General work description: The work in general consists of constructing parking lot improvements, paving of a multi-use path, ramp to basin, workout & bench areas, storm drain, and landscape improvements at the West Linda Detention Basin located in the West Linda area of Yuba County. Other such items or details not mentioned above that are required by the plans, Standard Specifications, or these Special Provisions, and as directed by the Engineer, shall be performed, placed, constructed or installed. Project Details 2.1 In-person Bid Opening Bids will be received at the Office of the County Clerk , Suite 107, 915 8th Street , Marysville , California 95901 , until 2:00 p.m. on Thursday, November 19, 2026 at which time they will be publicly opened and read aloud. The envelope enclosing the bid submittal shall be clearly marked "Bid For..." followed by the title of this project and the date and hour for opening of bids. Bids shall not be accepted after said date and time. 2.2. Successful Bidder - Contract Execution The contract shall be executed by the successful bidder and shall be returned, together with the Payment Bond, Performance Bond and Certificate(s) of Insurance to the County so that it is received within 8 working days after the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty. Introduction Summary Background Contact Information Timeline Vendor Questionnaire Attachments
Published attachments
Addenda and notices
Official Notice #1: Retention · 1
Please be advised that the contract specifies payment retention per Section 9-1.16F of the Special Provisions.
Addendum #1 · 1
The bid Date has changed to November 19th, 2026, at 2 p.m.
Official Notice #2: Cross Sections - For Information Only · 2
Cross sections have been added to the solicitation as an attachment. For general information purposes only. Not a part of the project plan set. Cross sections as depicted do not necessarily reflect final design grade or roadway geometrics. Yuba County accepts no responsibility for the use of these sheets.
Addendum #2 · 2
Addendum No.2
Official Notice #3: Project Start Date · 3
The County is advertising this West Linda Multi-Use Basin Phase II Project with an estimated first contract working day in May or June of 2027. The County anticipates issuing the Notice to Proceed in April or May of 2027, weather depending.
Official Notice #4: Apparent Low Bidder and List of Subcontractors · 4
See Notice 7
Official Notice #5: Notice of Intent to Award · 5
Official Notice #6: Bid Tabulation · 6
Official Notice #7: Revised Apparent Low Bidder and List of Subcontractors · 7
Public questions and answers
Please clarify and confirm if there is a percentage requirement for the general bidder to self-perform to be eligible to bid.
Per Section 5-1.13A the prime contractor must perform at least 30% of the original total bid.
Please confirm the applicable daily liquidated damages rate for this project
Per Section 8-1.10 Caltrans Standard Specs, the liquidated damages are $4,200/day
Identify the required services and anticipated frequency of attendance for the contractor supplied biologist under Item 66.
The Environmental Construction Commitments is attached and will be added to the Appendix with Addendum 1.
The specification section 10-6 states a water truck shall be onsite at all times. Can the contractor utilize a water buffalo in-lieu of a water truck?
No, a water truck will be required per the Special Provisions.
The plans show installation of approximately 96 LF of 12-inch HDPE storm drain, two Type G-1 drain inlets, and connections to the existing storm drainage system. However, we have been unable to identify pipe invert elevations or a storm drain profile establishing the required excavation depths. Please provide the proposed storm drain invert elevations at each inlet and connection point, along with the existing storm drain invert elevations, so bidders can accurately determine trench depths and the sheeting and shoring requirements associated with Bid Item 8.
See Sheet 5 tables for pipe and inlet invert elevations as well as inlet grate elevations.
Please provide a plan for Bid Item No. 7 - Implementation of SWPPP, there are no plans for implementation in the Contract Drawings.
Please see Section 13 of the Special Provisions and Caltrans Standard Specifications. The plan will be developed under Bid Item 6.
Section 13-3.11 A of the specifications states construction area signs must be post mounted at locations shown. However, there are no plans indicating the layout of where construction area signs are to be placed, please provide.
Please see the Appendix of the Notice to Bidders, Special Provisions, Bid Book, Contract Documents.
Bid Item 2 provides a lump-sum item for Construction Area Signs, and Section 12-3.11 of the Special Provisions requires construction area signs to be post-mounted at the locations shown on the plans. However, we have been unable to locate a construction area sign schedule or designated sign locations within the plans. Please clarify the number, type, size, and locations of construction area signs required for this project so that bidders can accurately estimate Bid Item 2.
Please see the Appendix of the Notice to Bidders, Special Provisions, Bid Book, Contract Documents.
What is the anticipated start date of the project, with the rainy season beginning? Does the County anticipate starting this project in March or April of 2027?
The County anticipates issuing the Notice to Proceed in April 2027, weather dependent.
Drawing Sheet 5 indicates an aggregate shoulder behind locations where 6" Type A-1 curb is poured. Sheet 4 the typical cross section for parking lot indicates placing soil in-lieu of Class 2 AB for the shoulder. Is aggregate base to be placed behind the curb or soil?
The callout on Sheet 4 and the layout on Sheet 5 specify aggregate base shoulders adjacent to retaining curbs.
Section 39-2.01C of the special provisions states pneumatic tired rollers shall not be used to compact HMA, vibratory rollers shall be double steel drum. However, Section 39-1.02C under method compaction equipment states to utilize 3 rollers and one of the rollers shall be a one steel-tired, 2 axle tandem roller. Please clarify whether or not pneumatic tired rollers can be utilized or not? Also, can the contractor utilize 2 rollers in-lieu of 3 due to the small quantity of HMA being placed?
Pneumatic tires are not to be used. The County is requiring three rollers per Section 39-1.02C(2)(c).
Sheets 5 and 6 provide proposed grading elevations; however, existing ground contours and elevations do not appear to be provided throughout the proposed work areas. To allow bidders to accurately calculate earthwork quantities and evaluate the anticipated cut-and-fill requirements, please provide the existing topographic contours and elevations on Sheets 5 and 6.
The County is working on cross sections for the path and parking lot showing existing and proposed grades. Anticipating having these done by 11/13/26. These would be provided for bidding purposes only.
Bid item 58 calls for Outdoor Creations concrete benches to be installed. Outdoor Creations offers several concrete benches. Does the agency have a preferred model number for these concrete benches?
Please see forthcoming Addendum 1.
There appears to be some overlap in square footage bid quantities between items 23 and 52. Please verify/ clarify the concrete flatwork areas to be paid under each item
The bid item 23 quantity covers the reinforced concrete areas shown on the access ramp, concrete pad, and overflow area. The bid item 52 quantity covers the concrete flatwork areas along the multi-use path as detailed on the landscape layout plan.
On Sheets 10 and 11 of the Contract Drawings there appears to be proposed contours for grading the basin. Please clarify whether or not we are to grade the basin per these contours? Also, if we are required to grade the basin, please provide the correct existing topographic elevations since the ones on the landscape layout plans do not match the ones on the civil sheets (Sheets 5 & 6).
Contours shown on plans are existing grades. Grading in the landscape areas shall be done in accordance with the contract documents - plan details, Special Provisions, and Caltrans Standard Specifications among other items.
Is pre-qualification required?
Pre-qualification is not required.
Bid item 30 calls out a temp HMA driveway. What is the thickness of the base rock under the driveway?
Please see Addendum 1.
Can you please confirm if the compaction testing is to be paid for by the contractor or City/County.
Per the Caltrans Standard Specifications and Special Provisions the quality control testing specified is included within the items of work it is performed under.
Can you please confirm the Compaction Testing Frequency for the Irrigation Trench.
Please see Addendum 1.
Please confirm if the new Hunter HDL-06-18-CV drip line will be subsurface or above grade install. If subsurface please advise depth.
The drip line is to be subsurface at a depth of 2" per Detail N on Sheet 16 of the plans.
There is a 2 wire decoder detail on sheet L3-03, Please confirm the existing control wire from friendship park is 2 wire and the existing controller is a 2 wire controller.
Yes, the control wire from friendship park is 2 wire and the existing controller is a 2 wire controller.
Please confirm the existing irrigation controller has enough stations for the new added remote control valves.
Yes, the existing controller has enough stations for the proposed valves.
Will the new trees planted in the decomposed granite area need mulch around their basins? or will they be installed in the decomposed granite as is. Please advise.
Trees planted in the decomposed granite areas shall have berm and mulch, among other items, per Detail A on Sheet 19.
CAD files allow for detailed earthwork takes off to be completed. Can the agency provide bidding contractors with CAD files for this project?
The County will not be providing CAD files for this project. Please see forthcoming cross sections and contract documents.
What are the approximate start and end dates?
Please see previous question regarding Notice to Proceed.
How many days will construction take?
Refer to Notice to bidders
Can you please confirm the seed mix, seed rate, and application rate (Lbs. of Seed per Acre) for hydroseeding of the disturbed areas.
See response to Question 29.
Can you please confirm the seed mix, seed rate, and application rate (Lbs. of Seed per Acre) for Bid Items 9, 10 and 50 as there are different mix designs on the plans and in the specifications.
Seed mix and rate for Bid Items 9, 10, and 50 will match table from Page 41 of the Special Provisions. Please see forthcoming Addendum 2 for application rate and removal of seed mix from Page 45 of the Special Provisions.
Sheet L3-02 indicates a wire bundle (from park plans by others) consisting of one pilot wire and one common wire. However, Sheet L3-03 includes a two-wire irrigation control system detail, which typically utilizes decoder-based control wiring rather than separate pilot and common wires. Please clarify the intended irrigation control system - conventional or 2-wire cable? If the 2-wire system is used, please provide the decoder model.
Irrigation system is to be 2-wire based. Model to be submitted by the Contractor and approved by the Engineer. Model TW-D compatible with Rain Master DX3 or approved equal would be acceptable.
The bid documents include federal-aid provisions, including Buy America, 23 CFR 635.109, Title 23 USC 112, 49 CFR 26 and 29, and Title VI, but no FHWA-1273, federal wage determination or DBE goal. Is the project federally funded, and if so, which federal labor and DBE requirements apply?
There is no federal funding on this project. Buy America and DBE requirements do not apply.
The structural section (HMA thickness, aggregate base thickness) for Bid Item No. 30 – Temporary HMA Ramp (To Cottonwood Ave) is not detailed on the plans or in the bid documents. Please provide the required structural section and material specifications for this bid item.
See Addendum 1 Item 11.
Bid proposal item 46, "24" box trees" shows a quantity of 175. There are 15 on the plans. Please consider correcting the quantity.
Please see forthcoming Addendum 2.
Sheet 11 notes 23 and 24 call for double 10 foot wide by 5 foot tall gates, while Item 60 is a 10 foot wide chain link access gate. Does each Item 60 unit provide a 10 foot clear opening with two leaves, or two 10 foot leaves in a 20 foot opening?
The note for Items 23 and 24 on Sheet 11 are for 20' openings. The plans and estimate specify 6 EA 10' swing gates.
For the Naturalized slope Hydroseed Mix, is there a recommended type of fertilizer and fiber? What is the required application rate of the fiber and fertilizer?
Please see forthcoming Addendum 2 for application rate. Fertilizer and fiber is to comply with contract documents and submitted by the Contractor for approval.
Plan sheet L1-01 on planting notes 8, states to install a 3" layer of mulch in all planted areas. But it does not give a type of mulch required? Please provide a type of mulch required for bidding.
The bid item for Bark Mulch is to comply with Caltrans Specifications and submitted by the Contractor for approval.
Sheet 2 General Note 22 requires a one-year maintenance period after acceptance and an additional one-year maintenance period for any items needing repair at the end of it, while Special Provisions 7-1.06J requires a 10 percent maintenance bond where the warranty period exceeds one year. Is a maintenance bond required on this contract?
Per the contract provisions no maintenance bond is required at bid time. If warranty repairs are performed a maintenance bond would be required at that time.
Addendum 1 item 8 reads "On Page 47" and states no change. Please confirm whether a change to Special Provisions page 47 was intended, and if so, issue it.
Please disregard Item 8 from the Addendum 1.
The response to question 3 stated that the Environmental Construction Commitments would be added to the Appendix with Addendum 1. Addendum 1 added the Mitigation Monitoring Plan instead. Are the Environmental Construction Commitments part of the Contract Documents, and if both apply, which governs where they differ?
The environmental construction commitments are a table summarized from the Mitigation Monitoring Plan.
The Mitigation Monitoring Plan added by Addendum 1 states no number of surveys or monitoring days for the contractor supplied biologist. Does the Item 66 lump sum cover only the preconstruction nesting survey, or also the daily on-site monitoring required while working inside the 1,320 foot buffer of an active nest?
Per Section 14, the Contractor Supplied Biologist item shall cover all costs for compliance with MM4.1 from the Mitigation Monitoring Plan.
Item 3, Mobilization, appears on the Bid Proposal, but Special Provisions 9-1.16D(1) states there is no bid item for mobilization and that the cost is included in other items of work. Will Item 3 be paid as a lump sum item, and if so under what payment terms?
Please see forthcoming Addendum 2. This clause from the Special Provisions will be removed.
Bid Proposal Items shows Item 46 at 175 EA and Item 24 at 275 SF, while the copy of the Engineer's Estimate and Contract Items Attachment A show 15 EA and 270 SF. Addendum 1 reissued all three tables and the difference remains. Please confirm the quantities to be used for Items 24 and 46.
Please see forthcoming Addendum 2. The quantities will be 15 EA for Bid Item 46 and 270 SF for Bid Item 24.
Addendum 1 adds Section 19-2.01D(1) requiring R-value testing of subgrade in all asphalt and concrete areas. No design or minimum R-value is stated in the plans or specifications and no geotechnical report was issued. What R-value is the structural section based on, and what is required if a tested subgrade R-value falls below it?
Please see forthcoming Addendum 2. The R-Value requirement for subgrade will be removed.
Per RFI response dated November 19th - Question No. 14, the response indicates that Addendum No. 1 would include the manufacturer and model for the concrete bench. However, no bench manufacturer or model information was identified in Addendum No. 1. Please provide the required bench manufacturer and model for Bid Item 58, "6' Concrete Bench with Armrests."
Please see Item 12 from Addendum 1.
Existing Original Ground (OG) elevations and contours are not shown on the bid plans, preventing verification of the Final Pay quantity of 407 CY for Bid Item No. 11 (F) – Roadway Excavation (CUT). Please provide the existing OG topographic survey and/or CAD surface files for bidding purposes or confirm if earthwork calculations will be provided to substantiate the Final Pay quantity.
Cross sections were provided in the Notices section for bidding purposes.
In the project manual, there are three locations for the "Bid Item Schedules", identified as "Copy of Bid Item List" (from page 8 of 99); Bid Book "Bid Proposal Items" (from page 64 of 99); and Contract Documents "Contract Items" (from page 80 of 99). Please advise which bid item schedule shall govern in the event of discrepancies, for example, bid item 46?
Please see forthcoming Addendum 2. Discrepancies will be corrected.
Please confirm if cross section for the ramp and concrete pad showing existing grades are also being provided. Providing existing topographic contours and elevations would allow bidders to accurately calculate quantities and evaluate the anticipated cut-and-fill requirements.
Please see Cross Sections provided in Notices tab. For bidding purposes only.
Can ratios per square feet be provided for the required soil amendments for the planted areas, for bidding purposes.
Per the plans and Special Provisions the Contractor shall recommend quantities of soil amendments after soil testing. A geotechnical report for sampling and testing performed at the project site has been included in the Attachments for bidding purposes.
Bid Item 41, "Irrigation Sleeves," includes the bid quantity of 165 LF. However, the sleeve quantity shown on Sheets L3-01 and L3-02 appears to greatly exceed the bid item quantity. Our takeoff quantity is approximately 540 feet for all mainline, lateral and wire sleeves. Please clarify the quantity of irrigation sleeves to be included for bidding purposes.
Please see Addendum 2. The quantity for Bid Item 41 has been revised to 255 LF.
Our plan takeoff for Bid Item No. 23 – Concrete Flatwork (6” Thickness Reinforced) totals approximately 2,995 SF, which is 848 SF less than the listed bid schedule quantity of 3,843 SF. Please verify the bid quantity and clarify if there are additional locations or details included in this item that are not clearly identified on the plans.
Please see Addendum 2. The quantity for Bid Item 23 has been revised to 2,980 SF.
There is no bid proposal item for imported topsoil. Is imported topsoil anticipated to be required for this project?
Please see pages 36-42 of the Special Provisions. Surface soil is to be reused if compatible.