State and local · OpenGov
Wood Utility Poles
Description
Gainesville Regional Utilities (GRU) is soliciting bids from qualified suppliers for the purchase and delivery of wood utility poles in accordance with the Scope of Work and Technical Specifications set forth in this solicitation. Scope of Work/Technical Specifications Scope Gainesville Regional Utilities (GRU) is soliciting bids from qualified suppliers for the purchase and delivery of wood utility poles in accordance with the Scope of Work and Technical Specifications set forth in this solicitation. All bid submittals must be in accordance with Exhbit A: Page P-25.00 through P31.34. Standards In addition to meeting the technical standards specified in the Agreement, Supplier shall perform all work in strict compliance with the most recent version of applicable standards issued by standards setting organizations including, but not limited to, the Institute of Electrical and Electronics Engineers (IEEE), National Electrical Code (NEC), National Electrical Manufacturers Association (NEMA), American National Standards Institute (ANSI), and ASTM International (ASTM) in addition to, as applicable, state electrical standards boards and committees. Shipping and Delivery Delivery Date. The delivery date shall be six (6) to eight (8) weeks from the date that the order has been placed. GRU has the right to set up scheduled deliveries if this is in the best interest of GRU. Contractor Requirement: Poles must be purchased in full truckload quantities. A truckload can be comprised of any mix of sizes or treatment. Lead time to ship poles with mixed treatment is six (6) to eight (8) from the factory. One truck load is 725 cubic feet. Delivery of Wood Poles will be made to: Gainesville Regional Utilities Eastside Operation Center Utilities Stores 4747 North Main Street, Gainesville, FL 32609 and Gainesville Regional Utilities Springhill Operation Center Utilities Stores 3805 Northwest 97 th Blvd, Gainesville, FL 32606 All materials and equipment shall be delivered F.O.B. Destination, freight included. All materials and equipment shall be delivered F.O.B. Destination, freight included. d. Contractor shall: Pack and mark the shipment in conformance with best industry practices for the specific commodity; Prepare and give receiving warehouse commercial bills of lading; Deliver the work in good order and condition to the point of delivery specified in the contract; Supplier is responsible for any loss or damage to poles prior receipt and acceptance by the receiving warehouse; Supplier is responsible for obtaining any permits required for transportation to the designated point of delivery as stated in the contract; Furnish the receiving warehouse a delivery schedule and designate the mode of delivering carrier; Pay and bear all charges to the specified point of delivery. Acceptance GRU will have a reasonable time after delivery of the poles to inspect and reject, or accept the delivery. Inspection and Testing Contractor shall permit GRU to inspect the process of manufacturing poles at any time and for any reason at the Contractor’s manufacturing or distribution facilities. Inspection of the poles or the process by GRU or their designated inspection company, or their failure to inspect the poles or the process will not relieve the Contractor of its obligations under this contract, nor will inspection or failure to inspect be construed as Acceptance of the Work. If any applicable law, rule or regulation requires poles or process to specifically be inspected, tested, or approved by someone other than the SUPPLER, then the Contractor shall give the Contract Manager timely notice of readiness. Contractor shall furnish the Contract Manager the required certificates of inspection, testing, conformance or approval. All such tests shall be in accordance with the methods promulgated by the American National Standards Institution (ANSI) or other applicable standards, laws, rules and regulations. Contractor shall pay for all inspections and tests required by any applicable laws, rules or regulations. Safety Data Sheets Contractor agrees to provide Safety Data Sheets (SDS) with the delivery of any materials and/or supplies which contain chemicals or which could precipitate harmful by-products through exposure to heat, ignition, or reactions to/with other chemicals, or which would in any manner create a health hazard should users of the product become exposed to the product or any associated by-product. New Materials and/or Supplies Unless otherwise specified by GRU, all materials and/or supplies furnished by Contractor shall be new, unused, not surplus (never previously sold for use), and not rebuilt or remanufactured. GRU may utilize this Contract to purchase poles that are not listed in the specifications, and will make purchases deemed to be in the best interest of GRU. Delays and Remedies Damage, loss, expense or delay incurred or experienced by Contractor in the prosecution of the manufacturing or delivery by reason of unforeseen circumstances, unanticipated difficulties and obstructions, bad weather, or other mischances that are generally considered to be a part of the usual hazards associated with work, shall be borne entirely by Contractor and shall not be the subject of any claim for additional compensation or a change in the in the approved schedule. Instructions It is the bidders responsibility to read and understand all instructions in this section. Definitions for Instructions Addendum/Addenda : Written or graphic document(s) issued prior to the Response due date, which make additions, deletions, or revisions to the solicitation or contract documents. Agreement : A written Contract between two or more Parties. “Contract” and “Agreement” are synonymous. Best and Final Offer (BAFO) : The final proposal submitted after competitive negotiations are completed that contains the Responders most favorable terms. Bid : The written response to a Solicitation. Due Date : The date the response is due. Non–Responsive : A response that does not meet the material requirements of the solicitation. Redacted : The censoring of part of a Response. Respondent : An individual or business entity that submits a response to a Solicitation. Response : A written document submitted by a Respondent in reply to Solicitation.. Solicitation : A written document issued by an agency to obtain information or pricing for goods and/or services. May also be referred to as an Invitation to Bid, Request for Proposal, Request for Quotation, or Request for Statement of Qualifications. Work : Activity involving mental or physical effort done in order to achieve a purpose or result requested in the scope. Responsible/Responsive Bidder A responsible bidder has the capability to perform the contract requirements in all respects, including the experience, integrity, reliability, capacity, facilities, equipment, and good credit, which will help assure good faith performance. A bidder’s qualifications may be considered in making an award recommendation. GRU has the right to verify the qualifications of a bidder as GRU deems appropriate either before or after the bid opening. A responsive bidder has submitted a bid which fully conforms in all material aspects to the solicitation’s requirements, as determined solely by GRU. “Material” aspect refers to factors of importance which help to ensure that the bidder will adequately comply with the prerequisites of the solicitation by performing the work in the manner specified, or providing equipment or goods meeting specifications. If GRU determines either that a bidder is not responsible, or the bid submitted is nonresponsive, written notice will be sent by the Purchasing representative to the bidder, setting forth the basis of the finding. The failure of a bidder to promptly supply such information to support their company’s capabilities as may be requested by the Purchasing representative may be grounds for GRU to determine that the bidder is not responsible. Similarly, the failure of a bidder to promptly supply information in connection with an inquiry may be grounds for a determination of non-responsiveness. GRU may, in the exercise of its sole discretion, require a prequalification process in connection with any bid. In such case, a prequalification form is sent to bidders to complete which helps GRU assess the bidder’s qualifications and experience. Bidders are notified whether or not they qualify to participate in the solicitation. The form may also be modified for submittal with the bid response based on the type of goods or services needed. If a prequalification process is not used, GRU may also elect to award the solicitation based on an evaluated process. Notice SOLICITATION FOR: Wood Utility Poles SOLICITATION NO.: ITB 2027-020 CLOSING DATE AND TIME: Thursday, December 17, 2026 at 2:00 pm GRU NEEDS: Gainesville Regional Utilities (GRU) is seeking to procure Wood Utility Poles WHERE TO SUBMIT BIDS: Bids shall be submitted online on the OpenGov website prior to the closing date and time. OpenGov can be accessed by the following: https://produrement.opengov.com/signup BID BOND REQUIRED: TBD Timeline Release Project Date: November 23, 2026 Question Submission Deadline: December 9, 2026, 4:00pm Response Submission Deadline: December 17, 2026, 2:00pm Intent to Award: January 5, 2027 Questions & Answers Process Questions are to be submitted to the https://procurement.opengov.com/portal/gru/projects/321150 portal no later than Wednesday, December 9, 2026 at 4:00 pm . Respondents shall submit all inquiries regarding this bid via GRU e-Procurement Portal, located at https://procurement.opengov.com/portal/GRU. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on GRU e-Procurement Portal. Respondents shall click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the respondent to check the website for answers to inquiries. Addenda Notification and Acknowledgement Addenda Notification: Respondents are required to register for an account via GRU e-Procurement Portal hosted by OpenGov. Once the respondent has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda at https://procurement.opengov.com/portal/GRU . Contact Information The contact for this project is Robbin Odowski . Procurement Specialist III can be reached at (352) 393-1209 or odowskirr@gru.com . Solicitation Response Bids may be received up to but no later than 2:00 pm on Thursday, December 17, 2026 via GRU e-Procurement Portal located at https://procurement.opengov.com/portal/GRU . GRU e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. Gainesville Regional Utilities strongly recommends completing your response well ahead of the deadline. By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. Responses will be electronically unsealed and publicly opened at the time and place indicated in the Solicitation and will be available for inspection upon notice of award or intended Award, or within thirty (30) calendar days after the opening of Responses, whichever occurs first. Prices may be publicly disclosed on GRU’s eProcurement Portal at the sole discretion of GRU Procurement. The Respondent’s Certification Form must be submitted with the Response. If required, a Bid Bond and other documents must be provided with the Response. If a Bid Bond is required by the Solicitation and not included the response will be deemed non-responsive. A “No-Bid” Response can be submitted for those who choose not to participate in the Solicitation. This designation can be submitted in GRU’s eProcurement Portal: https://procurement.opengov.com/portal/gru/projects/321150 Examination of Solicitation Documents and Work Site Prior to responding to the Solicitation, Respondents are responsible for the following: (a) examining the Solicitation thoroughly, (b) if applicable, visiting the work site to become familiar with local conditions that may affect the cost, progress, performance of furnishing the Work, (c) considering federal, state and local laws and regulations that may impact or affect cost, progress, performance or furnishing of the Work, (d) studying and carefully correlating Respondent’s observations with the Solicitation, and (e) notifying the Procurement Representative of all conflicts, errors or discrepancies in the Solicitation. Respondents are expected to become fully informed as to the requirements of the Specifications and failure to do so will be at their own risk. Respondents cannot expect to secure relief on the plea of error. A Respondent who is aggrieved in connection with the specifications of this Solicitation may protest in writing to GRU Procurement at least seven (7) business days prior to the Response due date. References A contact person listed as a reference shall be someone who has personal knowledge of the Firm's performance for the specific project listed. The contact person shall have been informed that they are being used as a reference and that GRU may be contacting them. The references shall be a principal, owner or a representative of the owner of the project that is listed by the Firm in its list of prior experience. Contractors or sub-contractors who will provide services for the Project shall not be accepted as references. Do not list principals or officers who will not be able to answer specific questions regarding the projects listed under prior experience. Failure of references listed to respond to GRU's inquiries may negatively impact the responsiveness of the Firm's response to this solicitation. Interpretations and Addenda All questions about the meaning or intent of the Solicitation are to be directed to the Procurement Representative, unless stated otherwise in the Solicitation. Interpretations or clarifications considered necessary in response to such questions will be issued by Addenda sent to all parties recorded as having received the Solicitation. Questions received less than seven (7) business days prior to the Response due date/time may not be answered by the Procurement Representative. Only questions answered by formal written Addenda will be binding. Addenda may also be issued to modify the Solicitation as deemed advisable by the Procurement Representative. Addenda issued by GRU prior to the Solicitation due date/time are considered binding as if written into the original Solicitation. Respondents are responsible for ensuring that all addenda have been received prior to submitting their Response. Response Preparation The Pricing Response Form is included in the Solicitation and should be used to submit pricing information, providing a price for all items listed on the form, unless noted otherwise. The Respondent’s Certification Form must be legibly completed in ink (computer printed, typed or handwritten). A Response submitted by a corporation must be executed in the corporate name by the president, a vice-president, or other corporate representative and accompanied by a document showing authorization of such person’s authority. Include the physical address and state of incorporation. A Response submitted by a partnership must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the physical address of the partnership must be shown below the signature. The names of individuals included on the Respondent’s Certification Form must be legibly printed below signatures (computer printed, typed or handwritten). Respondent must acknowledge receipt of all addenda using the space provided on the Respondent’s Certification Form. Costs for developing a response to the Solicitation are the sole obligation of the Respondent. Price The price stated on the Pricing Response Form is firm. Any additional charges that were not included in the Response will not be paid by GRU unless approved in writing by an authorized GRU representative. Subsequent to contract formation, pricing inconsistencies on invoices may be grounds to cancel the contract. If the Respondent offers discounted pricing, such as prompt payment discounts or volume discounts, it must be clearly stated and explained on the Pricing Response Form. Such discounts, if applicable, will not be used in determining award of the Solicitation. Deviations from Specifications Any deviation from this Solicitation must be provided and explained in detail with the Response. Deviations must be explained on a separate page labeled “Exceptions and Clarifications” and included with the Response. Each exception and clarification must correspond to the specific referenced section in the Solicitation. Otherwise, the Response will be considered in strict compliance with the Solicitation and the selected Respondent will be held accountable for compliance with the Specifications. GRU reserves the right to waive exceptions and clarifications to the Solicitation if determined by GRU to be in GRU’s best interest. Exceptions and Clarifications While a responsive bid meets all material requirements of the solicitation, GRU may waive non-material requirements. Some requirements cannot be waived without adversely impacting the competitive bid process. If, during bid evaluation, there is any doubt as to the materiality of any exception or clarification, Utilities Procurement and/or the Utilities Attorney shall be consulted before acceptance of a bid. Similarly, a bid will not be rejected without such consultation. Distribution of Information GRU requires electronic submission of bids and proposals. Submit electronic responses via GRU e-Procurement Portal: https://procurement.opengov.com/portal/GRU . By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. The OpenGov portal allows the following: Access procurement documents and related information. Receive automatic and instant notifications of government opportunities. Download solicitation documents and specifications online. Submit your bids and proposals online. See all the forms and documents you need to complete in one place. Receive and respond to government requests for quotes immediately. Automatic notification of awards. For more information about OpenGov, visit https://procurement.opengov.com . Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda at https://procurement.opengov.com/portal/GRU . Vendor failure to retrieve available, required procurement information and include the appropriate documentation and information in solicitation responses may result in disqualification. Cancellation of Solicitation Procurement may determine, at its sole discretion, that it is in GRU's best interest to cancel a solicitation before the bid due date, either for the purpose of reissuing the solicitation or because there is no longer the need for the equipment, materials or services. Any responses to the solicitation received by Procurement will not be opened but will be maintained pursuant to the State of Florida’s Records Retention Schedules, as may be modified from time to time. Modification or Withdrawal of a Response Changes to a vendor’s bid submittals in GRU's eProcurement Portal can be made up to the deadline date for the bid submittal. After responses have been opened, corrections to the r