State and local · OpenGov
West Park Cemetery Administrative Building
Description
The City of Cleveland ("City" “Client” “Owner”) is seeking qualified Design-Build Team Partners ("Contractor" “Design-Builder” “D-B” “D-B Team” "Consultant") to provide professional Architecture, Engineering, and Construction services for the new West Park Cemetery Administrative Building. The Project is considered a Traditional Design-Build, and will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD). MOCAP oversees the administration of the City’s Capital Improvement Plan (CIP) for all City-owned facilities, outdoor spaces, and infrastructure, working through its three divisions: the Division of Architecture & Site Development, the Division of Engineering & Construction, and the Division of Real Estate. The mission statement for MOCAP is: To provide for the planning, designing, construction, and preservation of the City of Cleveland's facilities and infrastructure through collaborative and comprehensive planning, leadership in management, excellence in sustainable design and technical expertise, and quality construction based on integrity and professionalism. Scope of Services Program It is the City’s intent to hire an experienced, communicative, responsive, and collaborative Contractor with a creative Architectural and Engineering Team (“Consultant”) qualified in Design-Build construction. The Contractor and its Consultant is to provide full design and construction services outlined below. Site Design Site work will include the extension of existing underground and or overhead utilities (or new) as required to provide appropriate operational services to the facility. New pavement and sidewalks will be incorporated into site design Administrative Building The new construction will comprise of a single-story facility to support administrative functions associated with the property. Building programmed spaces shall include a records and meeting area, office, (2) ADA compliant unisex restrooms, kitchenette, along with building support spaces (mechanical, electrical, janitor closet, etc.). Possible Separate Bid Packages Based on any opportunity agreed upon with the Director of the Mayor’s Office of Capital Projects, the Design-Builder shall be responsible to evaluate the advantages and disadvantages of the need for separate bid packages that best serve the economic interests of the City. City’s Consultants The City of Cleveland has retained a bridging criteria Architect and Engineering Consultant(s) (“Consultant” “City’s Consultant” “Architect” “Engineer” “A-E” “Criteria Designer”) through the end of Construction, of which will remain contractually under the City of Cleveland or its’ Designee. The Consultants shall advise and consult with the City, and may perform such tasks as submittal and RFI review, field verification, meeting attendance, and other customary Construction Administration activities. Existing Documentation Brief MOCAP and the Owner’s Representative Team have compiled design criteria documents with preliminary diagrams which capture the owner’s intended design and function for the building. This information will serve as a basis for the overall project intent. Stages Stages Below are the brief outlined phases of the Project. Due Diligence and Early Design: This is work prior to execution of the design-build amendment. Here, the Design-Build Team will gather and document information related to the existing physical conditions and project needs, conduct project kick-off workshops, complete various other activities to establish goals and constraints of the project, and develop, document, and present design solutions through Design Development for the purpose of attaining an approved design set, and a Guaranteed Maximum Price (GMP). Phase A: Existing Conditions Verification Phase B: Program Verification and Preliminary Design Phase C: Technical Review and Schematic Design Execution of the GMP Construction Amendment: THIS IS FOR TRADITIONAL DB This is work including development and approval of the final GMP cost prior to Construction Documents. Phase E: Design-Builder’s Final GMP Review Phase F: Confirmation of the Proposal to continue through Design and Construction Detailed Design and Construction: This is work following approval of the design, whereas the Design-Builder will progress into Construction Documents in accordance with project requirements. Efforts will also correlate with the sequence of construction of the project. Phase G: Construction Documents Phase H: Permit Attainment Phase I: Construction Administration Phase J: Closeout Administrative Phase Requirements Below is the outlined administrative and project management requirements for each Stage and Phase to be included in the Design-Built Teams’ fee. All meetings are to be hosted by the Design-Build Team with agenda and minutes, and in person, with exact nature of the meetings are to be determined with the City’s PM. Coordination, communication, and quality control is expected through the entirety of the project. Phase A : Existing Conditions Verification Kickoff with City staff, establishing phase goals. Due diligence field verification including all applicable disciplines. Exact duration required is up to the Consultant. Bi-Weekly meetings with agenda and minutes. Review meetings for reports, surveys, and preliminary code analysis. Phase B : Program Verification and Preliminary Design Kickoff with City, establishing phase goals with attention to scope, existing conditions, code risk, scope risk, schedule, and budget. Bi-Weekly meetings with agenda and minutes. Provide an Excel spreadsheet encapsulating all City review comments with direction, feedback, solutions, etc. on the comments. Conceptual Phasing Plan: Create phasing plan for renovations, identifying sequence of renovations and swing space(s) to be used. Phase C1 : Technical Review Review meeting of narratives, scope questions, field verification risk and concerns, recommendations, and code. Phase C2 : Schematic Design Bi-Weekly meetings with agenda and minutes. Review meeting to be model walk through or plan flip session. Public meetings including Landmarks, Design Review Committees, Planning, and other State, municipal, or local agency meeting. Provide an Excel spreadsheet encapsulating all City review comments with direction, feedback, solutions, etc. on the comments. Phase E: Design-Builder’s Final GMP THIS IS FOR TRADITIONAL DB Assume OEO compliance will be requested including backup documentation based on the final agreed upon GMP. GMP negotiation exercises for unforeseen conditions or requests may be requested. The parties will engage in an "open book" pricing method in which all work shall be based upon competitive pricing that will be reviewed by the Contracting Authority and the Owner, the Criteria A/E, and the D-B. The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the D-B's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Approval of the Final GMP prior to Construction. Any “bid day savings” shall become part of the Contingency. Phase G : Construction Documents Bi-Weekly meetings with agenda and minutes. Review meeting to be model walk through or plan flip session. Continuation of Public meeting needs. Provide an Excel spreadsheet encapsulating all City review comments with direction, feedback, solutions, etc. on the comments. Phase H : Permit Attainment Submit to all permitting authorities on behalf of the City, including but not limited local and state. Periodic AHJ follow-up including at the 30 day mark and weekly beyond. Response letter to AHJ comments. Public/ AHJ meetings related to permit attainment. Perform an AHJ review meeting as necessary, including create agenda and minutes with action items. Phase I : Construction Administration Fee for CA shall be all-inclusive and unstipulated. General communication with the City and the General Contractor. Weekly OAC meetings in person. For budgeting, assume no less than (2) total field visits by either the Architect and other pertinent consultant per week. Multiple on-site meetings may be requested during critical phases of construction and swapped for other weeks. Prior to the City, review and approve all A-E related requests for interpretation, submittals, cut sheets, and shop drawings. Mock-ups as required. Provide sketches, bulletins, and revised drawings for interpretation requests. Review and certify all pay applications for payment prior to the City, electronically. Review and approve all Field Changes and Field Change Requests. Provide (2) punch list walk through including (1) person for each discipline. Phase J : Closeout Provide complete as-built condition drawings in PDF and CAD. Provide complete O&M Manuals. 1-year warranty walkthrough at approximately 10-11 months after construction. Resolve post-occupancy claims of deficient work during the 1-year warranty period. Project Architect(s) and Engineer(s) of Record are expected to facilitate and interpret the needs of the City and its&rsq City Agencies (Cleveland) The Design-Builder shall consult in detail with the Director of the Mayor’s Office of Capital Projects (MOCAP) and/or his designee and carefully analyze any information furnished by the Owner concerning the specific requirements of the Project, including but not limited to, design, construction, scheduling, budgetary, or operational requirements, limitations, and objectives. The Division of Architecture and Site Development (DASD) will coordinate the project and will work closely with the Design-Builder in all phases of the development. The Design-Builder shall comply with all standards and directives established and issued by the Division of Architecture and Site Development. The City of Cleveland may retain an Owner’s Representative Team to perform functions of DASD as needed. This facility is located within the corporate limits of Cleveland, Ohio and all work shall comply with all local, state and/or federal standards and ordinances and revised codes, including but not limited to Ohio Revised Code (O.R.C.) Chapter 153, as applicable to the scope of work. Compliance with these standards is mandatory by the Design-Builder and any resources needed to gain design compliance shall be borne by the Design-Builder. Proposal Submission Requirements COMPONENTS Each Design-Builder shall electronically submit to the DASD two separate PDF files: one labelled Design-Build Services Proposal , and one labeled Design-Build Fee Proposal . SERVICES PROPOSAL Cover Letter (One page): Clearly indicate contact information, including phone and e-mail, for project primary contact individual. Project Approach (One Page): The Design-Builder shall include a description how they plan to achieve the goals of this project, with specific descriptions of information gathering, evaluation, prioritization design, phasing, and documentation, and of their management, technical, and QA/QC approach taking into account the unique project goals and constraints. Include a specific and complete list of proposed deliverables. Describe the methods utilized to track work progress, budgets, and deadlines to maintain schedule and budget. Organization of the Design-Build Team (up to Two pages): Include a description of the Design-Build Team, including the A-E professional services team and the construction team, including information regarding its primary business, its background and history, its organizational structure, QA/QC program, the number of employees, and commitment to diversity. This section should contain any additional information about the firm that the firm feels will assist in understanding the qualifications of the firm. It is required that there be a local component to the Design-Builder’s professional service team to facilitate response time to matters that require on-site reviews. Project Team Qualifications (to Two Pages Each): Include a list of all key employees to be assigned or employed on the Project by the Design-Builder. The resume of each such person shall be included in the Qualifications. The Proposal shall also identify the person who will be the primary day-to-day contact and any alternate personnel assigned. The DASD requests that only resumes of key employees be included in the Proposal and should focus on highlighting their relevant qualifications and experiences that will most likely be comparable to work as detailed in this RFP. Licensure and Liability (One Page): Design-Builder shall provide professional licenses for any and all members of the Project Team including design/engineering firms, certificates of current professional liability insurance, and any associations of which they hold membership. This may be included with the Qualifications. Relevant Project Experience (One Page Each): Project sheets for completed relevant projects demonstrating ability to successfully lead and execute the type of work required for this project. Provide at least (3) completed municipal Design-Build project as reference as the construction general contractor, and as a design professional. Denote past partnerships between the contractor and the design professional team. Capacity to Perform Work (One Page): Provide a description of the capacity to perform work requested by describing the Team’s current workload, including consideration for current City project workload, and the availability of the staff to meet required schedules. Identify projects underway by the proposed Design-Build Team including, in brief, the projects’ stage of development. Special Commendations (Optional – up to Two Pages): The Design-Builder shall provide any other pertinent data, information and other extraordinary circumstances which will clearly demonstrate their unique ability to provide the required Professional Services in a manner not detailed previously within this RFP. Proposed Project Schedule (One Page): Provide a conceptual Project Schedule including design through closeout indicating a proposed timeline for the performances of all Services of this RFP. The Design-Builder must be prepared to commence work immediately after the execution of a Contract for Professional Services. Include Client review time and expectations based on calendar day and weeks. See sample below and edit to the scope: Start Date: May 3, 2027 Due Diligence – X Weeks Programming – X Weeks City Review – 2 Weeks Concept Design – X Weeks City Review – 2 Weeks Schematic Design – X Weeks City Review – 2 Weeks Design Development – X Weeks City Review – 2 Weeks Design-Build Amendment City Review and Processing – 16 Weeks Construction Documents – X Weeks Permitting – 6 Weeks GMP Phase – X Weeks Construction and Construction Administration – 52 Weeks Max Closeout – X Weeks Compliance Affidavit: Non-Competitive Bid Contract Statement for the current calendar year is enclosed. All Design-Builders submitting proposals for contracts awarded on or after January 1 of this year must submit a notarized affidavit for this year. If award of contract extends into subsequent years, then an updated form shall be required. Submit the Non-Competitive Bid Contract Statement with the fee proposal. Northern Ireland Fair Employment Practices Disclosure: Interested Consultants shall complete and submit the Northern Ireland Fair Employment Practices Disclosure form as part of their proposal, included. Certificate of Insurance: Submit a Certificate of Insurance form indicating limits of professional services (errors and omissions) and general liability coverage as a separate attachment to their Proposal, and shall at all times during the term of the contract resulting from this RFP, maintain the following insurance coverage: The insurance company or companies providing the required insurance shall be authorized by the Ohio Department of Insurance to do business in Ohio and rated “A” or above by A. M. Best Company or equivalent. The Successful Proposer, as contractor, shall provide a copy of the policy or policies and any necessary endorsements, or a substitute for them satisfactory to and approved by the Director of Law, evidencing the required insurances upon execution of the contract. Professional liability insurance with limits of not less than $1,000,000.00 for each occurrence and subject to a deductible for each occurrence of not more than $1,000,000.00 per occurrence and in the aggregate, and FEE PROPOSAL The Design-Build Fee Proposal shall be submitted as a separate pdf file in 8 1/2" × 11" format. Note that OEO schedules, which contain Design-Build Fee information, should be part of the Design-Build Fee Proposal and NOT part of the Design-Build Services Proposal. Content for this part of the Proposal Submission shall be organized as follows : Compensation Fee and Cost Proposal Schedule: The Design-Builder’s proposal shall indicate the proposed fee for each Phase of service, shall include an appropriate amount for inclusive reimbursable expenses in each Phase, and shall indicate a total Lump Sum Fee broken down by Phase as follows: PROFESSIONAL SERVICES Phase A: Existing Conditions Verification: __________ Phase B: Program Verification and Preliminary Design: __________ Phase C: Technical Review and Schematic Design: __________ Phase G: Construction Documents: __________ Phase H: Permit Attainment: __________ Phase I: Construction Administration: __________ Phase J: Closeout: __________ Professional Services Subtotal (1+2+3+4+5+6+7): __________ Design Contingency (10% of 8): __________ SUBTOTAL I (8 + 9): __________ CONSTRUCTION Construction Cost: ________________ Allowance 1: Project Sign: $1,500.00 Allowance 2: Testing: $5,000.00 Construction Subtotal (1+2+3): __________ Complete Construction Contingency (10% of 4): __________ SUBTOTAL II (4 + 5): __________ GRAND TOTAL FEE (SUBTOTAL I + SUBTOTAL II): __________ Permit Fees : Plan review fees and construction permit fees are waived by the City of Cleveland Building and Housing Department. All other permits, inspections and/or permits falling outside the City of Cleveland are not waived. Contingency: The Contingency is eligible for use in performing Services necessary to complete the project as contemplated in this RFP but are unforeseen at the time of issuance of this RFP. Any change in Services to be paid from this Contingency shall be preceded by a Clarification, an itemized scope and fee breakdown provided by the Design-Builder, and a written determination by the Director’s designee. The Consultant’s cost for overhead, profit and other expenses contemplated for assessment against the Contingency are to be included in the Lump Sum Fee. Modifications and Amendments: Contingency will be used to capture scope and services changes unless the value exceeds the contingency. Additional scope resulting in additional Consultant fees and/or changes in Project schedule shall not carry forward until given written approval through either memo, letter, notice to proceed, or other formal mechanism. Providing additional services without written request may forfeit the Consultants’ right to additional compensation or time. The Consultant errantly excluding terms of the RFP and its’ Exhibits will not be grounds for an additional service, extension, or additional compensation. Reimbursable Expenses: Expenses are to be included within the Design fee and not a separate expense. Where Reimbursable expenses are considered above and beyond and ap
Published attachments
- 01 NORTHERN IRELAND DISCLOSURE
- 02 CCO 187-22
- 03 Subcontractor Addition and Subtraction Policy
- 04 DASD Minimum Deliverables (2026.06.04)
- 05B Design-Build Agreement Sample for MOCAP
- 06 2023 Reimbursables_Policy
- 07 Cleveland City-Wide Asbestos Policy (2017.05.19)
- 08 City of Cleveland Sustainable Building Policy 2013-04
- 09 017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
- 10 FORM CWM-7 DEMOLITION WASTE
- 11 FORM CWM-8 CONSTRUCTION WASTE
- 12 PART B - General Conditions (final 8-28-25) - Shortcut
- 13 PART C - SUPPLEMENTAL GENERAL CONDITIONS__2025_09_16
- 14 PW NOTICE -Valerie Harvey (2024.12.27)
- 15 Prev Wage Notification (2024.12.27)
- 16 PW CONTRACTOR RESPONSIBILITY - OHIO (2024.12.27)
- 17 PW NOTIFICATION TO EMPLOYEE - OHIO (2024.12.27)
- 18 PW AFFIDAVIT OF COMPLIANCE - OHIO (2024.12.27)
- 19 PW THRESHOLD LEVELS - OHIO (2024.01.01)
- 20 PW INSTRUCTIONS FOR PREPARING CERTIFIED REPORTS - OHIO (2024.12.27)
- 21 PW CERTIFIED PAYROLL REPORT - OHIO (2024.12.27)
- 22 PW RATES - COVER LETTER (2024.12.27)
- 23 Wage Theft PDF Version
- 24 RFP MAILING LIST - DB 2026 08 27
- 25 Westpark Cemetery Existing Conditions Survey 2025-03-25
- 26 Criteria Drawings and Narratives
- West_Park_Cemetery_Administrative_Building.pdf
Public questions and answers
Can their be substitutes for building materials for the buildings thermal envelope, insulation, and structural design?
Currently we are not accepting alternates as the current base bid. However, substitutions may be considered after awarding of the RFP.
OpenGov categories
- 90924 · Building Construction, Commercial and Institutional