM E648: Class II ASTM F925: Good chemical resistance Option 2 – Ecore Performance Monster Rolls 22.5 mm total system thickness, including 12 mm shock pad ASTM F970 @ 250 psi: 0.025-inch indentation ASTM D2047: Coefficient of friction greater than 0.80 ASTM E648: Class II ASTM F925: Pass Both products are intended for athletic and fitness flooring applications. However, the products have differences from the specified thickness and performance requirements, as shown in the attached manufacturer specifications. Please confirm whether either product is acceptable for substitution, including approval of the identified deviations, or whether the specified REGUPOL system must be provided. Additionally, please confirm any required color selections, warranty documentation, or additional performance testing. Attached are the highlighted Ecore manufacturer specifications for review.

    Refer to response provided in Addendum # 4

  • On Sh. C04 - Storm Drainage Layout, the scale seems to be incorrect. When I apply the 1' = 20' scale, none of the dimensions match the distances shown on the plan.

    Refer to response provided in Addendum # 3

  • RH-1 is shown on M1.2 and RH-2 is shown on M1.1. There is no schedule for these. Please provide a schedule/specs.

    Refer to response provided in Addendum # 3

  • L-1 to L-7 is shown on M1.1, M1.2, M1.4, M1.5. There is no schedule for these. Please provide a schedule/specs.

    Refer to response provided in Addendum # 3

  • M1.1, keynote 5 states route retrig lines to mezzanine for AHU-9. Split system schedule does not show AHU-9. Assumed this a misprint?

    Refer to response provided in Addendum # 3

  • M1.0, keynote 2 states to refer to detail for cap. There is no detail referring to underground sleeves. Please provide the detail.

    Refer to response provided in Addendum # 3

  • Fire alarm and fire sprinklers. G0.02 and the electrical notes say both are required and will be furnished by licensed designers and installers. The project manual has no sections for either. Please confirm who designs, who furnishes and who pays for each, and whether they are in the base bid or a deferred submittal.

    Refer to response provided in Addendum # 3

  • Communications, audio-video and security. The cabling spec is “specified elsewhere” but there is no Division 27 in the manual. The plans show data, TV and HDMI outlets and wireless access points. Please confirm who provides cabling, racks and equipment, and whether any security or access control is intended.

    Refer to response provided in Addendum # 3

  • Door hardware. Section 08 71 00 is referenced but is not in the manual, and hardware sets are scheduled for only three doors (104, 105A, 105B). Please provide the hardware schedule and confirm any electric hardware.

    Refer to response provided in Addendum # 3

  • Special inspection and testing. S1.0 and Section 31 20 00 say the Contractor hires the geotechnical lab, while S1.1 says the Owner hires the special inspection agency. Please confirm who hires and pays for each, and who pays for retesting.

    Refer to response provided in Addendum # 3

  • Electrical code edition. E0.0 and the specifications say 2020 NEC, but G0.02 lists 2023 NEC.

    Refer to response provided in Addendum # 3

  • Plumbing code edition. G0.02 lists the 2018 IPC and E0.0 lists a different edition.

    Refer to response provided in Addendum # 3

  • Specification sections that may not apply. Division 26 (26 03 13) includes electrical demolition, data center busway, general busways, and lightning protection for high-rise buildings. Please confirm which apply.

    Refer to response provided in Addendum # 3

  • Roof and wall system. Please confirm the roof panel type, insulation requirements, and who furnishes flashing, gutters and downspouts (Section 07 62 00 versus the metal building package).

    Refer to response provided in Addendum # 3

  • Toilet accessories (10 28 13). No accessory schedule was found. Please provide the list, and confirm who provides accessible and other signage.

    Refer to response provided in Addendum # 3

  • Floor finishes. Please confirm the carpet tile shown in the transition legend (none is scheduled in rooms), the coating system on painted concrete CS-1, any sealer or polish, and whether moisture mitigation is required.

    Refer to response provided in Addendum # 3

  • Synthetic turf and netting. Please provide infill, padding and seam details for TF-1, and details, quantities and overhead support for the netting (32 31 13.35). Please also say who installs the netting.

    Refer to response provided in Addendum # 3

  • Painting. Please confirm what “exposed ceilings” includes for P-5 black (deck, joists, ducts, conduit) and the exterior metal panel colors.

    Refer to response provided in Addendum # 3

  • Allowances. S1.0 and S1.1 list allowances (5 CY concrete, 500 lb reinforcing, 2,000 lb structural steel, 8,000 lb red iron). Please confirm they are to be carried and how overruns are handled.

    Refer to response provided in Addendum # 3

  • Pavement sections. Please confirm base and asphalt thicknesses from C12, and stabilization requirements.

    Refer to response provided in Addendum # 3

  • Fences and gates. Please provide limits, heights and gate locations, and confirm any fence relocation shown on CDS100.

    Refer to response provided in Addendum # 3

  • Please confirm who pays utility service, tap, meter and connection fees, and who provides the utility transformer pad.

    Refer to response provided in Addendum # 3

  • Geotechnical report. Please provide the full report (Millennium Engineers Group 01-24-29109) and confirm the earthwork basis, including 4 ft removal, select fill and the dewatering allowance.

    Refer to response provided in Addendum # 3

  • There is no irrigation section. Please confirm whether irrigation is required with Alt 2, and what seeding and sodding is in the base bid.

    Refer to response provided in Addendum # 3

  • Signs. Please confirm who furnishes the signs powered from circuits R2-1 and R2-3.

    Refer to response provided in Addendum # 3

  • The specs include switchboard sections but the drawings show only a main disconnect (MDS-1). Please confirm which applies.

    Refer to response provided in Addendum # 3

  • The spec leaves options unselected. Please confirm the feeder conductor type (THHN/THWN-2 or XHHW), the interior raceway type, and whether MC cable is allowed.

    Refer to response provided in Addendum # 3

  • Please confirm the control system for occupancy sensors and dimmers, and the exterior dimming method.

    Refer to response provided in Addendum # 3

  • Please confirm the DDC controls scope and who provides control power, the refrigerant monitor requirement, and the type and power needs of RH-1 and RH-2.

    Refer to response provided in Addendum # 3

  • Please provide hydrant flow data, the sprinkler code edition, the fire department connection location, and scope of the underground fire line. And specifications.

    Refer to response provided in Addendum # 3

  • Substitution Request: Resilient Athletic Flooring

    Refer to response provided in Addendum # 4

  • Substitution Request: Synthetic Turf System

    Refer to response provided in Addendum # 4

  • If alternate for Mezzanine is not accepted, what is finished height of partitions that are called to go to deck.

    Response provided in Addendum #3.

  • General note #7 on mech sheets state condensate to nearest exterior wall and provide french drain. There is no routing shown for condensate drains. Plumbing plans show HD-1 hub drain. Are these the intended termination points for condensate and what is routing/sizes needed?

    Response provided in Addendum #4.

  • On sheet A811 the hardware set type is not shown on the door schedule. Additionally, the hardware specification section appears to be missing.

    Response provided in Addendum #3.

  • Note on the partitions the Div 10 specs state HDPE partitions. The drawings, A-401, state solid phenolic partitions. Please confirm what material type should be used.

    Response provided in Addendum #3.

Plain text

OpenGov categories

  • 90916 · Athletic Facility Construction
  • 90921 · Building Construction, Industrial (Warehouse, etc.)
  • 90922 · Building Construction, Non-Residential (Office Bldg., etc.)
  • 90924 · Building Construction, Commercial and Institutional
  • 90930 · Building Construction (Not Otherwise Classified)